Railway Cased Crossing
Railway Cased Crossing
Railway Cased Crossing
5+108 KM
PLAN VIEW
RA
ENTRY SIDE
AY
EXIT SIDE
TR
AC
2000mm
4.79m
5.77m
200 mm
2.61m
22" CASING PIPE
1.60 m
16" CARRIER PIPE
4000 mm
1.50m
TIE IN POINT TIE IN POINT
200 mm
EXIT POINT ENTRY POINT
500 mm
11.925m 11.760m 12.470m 11.800m
ETBPNMTPL NATURAL GAS PIPE LINE PROJECT
INDIAN OIL CORPORATION LIMITED
AL MUASER PETROLEUM SERVICES PVT LTD