496occ Minute
496occ Minute
496occ Minute
3.3 Anticipated power supply position for the months – June 2017
& July – 2017
Details of anticipated restricted & un-restricted demands for the months
of June & July, 2017 are given in Annexure 3.3.
WRPC asked for justification to be submitted by MP for higher deviations.
The justification from MP is still awaited. The modified data is incorporated in
Annexure 3.3.
The Sub-Committee noted the information.
Maharashtra (STU)
1 400 kV Bableshwar-Kudus July -18 Forest clearance
D/C (Quad) awaited, severe
ROW problem
Adani Transmission Ltd
1 765 kV switching station at - June’2017
Rajnandgaon.
2 Raipur Pool - Rajnandgaon 40 Completed
765 kV D/C line.
3 Rajnandgaon – new pooling 266 Mar’2018
station at near Warora 765 kV
D/C line.
4 400 / 220 kV Substation at - Dec’2017
Morena.
5 Gwalior 765 /400 kV – Morena 48 Jun’2017
400 kV D/C
6 Vindhyachal-IV&V STPP - 27 Dec’2017
Vindhyachal
Pool 400 kV D/C (Quad)
2nd line.
7 2-Nos 400 kV Line bays at - Dec’2017
Vindhyachal
IV. STPP Switchyard.
8 1-No 765 kV line bay at Sasan - Dec’2017
UMPP.
9 Sasan UMPP - Vindhyachal 6 Dec’2017
Pooling station 765 kV S/C
line.
10 LILO of one circuit of 64 Mar’2018
Aurangabad – Padghe 765 kV
D/C line at Pune.
11 Raigarh (Kotra) – Champa 94 Dec’2017
(Pool) 765 kV 2nd S/C Line.
12 Champa (Pool) – 49 Dec’2017
Dharamjaygarh 765 kV
2nd S/C line.
13 Bilaspur pooling station – 162 Dec’2017
Rajnandgaon
765 kV D/C line.
14 Sipat – Bilaspur Pooling Dec’2017
station 3rd 765 kV S/C line.
15 1 No 765 kV Line bay at Sipat Completed &
STPPS of NTPC. Charged on
30.05.2017
The Sub-Committee noted the above information.
7.3 Commissioning of new Generating units in Western Region and
the capacity expected to be commissioned during the current
year 2016-17.
The status of Generating units, commissioned /expected to be
commissioned during the current year according the available information is as
follows:
Name of the Power Projects Unit Capacity Date of Commissioning
No. (MW) /Schedule Date
Gujarat
NIL
Chhattisgarh
NIL
Maharashtra
CHANDRAPUR 8 500 COD on 04.06.2016
6 CHHATTISGARH
7 MADHYA PRADESH Submitted status by SLDC MP
8 DD/DNH
9 GOA
10 NPCIL
11 NCA
12 NHDC
13 Jindal PL
14 CGPL Status Submitted on 05.05.2017
15 DB POWER
16 KWPCL
17 ACBIL/TRN
18 ENERGY
KSK
19 GMR
20 CHHATTISHGARH
JNSTPS Status Submitted on 03.05.2017
21 MB POWER
22 SASAN UMPP Status Submitted on 29.04.2017 Status
Submitted
on
23 NSPCL 29.04.2017
24 RGPPL
25 SUGEN/DGEN Status Submitted on 06.05.2017
26 RKM POWER
27 ESSAR POWER
28 BDTCL/JTCL/RTCL
29 RELIANCE
30 TRANSMISSION
ATIL Status Submitted on 14.06.2017
31 JHABUA POWER
32 EPTCL
SE(O), WRPC informed that PLF division of CEA in consultation with
various Power Companies, prepared sector wise generic documents which
comprises of format of report, nodal officers details etc. He requested utilities to
consult CEA for smooth implementation of CMP & cyber security programme.
MS, WRPC informed that a meeting would be conducted shortly on this issue at
WRPC Mumbai by CEA. Therefore he reiterated that all other constituents must
submit the Status report positively.
Sub-committee noted as above.
8.2: Monitoring of schemes funded from PSDF
Background:
In the 6th meeting of NPC held on 19th December 2016 at Bengaluru, it
was decided that all the RPCs in the monthly OCC meetings may follow up with
the utilities to expedite the completion of schemes by giving due priority. The
implementation of most of the schemes are based on the recommendation of the
enquiry committee on grid disturbance of July 2012 headed by Chairperson,
CEA. Therefore timely implementation of these schemes would enhance the grid
security and reliability. Accordingly the details of grant sanctioned from PSDF
for the schemes of Western Region is enclosed at Annexure-8.2A for the
deliberation in the meeting. The NPC has further directed that the status of
implementation of above schemes (physical as well as financial progress) may be
reviewed and the utilities be requested to expedite implementation of the
schemes. The utilities were advised to furnish the information in the format
enclosed at Annexure–8.2B by first week of every month on regular basis to
Member Convener, PSDF project monitoring group (AGM, NLDC, POSOCO) with
a copy to NPC & WRPC division.
Gujarat & Madhya Pradesh have submitted progress/status in prescribed
format (Annexure 8.2C1 and C2).
Chief Engineer, SLDC, Gujarat requested to disburse the final instalment
for Automatic Demand Management Scheme of GETCO and first and second
stage of fund for Wind generation forecasting and in the State of Gujarat
WRPC requested all other utilities to which the grants have been
sanctioned, to update on the progress of the schemes at the earliest as per
format at Annexure 8.2B.
The Sub-Committee noted as above.
8.3: Phasing out of Generating Units which do not have a space for
installation if FGD for compliance of new MoEF norms of SOx emissions
Background:
[ A Special TCC meeting of WRPC was held on 05.04.2017 at WRPC,
Mumbai to discuss a single point agenda of Phasing out of generating units
which do not have a space for installation of FGD for compliance of new MOEF
norms of SOX emissions.
During the meeting it was decided that the generating units have to
initiate the process of installation of FGD at the earliest. The progress of
installation would be monitored in OCC forum regularly. As the Environmental
Norms have to be complied by December 2017. The generators are required to
place the supply order by December 2017 and submit a copy to WRPC. In this
matter progress in this direction may be furnished during the meeting. The list
of generating units which have been finalised for FGD installation / phasing
out by CEA is enclosed at Annexure 8.3, for status update in OCC meeting. In
special TCC, it was also decided that those generator who comply the new
environmental norms shall submit the compliance report from respective State
Pollution Control Board regularly on quarterly basis to CEA /WRPC. .
In 495th OCC meeting, General Manager Torrent Power, Ahmedabad
stated that AMGEN is supplying power to capital city of Gujarat i.e. Ahmedabad
and Gandhinagar. Presently there are technical constraints in terms of limited
import points and capacity of the above cities which necessitates continued
running of AMGEN at least for next 5 years, till necessary infrastructure is put
in place to ensure sustained power supply. Along with above technical
constraint, AMGEN is also exploring all technically feasible and commercially
viable options to comply to revised SO2 norms by commissioning of P-FGD. (all
other norms are already complied including SPM).
Chief Engineer, SLDC Gujarat informed that progress in the direction of
installation of FGD viz. feasibility study, tendering status, award of tender etc.
shall be submitted by December 2017, as per the decision taken.
In 495th OCC meeting, Member Secretary (I/c), WRPC informed that
scope of OCC is to update the status of progress of FGD installation on monthly
basis. However any matter related to implementation/exemption shall directly
taken up with CEA/MOEF. He further requested all the generating stations to
submit an update status on the above issue to WRPC regularly.
In regard to the statement that some generating stations are already
compliant with norms and FGD is not required, OCC recommended that such
generating companies may take up the matter with the respective environment
board and get NOC and submit the same to CEA / WRPC on regular basis. ]
In the meeting, the OCC forum observed that there was no
significant progress in this direction and requested for a DO letter to be
sent from WRPC Secretariat to individual generating station for quicker
action in this regard. MS, WRPC assured to send DO letter to individual
generating station.
The Sub-Committee noted as above.
CE, SLDC Gujarat explained regarding usefulness of the 500 MVA ICT at
KAPS. On query from WRPC, representative from KAPS 1&2 informed that exact
status of commissioning of KAPS 3&4 will be submitted before next OCC
meeting.
The Sub- Committee noted as above.
In the meeting, WRPC informed that above proposed outages for 30 days
may have significant impact on grid operation. He requested CE, SLDC Gujarat
to squeeze out the outage duration.
CE, SLDC Gujarat informed that they will try to reduce the outage period
from their side and requested for giving the outage as listed above.
The Sub- Committee noted.
8.10 Tripping of 400 KV Kotra - Lara line 1&2 and subsequent power
failure at NTPC Lara
Background:
AGM, NTPC Raipur informed that on 27/05/2017 at 18:34:51:511 hours
(GPS synchronized) 400 KV Kotra-Lara Line 1 CB (403 & 402) Y-Phase opened
at Lara End on Zone 1 fault (Y-ph to Earth, 0.68 KA at 13.6 KM). DR & SOE at
Lara end is enclosed. As informed, 400 KV Kotra-Lara Line 1 Y – Phase also
opened at the same time at Kotra End on Z1 Fault (Y-ph to Earth, around 50KA
at 3.6 KM). Subsequently auto reclosing was in process, meanwhile both the
400 KV Kotra – Lara Lines 1 & 2 tripped at Kotra End on overvoltage stage 2,
resulting in total power failure at NTPC, Lara 400 KV Switchyard. At Lara End
CB 403 & 402 got Tripped (DT received) and CB 401, 404, 405, 406, 410, 411 &
412 remained in closed condition. It is to mention here that presently NTPC,
Lara is being fed from 02 number of 400KV lines namely Kotra-Lara line 1 & 2.
Our both the construction power feeders (33 KV from Kotra & Jhalmala S/S of
CSPDCL) also tripped at source.
For the occurrence as above, in case of a single phase to earth fault,
tripping of both the 400 KV lines at Kotra end is a serious concern as it led to
total power failure at NTPC, Lara. Due to this all commissioning activity was
affected at NTPC, Lara.
In the meeting, GM, WRLDC informed that it was one of the rarest of rare
cases happened and ensured that it will not happen in future. He further
informed that after commissioning of 400 kV Lara-Champa D/c line, reliability
will further be improved.
OCC forum opined that the detailed analysis of the events shall be carried
out in ensuing PCM. The forum suggested for submission of tripping details
from PGCIL to NTPC.
The Sub- Committee noted.
8.11 Technical minimum scheduling
Background:
AGM, NTPC Raipur informed that as per Clause 6.3B of IEGC 4th
amendment, “The technical minimum for operation in respect of a unit or
units of a Central Generating Station of inter-State Generating Station
shall be 55% of MCR loading or installed capacity of the unit of at
generating station.” The technical minimum level is determined taking into
account stability, reliability and safety of units operation at partial load.
But it is observed that RLDC considers technical minimum as 55% of DC
declared by the generator instead of 55% of gross generation less normative AEC
of the units.
Whenever due to equipment problem, coal or ash handling problem or wet
coal issue, DC declared by the generator is less than normative DC, technical
minimum running of the units (i.e. 55% of gross generation less normative AEC)
will not change.
Technical minimum of a 500MW unit is as follow:
Unit gross gen=500 MW,
Normative Aux Energy Consumption = 5.75%
EX-bus technical min = 500*(1-5.75/100)*0.55 = 259 MW
(The level of technical minimum will not change with DC declared
by Generator)
Thus technical minimum of the unit is constant, is not depending on DC
declared by Generator. The same technical minimum may please be
incorporated in case of lowering of schedule of Generating station in the
software of POSOCO.
In the meeting, GM, WRLDC clarified that technical minimum considered
by WRLDC is 55% of normative DC only and not the DC declared by Generator.
He further told that lowering of schedule of Generating station in the software of
POSOCO is based on normative DC of generator as well as real time situation of
the demand and generation in the region.
OCC forum suggested to take up the matter in forthcoming CCM for detail
discussion.
The Sub- Committee noted.
8.12 Declaration of declared capacity of generator
AGM, NTPC, Vindhyachal informed that with the implementation of new
regulations of CERC in relations to technical minimum scheduling, it is
instructed to generators by M/S POSOCO to declare DC limited up to 100% of
normative DC. Accordingly generators had started declaring DC up to 100% of
normative level.
In regulation of CERC, it is mentioned that respected SLDC / RLDC had
to restrict scheduling up to normative level so that generators can have
sufficient margin to raise load when RGMO operation come into vogue. Thus it
may be concluded that CERC does not restrict generator to limit their respective
DC up to normative level .
General Manager, WRLDC clarified that DC declaration is in purview of
generator, where as WRLDC can schedule only up to 100% of normative DC.
OCC forum suggested to take up the matter in forthcoming CCM for detail
discussion.
The Sub- Committee noted.
The primary response of WR generating units for last three Grid Events
was discussed in the 495th OCC. The primary response of KWPCL, KSK, RKM
and DB Power was NIL. The response of CGPL was very sluggish. The matter
was subsequently followed up with the concerned generating stations. Summary
is as below:
Generating Remarks Status
Station
KWPCL Primary response was NIL. KWPCL was advised to
correct the logic as per
IEGC. KWPCL informed
that their units are under
shutdown and the RGMO
logic shall also be corrected.
Representative from
KWPCL/ Adani informed
that on 22.05.2017
KWPCL Generator was
tripped at 22:12 Hrs. on
stator earth
fault. Generator will not be
available for 4 to 5 months.
KSK Primary response was NIL. KSK was advised to correct
KSK informed that they have the logic as per IEGC.
inhibited the generating units Representative from KSK
from responding between informed that present
49.90 to 50.05 Hz. status of fine tuning of
RGMO logic is under
progress.
RKM Primary response was positive RKM to update the reason
but inadequate. The increase for inadequate response.
in generation during the No representative from RKM
frequency dip was inadequate. was present.
DB Power Primary response was NIL. DB DB Power was advised that
Power informed that response IEGC 5th amendment
was poor due to deterioration prohibit generating units to
in coal quality and operation be operated with VWO.
in Valve Wide Open (VWO). DB Power to intimate
actions being taken.
CGPL Primary Response is very Informed that issue was
sluggish. taken up with OEM and
fine tuning of RGMO will be
done by Sept’17.
Sasan Primary Response calculated Sasan to apprise actions
using WRLDC SCADA data being taken to address the
was seen to be negligible. SCADA related issue.
However response calculated
using data submitted by
Sasan was around 15%. After
deliberation it was understood
that the SCADA data
transmitted from Sasan to
WRLDC only when the change
is greater than a certain
threshold.
The Sub-committee noted as above.
Generating stations MCCPL and BALCO shall give the plan for integrating
RGMO status to WRLDC.
Extending RGMO Status signal to SLDC/WRLDC is been a regular agenda
from 491 OCC. State SLDCs may apprise OCC, the number of state generating
units whose RGMO signal was extended to SLDCs.
The sub-committee noted as above.
5. CERC Regulations for Communication System for Inter-State
transmission of Electricity, 2017
On 15th May, 2017 CERC notified regulations for “Communication System for
Inter-State transmission of Electricity”. These regulations shall come into force
w.e.f. 1st July 2017.
These regulations lay down the rules, guidelines and standards to be
followed by various persons and participants in the system for continuous
availability of data for system operation and control including market
operations. Further, the regulations deal with the planning, implementation,
operation and maintenance and up-gradation of reliable communication system
for all communication requirements including exchange of data for integrated
operation of National Grid.
Few highlights of these regulations are quoted below
Quote
“SCOPE and APPLICABILITY:
(i) These regulations shall apply to the communication infrastructure to be
used for data communication and tele -protection for the power system at
National, Regional and inter-State level and shall also include the power
system at the State level till appropriate regulation on Communication is
framed by the respective State Electricity Regulatory Commissions.
(ii) All Users, SLDCs, RLDCs, NLDC, CEA, CTU, STUs, RPCs, REMC, FSP
and Power Exchanges shall abide by the principles and procedure as
applicable to them in accordance with these regulations.”
Unquote
Quote
“Role of National Power Committee (NPC) and Regional Power
Committee (RPC):
(i) NPC shall be responsible for issuance of the guidelines with the
approval of the Commission on “Availability of Communication System” in
consultation with RPCs, RLDCs, CTU, CEA and other stakeholders within
a period of two months from the date of notification of these regulations.
(ii) The RPC Secretariat shall certify the availability of communication
equipment for CTU, ISGS, RLDCs, NLDC, SLDCs based on the data
furnished by RLDC.
(iii) The RPC Secretariat shall monitor instances of non-compliance of
these regulations as amended from time to time and make endeavor to
sort out the issues in the respective region in such a way that cases of
non-compliance are prevented in future. Unresolved issues and non-
compliance of any of the provisions of these regulations shall be reported
by the Member Secretary of respective RPC to the Commission.
(iv) The RPC Secretariat shall be responsible for outage planning for
communication system in its region. RPC Secretariat shall process outage
planning such that uninterrupted communication system is ensured.”
Unquote
Quote
“COMMUNICATION SYSTEM AVAILABILITY:
All users of CTU, NLDC, RLDCs, SLDCs, STUs shall maintain the
communication channel availability at 99.9% annually:
Provided that with back up communication system, the availability of
communication system should be 100%.”
Unquote
The Sub-committee noted as above.
6. Telemetry issues
7. Telemetry of RES
In view of above Maharashtra SLDC may instruct all the wind generators
in south Maharashtra to absorb VAR and avoid injecting VAR at point of
connection to contain high voltages.
AGM, WRLDC informed that there is penalty mechanism in Intra-ABT
in Maharashtra system for absorbing VARs.
CE, SLDC Maharashtra endorsed the same.
The sub-committee noted as above.
All SLDCs are advised to monitor MVAr injection from 220 kV to 400
kV side and explore/review ICT tap positions to avoid high voltages in
Grid.
SLDC Maharashtra to review ICT tap positions at above mentioned
locations.
SLDC Maharashtra and NCA to explore operating of all machines at
Koyna, Ghatghar and SSP in condenser mode during night hours,
particularly at high voltage conditions.
The sub-committee noted the same.
13. Status of compliance of IEGC 5.2 by Gas Stations
As per IEGC 5th amendment notified by CERC on 12th April 2017, allgas
turbines of capacity more than 50 MW each shall be operated under restricted
governor mode of operation with effect from the date 01.10.2017. The central
gas generating stations in WR are given below
1. RGPPL (2x205+1x230)+(2x213+237.54)+(2x213+237.55): 1967.08 MW
2. Kawas (4x106+2x116): 656.20 MW
3. Gandhar (3x144.3+1x224.49): 657.39 MW
4. DGEN (3x400): 1200 MW
Above generating stations to apprise OCC regarding actions being taken to
comply with IEGC regulations
All SLDCs to apprise status of state gas generating stations regarding
operation of gas turbines under restricted governor mode of operation
The sub-committee noted the same.
WRPC
1 Shri A. Balan, M.S. 9483540528 ms-wrpc@nic.in
2 Shri J.K. Rathod, S.E. 9987410799 jkrathod77@yahoo.com
3 Shri L.K.S. Rathore, D.D. 9833371844 lksr_ies@nic.in
4 Shri P.D.Lone, D.D. 9867622823 comml-wrpc@nic.in
5 Shri D.N. Gawali, D.D. 9930666765 comml-wrpc@nic.in
6 Shri Sachin K. Bhise, D.D. 9819156260 sachinkbhise@gmail.com
7 Shri Ratnesh Kumar Yadav, Asst. Dir.-I 9969948089 ratneshkumar7437@gmail.com
8 Shri Vikas Mundotia, A.D.-I 9011022577 comml-wrpc@nic.in
II MSETCL / MSEDCL/MahaGenco/MSPGCL
9 Shri Sanjay S. Kulkarni, C.E. 9819363329 drsanjaykulkarni@gmail.com
10 Shri D.K. Rokade, S.E. 9167831551 dkrokade@gmail.com
11 Shri Bulbule Arvind U., S.E. 9833383882 selmkalwa@gmail.com
12 Shri D.J. Kolhe, E.E. 9820981115 deepakkolhe@yahoo.com
13 Shri Sandeep S. Patil, E.E. 9833980238 selmkalwa@gmail.com
14 Shri Ashish Tadwar, A.E. 9833929934 ashishtadwar@gmail.com
IV CSPTCL
16 Shri A.K. Shrivastava, Addl.C.E. 9827177466 ashokdivyashrivastava@yahoo.co.in
V GETCo. / GSECL
17 Shri B.B. Mehta, C.E. 9879200736 celd@gebmail.com
18 Shri G.J. Mistry, D.E. 9925213180 emisldc.getco@gebmail.com
VI WRLDC POSOSCO
19 Shri Vinay Kumar Shrivastav, G.M. 9869450221 vks@posoco.in
20 Shri Abhimanyu Gartia, Addl.G.M. 9869088058 agartia@posoco.in
21 Smt. Pushpa S., Asst. G.M. 9869404482 pushpa@posoco.in
22 Smt. Sachala Mishra, Asst.G.M. 9869450223 sachalamishra@posoco.in
23 Shri Vivek Pandey, C.M. 9869404673 vivek.pandey@posoco.in
24 Shri S.S. Raghuwanshi, C.M. 9427615762 satyendra@posoco.in
25 Ms. Chitrankshi Ghangrekar, Mgr. 9869004892 chitrankshi@posoco.in
26 Shri M. Venkateswara Rao, Engr. 8452928806 venkyminnakuri@posoco.in
27 Shri Ch. Jagadeesh, Engr. 9869469376 jagadeesh537@gmail.com
28 Shri Rajkumar A., Dy. Mgr. 9869459106 rajkumar@posoco.in
29 Shri Chandan Kumar, Sr.Engr. 9869251460 chandan@posoco.in
30 Shri Akhil Gupta 9574077727 akhil.gupta@posoco.in
31 Shri Absar Ahmad, Engr. 8080484278 absarahmad@posoco.in
POWERGRID
32 Shri Kuleshwar Sahu, Asst.G.M. 9425294214 kuleshwar@powergridindia.com
33 Shri Manoj Kumar Tripathi, Asst. G.M. 8275025586 tripaim@powergridindia.com
34 Shri D. Bruhananda, C,M. 9428504279 dbruhanandad@powergridindia.com
35 Shri Nageswara Rao M., Dy. Mgr. 9423044126 nrao@powergridindia.com
VII NTPC
36 Shri P. Sreenivas, G.M. 9004677573 psreenivas@ntpc.co.in
37 Shri Baishnaba Charan Mahanta, A.G.M 9425823414 bcmahanta@ntpc.co.in
38 Shri Sanjib Kr. Saha, A.G.M. 9650998625 sksaha01@ntpc.co.in
VIII NSPCL
39 Shri P.M. Chandrakar, Sr. Supdt.(O&M) 9425553638 pm.chandrakar@nspcl.co.in
IX NPCIL
40 Shri J.S. Chaubey 9428821915 jschaube@npcil.co.in
X RELIANCE ADA
41 Shri S.G. Zirpe, Asst. V.P. 9322607630 sachin.zirpe@relianceada.com
42 Shri Ghanashyam A. Raut, G.M. 9325119787 ghanashyam.raut@relianceada.com
43 Shri Murthi Thandavaran, G.M. 9324574491 murthi.thandavaran@relianceada.com
44 Shri Mayank Gupta, G.M. 9320930718 mayank.m.gupta@relianceada.com
45 Shri Vijay Chavan, Sr. Mgr. 9320167746 vijay.chavan@relianceada.com
XI APML
46 Shri Manoj Taunk, G.M. 9099005517 manoj.taunk@adani.com
47 Shri Rakesh Bhalerao, Asst. Mgr. 7045953823 rakesh.bhalerao@adani.com
XVI GMR
53 Shri Bharat Pinjarkar, G.M. 8390903659 bharat.pinjarkar@gmrgroup.in
XX M.B. POWER
59 Shri Gajanan Jagtap, Sr. Mgr. 9644009817 gajanan.jagtap@hpppl.in
3. %AGE OF TIME WHEN FREQUENCY WAS MAY 2017 APRIL 2017 MARCH 2017
AavaRi%t ka samaya p`itSat maoM
3.1 BELOW 48.5 Hz. 0.00 0.00 0.00
48.5 hT\ja ko naIcao
3.2 BETWEEN 48.5 Hz. AND 48.8 Hz. 0.00 0.00 0.00
48.5 hT\ja AaOr 48.8 hT\ja ko baIca
3.3 BETWEEN 48.8 Hz. AND 49.2 Hz. 0.00 0.00 0.00
48.8 hT\ja AaOr 49.2 hT\ja ko baIca
3.4 BETWEEN 49.2 Hz. AND 49.5 Hz. 0.00 0.00 0.00
49.2 hT\ja AaOr 49.5 hT\ja ko baIca
3.5 BETWEEN 49.5 Hz. AND 49.7 Hz. 0.00 0.00 0.00
49.5 hT\ja AaOr 49.7 hT\ja ko baIca
3.6 BETWEEN 49.7 Hz. AND 49.9 Hz. 9.09 9.05 8.95
49.7 hT\ja AaOr 50.2 hT\ja ko baIca
3.7 BETWEEN 49.9 Hz. AND 50.05 Hz. 71.45 74.49 73.56
49.9 hT\ja AaOr 50.05 hT\ja ko baIca
3.8 BETWEEN 50.05 Hz. AND 51.5 Hz. 19.46 16.45 17.50
50.05 hT\ja AaOr 51.5 hT\ja ko baIca
3.9 ABOVE 51.5 Hz. 0.00 0.00 0.00
51.5 hT\ja ko }pr
4.1 NO. OF TIMES FREQUENCY 0 0 0
TOUCHED 48.80 Hz. AavaRi%t 48.80 hT\ja kao CUhI
4.2 NO. OF TIMES FREQUENCY 0 0 0
TOUCHED 48.60 Hz. AavaRi%t 48.60 hT\ja kao CUhI
4.3 NO. OF TIMES FREQUENCY 0 0 0
TOUCHED 51.00 Hz. AavaRi%t 51.00 hT\ja kao CUhI
मई
2017
Voltage Profile during the month of May'2017 Annex-2.3
भोपाल खंडवा इटारसी दमोह नागदा इंदौर रायपुर रायगढ़
Date Bhopal Khandwa Itarsi Damoh Nagda Indorer Gwalior Raipur Raigarh
400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV
Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 415 400 421 405 412 396 417 403 415 401 415 400 410 384 416 409 422 416
2 413 402 419 405 411 400 416 401 414 402 413 402 411 393 414 406 420 413
3 413 401 419 404 409 396 414 402 415 403 414 402 412 393 415 409 420 414
4 414 402 418 406 408 396 413 402 415 402 414 400 407 390 415 406 420 414
5 417 402 420 405 410 396 416 402 416 403 415 401 412 393 414 406 420 415
6 415 403 421 403 409 396 417 404 418 402 417 400 410 390 418 409 424 416
7 423 400 427 409 417 397 422 405 422 407 422 404 415 384 420 410 425 418
8 418 402 424 406 412 395 418 403 419 401 419 401 414 391 416 407 422 415
9 420 401 424 406 414 397 421 404 420 402 419 402 417 392 417 408 423 416
10 416 402 421 404 411 395 418 403 414 399 415 399 408 393 416 407 423 417
11 414 401 420 406 409 396 418 404 415 399 414 399 415 390 418 409 424 417
12 414 401 419 407 409 396 416 403 414 400 413 400 410 391 416 409 423 417
13 414 403 421 407 411 398 416 405 414 400 414 401 411 392 417 410 423 416
14 418 406 423 410 414 402 419 407 417 406 418 405 416 392 418 411 425 418
15 414 400 421 408 411 397 416 403 416 402 414 401 414 389 416 409 422 416
16 414 400 421 408 411 397 416 403 416 402 414 401 414 389 416 409 422 416
17 415 400 422 407 410 397 418 403 416 402 415 400 409 391 417 407 423 415
18 416 402 422 406 412 396 418 405 413 401 414 400 410 393 415 408 422 416
19 417 402 424 410 411 396 419 404 414 401 414 401 411 394 418 410 423 417
20 415 401 423 410 411 396 418 405 415 402 414 400 416 396 417 410 422 415
21 419 401 428 408 415 397 422 406 419 404 418 403 417 394 421 413 425 417
22 415 402 421 408 409 397 414 404 418 403 416 402 406 391 419 400 421 411
23 418 401 423 404 412 394 415 406 416 397 416 398 410 394 424 400 426 416
24 415 399 421 406 410 395 419 405 416 401 414 399 408 390 418 412 422 415
25 414 397 423 409 410 396 412 406 417 403 416 402 408 391 420 411 424 415
26 416 398 425 408 412 396 415 400 417 402 416 401 416 391 422 412 427 416
27 417 398 423 407 412 395 418 404 417 402 415 399 409 389 422 411 423 414
28 421 404 427 412 417 401 419 403 419 406 419 404 413 394 423 416 426 414
29 419 400 424 384 414 400 426 389 417 405 416 403 416 393 422 384 425 386
30 414 399 423 407 410 397 419 406 417 401 414 398 412 394 422 414 422 415
423 397 428 384 417 394 426 389 422 397 422 398 417 384 424 384 427 386
धुले बोईसर कलवा कराड़ असोज दे हगाम
Date Bhilai Wardha Dhule Parli Boisar Kalwa Karad Dehgam
Asoj
400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV
Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 413 406 419 409 425 403 419 395 417 404 425 407 430 410 412 398 422 409
2 411 403 418 406 425 400 415 390 419 393 426 394 425 402 411 397 421 409
3 412 405 417 409 426 406 415 392 413 393 422 394 425 398 411 397 423 409
4 412 403 417 407 424 401 419 395 411 392 418 393 426 401 411 397 422 408
5 411 404 418 408 425 402 418 390 410 397 418 399 427 400 412 397 423 408
6 415 405 422 405 426 402 419 388 412 395 421 393 428 400 411 394 421 406
7 417 407 423 412 430 408 423 396 416 400 421 402 429 407 414 401 422 413
8 412 403 422 409 426 404 420 392 414 391 419 390 427 400 411 395 422 406
9 414 404 423 407 428 401 418 389 408 386 419 388 400 400 413 397 419 408
10 412 404 423 409 428 401 420 388 410 387 416 386 422 385 412 395 420 406
11 415 406 420 412 425 404 419 392 409 389 414 389 425 401 410 396 420 385
12 413 405 421 413 426 406 421 392 411 396 417 396 427 398 410 395 420 405
13 414 406 422 414 428 405 421 390 411 396 416 396 430 403 409 395 418 406
14 415 408 423 413 425 405 424 396 414 399 421 402 431 407 411 399 421 411
15 412 405 422 413 426 406 426 396 414 395 422 395 430 408 411 396 422 406
16 412 405 422 413 426 406 426 396 414 395 422 395 430 408 411 396 422 406
17 413 403 423 411 425 401 421 394 414 389 422 390 426 401 410 396 421 400
18 412 404 421 410 424 403 420 394 412 391 417 392 426 399 409 395 420 406
19 414 407 424 413 428 404 423 387 409 394 417 396 426 397 409 395 420 382
20 413 406 422 415 428 408 421 396 408 393 417 397 427 401 409 393 421 381
21 418 410 427 415 429 406 425 397 413 395 422 398 428 400 414 399 422 400
22 415 408 422 414 426 404 418 396 412 393 420 394 426 408 415 396 427 406
23 419 409 425 414 427 401 421 395 416 391 419 390 426 400 412 394 423 406
24 414 408 421 413 426 404 421 390 411 393 420 395 426 400 413 397 424 405
25 415 407 427 415 427 408 421 399 415 397 422 398 426 385 412 400 422 408
26 418 407 426 412 428 407 423 392 417 398 425 398 427 400 412 396 420 405
27 418 407 424 414 427 404 422 398 412 394 420 398 427 400 410 396 419 405
28 420 412 425 415 429 406 423 397 413 394 423 403 432 408 412 400 419 409
29 419 410 426 387 429 401 423 398 410 391 417 394 425 400 412 398 420 400
30 419 410 425 415 428 406 424 400 411 392 423 398 427 400 412 395 424 409
420 403 427 387 430 400 426 387 419 386 426 386 432 385 415 393 427 381
कासोर जेतपुर वापी मापुसा कला मगरवाड़ा हज़ीरा
Date Kasor Jetpur Amreli Vapi Mapusa Kala Magarwada Hazira
400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV
Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 419 408 410 401 415 406 416 401 426 398 414 404 400 400 416 400
2 418 409 412 400 418 406 418 390 425 390 415 389 400 400 417 397
3 418 409 411 401 414 406 413 392 424 390 411 390 408 395 418 397
4 418 409 411 402 415 407 412 391 424 393 409 389 413 393 416 396
5 418 409 412 403 416 406 412 396 431 392 410 393 413 397 416 394
6 419 409 413 401 418 406 413 393 436 396 411 391 414 396 414 393
7 419 410 409 401 415 408 414 399 435 404 412 397 416 401 416 395
8 419 407 410 401 416 407 414 390 431 402 412 388 414 391 415 391
9 418 409 410 401 416 406 409 387 422 391 406 389 408 388 414 395
10 416 408 409 401 414 407 409 384 421 392 407 384 409 387 412 390
11 417 408 411 400 416 407 408 389 420 393 405 387 409 388 411 393
12 417 408 411 401 416 406 410 394 425 392 408 392 410 393 411 391
13 415 407 411 398 416 403 410 394 429 397 407 391 408 393 410 388
14 417 408 411 402 416 407 415 397 432 399 413 394 414 399 413 392
15 418 408 410 400 415 405 413 395 429 401 411 393 411 394 415 395
16 418 408 410 400 415 405 413 395 429 401 411 393 411 394 415 395
17 419 408 411 403 416 408 413 389 427 399 411 387 413 391 412 388
18 417 408 410 402 415 407 412 390 427 390 411 389 412 392 412 387
19 418 409 411 404 414 407 409 393 426 391 408 392 412 394 412 394
20 418 408 411 402 417 407 410 394 426 395 408 392 410 394 413 392
21 420 410 411 403 415 408 414 396 429 393 413 394 415 397 417 393
22 420 409 413 402 418 400 413 394 428 393 411 392 413 396 417 393
23 420 407 411 402 415 405 416 392 427 399 415 391 417 395 416 391
24 420 408 411 402 416 406 414 393 427 400 412 392 414 394 413 389
25 419 408 412 402 416 406 417 398 426 396 414 395 417 399 415 395
26 419 408 413 402 418 405 416 397 426 395 413 394 414 397 414 392
27 417 408 412 399 418 404 414 396 424 395 411 393 413 394 413 393
28 418 410 410 401 415 397 414 395 426 396 411 392 413 395 414 391
29 418 410 411 401 417 404 412 395 425 394 409 393 411 395 411 390
30 420 408 411 401 415 405 413 392 430 402 410 388 413 391 414 386
420 407 413 398 419 397 418 384 436 390 415 384 417 387 418 386
सासन सतना तमनार कोटरा वडोदरा बीना इंदौर
Date Sasan Satna Tamnar Kotra Vadodara Durg Gwalior Sipat Seoni Wardha Bina Indore
765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv
Max Min Max Min Max Max Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 770 755 777 748 800 789 801 789 785 758 793 784 790 745 770 759 788 767 801 776 783 751 777 750
2 771 761 778 758 796 783 796 782 782 755 793 782 788 753 769 757 786 764 801 771 781 758 781 751
3 770 758 775 760 797 785 797 785 783 757 791 782 788 756 766 755 784 765 802 775 780 758 780 751
4 769 757 776 755 797 785 796 784 782 758 792 779 786 755 765 754 783 765 797 779 780 757 775 755
5 769 754 781 754 800 789 799 789 785 755 796 783 792 759 770 756 791 766 803 775 786 759 787 757
6 768 756 774 753 806 791 807 791 785 750 801 786 786 753 774 763 791 766 808 772 782 757 790 754
7 780 754 792 750 807 794 807 793 792 764 801 791 798 746 774 761 798 772 810 782 797 752 793 754
8 774 759 782 757 803 790 803 790 785 753 797 787 791 758 769 756 793 763 808 774 788 761 789 751
9 779 756 791 757 803 790 804 790 797 758 806 787 799 762 771 757 792 764 804 774 793 757 799 754
10 775 759 787 763 805 791 806 792 793 750 797 787 792 764 773 758 792 765 806 775 789 766 790 754
11 771 754 779 753 805 794 805 793 786 756 803 792 793 755 775 762 788 766 799 779 787 762 786 756
12 767 754 777 754 803 794 803 793 782 756 796 793 791 755 773 762 785 768 800 779 785 762 785 757
13 775 761 784 761 803 790 803 789 783 753 796 787 791 760 775 764 789 770 799 778 788 766 782 758
14 778 763 789 763 807 793 808 792 786 762 805 791 799 757 774 761 791 771 802 776 794 767 788 766
15 777 758 785 756 799 789 799 789 784 755 796 784 792 755 771 759 787 765 799 761 787 759 783 757
16 777 758 785 756 799 789 799 789 784 755 796 784 792 755 771 759 787 765 799 778 787 759 783 757
17 771 755 779 753 801 787 802 786 783 755 802 783 790 755 771 757 787 764 803 772 783 759 785 757
18 773 756 779 756 801 790 801 789 780 757 794 784 788 757 772 759 790 765 799 775 785 762 788 756
19 778 762 787 763 802 792 802 791 781 755 796 787 796 763 774 762 791 766 803 775 787 762 784 755
20 773 761 780 762 801 792 801 791 783 752 796 787 793 765 773 762 788 768 798 780 786 762 781 751
21 782 761 794 762 806 787 807 787 791 761 805 781 805 763 775 763 798 771 808 781 796 759 790 753
22 772 755 775 753 795 787 795 786 783 758 791 788 784 756 773 764 787 772 799 779 782 761 789 757
23 774 760 784 761 809 787 810 786 785 749 809 790 792 764 776 764 796 770 807 778 792 764 788 752
24 770 755 777 753 797 784 798 784 789 757 799 780 789 756 773 759 789 766 797 772 786 756 786 749
25 772 756 780 752 801 784 803 784 789 763 799 788 789 758 775 759 791 769 809 777 787 759 788 752
26 777 759 789 759 809 787 809 787 788 754 807 787 803 759 779 764 802 773 809 777 794 762 784 751
27 777 754 783 751 798 781 799 781 785 756 796 787 791 754 775 759 791 765 802 774 787 756 781 748
28 777 758 787 758 807 784 809 785 791 765 805 774 799 763 773 758 796 772 805 772 794 765 789 758
29 780 756 790 758 800 785 801 727 786 758 799 732 803 761 773 758 795 772 806 729 797 763 782 755
30 772 758 784 761 796 783 797 783 785 752 798 780 796 763 769 755 790 767 802 774 789 763 776 747
782 754 794 748 809 781 810 727 797 749 809 732 805 745 779 754 802 763 810 729 797 751 799 747
ANNEXURE-2.5
Power Cut/Restrictions in Western Region for the month of May-2017
k : gaujarat Gujarat
1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM
1 Power Cut/ Restriction on Industries
a) All industries are allowed to run their units on all days of week & if they want to avail staggered holiday,
then they will have to staggered on notified day only & cannot avail as per their choice.
b) All industries are required to keep their recess timings staggered.
3 Anya jaanakarI
3. Any other information: NIL.
K : maQya p`doSa Madhya Pradesh
1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid
1 Power Cut/ Restriction on Industries, Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~a pabandI ka samaya p`it idna kula }jaa- kTaOtI
Quantum of Restriction Timing Total Energy Cut
power cut (MW) sao From tk To (MUs /day
(a) Power Restrictions(Evening SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil
peak Hour) on non continuous
process HT/LT IndustriesM
(b) Baar inayamana Load Shedding SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil
(c) Anya jaanakarI Other information
1.Weekly Off SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil
2.Staggering of power supply SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil
ivavarNa Details ivaVut kTaOtI kI maa~a pabandI ka samaya p`it idna kula
Quantum of power cut (MW) Restriction Time }jaa- kTaOtI
sao From tk Total
To Energy Cut
(MUs /day)
(A) Scheduled
(a) (i) Power Cuts/ 00.00(Av) - - -
Restriction on HT Industries
(ii) Power Cuts/Restriction
on LT Industries 00.00(Av) - - -
(iii) Power Cuts/Restriction
on Rural 00.00 (Av) - - -
(iv) Agriculture pump* 00.00 (Av) 00.00 00.00 0.00
(v)Urban/ Sub-Urban 00.00(Av) - - -
(iv)Town feeders(C-1to C-6) 00.00 (Av) - - -
(B) Un-Scheduled
(a) Load Shedding 1.Rural NIL. - - -
2.Town Feeders (C-1to C-6 & X) : 0.00(Av)
- -
0.00
3. Industries NIL
Total Energy Cut/day 0.00
( b) Any other information
1.Weekly Off/staggering of - - - -
power supply
ivavarNa Details sao From tk To p`it idna AapUit- GaMTo Supply Hours per day
idnaaMk Date idnaaMk Date Max. (Hrs) Min. (Hrs) Average (Hrs)
2.1 Three-Phase Supply 01.05.2017 to 31.05.2017 18.00
2.2 Single-Phase Supply - - - - -
2.3 Remarks/Note/ - - - - -
मई2017
Details of forced unit outages during the month ofMay.2017
Sl.No Cap.MW
Time Date Time Date
1. उकाईUkai-2 GSECL 120 16:00 09-04-2016 Still out Still out Long restoration period
2. उकईUkai 1 GSECL 120 03:18 07-05-2016 Still out Still out Excitation problem
3. STPS 2 GSECL 120 13:05 24-09-2016 Still out Still out Bunker problem
4. STPS 1 GSECL 120 18:00 26-09-2016 Still out Still out RSD
6.
जीआईपीसीएल GSECL 145 14:08 10-03-2017 02:42 30-05-2017 RSD
GIPCL STG 1
7. जीपेक GPEC 2 GSECL 218 00:00 21-03-2017 00:22 04-05-2017 PSD(Planned Shutdown)
8. डीजीबीपी DGBP 1 GSECL 107 02:10 08-04-2017 Still out Still out
RSD
9. उकईUkai 3 GSECL 200 01:14 14-04-2017 17:18 02-05-2017 BTL
10. जीपीपीसी GPPC 1 GSECL 351 17:22 24-04-2017 23:19 03-05-2017 Desynchronized
11. जीपेक GPEC 1 GSECL 218 09:52 28-04-2017 14:54 06-05-2017 RSD
12. जीपीपीसी GPPC 2 GSECL 351 14:05 29-04-2017 16:29 01-06-2017 RSD
13. जीपेक GPEC 2 GSECL 218 01:36 04-05-2017 23:00 10-05-2017 RSD
14. जीपेक GPEC 3 GSECL 218 02:33 04-05-2017 23:27 10-05-2017 RSD
15. जीपीपीसी GPPC 1 GSECL 351 17:52 04-05-2017 06:50 17-05-2017 RSD
16. एसएलपीपी SLPP 2 GSECL 125 23:00 04-05-2017 05:02 08-05-2017 BTL
17. हाजीराHazira(Extn) GSECL 351 23:28 04-05-2017 Still out Still out RSD
19. जीपेक GPEC 1 GSECL 218 17:41 06-05-2017 03:32 11-05-2017 RSD
20. उतरण UTRAN STG II 1 GSECL 375 18:42 07-05-2017 13:51 11-05-2017 RSD
21. एसएलपीपी SLPP 2 GSECL 125 14:32 08-05-2017 09:04 15-05-2017 BTL
22. एसएलपीपी SLPP 1 GSECL 125 07:00 09-05-2017 22:30 12-05-2017 BTL
बीईसीएल BECL 1
Main steam temperature
23. GSECL 250 13:40 10-05-2017 21:16 13-05-2017
high
24. जीपेक GPEC 3 GSECL 218 16:06 11-05-2017 07:22 22-05-2017
RSD
25. जीपेक GPEC 2 GSECL 218 16:35 12-05-2017 00:00 16-05-2017 RSD
26. उतरन UTRAN STG II 1 GSECL 375 08:58 13-05-2017 08:56 26-05-2017 RSD
27. डीजीबीपी DGBP 3 GSECL 375 23:34 13-05-2017 Still out Still out Taken in RSD
30. जीपेक GPEC 2 GSECL 218 09:47 17-05-2017 18:47 23-05-2017 RSD
32. Wanakbori 1 GSECL 210 12:45 19-05-2017 02:28 24-05-2017 Merit order dispatch
33. जीपीपीसी GPPC 1 GSECL 351 03:44 23-05-2017 Still out Still out RSD costly generation
34. जीपेक GPEC 3 GSECL 218 07:46 26-05-2017 05:45 30-05-2017 RSD
35. जीपेक GPEC 2 GSECL 218 08:32 26-05-2017 02:07 30-05-2017 RSD
36. बीईसीएल BECL 1 GSECL 250 17:57 26-05-2017 08:58 31-05-2017 Combustion problem
37. उरण UTRAN STG II 1 GSECL 375 00:14 27-05-2017 07:46 30-05-2017 RSD
38. GTPS 3 GSECL 210 10:55 27-05-2017 22:54 01-06-2017 RSD/ Merit order dispatch
42. Parli 4 MAHAGENCO 210 19:47 05-07-2015 Still out Still out Economic Shutdown
43. Parli 5 MAHAGENCO 210 14:55 06-07-2015 Still out Still out Economic Shutdown
44. WPCL 1 MAHAGENCO 135 17:03 16-02-2016 Still out Still out No PPA
45. WPCL 2 MAHAGENCO 135 21:46 29-02-2016 Still out Still out No PPA
46. भुसावलBhusawal 2 MAHAGENCO 210 19:35 14-06-2016 Still out Still out Economic Shutdown
पायोनीर
Zero Schedule by
48. MAHAGENCO 388 17:45 07-02-2017 Still out Still out MSEDCL from
PIONEER(262+127) 1 01.06.2017
49. WPCL 3 MAHAGENCO 135 00:01 16-04-2017 23:21 08-05-2017 Gas formation in GT
50. PARLI 8 MAHAGENCO 250 07:52 25-04-2017 12:53 11-05-2017 Coal Shortage
55. WPCL 4 MAHAGENCO 135 05:10 09-05-2017 22:36 14-05-2017 Flame Failure
उरणUran 6
Decommissioned on
56. MAHAGENCO 108 17:23 09-05-2017 00:25 13-05-2017
01.04.2016
57. जयगढ़Jaigad 2 MAHAGENCO 300 05:35 11-05-2017 20:58 20-05-2017 R & M Work
58. WPCL 3 MAHAGENCO 135 02:43 15-05-2017 21:05 05-06-2017 Economic Shutdown
59. कोराडी KoradI-2 MAHAGENCO 660 15:30 22-05-2017 08:22 29-05-2017 Economic Shutdown
Decommissioned on
60. PARLI 8 MAHAGENCO 250 22:54 24-05-2017 01:41 28-05-2017
01.04.2016
61. खापरखेड़ाKhaparkheda 5 MAHAGENCO 500 19:42 26-05-2017 19:46 29-05-2017 No PPA
62. NASIK3 MAHAGENCO 210 11:30 29-05-2017 Still out Still out No PPA
63. वीआईपीएल VIPL 2 MAHAGENCO 300 23:51 29-05-2017 Still out Still out Economic Shutdown
कोराडीKoradi 7
Decomissioned on
64. MAHAGENCO 210 14:22 31-05-2017 09:46 03-06-2017
02.03.2017
65. PARLI 8 MAHAGENCO 250 21:58 31-05-2017 Still out Still out No Schedule
Zero Schedule by
66. जयगढ़Jaigad 2 MAHAGENCO 300 23:58 31-05-2017 Still out Still out MSEDCL from
01.06.2017
67.
आरजीपीपीएल RGPPL 320 23:00 31-03-2014 Still out Still out Gas formation in GT
RGPPL-1B
68.
आरजीपीपीएल RGPPL 320 13:30 8-07-2014 Still out Still out Coal Shortage
RGPPL-1A
69.
आरजीपीपीएल RGPPL 230 17:17 10-04-2017 09:07 02-06-2017 NO Schedule
RGPPL 2B
आरजीपीपीएल
Zero Schedule by
70. RGPPL 230 15:57 12-04-2017 13:28 05-05-2017 MSEDCL from
RGPPL 2A 09.06.2017 at 01:39 hrs
आरजीपीपीएल
Zero Schedule by
71. RGPPL 230 18:02 05-05-2017 14:29 18-05-2017 MSEDCL from
RGPPL 3A 09.06.2017 at 00:20 Hrs
72.
आरजीपीपीएल RGPPL 230 18:05 18-05-2017 Still out Still out Swaping with unit 5
RGPPL 2A
अमरावती RATTAN POWER
73. AMRAVATI 270 08:59 15-04-2017 10:47 05-06-2017 Flame Failure
INDIA LTD
TPP(INDIABULL)-5
अमरावती RATTAN POWER Decommissioned on
74. AMRAVATI 270 12:08 15-04-2017 14:32 24-05-2017
INDIA LTD 01.04.2016
TPP(INDIABULL)-4
अमरावती RATTAN POWER
75. AMRAVATI 270 19:30 19-04-2017 18:12 03-05-2017 R & M Work
INDIA LTD
TPP(INDIABULL)-3
अमरावती RATTAN POWER
76. AMRAVATI 270 03:27 24-05-2017 Still out Still out Economic Shutdown
INDIA LTD
TPP(INDIABULL)-1
77. एमबीपावरMB Power 2 MPPGCL 600 20:12 16-05-2016 21:30 09-05-2017 Flame failure
78. सातपुराSatpura III 8 MPPGCL 210 11:42 27-12-2016 02:46 05-05-2017 RSD
79. सातपुराSatpura II 6 MPPGCL 200 11:50 21-02-2017 Still out Still out Deaerator Problem
80. सातपुराSatpura II 7 MPPGCL 210 15:00 10-03-2017 Still out Still out RSD
83. सातपुराSatpura III 9 MPPGCL 210 11:30 22-04-2017 18:55 03-05-2017 BTL
85. सातपुराSatpura III 9 MPPGCL 210 20:34 07-05-2017 Still out Still out RSD
86. सातपुराSatpura III 8 MPPGCL 210 18:17 08-05-2017 Still out Still out RSD
Ash handling plant
87. SGTPS 1 MPPGCL 210 14:30 13-05-2017 15:00 29-05-2017
problem
88. SGTPS 2 MPPGCL 210 10:24 18-05-2017 02:44 24-05-2017 BTL
89. Singaji 1 MPPGCL 600 19:00 20-05-2017 11:02 02-06-2017 RSD/ Merit order dispatch
90. Singaji 2 MPPGCL 600 18:50 29-05-2017 Still out Still out RSD
93. सीजीपीएलCGPL 50 CGPL 830 02:29 28-04-2017 08:19 31-05-2017 Metal Temp Problem
94. सीजीपीएल CGPL 10 CGPL 830 02:43 05-05-2017 23:06 09-05-2017 Metal Temp Problem
HP Heater & Bottom ash
95. सीजीपीएल CGPL 30 CGPL 830 01:34 18-05-2017 Still out Still out
hopper Problem
96. सीजीपीएल CGPL 10 CGPL 830 11:57 22-05-2017 10:11 26-05-2017 Spray line problem
97. सीजीपीएल CGPL 10 CGPL 830 21:58 28-05-2017 19:25 06-06-2017 CRH line leakage.
98.
एपीएमएल मुँदरा Adani Power Ltd 660 02:58 27-04-2017 Still out Still out
Critical Coal Stock
APL Mundra 6 Position
99.
एपीएल मुँदरा 660 02:46 03-05-2017 Still out Still out
Deterioration in coal stock
APL Mundra 5 Adani Power Ltd position
100.
एपीएल मुँदरा 660 04:00 03-05-2017 04:13 11-05-2017
Deterioration in coal stock
APL Mundra 8 Adani Power Ltd position
101.
एपीएल मुँदरा 330 00:47 08-05-2017 14:09 24-05-2017 Critical coal stock position
APL Mundra 1 Adani Power Ltd
102.
एपीएल मुँदरा 660 05:06 18-05-2017 06:32 26-05-2017 Pre-Heater leakage
APL Mundra 8 Adani Power Ltd
103.
एपीएमएल ितरोड़ा 330 22:35 21-05-2017 15:45 29-05-2017 Coal shortage.
APML Tiroda 4 Adani Power Ltd
104.
एपीएल मुँदरा 330 02:04 25-05-2017 Still out Still out Capital overhauling
APL Mundra 4 Adani Power Ltd
Due to delayed E/F
105.
एपीएमएल ितरोड़ा Adani Power Ltd
660 18:09 28-05-2017 Still out Still out
protection stage 1 operated
APML Tiroda 5 (765kV Koradi-Tirora-1
tripped at 18:09hrs).
111. जेपीएल JPL Stg-II 4 JPL 600 13:59 11-12-2016 Still out Still out Taken out after COD test
112. जेपीएल JPL Stg-II 2 JPL 600 01:02 08-04-2017 08:15 30-04-2017 Schedule Constraints
113. जेपीएलJPL Stg-II 1 JPL 600 13:30 30-04-2017 03:36 27-05-2017 Ash evacuation problem.
2017 due to heavy gland
114. जेपीएलJPL Stg-II 2 JPL 600 07:46 27-05-2017 Still out Still out leakage in Boiler Main
Steam Stop Valve-1.
115. जेपीएल JPL Stg-I 4 JPL 250 00:00 31-05-2017 19:44 04-06-2017 Low schedule
116.
बालको BALCO 300 04:58 23-05-2017 04:40 26-05-2017 Ash handling problem
BALCO(300 MW) 4
117. Dhariwal-1 DHARIWAL 300 2:27 28-May-14 19:23 06-05-2017 High vibration problem.
118. उनोसुजनUNOSUGEN-1 TPGL 382 21:55 04-03-2016 Still out Still out RSD
119. डीजीईएन DGEN-52 2 TPGL 400 20:00 25-11-2016 Still out Still out No schedule
120. डीजीईएन DGEN-51 TPGL 400 19:28 02-12-2016 Still out Still out No schedule
121. डीजीईएन DGEN-53 TPGL 400 19:12 23-12-2016 Still out Still out Low schedule
122. GMR 685 01:10 02-08-2016 Still out Still out No Schedule
GMR CHHATISGARH 2
Due to turbine bearing no-
123. GMR 300 22:09 22-04-2017 Still out Still out
GMR_CHHATISGARH 1 5 vibration high
124.
आरकेएम पावर RKMPPL 360 14:45 10-05-2017 10:10 15-05-2017 BTL
RKM Power 1
125. Lanco 1 LANCO 300 00:00 10-05-2017 14:15 13-05-2017 BTL
126. ससान Sasan 4 SASAN 660 13:33 09-05-2017 11:21 12-05-2017 PA Fan Problem
127. ससान Sasan 4 SASAN 660 14:19 13-05-2017 12:56 16-05-2017 feed water pump problem
Boiler license renewal; the
झाबुआ पावर
unit is in the process of
128. JHABUA 600 23:36 19-05-2017 00:00 30-05-2017 withdrawal at 24:00hrs but
Jhabua Power 1 tripped at 23:36hrs on
flame failure
129.
झाबुआ पावर JHABUAP 600 16:43 30-05-2017 Still out Still out CW Pump trip
Jhabua Power 1
130. KMPCL 600 00:04 21-05-2017 15:55 05-06-2017 Bottom ash problem
KSK Mahanadi 1
135. KAPS 1 NPCIL 220 08:52 11-03-2016 Still out Still out Reactor side problem
136. टॅ TAPS 2 NPCIL 160 20:21 30-04-2017 12:12 03-05-2017 Maintenance Works
137. बालकोBALCO- 1 BALCO 300 05:09 31.05.2017 Still out Still out Low schedule
138. ईपीजीएल EPGL 2 ESSAR 600 14:46 16-03-2017 00:19 21-05-2017 BTL
139. ईपीजीएल EPGL 2 ESSAR 600 11:59 29-05-2017 Still out Still out Coal Shortage
140. ससानSasan 4 SASAN 660 19:36 16-05-2017 Still out Still out Turbine valve Problem
141. कावासKawas ST 2C NTPC 116 16:27 22-01-2017 15:07 27-04-2017 Low schedule/Change over
142. कावासKawas GT 2A NTPC 106 08:21 29-03-2017 09:59 27-04-2017 Withdrawn on low schedule
144. गांधारGandhar GT ST 2 NTPC 219 04:08 01-04-2017 Still out Still out RSD
Tripped during Over speed
145. SIPAT I 1 NTPC 660 21:01 27-04-2017 00:12 02-06-2017
test./AOH from 22:00hrs
146. गांधारGandhar GT ST 3 NTPC 219 23:00 29-04-2017 Still out Still out Unit withdrawn
151.
कावास NTPC 106 13:17 16-05-2017 15:20 01-06-2017 RSD
Kawas GT 1B
152. Gandhar GT ST 1 NTPC 219 01:11 23-05-2017 12:54 01-06-2017 RSD/Less schedule
fire on Y phase GT
153. VSTPS 8 NTPC 500 17:43 23-05-2017 07:01 03-06-207 transformer of VSTPS
Unit no 8
Testing works on
154. KSTPS 3 NTPC 200 02:00 25-05-2017 22:35 28-05-2017 completion of R & M
,outage for 3 days
Note: Units out for more than 72 hrs are only included.
Annex-2.7
मई2017
Details of planned unit outages during the month of May.2017
अनु संघटक मता सo सo कारण
Unit Constituent/IPP मेगावॉट From From Reason
Sl.No Cap.MW
Time Date Time Date
1. TPC 500 00:00 06-03-2016 Still out Still out Economic Shutdown
TROMBAY 6
2.
एसएसपी SSP 200 09:00 15-03-2017 11:00 17-04-2017
AOH for 30
SSP(RBPH) 1 Days(upto 14.04.17)
3.
एमसीसीपीएलMCC ACBIL 300 23:59 06-05-2017 21:43 27-05-2017 AOH
PL 1
ANNEXURE 3.1
DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING JUNE 2017 AND JULY 2017
3 CHHATTISHGARH
3.1 Korba West-2 2 210 30-Jul-2017 22-Aug-2017 AOH
4 MAHARASHTRA
4.1 PARAS Unit 4 250MW 1/Jul/2017 24/Jul/2017 AOH
4.2 BHUSAWAL Unit 5 500MW 1/Jul/2017 26/Jul/2017 AOH
4.3 CHANDRAPUR Unit 5 500MW 5/Jul/2017 30/Jul/2017 AOH
4.4 Khaperkheda Unit 2 210MW 1/Jul/2017 26/Jul/2017 AOH
4.5 PARAS Unit 4 250MW 1/Jun/2017 24/Jun/2017 AOH
4.6 NASIK Unit 3 210MW 1/Jul/2017 30/Aug/2017 AOH
DTPS REPRESENTATIVE INFORMED THAT AS NO
DTPS Unit 2 250MW 10/Jul/2017 8/Aug/2017 SPARE PARTS AVAILBALE, OUTAGES PROGRAMME
4.7 DEFER
4.7 TROMBAY Unit 7 180MW 22/Jul/2017 30/Jul/2017
5 Central Sector
5.1 U#7 500 25-Jun-17 19-Jul-17
NTPC Korba BLR +RETROFIT OF 100 KW & MORE MODULES
5.2 U#5 500 27-Jul-17 25-Aug-17
NTPC Korba BLR+HPT+IPT
5.3 NTPC Vindhyachal U#11 500 03-Jul-17 27-Jul-17 Boiler +LPT+Condensor chemical cleaning
5.4 NTPC Vindhyachal U#3 500 25-Jul-17 28-Aug-17 Boiler modification + CW duct
5.5 NTPC SIPAT U#3 660 01-Jul-17 14-Aug-17 BOILER+LPT+GEN
5.6 40 24-Jun-17 23-Jul-17
CGPL REPRESENTATIVE INFORMED THATOUTAGES
PROGRAMME DEFER IN SEPTEMBER 2017
CGPL 800
5.7 Sasan Power Ltd 1 660 10-Jul-17 08-Aug-17 AOH
5.8 Sasan Power Ltd 2 660 25-Jun-17 24-Jul-17 AOH
LIST OF TRANSMISSION ELEMENTS OUTAGES PROPOSALS FOR THE MONTH OF JULY 2017
ANNEXURE 3.2
From To
SN Line / Element Basis Reason System Agency Type
Date Time Date Time
WR_NR TTC may
To facilitate the testing & commissioning of 800KV HVDC Pole-2 (under construction) at
1 800 Champa Kurukshetra HVDC Pole-I 22/Jun/17 9:00 24/Jun/17 18:00 Daily NRPC NRPC be Reduced by
Kurukshetra.
1500MW.
2 400 400KV Bus 1 at Bhachau 1/Jul/17 8:00 4/Jul/17 18:00 Daily RTV Coating of 400KV BUS 1 BPI & Bus1 Isolators of all feeders. POWERGRID WR-II C
3 765 765KV Bus-I at Jabalpur PS 1/Jul/17 10:00 2/Jul/17 18:00 Daily For Vindhyachal Bay Extension work at Pooling station,Jabalpur POWERGRID WR-II C
4 400 50MVAR Bina-I Line Reactor at Shujalpur 1/Jul/17 10:00 15/Jul/17 18:00 Continuous Construction of Reactor Switching Scheme By M/S Godrej Ltd. POWERGRID WR-II C
5 765 Sasan - Satna Ckt-I 1/Jul/17 6:00 31/Jul/17 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode POWERGRID WR-II C
6 765 Satna - Gwalior Ckt-I 1/Jul/17 6:00 31/Jul/17 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode POWERGRID WR-II C
7 220 Chhegeon – Khandwa # 1,2 1/Jul/17 6:00 31/Jul/17 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode MPPTCL WR-II C
8 220 Barwaha –Chhegeon (MPPTCL) # 1,2 1/Jul/17 6:00 31/Jul/17 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode MPPTCL WR-II C
9 220 Seoni- Seoni ( MPPTCL) 1/Jul/17 6:00 31/Jul/17 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode MPPTCL WR-II C
10 400 Mundra-Jetpur Ckt 1 1/Jul/17 6:00 31/Jul/17 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode POWERGRID WR-II C
11 400 Dehgam- Nagda Ckt 1 1/Jul/17 6:00 31/Jul/17 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode POWERGRID WR-II C
12 765 Indore PG - Bina-S/c 1/Jul/17 6:00 31/Jul/17 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode POWERGRID WR-II C
13 220 400kV Bina(MPPTCL)-220 kV Bina (MPPTCL) 1/Jul/17 6:00 31/Jul/17 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode MPPTCL WR-II C
14 220 Gwalior(PG)-Malanpur(MPPTCL) D/C 1/Jul/17 6:00 31/Jul/17 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode MPPTCL WR-II C
15 220 Bina(PG)-Shivpuri ckt-1 1/Jul/17 6:00 31/Jul/17 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode MPPTCL WR-II C
16 400 400KV, 125 MVAr BR-II at Indore 1/Jul/17 10:00 1/Jul/17 18:00 Daily AMP OF BUS REACTOR POWERGRID WR-II R
17 765 765KV ICT#2 Tie Bay (705 Bay) at Satna 1/Jul/17 9:00 1/Jul/17 18:00 Daily For Attending Isolator problem POWERGRID WR-II C
Power line crossing of 765KV S/C Dharmajaigarh Pooling Station - Champa at Tower No.
18 765 kV 765KV S/C Dharmajaigarh Pooling Station - Champa 1/Jul/17 8:00 1/Jul/17 19:00 Daily PGCIL CWRTL
97 & 98 by 765 kV S/C Champa-Dharamjaigarh line at Loc. No. 14/0-15/0
19 400 Jejuri - Koyna Stage -IV 1/Jul/17 7:00 31/Jul/17 19:00 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW work MSETCL MSETCL
Jhabua Power
20 400 400 KV Jhabua line # 01; Bay 403Main & tie Bay 402 1/Jul/17 9:00 1/Jul/17 18:00 daily For bellow checking of 402 CT -R Phase & tightness Checking of 403 Bay Jhabua Power
Switchyard
21 400kV 400 KV Dabhol -Nagothane CKt 2 1/Jul/17 8:00 5/Jul/17 18:00 Daily For hill cutting of line area. MSETCL MSETCL
22 220 Wardha PG - Pusad Line 1/Jul/17 10:00 31/Jul/17 18:00 Daily For PID Work, Shifting of auto reclose switch to non auto mode. MSETCL MSETCL
23 400KV Babhaleshwar-Padghe-Ckt-1 @BBLR 1/Jul/17 9:00 1/Jul/17 17:00 Daily Routine Maintenance & Servicing and allignment of PG isolators work MSETCL MSETCL
24 400 Lonikand - Koyna Stage-IV 1/Jul/17 7:00 31/Jul/17 19:00 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW work MSETCL MSETCL
25 400 Lonikand - Jejuri 1/Jul/17 7:00 31/Jul/17 19:00 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW work MSETCL MSETCL
26 400 Babhaleshwar -Dhule I & II 1/Jul/17 7:00 31/Jul/17 19:00 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW work MSETCL MSETCL
27 400 Babhaleshwar - Aurangabad 1/Jul/17 7:00 31/Jul/17 19:00 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW work MSETCL MSETCL
i) PG Isolator Scissor Replacement of R Ph PG Isolator Bus I ii)Erection of New Hanger
28 400KV 400kV Main Bus-I at 400kV Khadka 1/Jul/17 8:30 2/Jul/17 17:30 Continuous MSETCL MSETCL
Rod of PG isolator for newly commisioned 400 kV Bus Reactor Bay
400/220k
29 315 MVA ICT-3 at 400kV Khadka to be shifted on TBC 1/Jul/17 8:30 2/Jul/17 17:30 Continuous i) PG Isolator Scissor Replacement of R Ph PG Isolator Bus I MSETCL MSETCL
V
30 400 400KV BIRSINGHPUR-KATNI - I 1/Jul/17 9:00 1/Jul/17 17:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
31 400 400KV ISP MAIN BUS-A AT 400KV ISP HPS 1/Jul/17 7:00 1/Jul/17 12:00 daily ANNUAL MAINTENANCE & RELAY TESTING WORK NHDC NHDC R
32 400 400KV ISP MAIN BUS-B AT 400KV ISP HPS 1/Jul/17 12:00 1/Jul/17 18:00 daily ANNUAL MAINTENANCE & RELAY TESTING WORK NHDC NHDC R
400KV D/C Sundargarh-Raigarh (CKT-1&)Rourkela-Raigarh for Overhead Stringing of U/C 400KV D/C OPGC- Sundargarh(IB Thermal) Transmission
33 400 1/Jul/17 7:00 2/Jul/17 17:00 Daily PGCIL OGPTL C
(CKT 2) line(of OGPTL) at OGPTL Location numbers AP 23/0- AP24/0(PGCIL tower Nos: 797-798)
34 765 765kV Bus_1 at Aurangabad 1/Jul/17 8:00 1/Jul/17 18:00 Daily For construction of new Solapur bays WRTS-I WRTS-I C
35 400 Korba - Birsingpur - II 1/Jul/17 6:00 31/Jul/17 18:00 Daily Online OPGW work. A/R to be kept in Non auto mode WRTS-II WRTS-I C
36 400 400kV WARDHA-PARLI- I 1/Jul/17 9:00 31/Jul/17 18:00 Daily Auto Recloser of Wardha-Parli #1 to be kept in non Auto Mode for ONLINE OPGW works. WRTS-I WRTS-I C
Ckt ID to be
37 400 RKM Bay No:438 at 765/400 KV pooling Station New Kotra 1/Jul/17 8:00 2/Jul/17 18:00 Daily CT Sample Oil Collect for DGA Purpose RKMPPL RKMPPL mentioned/Main or
tie by.
For Diversion/ modification of multi curcuit line in between 220kv Budhipadhar -Korba S/C
from Loc 29 to 39 and 400Kv D/C Rourkela-Raigarh line III &IV from 385 to 375 for
38 220 220Kv BudhiPadhar -Korba S/C Line 1/Jul/17 9:00 14/Aug/17 18:00 Continuous ERPC ERPC
construction of dedicated MGR (Rail Line) at Village Belpahar,Amdhara & Chualiberna (
Depositary works on behalf of OPGC)
39 400 400kV BHILAI-BHADRAVATI I 2/Jul/17 9:30 2/Jul/17 17:30 Daily Relay testing and AMP work at Bhilai S/S WRTS-I WRTS-I R
40 400 400KV SOLAPUR-KOLHAPUR#1 2/Jul/17 6:00 2/Jul/17 19:00 DAILY For Power line crossing stringing works in 400kV NTPC-PG Line #3&4 Reliance WRTS-1 C
41 400 400KV SOLAPUR-KOLHAPUR#2 2/Jul/17 6:00 2/Jul/17 19:00 DAILY For Power line crossing stringing works in 400kV NTPC-PG Line #3&4 Reliance WRTS-1 C
42 400 J P NIGRIE-SATNA-1 2/Jul/17 9:00 2/Jul/17 17:00 Daily Fixing of missing Arcing Horns,Twin Spacers & Rigid Spacers JP NIGRIE JP NIGRIE
43 400KV Kalwa -Padgha I@ Kalwa 2/Jul/17 9:00 2/Jul/17 18:00 Daily Routine Maintenance & testing work MSETCL MSETCL
TTC may be
44 765 765kV Raichur-Solapur-1 2/Jul/17 8:00 2/Jul/17 18:00 Daily AMP SRPC SRPC reduced by 1200
MW.
765KV RANCHI #02 MAIN BAY(728) AT
45 765 3/Jul/17 9:00 3/Jul/17 18:00 Daily AMP WORKS OF BAY WRTS-I WRTS-I R
DHARAMJAYGARH(KORBA) SS
Replacement of Conventional Insulators with Polymer insulators in major crossings line
46 400 400KV Khandwa-Dhule Ckt-I 3/Jul/17 9:00 7/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-II WRTS-I C
other ckt will be required during above period
47 400 412,Shujalpur-2 Main bay at Bina 3/Jul/17 9:30 3/Jul/17 18:00 Daily For AMP works POWERGRID WR-II R
48 220 ICT2 (201 Bay )CB at Damoh 3/Jul/17 9:00 3/Jul/17 18:00 Daily Repeat test of DCRM on 201-52 as per recommended by RHQ, Vadodara POWERGRID WR-II R
49 765 765KV Bus-II at Jabalpur PS 3/Jul/17 10:00 6/Jul/17 18:00 Daily For Urai Bay Extension work at Pooling station,Jabalpur POWERGRID WR-II C
50 220 220KV Vapi-Khadoli 3/Jul/17 9:00 3/Jul/17 16:00 Daily Main-2 relay replacement work POWERGRID WR-II C
51 765 BAY 712 (MAIN BAY FOR 765KV BR-II) at Indore 3/Jul/17 10:00 4/Jul/17 18:00 Daily BAY AMP POWERGRID WR-II R
52 400 Itarsi-Jabalpur#2 Main Bay at Itarsi 3/Jul/17 9:00 3/Jul/17 17:00 Daily AMP works POWERGRID WR-II R
53 400 Aurangabad Reactor-I at Boisar 3/Jul/17 9:00 4/Jul/17 18:00 Daily 145KV CB Erection Work for implementation of NGR bypass system POWER GRID WR-II R
54 400 315 MVA, Gwalior ICT # 2 at Gwalior 3/Jul/17 10:00 3/Jul/17 18:00 Daily AMP WORKS POWERGRID WR-II R
Load manage on
55 400 KV 400KV NEW KOYANA-I @ KARAD 3/Jul/17 10:00 3/Jul/17 17:00 Daily Quarterly. Maint. work MSETCL MSETCL 400 kV NEW
KOYANA 2
56 400KV 400KV Dhule-SSNNL Ckt-I & II 3/Jul/17 9:00 4/Jul/17 17:00 Daily PID testing MSETCL MSETCL
765 kV Koradi-III Akola-II Line-1 non switchable reactor at For changeover of Rph Line reactor against Spare reactor of 765 kV Koradi-III Akola-II
57 765 kV 3/Jul/17 7:00 3/Jul/17 15:00 Daily MEGPTCL MEGPTCL
MEGPTCL 765/400KV Akola-II SS Line-1 main bay 706 at MEGPTCL-765/400KV Akola-II Substation
Replacement of bolted type clamp by crimping clamp at LILO tower loc. No. 02 &
58 400KV GCR Chandrapur - Chandrapur 2 Ckt-2 3/Jul/17 8:00 3/Jul/17 17:00 Daily MSETCL MSETCL
Replacement of broken / damaged disc insulators
400/220k
59 501 MVA, ICT 3 @ Talandge 3/Jul/17 9:00 3/Jul/17 18:00 Daily Quarterly Maintenance work and Back Up relay retrofitting work MSETCL MSETCL
V
60 400 400KV S/S BHOPAL - 315MVA XMER - 3 3/Jul/17 9:00 3/Jul/17 17:00 daily FOR MAINTENANCE AND TESTING WORK MPPTCL MPPTCL R
61 400 400 KV S/S NAGDA MAIN CB ICT-II 3/Jul/17 9:00 15/Jul/17 18:00 cont. FOR REPLACEMENT OF MAIN CIRCUIT BREAKER AND 3 NOS MAIN CTS MPPTCL MPPTCL R
62 220 220KV SEONI(PG)-CHHINDWARA - II 3/Jul/17 10:00 3/Jul/17 16:00 daily FOR CVT ERECTION COMMISSIONING & TESTING WORK MPPTCL MPPTCL R
63 220 220 KV RAJGARH-I/C - I 3/Jul/17 9:00 3/Jul/17 17:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
64 400 Korba Vindhyachal-2 3/Jul/17 8:30 3/Jul/17 17:30 Continuous For annual maintenance of bay equipments and hot spot attending & LA replacememt NTPC NTPC
65 765 KV 765KV Sipat-Bharari-1 Tie Bay-19 at Sipat 3/Jul/17 9:00 5/Jul/17 18:00 Continuous For Annual maint works NTPC NTPC
66 765 765kV ICT-1 Main bay-703 at Aurangabad 3/Jul/17 9:00 3/Jul/17 18:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R
Replacement of Conventional Insulators with Polymer insulators in major crossings line
67 400 400 kV Bhadrawati - Parli # 01. 3/Jul/17 8:00 3/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
68 765 765/400KV ICT-4 at Champa PS 3/Jul/17 9:00 3/Jul/17 17:30 Daily Spare ICT normalisation WRTS-I WRTS-I C
69 765 765 kVKotra #2 Main bay 813 at Durg PS 3/Jul/17 8:00 3/Jul/17 18:00 Daily AMP of bay WRTS-I WRTS-I R
765KV RANCHI #01 MAIN BAY(731) AT
70 765 3/Jul/17 9:00 3/Jul/17 18:00 Daily AMP WORKS OF BAY WRTS-I WRTS-I R
DHARAMJAYGARH(KORBA) SS
71 220 SEONI1_LINE_BAY_204L at Seoni 3/Jul/17 8:00 3/Jul/17 18:00 Daily For AMP testing work MPPTCL WRTS-I R
72 400 SOLAPUR_BAY 418_MAIN BAY_KOLHAPUR#2 at Solapur 3/Jul/17 9:00 3/Jul/17 18:00 DAILY AMP WORKS WRTS-1 WRTS-1 R
73 765 ICT4_765/400kv_TAMNAR PS 3/Jul/17 10:00 3/Jul/17 18:00 Daily For commissioning of CSD OF ICT4 through 765 kV Main and Tie Bays WRTS-I WRTS-I C
Replacement of Conventional Insulators with Polymer insulators in major crossings line
74 400 400 KV Wardha Akola Line 1 3/Jul/17 9:00 3/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
765 KV Wardha-Aur'bad # 2 Switchable Line Reactor 716R
75 765 3/Jul/17 9:00 8/Jul/17 18:00 Daily All 6 poles CB Mechanism Boxes Replacement Work. Line will be in service. WRTS-I WRTS-I R
at wardha
FOR SCHEDULE MAINTENANCE/juMPER TIGHTENING/SPACER/DAMPER
76 400 EMCO-BHADRAWATI-I 3/Jul/17 9:00 8/Jul/17 18:00 DAILY EMCO EMCO
INSTALLATION
Ckt ID to be
RKM Bay No:439 & 440 at 765/400 KV pooling Station New
77 400 3/Jul/17 8:00 4/Jul/17 18:00 Daily CT Sample Oil Collect for DGA Purpose RKMPPL RKMPPL mentioned/Main or
Kotra
tie by.
78 400 kV 400 kV Akola- Bhusawal Line 4/Jul/17 12:00 6/Jul/17 18:00 Daily PID testing of insulator strings by Hot line Uint Akola. A/R shall be kept in non auto mode. MSETCL MSETCL
400 KV Chandrapur II ckt N0. II ( bay 416) & Tie bay 415 at
79 400KV 4/Jul/17 8:00 4/Jul/17 17:00 Daily Rotuine bay maintanince work at 400 KV S/stn. Warora.. MSETCL MSETCL
Warora.
80 400 400 KV S/S KATNI 400/220KV 315MVA BHEL XMER - 1 4/Jul/17 9:00 5/Jul/17 17:00 cont. FOR MAINTENANCE AND TESTING WORK MPPTCL MPPTCL R
81 400 400 KV Bus-I at Parli 4/Jul/17 10:00 4/Jul/17 18:00 Daily For AMP works at Parli WRTS-I WRTS-I R
Line reactor will be out of service for 5 days from 03.07.2017 to 08.07.2017 for O-rings
82 400 L/R of 400kV RAIPUR-BHADRAVATI II at Raipur 4/Jul/17 8:00 9/Jul/17 18:00 Continuous WRTS-I WRTS-I R
replacement work of Reactor Bushing at Raipur SS. Line will be in service.
83 400 405,Bina-1 & 400KV/220KV ICT tie bay at Bina 4/Jul/17 9:30 4/Jul/17 18:00 Daily For AMP works POWERGRID WR-II R
84 220 220KV BUS-1 at Damoh 4/Jul/17 9:00 4/Jul/17 18:00 Daily Extension work of 400/220KV substation by M/s Techno electric POWERGRID WR-II C
85 400 Nagda-Dehgam#1 4/Jul/17 9:00 4/Jul/17 17:00 Daily Retrofitting of REL 521 Distance Relay with REL 670 POWERGRID WR-II C
86 400 500 MVA ICT-3 at Navsari 4/Jul/17 8:00 4/Jul/17 19:00 Daily FO tempertaure sensing work POWERGRID WR-II R
87 765 Vadodara-Dhule Line 4/Jul/17 10:00 4/Jul/17 18:00 Daily For RTV Coating on 765 kV Trench Make Bushings of Line Reactor STERLITE WR-II C
88 220 220KV Vapi-Sayali 4/Jul/17 9:00 4/Jul/17 16:00 Daily Main-2 relay replacement work POWERGRID WR-II C
89 400 Itarsi-Jabalpur#2 Tie Bay at Itarsi 4/Jul/17 9:00 4/Jul/17 17:00 Daily AMP works POWERGRID WR-II R
90 220 220kV Bus-1 at Gwalior 4/Jul/17 10:00 4/Jul/17 17:00 Daily AMP WORKS POWERGRID WR-II R
91 765 765KV ICT#2 at Satna 4/Jul/17 9:00 4/Jul/17 18:00 Daily For Attending Isolator problem POWERGRID WR-II C
92 400 Satna - Bina Ckt.1 4/Jul/17 8:00 4/Jul/17 18:00 Daily AMP of line and bay terminal equipment POWERGRID WR-II R
93 400 400 KV UKAI-1 Main + Tie bay Kosamba 4/Jul/17 8:00 4/Jul/17 18:00 Daily Half Yearly maintenance & testing activity
94 400 400 KV Transfer Bus Soja 4/Jul/17 8:00 4/Jul/17 18:00 Daily Maintenance work
95 400 500MVA, 400/220 KV ICT No. 1 Asoj 4/Jul/17 8:00 4/Jul/17 18:00 Daily Condition monitoring
96 400 400 KV Chorania - Asoj - 1 4/Jul/17 8:00 4/Jul/17 18:00 Daily CVT Tan Delta Testing work
400/220/33 kV 315
400/220/3
97 315 MVA ICT- 2 at 400 kV Akola 4/Jul/17 9:00 4/Jul/17 18:00 Daily Routine Maintenance, testing and painting work of New ICT MSETCL MSETCL MVA ICT-I will be
3KV
in service
Load manage on
98 400 KV 400KV Bus Coupler @ KARAD 4/Jul/17 10:00 4/Jul/17 17:00 Daily Quarterly. Maint. work MSETCL MSETCL
BUS I& II
99 400 400KV S/S BHOPAL - 315MVA XMER - 3 4/Jul/17 9:00 4/Jul/17 17:00 daily FOR MAINTENANCE AND TESTING WORK MPPTCL MPPTCL R
100 400 400KV BINA-BHOPAL -I 4/Jul/17 9:00 4/Jul/17 17:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
101 220 220KV SEONI(PG)-CHHINDWARA - I 4/Jul/17 10:00 4/Jul/17 16:00 daily FOR CVT ERECTION COMMISSIONING & TESTING WORK MPPTCL MPPTCL R
102 220 220 KV RAJGARH-I/C - II 4/Jul/17 9:00 4/Jul/17 17:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
103 220 220KV DAMOH-SAGAR (PGCIL) - II 4/Jul/17 8:00 4/Jul/17 18:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
VINDH BAY NO 412 VINDHYACHAL POOLING LINE-I
104 400KV 4/Jul/17 9:00 5/Jul/17 18:00 Continuous HOTSPOT ATTEND (Bus shutdown required for attending the Hot spot) NTPC NTPC
STAGE-IV ALONG WITH BUS 7(stage IV)
105 765 765kV WARDHA - AURANGABAD(PG) IV 4/Jul/17 8:00 4/Jul/17 18:00 Daily For AMP works of line & S/S WRTS-I WRTS-I R
765KV RANCHI #01 TIE BAY(732) AT
106 765 4/Jul/17 9:00 4/Jul/17 18:00 Daily AMP WORKS OF BAY WRTS-I WRTS-I R
DHARAMJAYGARH(KORBA) SS
107 400 SOLAPUR_BAY 417_TIE BAY_KOLHAPUR#2 AT SOLAPUR 4/Jul/17 9:00 4/Jul/17 18:00 DAILY AMP WORKS WRTS-1 WRTS-1 R
108 400 400 KV ICT # 2 at Wardha 4/Jul/17 9:00 4/Jul/17 18:00 Daily for variable frequency tan delta measurement WRTS-I WRTS-I R
Replacement of Conventional Insulators with Polymer insulators in major crossings line
109 400 400 KV Wardha Akola Line 2 4/Jul/17 9:00 4/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
110 400 HVDC Pole-1 at BVT 4/Jul/17 9:00 5/Jul/17 18:00 Daily Six monthly AMP WRTS-I WRTS-I R
Replacement of broken insulator, rectification of Spacer cum damper, Installation of Arcing
111 765 765kV D'JAIGARH-RANCHI I 4/Jul/17 9:00 6/Jul/17 18:00 Daily WRTS-I WRTS-I R
horn
112 400 Bus-Sectionalizer BS-1& Bus-1 at JPL Stage-1 4/Jul/17 9:00 4/Jul/17 18:00 Daily Annual Bay Maintenance JPL JPL
113 400 400KV Sundergarh-Raigarh- I 4/Jul/17 8:00 5/Jul/17 18:00 ODB For replacemet of Porceline insulator at various crossing span by CLR polymer ERPC ERPC
Diagnostic Testing , Replacement of bolted type clamp by crimping clamp at LILO tower
114 400KV Chandrapur 2- Kubhargaon ( Nanded) ckt - 2 5/Jul/17 8:00 5/Jul/17 17:00 Daily MSETCL MSETCL
loc. No. 02 & Replacement of broken / damaged disc insulators
Line reactor will be out of service for Tan delta Measurement of Reactor Bushings at Akola
115 400 L/R of 400 KV Akola-Aurangabad# 2, At Akola 5/Jul/17 9:00 5/Jul/17 18:00 Daily WRTS-I WRTS-I R
SS. Line will be in service without LR.
116 400 400KV Bus 2 at Bhachau 5/Jul/17 8:00 8/Jul/17 18:00 Daily RTV Coating of 400KV BUS 2 BPI & Bus 2 Isolators of all feeders. POWERGRID WR-II C
117 400 404, Bina-1 main bay at Bina 5/Jul/17 9:30 5/Jul/17 18:00 Daily For AMP works POWERGRID WR-II R
118 220 220KV BUS-2 at Damoh 5/Jul/17 9:00 5/Jul/17 18:00 Daily Extension work of 400/220KV substation by M/s Techno electric POWERGRID WR-II C
119 400 Nagda-Dehgam#2 5/Jul/17 9:00 5/Jul/17 17:00 Daily Retrofitting of REL 521 Distance Relay with REL 670 & AMP of Terminal Equipments POWERGRID WR-II C
120 400 JBP POOLING-1 TIE BAY(411) at Jabalpur 5/Jul/17 9:00 5/Jul/17 17:00 Daily AMP WORK POWERGRID WR-II R
Shifting of 220 D/C Kawas-Navsari line between loc.no. 96-98 to facilitate clearance for
121 220 Kawas -Navsari 1&2 5/Jul/17 9:00 10/Jul/17 18:00 Continuous POWERGRID WR-II C
DFCCI Railway line corrioder
122 400 400KV Vapi-Sugen line 5/Jul/17 9:00 5/Jul/17 16:00 Daily Main-1 relay replacement work POWERGRID WR-II C
123 765 BAY 715(MAIN BAY FOR INDORE-VADODARA LINE) 5/Jul/17 10:00 6/Jul/17 18:00 Daily BAY AMP POWERGRID WR-II R
124 400 Khandwa #2-Satpur Tie Bay at Itarsi 5/Jul/17 9:00 5/Jul/17 17:00 Daily AMP works POWERGRID WR-II R
125 400 Aurangabad Reactor-II at Boisar 5/Jul/17 9:00 6/Jul/17 18:00 Daily 145KV CB Erection Work for implementation of NGR bypass system POWER GRID WR-II R
126 400 Bus-II at Vindhyachal PS 5/Jul/17 7:00 5/Jul/17 18:00 Daily FOR ICT-3 Commissioning work POWER GRID WR-II C
127 765 (713 LR) Satna#1 Line Reactor Bay at Gwalior 5/Jul/17 10:00 5/Jul/17 17:00 Daily AMP WORKS POWERGRID WR-II R
128 400 Pirana Vadodara-1 line 5/Jul/17 8:00 5/Jul/17 18:00 Daily AMP of terminal equipment POWERGRID WR-II R
129 400 Vindhyachal - Jabalpur Ckt.1 5/Jul/17 8:00 6/Jul/17 18:00 Daily AMP of line and bay terminal equipment and providing insulatrion in TP tower jumpers POWERGRID WR-II R
130 400 Satna - Bina Ckt.2 5/Jul/17 8:00 5/Jul/17 18:00 Daily AMP of line and bay terminal equipment POWERGRID WR-II R
131 400 KV Thaptitanda - Waluj @ Taptitanda 5/Jul/17 10:00 5/Jul/17 17:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL
Reactor will be out
132 400kV 400kV Parli-Chandrapur ckt 3 5/Jul/17 9:00 7/Jul/17 17:00 Daily Reactor painting work. MSETCL MSETCL
for three days.
133 400kV 400kv Parli-Chandrapur ckt-3 bay @ Girwali 5/Jul/17 9:00 5/Jul/17 17:00 Daily Routine Maintenance & Dignostic testing work(CB DCRM & Timing measurement) MSETCL MSETCL
765 kV Aurangabad-III Akola-II Line-1 non switchable reactor For changeover of Spare reactor against Rph- Line reactor of 706 bay of 765 kV
134 765 kV 5/Jul/17 10:00 5/Jul/17 18:00 Daily MSETCL MEGPTCL
at MSETCL 765/400KV Aurangabad-III Ektuni SS Aurangabad-III Akola- at MSETCL 765/400KV Aurangabad-III Ektuni SS
Load will be shifted
422-Bay (Main Bay of Station Transformer-1) at 400KV
135 400 KV 5/Jul/17 9:00 5/Jul/17 18:00 Daily TAN DELTA MEASUREMENT OF 422 LINE CT MSETCL MSETCL to Station
Koradi-2
Transformer -2
136 400KV TBC @ Talandge 5/Jul/17 9:00 5/Jul/17 18:00 Daily Quarterly Maintenance work PGCIL MSETCL
137 400 400 KV S/S NAGDA 400KV 125 MVAR BUS REACTOR - II 5/Jul/17 8:00 5/Jul/17 17:00 daily FOR MAINTENANCE AND TESTING WORK MPPTCL MPPTCL R
138 400 400KV BINA-BHOPAL - II 5/Jul/17 9:00 5/Jul/17 17:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
139 220 220KV SEONI-CHHINDWARA - II 5/Jul/17 10:00 5/Jul/17 16:00 daily FOR CVT ERECTION COMMISSIONING & TESTING WORK MPPTCL MPPTCL R
140 220 220 KV DHAR - RAJGARH (PGCIL) 5/Jul/17 9:00 5/Jul/17 16:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
400KV D/C DCDS Khedmara-Korba(West) and Khedamara- for Overhead Stringing of U/C 765KV D/C Raipur- Sundargarh Transmission line(of
141 400 5/Jul/17 7:00 6/Jul/17 17:00 Daily CSPTCL OGPTL C
Marwa PH Circuit of CSPTCL OGPTL) at OGPTL Location numbers AP12/0-AP13/0.(CSPTCL Tower nos 554-555)
142 400 KV ICT # 1 at Wardha 5/Jul/17 9:00 5/Jul/17 18:00 Daily for variable frequency tan delta measurement WRTS-I WRTS-I R
143 765 765kV Wardha-4 Main Bay 721 at Aurangabad 5/Jul/17 9:00 5/Jul/17 18:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R
144 765 Seoni#2_707_Main Bay at Bilaspur PS 5/Jul/17 9:00 5/Jul/17 18:00 Daily AMP works (CB Timings and CT tan delta meas.) WRTS-I WRTS-I R
145 765 765 kV Champa #2 Main bay 819 at Durg PS 5/Jul/17 8:00 5/Jul/17 18:00 Daily AMP of bay WRTS-I WRTS-I R
146 400 400 KV BUS-1 at Talegaon 5/Jul/17 9:00 5/Jul/17 18:00 Daily For AMP works WRTS-I WRTS-I R
147 765 765KV D'JAIGARH- CHAMPA 5/Jul/17 9:00 5/Jul/17 17:30 Daily 715-89L Line Isolator (R-Ph) replacement work. WRTS-I WRTS-I R
148 765 ICT1_765/400kv_SEONI 5/Jul/17 8:00 5/Jul/17 18:00 Daily For AMP testing work WRTS-I WRTS-I R
149 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_1 5/Jul/17 6:00 5/Jul/17 19:00 DAILY For Power line crossing stringing works in 400kV NTPC-PG Line #3&4 WRTS-1 WRTS-1 C
150 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_2 5/Jul/17 6:00 5/Jul/17 19:00 DAILY For Power line crossing stringing works in 400kV NTPC-PG Line #3&4 WRTS-1 WRTS-1 C
151 400 TRN Line 1 (403) Main Bay at Tamnar PS 5/Jul/17 10:00 5/Jul/17 18:00 Daily For AMP Works of TRN line 1 (403) Main Bay WRTS-I WRTS-I R
152 400 400 KV Bus Reactor at Wardha 5/Jul/17 9:00 5/Jul/17 18:00 Daily AMP works WRTS-I WRTS-I R
Replacement of Conventional Insulators with Polymer insulators in major crossings line
153 400 400 KV Wardha Akola Line 1 5/Jul/17 9:00 5/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
154 400 Tie Bay of Akola-A'Bad #2 406 at Akola 5/Jul/17 9:00 5/Jul/17 18:00 Daily AMP works related to Bay WRTS-I WRTS-I R
155 220 D/C Korba-Budipadar CKT-I & II 5/Jul/17 8:00 6/Jul/17 18:00 Continuous Power line Crossing of U/C 765 KV D/C Jharsuguda-Korba Line-II of POWERGRID WRTS-I CSPTCL C
156 220 S/C Korba-Budipadar CKT-III 5/Jul/17 8:00 6/Jul/17 18:00 Continuous Power line Crossing of U/C 765 KV D/C Jharsuguda-Korba Line-II of POWERGRID WRTS-I WRTS-I C
157 400 400 KV Bus 1 at wardha 5/Jul/17 9:00 6/Jul/17 18:00 Continuous Bus extension for Aurangabad bays WRTS-I WRTS-I C
WR_NR TTC may
To facilitate the testing & commissioning of 800KV HVDC Pole-2 (under construction) at
158 800 Champa Kurukshetra HVDC Pole-I 5/Jul/17 9:00 7/Jul/17 18:00 Daily NRPC NRPC be Reduced by
Kurukshetra.
1500MW.
159 400kV 400kV Bus -I @ New Koyna 6/Jul/17 8:00 6/Jul/17 18:00 Daily For the replacement of faulty CVT of BUS -I MSETCL MSETCL
160 765 Seoni#1_704_Main Bay at Bilaspur PS 6/Jul/17 9:00 6/Jul/17 18:00 Daily AMP works (CB Timings and CT tan delta meas.) WRTS-I WRTS-I R
161 400 500MVA, 400/220KV ICT No. 2 Asoj 6/Jul/17 8:00 6/Jul/17 18:00 Daily Condition monitoring
162 400kV 400 KV Dabhol -Nagothane CKt 1 6/Jul/17 8:00 13/Jul/17 18:00 Daily For Insulator String replacement of Line. MSETCL MSETCL
163 765 706,ICT-2 Main bay at Bina 6/Jul/17 9:30 6/Jul/17 18:00 Daily For AMP works DCRM & Timing POWERGRID WR-II R
164 400 ICT#3 at Damoh 6/Jul/17 9:00 6/Jul/17 18:00 Daily Extension work of 400/220KV substation by M/s Techno electric POWERGRID WR-II C
165 765 Main Bay of Vadodar Indore line (bay 704) at Vadadara GIS 6/Jul/17 10:00 6/Jul/17 17:00 Daily for CB AMP POWERGRID WR-II C
166 400 400KV Vapi-Boisar line 6/Jul/17 9:00 6/Jul/17 16:00 Daily Main-1 relay replacement work POWERGRID WR-II C
167 400 Bus Reactor #3 Main Bay at Itarsi 6/Jul/17 9:00 6/Jul/17 17:00 Daily AMP works POWERGRID WR-II R
168 220 220kV Gwalior-Sithouli line 6/Jul/17 10:00 6/Jul/17 17:00 Daily AMP WORKS POWERGRID WR-II R
400 KV Chorania line No. 1 LINE + MAIN +
169 400 6/Jul/17 9:00 6/Jul/17 18:00 Daily Half Yearly maintenance & testing activity
TIE BAY + Line Reactor at Kosamba end
170 400 315MVA, 400/220KV ICT No. 3 Asoj 6/Jul/17 8:00 6/Jul/17 18:00 Daily Condition monitoring
171 400 400 KV Chorania - Asoj - 2 6/Jul/17 8:00 6/Jul/17 18:00 Daily CT/CVT Tan Delta Testing work
400/220
172 105 MVA Spare ICT @Chakan 6/Jul/17 9:00 6/Jul/17 18:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL
KV
Load will be on
400/220k
173 501 MVA, ICT 2 @ Jejuri 6/Jul/17 9:00 6/Jul/17 18:00 Daily Maintenance work MSETCL MSETCL 400/220 KV 501
V
MVA ICT 1
Diagnostic Testing ,Replacement of broken / damaged disc insulators & tighting of
174 400KV Chandrapur - Khaperkheda 6/Jul/17 8:00 6/Jul/17 18:00 Daily MSETCL MSETCL
conductor & earthwire hardware
175 400 400KV S/S BHOPAL - 315MVA XMER - 1 6/Jul/17 9:00 6/Jul/17 17:00 daily FOR MAINTENANCE AND TESTING WORK MPPTCL MPPTCL R
176 400 400 KV S/S INDORE 3X105MVA 400/220KV XMER-II 6/Jul/17 10:00 7/Jul/17 17:00 cont. FOR 400KV CT REPLACEMENT WORK MPPTCL MPPTCL R
400 KV S/S NAGDA 400KV TIE CB OF 400KV RAJGARH-1
177 400 6/Jul/17 8:00 6/Jul/17 17:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
FEEDER & ICT-IV
178 220 220 KV MALANPUR-AOURIYA 6/Jul/17 9:00 6/Jul/17 17:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
179 220 220 KV PITHAMPUR - RAJGARH PGCIL 6/Jul/17 9:00 6/Jul/17 16:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
180 765 765kV WARDHA - AURANGABAD(PG) III 6/Jul/17 8:00 6/Jul/17 18:00 Daily For AMP works of line & S/S WRTS-I WRTS-I R
181 765 765kV Wardha-3 Tie Bay 717 at Aurangabad 6/Jul/17 9:00 6/Jul/17 18:00 Daily For construction of new Solapur-2 main bay 716 WRTS-I WRTS-I C
182 400 400kv TIE BAY (402)Chakan & Kharghar Line at Talegaon 6/Jul/17 9:00 6/Jul/17 18:00 Daily For AMP works WRTS-I WRTS-I R
183 400 TRN Line 1 (402) Tie Bay at Tamnar PS 6/Jul/17 10:00 6/Jul/17 18:00 Continuous For AMP Works of TRN line 1 (402) Tie Bay WRTS-I WRTS-I R
184 765 765 KV ICT #2 Main Bay 706 at wardha 6/Jul/17 9:00 6/Jul/17 18:00 Daily AMP works related to Bay WRTS-I WRTS-I R
Replacement of Conventional Insulators with Polymer insulators in major crossings line
185 400 400 KV Wardha Akola Line 2 6/Jul/17 9:00 6/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
Non auto mode of Line II- for replacement of broken insulator in Ranchi # I D/C Portion i.e.
186 765 765kV D'JAIGARH-RANCHI II 6/Jul/17 9:00 6/Jul/17 18:00 Daily WRTS-I WRTS-I R
Tower No. 12
187 400 SOLAPUR_400KV BUS#2 6/Jul/17 9:00 7/Jul/17 18:00 DAILY STATCOM CONSTRUCTION WORKS WRTS-1 WRTS-1 C
188 765 D/C Champa -Durg 6/Jul/17 7:00 8/Jul/17 19:00 Daily Non Auto Mode of T/L for Tower top patrolling WRTS-I WRTS-I R
Replacement of Conventional Insulators with Polymer insulators in major crossings line
189 400 400KV Khandwa-Dhule Ckt-II 6/Jul/17 9:00 10/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-II WRTS-I C
other ckt will be required during above period
Powerline crossing works of 400kV D/C LILO of both ckts of Wardha - Parli TL (LOOP IN)
190 400 Wardha - Warora (Quad) Line 6/Jul/17 9:00 6/Jul/17 18:00 Continuous MSETCL WRTS-I C
between tower location Nos10/0 & 11/0 (400kV Wardh - Warora line tower nos. 112&113)
191 400 JBP POOLING-1 MAIN BAY(410) at Jabalpur 7/Jul/17 9:00 7/Jul/17 17:00 Daily AMP WORK POWERGRID WR-II R
For Jumpering of Reactor NGR Breaker & Wiring of Single Phase Breaker for Switching
192 765 765KV Sasan-Satna#1 Line at Satna SS 7/Jul/17 9:00 7/Jul/17 18:00 Daily POWERGRID WR-II C
scheme.
193 400 400 KV BUS-2 at Talegaon 7/Jul/17 9:00 7/Jul/17 18:00 Daily For AMP works WRTS-I WRTS-I R
194 765 Seoni - Bina ckt -1 7/Jul/17 8:00 8/Jul/17 18:00 Daily LINE AMP WRTS-II WRTS-I R
195 400 Sipat - Ranchi # 1 7/Jul/17 8:00 12/Jul/17 18:00 cont. basis For Redctification of Bend C-leg at Tower No 664, on permanent basis WRTS-I WRTS-I R
196 400 Sipat - Ranchi # 2 7/Jul/17 8:00 12/Jul/17 18:00 cont. basis For Redctification of Bend C-leg at Tower No 664, on permanent basis WRTS-I WRTS-I R
197 765 S/C Bilaspur- Dharamjaigarh 7/Jul/17 7:00 7/Jul/17 19:00 Daily AMP of transmission Line WRTS-I WRTS-I R
198 765 KV 765KV Sipat-Bharari-2 Tie Bay-14 7/Jul/17 9:00 9/Jul/17 18:00 Continuous For Annual maint works NTPC NTPC
For confirmation of tan delta of B-ph bushing of 400KV Katni line L/R as per recommended
199 400 400KV Damoh-Katni line#1 7/Jul/17 9:00 7/Jul/17 18:00 Daily MPPTCL WR-II R
by RHQ, Vadodara. Matter is to be taken up with MPPTCL
200 400 ITARSI-4 MAIN BAY(412) at Jabalpur 7/Jul/17 9:00 7/Jul/17 17:00 Daily AMP WORK POWERGRID WR-II R
201 400 Pirana Vadodara-2 line 7/Jul/17 8:00 7/Jul/17 18:00 Daily AMP of terminal equipment POWERGRID WR-II R
202 400 Kala Magarwada 7/Jul/17 9:00 7/Jul/17 18:00 Daily AMP work POWERGRID WR-II R
203 400 Vindhyachal -Jabalpur Ckt.2 7/Jul/17 8:00 8/Jul/17 18:00 Daily AMP of line and bay terminal equipment and providing insulatrion in TP tower jumpers POWERGRID WR-II R
For 400KV Bus Conductor replacement at Padghe S/stn . HVDC Flow will be restricted
204 400KV Padgha -BBLR Ckt 1&2 on 400KV Bus 1 at Padgha S/stn. 7/Jul/17 8:00 9/Jul/17 18:00 Continuous MSETCL MSETCL
upto 1000MW
For 400KV Bus Conductor replacement at Padghe S/stn . HVDC Flow will be restricted
205 400KV HVDC Tie 1 & Tie 2 lines on 400KV Bus 1 at Padgha S/stn. 7/Jul/17 8:00 9/Jul/17 18:00 Continuous MSETCL MSETCL
upto 1000MW
400 KV Chorania line No. 1 LINE + MAIN +
206 400 7/Jul/17 9:00 7/Jul/17 18:00 Daily Half Yearly maintenance & testing activity
TIE BAY + Line Reactor at Kosamba end
207 400 500MVA, 400/220KV ICT No. 4 Asoj 7/Jul/17 8:00 7/Jul/17 18:00 Daily Condition monitoring
208 400 400 KV Chorania - Hadala 7/Jul/17 8:00 7/Jul/17 18:00 Daily Breaker DCRM testing done
Jhabua Power
209 400 400 KV Jhabua line # 02; Bay 409Main & tie Bay 408 7/Jul/17 9:00 7/Jul/17 18:00 daily Preventive maintenace of Line #02 & tightness checking of Bay 409 Jhabua Power
Switchyard
210 400KV Babhaleshwar-Padghe-Ckt-2 @BBLR 7/Jul/17 9:00 7/Jul/17 17:00 Daily Routine Maintenance & Servicing and allignment of PG isolators work MSETCL MSETCL
Load will be
211 400/220k 315MVA , ICT 3 Bay @ Lonikand 7/Jul/17 9:00 7/Jul/17 17:00 Daily Routine Maintenance work MSETCL MSETCL managed by other
V 400 kV ICT's.
212 400KV Station - 4A at 400kV Deepnagar 7/Jul/17 8:00 7/Jul/17 17:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL
213 400KV Babhaleshwar-Aurangabad @BBLR 7/Jul/17 9:00 7/Jul/17 17:00 Daily Routine Maintenance & Servicing and allignment of PG isolators work MSETCL MSETCL
400/220/3 1) For Measurement of Tan delta & capacitance of Bushings and Windings. 2) Routine
214 315 MVA, NGEF make ICT-I @400KV S/S Chandrapur 7/Jul/17 8:00 7/Jul/17 18:00 Daily MSETCL MSETCL
3KV, maintenance of the bay.
400 kV Main Bay 413 ( Main bay of Nandgaon Line) at 400
215 400KV 7/Jul/17 9:00 7/Jul/17 17:00 Daily Routine Maintenance & testing work MSETCL MSETCL
kV Akola SS
216 400kV 80MVAr Bus Reactor @ Talandage 7/Jul/17 9:00 7/Jul/17 18:00 Daily Qurterly Maint.Work MSETCL PGCIL
217 400 400KV S/S BHOPAL - 315MVA XMER - 1 7/Jul/17 9:00 7/Jul/17 17:00 daily MAINTENANCE WORK MPPTCL MPPTCL R
218 400 400KV SEONI-SARNI 7/Jul/17 9:00 7/Jul/17 18:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
219 220 220 KV MAHEGAON-AOURIYA 7/Jul/17 9:00 7/Jul/17 17:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
For attending hot spot at Bus-4 gantry above Transfer Bus Coupler (TBC)-2 and Tie
KORBA Bus-4 S/D with TBC-2 SD followed by Tie
220 400 7/Jul/17 8:30 7/Jul/17 17:30 Continuous Transformer-02, Buscoupler-2 (between bus-3 & 4 which shall be in SD due to outage of NTPC NTPC
Transformer-02 in TBC-2 after TBC-2 bay normalization
bus-4). All other loads of bus-4 shall be shifted to bus-3.
221 765 Seoni#2_708_Tie Bay at Bilaspur PS 7/Jul/17 9:00 7/Jul/17 18:00 Daily AMP works (CB Timings and CT tan delta meas.) WRTS-I WRTS-I R
For attending DC earth fault in reactor Buchholz relay and AMP of line terminal equipment
222 400 400kV WARDHA-PARLI- II 7/Jul/17 9:00 7/Jul/17 18:00 Daily WRTS-I WRTS-I R
at Parli.
223 765 765/400KV ICT-1 at Champa PS 7/Jul/17 9:00 7/Jul/17 17:30 Daily Providing insulation sleev to ICT tertiary connected jumpers WRTS-I WRTS-I C
765KV BUS REACTOR #01 MAIN BAY(707) AT
224 765 7/Jul/17 9:00 7/Jul/17 18:00 Daily AMP WORKS OF BAY WRTS-I WRTS-I R
DHARAMJAYGARH(KORBA) SS
225 400 400kV WARDHA- II Main Bay (404) at Parli 7/Jul/17 9:00 7/Jul/17 18:00 Daily For AMP works at Parli WRTS-I WRTS-I R
403 Bay (Main bay of 400KV Talegaon Kharghar Line) at
226 400 7/Jul/17 9:00 7/Jul/17 18:00 Daily For AMP works WRTS-I WRTS-I R
Talegaon
227 400 TRN Line 2 (406) Main Bay at Tamnar PS 7/Jul/17 10:00 7/Jul/17 18:00 Daily For AMP Works of TRN line 2 (406) Main Bay WRTS-I WRTS-I R
228 765 765 KV Wardha - Nbad #2 Main bay 704 at wardha 7/Jul/17 9:00 7/Jul/17 18:00 Daily AMP works related to Bay WRTS-I WRTS-I R
229 400 ICT1_400/220kv_SEONI 7/Jul/17 8:00 7/Jul/17 18:00 Daily For AMP testing work WRTS-I WRTS-I R
Replacement of Conventional Insulators with Polymer insulators in major crossings line
230 400 400 KV Wardha Akola Line 1 7/Jul/17 9:00 7/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
Powerline crossing works of 400kV D/C LILO of both ckts of Wardha - Parli TL (LOOP
231 400 Wardha - Warora (Quad) Line 7/Jul/17 9:00 7/Jul/17 18:00 Continuous OUT) between tower location Nos15/0 & 16/0 (400kV Wardh - Warora line tower nos. MSETCL WRTS-I C
109&110)
Powerline crossing works of 400kV D/C LILO of both ckts of Wardha - Parli TL (LOOP IN)
232 400 IEPL - Warora (Quad) Line 7/Jul/17 9:00 7/Jul/17 18:00 Continuous MSETCL WRTS-I C
between tower location Nos10/0 & 11/0 (400kV Wardh - Warora line tower nos. 112&113)
Powerline crossing works of 400kV D/C LILO of both ckts of Wardha - Parli TL (LOOP
233 400 IEPL - Warora (Quad) Line 7/Jul/17 9:00 7/Jul/17 18:00 Continuous OUT) between tower location Nos15/0 & 16/0 (400kV Wardh - Warora line tower nos. MSETCL WRTS-I C
109&110)
234 765 765 KV BUS II at Satna SS 8/Jul/17 9:00 8/Jul/17 18:00 Daily For shortening the Jumper POWERGRID WR-II C
235 400 INDORE-INDORE CKT1 8/Jul/17 10:00 8/Jul/17 18:00 Daily For checking auto reclosing scheme in TBC bay at MPPTCL, Indore POWERGRID WR-II C
236 400 400KV Damoh-Bhopal line#1 8/Jul/17 9:00 8/Jul/17 18:00 Daily AMP Work POWERGRID WR-II R
237 765 Tie Bay of Vadodar Indore line (bay 705) at Vadodara GIS 8/Jul/17 10:00 8/Jul/17 17:00 Daily for CB AMP POWERGRID WR-II C
400/220k
238 501MVA, ICT 3 @ BBLR 8/Jul/17 9:00 8/Jul/17 17:00 Daily Routine Maintenance & Servicing and allignment of PG isolators work MSETCL MSETCL
V
239 400 400KV BIRSINGHPUR-KATNI - II 8/Jul/17 8:00 8/Jul/17 18:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
240 765 765kV WARDHA - AURANGABAD(PG) I 8/Jul/17 8:00 8/Jul/17 18:00 Daily For AMP works of line & S/S WRTS-I WRTS-I R
241 765 765kV Wardha-1 Tie Bay 714 at Aurangabad 8/Jul/17 9:00 8/Jul/17 18:00 Daily For construction of new Solapur-1 main bay 713 WRTS-I WRTS-I C
765KV BUS REACTOR #01 TIE BAY(708) AT
242 765 8/Jul/17 9:00 8/Jul/17 18:00 Daily AMP WORKS OF BAY WRTS-I WRTS-I R
DHARAMJAYGARH(KORBA) SS
243 400 400kv Tie bay (411) of GIS # 4 & ict # 2 at Talegaon 8/Jul/17 9:00 8/Jul/17 18:00 Daily For AMP works WRTS-I WRTS-I R
Replacement of Conventional Insulators with Polymer insulators in major crossings line
244 400 400 KV Wardha Akola Line 2 8/Jul/17 9:00 8/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
245 400 BUS-2 at Navsari 9/Jul/17 9:00 9/Jul/17 20:00 Daily Trip logic implimenation for kapp bays for LOW gas pressure in compartments POWERGRID WR-II R
246 400 400 KV Bus 1 Jetpur 9/Jul/17 8:00 9/Jul/17 18:00 Daily For Bus routine maint work Gujarat Gujarat
247 400 Mundra Bhachau Line-1 9/Jul/17 8:00 10/Jul/17 20:00 Daily Protection testing and trials PGCIL CGPL
248 765 765 KV Satna-Gwalior 1 Line 9/Jul/17 9:00 9/Jul/17 18:00 Daily For Attending line Isolator problem POWERGRID WR-II C
249 400 INDORE-INDORE CKT2 9/Jul/17 10:00 9/Jul/17 18:00 Daily For checking auto reclosing scheme in TBC bay at MPPTCL, Indore POWERGRID WR-II C
Power line crossing of 765 KV S/C Sasan - Vindhyachal Pooling Station at Tower No. 16 &
250 765 kV 765 KV S/C Sasan - Vindhyachal Pooling Station 9/Jul/17 8:00 9/Jul/17 19:00 Daily PGCIL CWRTL
17 by 765 kV S/C Sasan - UMPP - Vindhychal pool line at Loc. No. AP 11/0 - AP 12/0
251 400 J P NIGRIE-SATNA-2 9/Jul/17 9:00 9/Jul/17 17:00 Daily Fixing of missing Arcing Horns,Twin Spacers & Rigid Spacers JP NIGRIE JP NIGRIE
252 400KV ICT III @ Kalwa 500 MVA 9/Jul/17 9:00 9/Jul/17 18:00 Daily Routine Maintenance & testing work MSETCL MSETCL
Replacement of Conventional Insulators with Polymer insulators in major crossings line
253 400 400 KV Wardha Akola Line 1 9/Jul/17 9:00 9/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
254 765 Bus-II at Vindhyachal PS 10/Jul/17 7:00 10/Jul/17 18:00 Daily FOR ICT-3 Commissioning work POWER GRID WR-II C
For Rectification/placement of Conductor, Spacers and Tightening of Jumper, VD and
255 400 400Kv PARLI-PUNE(GIS)_1 10/Jul/17 8:00 10/Jul/17 18:00 Daily Corona ring,etc. (400Kv AURANGABAD(MSETCL)-PUNE(GIS) II, Outage also required on WRTS-I WRTS-I R
the same day in view of M/c Towers).
For Rectification/placement of Conductor, Spacers and Tightening of Jumper, VD and
256 400 400Kv AURANGABAD(MSETCL)-PUNE(GIS) II 10/Jul/17 8:00 10/Jul/17 18:00 Daily Corona ring,etc. (400Kv PARLI-PUNE(GIS)_1, Outage also required on the same day in WRTS-I WRTS-I R
view of M/c Towers).
257 765 707,Satna-1 main bay at Bina 10/Jul/17 9:30 10/Jul/17 18:00 Daily For AMP works DCRM & Timing POWERGRID WR-II R
258 400 VINDHYACHAL -4 TIE BAY(408) at Jabalpur 10/Jul/17 9:00 10/Jul/17 17:00 Daily AMP WORK POWERGRID WR-II R
259 400 315MVA ICT-I at Shujalpur 10/Jul/17 10:00 11/Jul/17 18:00 Continuous Replacement and testing of 2 Nos. Relays & AMP works POWERGRID WR-II C
260 220 220KV Vapi-Vapi 10/Jul/17 9:00 10/Jul/17 16:00 Daily Main-1 relay replacement work POWERGRID WR-II C
261 765 INDORE-BINA LINE 10/Jul/17 10:00 10/Jul/17 18:00 Daily CHECKING OF NGR BYPASS SCHEME POWERGRID WR-II C
262 765 702-Bay at Vindhyachal PS 10/Jul/17 9:00 10/Jul/17 18:00 Daily FOR AMP WORK POWER GRID WR-II R
263 765 704 Bay (Jaipur#1 Main bay) at Gwalior 10/Jul/17 10:00 11/Jul/17 18:00 Daily AMP WORKS POWERGRID WR-II R
264 400 Boisar Magarwadd 10/Jul/17 9:00 10/Jul/17 18:00 Daily AMP work POWERGRID WR-II R
265 400 Jaypee - Bina MPPTCL 10/Jul/17 6:00 10/Jul/17 17:00 Daily Outage required to attend low clearnace problem due heavy induction during execution. JAYPEE WR-II R
For attending electircal clearance problem in crossing span of 400kV Jaypee-Bina & 765kV
266 765 Bina - Indore 10/Jul/17 6:00 11/Jul/17 17:00 Daily POWERGRID WR-II R
Bina-Indore lines.
267 400 400kV Main Bus-I at CGPL 10/Jul/17 9:00 11/Jul/17 18:00 Daily Main Bus-1 isolator maintenance CGPL CGPL
Load manage on
268 400 KV NEW KOYANA-II @ KARAD 10/Jul/17 10:00 10/Jul/17 17:00 Daily Quarterly. Maint. work MSETCL MSETCL 400 kV NEW
KOYANA 1
269 400KV 400KV Dhule-SSNNL Ckt-I & II 10/Jul/17 9:00 11/Jul/17 17:00 Daily PID testing MSETCL MSETCL
270 400 kV Waluj - Bhusawal @ Waluj 10/Jul/17 10:00 10/Jul/17 17:00 Daily Annual Maintenance MSETCL MSETCL
271 220kV 220kV PGCIL Deoli - Badnera at 220kV Badnera 10/Jul/17 9:00 10/Jul/17 17:00 Daily Quarterly routine maintenance of bay equipments. MSETCL MSETCL
272 400KV (3*105) MVA ICT-II & It's Bay @400KV S/S Chandrapur 10/Jul/17 8:00 18/Jul/17 18:00 Continuous Replacement of B- ph ICT-II By repaired 105 MVA Spare ICT. MSETCL MSETCL
273 400 kV 400 kV Akola- Nandgaonpeth Line 10/Jul/17 12:00 12/Jul/17 18:00 Daily PID testing of insulator strings by Hot line Uint Akola. A/R shall be kept in non auto mode. MSETCL MSETCL
Main Bay 414 ( Main Bay of Yelwan CKt-I) at 400 kV Akola
274 400KV 10/Jul/17 9:00 10/Jul/17 17:00 Daily Routine Maintenance & testing work MSETCL MSETCL
SS
275 400 400 KV S/S NAGDA 315MVA ICT-III 400/220/33 KV 10/Jul/17 8:00 12/Jul/17 18:00 cont. FOR MAINTENANCE AND REPLACEMENT OF DISC INSULATORS MPPTCL MPPTCL R
276 400 400KV S/S BHOPAL - 315MVA XMER - 3 Main CB 10/Jul/17 9:00 15/Jul/17 17:00 cont. FOR CB REPLACEMENT WORK MPPTCL MPPTCL R
277 400 400 KV S/S NAGDA 400 KV MAIN BUS-I 10/Jul/17 8:00 12/Jul/17 18:00 cont. FOR MAINTENANCE AND REPLACEMENT OF DISC INSULATORS MPPTCL MPPTCL R
278 400 KV 400KV Sipat-Raipur-3 LINE 10/Jul/17 9:00 12/Jul/17 18:00 Continuous For Annual maint works NTPC NTPC
279 765 765kV WARDHA - AURANGABAD(PG) II 10/Jul/17 8:00 10/Jul/17 18:00 Daily For AMP works of line & S/S WRTS-I WRTS-I R
280 765 765kV Wardha-2 Tie Bay 711 at Aurangabad 10/Jul/17 9:00 10/Jul/17 18:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R
Replacement of Conventional Insulators with Polymer insulators in major crossings line
281 400 400 kV Dhariwal TPP- Parli # 02. 10/Jul/17 8:00 10/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
282 765 Sipat#1_709_Main Bay at Bilaspur PS 10/Jul/17 9:00 10/Jul/17 18:00 Daily AMP works (CB Timings and CT tan delta measurement) WRTS-I WRTS-I R
283 400 MAIN BUS 1_KOTRA PS 10/Jul/17 9:00 10/Jul/17 18:00 Daily AMP 2017 - 2018 WRTS-I WRTS-I R
284 400 400kV main bay (416)of Kalwa at Talegaon 10/Jul/17 9:00 10/Jul/17 18:00 Daily For AMP works WRTS-I WRTS-I R
285 400 400kV RAIPUR-DURG I 10/Jul/17 9:30 10/Jul/17 17:30 Daily Relay testing and AMP work at Raipur WRTS-I WRTS-I R
286 220 SOLAPUR_220KV BUS#2 10/Jul/17 8:00 10/Jul/17 18:00 DAILY AMP WORKS WRTS-1 WRTS-1 R
287 400 TRN Line 2 (405) Tie Bay at Tamnar PS 10/Jul/17 10:00 10/Jul/17 18:00 Daily For AMP Works of TRN line 2 (405) Tie Bay WRTS-I WRTS-I R
Replacement of Conventional Insulators with Polymer insulators in major crossings line
288 400 400 KV Wardha Akola Line 2 10/Jul/17 9:00 10/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
289 400 400kV BHATAPARA-KORBA 10/Jul/17 9:00 10/Jul/17 18:00 Daily Rectification of open spacer cum damper, Installation of Arcing horn, WRTS-I WRTS-I R
290 765 765/400KV ICT-5 at Champa PS 10/Jul/17 9:00 11/Jul/17 17:30 Daily AMP/Warranty Tests WRTS-I WRTS-I R
291 765 D/C Champa -Durg 10/Jul/17 7:00 12/Jul/17 19:00 Daily Non Auto Mode of T/L for Tower top patrolling WRTS-I WRTS-I L
292 765 765 KV Wardha-Aur'bad # 2 Main Bay at wardha 10/Jul/17 9:00 15/Jul/17 18:00 Daily All 6 poles CB Mechanism Boxes Replacement Work WRTS-I WRTS-I R
293 400 400KV Mundra Bhachau 1 Line 10/Jul/17 8:00 10/Jul/17 18:00 Daily RTV coating of Line Main bay & Tie Bay isolators, CB & CT. POWERGRID WR-II C
FOR SCHEDULE MAINTENANCE/juMPER TIGHTENING/SPACER/DAMPER
294 400 EMCO-BHADRAWATI-II 10/Jul/17 9:00 15/Jul/17 18:00 DAILY EMCO EMCO
INSTALLATION
295 400 BUS-1 at Navsari 11/Jul/17 9:00 11/Jul/17 18:00 Daily Trip logic implimenation for kapp bays for LOW gas pressure in compartments POWERGRID WR-II R
Power line crossing of 400 KV D/C Sasan- Vindhychal Pooling Station line at Tower No.20
296 400 KV 400 KV D/C Sasan- Vindhychal Pooling Station 11/Jul/17 8:00 11/Jul/17 19:00 Daily PGCIL CWRTL
& 21 by 765 kV S/C Sasan - UMPP - Vindhychal pool line at Loc. No. AP 10/0- AP 11/0
297 400 400KV Mundra Bhachau 2 Line 11/Jul/17 8:00 11/Jul/17 18:00 Daily RTV coating of Line Main bay & Tie Bay isolators, CB & CT. POWERGRID WR-II C
765KV Satna-Gwalior Line#2 Main Bay (715 Bay) at Satna
298 765 11/Jul/17 9:00 12/Jul/17 18:00 Daily For AMP work POWERGRID WR-II R
SS
299 765 711,Bus reactor & Gwalior-1 tie bay at Bina 11/Jul/17 9:30 11/Jul/17 18:00 Daily For AMP works DCRM & Timing POWERGRID WR-II R
300 400 63 MVAR BUS REACTOR MAIN BAY (409) at Jabalpur 11/Jul/17 9:00 11/Jul/17 17:00 Daily AMP WORK POWERGRID WR-II R
301 400 Khandwa -Rajgarh -Ckt.1 11/Jul/17 9:00 11/Jul/17 18:00 Daily Line Terminal Equipment maintenance work.AMP POWERGRID WR-II R
302 220 Navsari- Navsari GETCO 2 11/Jul/17 9:00 11/Jul/17 18:00 Daily AMP work and DCRM testing POWERGRID WR-II R
303 400 Asoj-Indore Ckt#1 at Asoj (GETCO) end 11/Jul/17 10:00 10/Jul/17 17:00 Daily PLCC Panel ETL41 Retrofitting POWERGRID WR-II C
304 220 220KV Vapi-Bhilad-1 11/Jul/17 9:00 11/Jul/17 16:00 Daily Main-1 relay replacement work POWERGRID WR-II C
305 765 INDORE-BHOPAL LINE 11/Jul/17 10:00 11/Jul/17 18:00 Daily CHECKING OF NGR BYPASS SCHEME STERLITE WR-II C
306 220 220 kv Bus -1 at Pirana 11/Jul/17 8:00 11/Jul/17 18:00 Daily AMP work POWERGRID WR-II R
307 400 Jaypee - Bina (PGCIL) 11/Jul/17 6:00 11/Jul/17 17:00 Daily Outage required to attend low clearnace problem due heavy induction during execution. JAYPEE WR-II R
400 KV Chorania-2 Line+Main+Tie Bay+Line Reactor at
308 400 11/Jul/17 8:00 11/Jul/17 18:00 Daily Half Yearly maintenance & testing activity
Kosamba end
309 400 400 KV Bus - 2 Chorania 11/Jul/17 8:00 11/Jul/17 18:00 Daily CVT Tan Delta Testing work
PGCIL ckt (Bay420) Tie bay 421 & 400 KVFuture ckt II
310 400KV 11/Jul/17 8:00 11/Jul/17 17:00 Daily Rotuine bay maintanince work at 400 KV S/stn. Warora. MSETCL MSETCL
(bay422) at Warora
311 400KV Talandge - Karad 2 @ Talandge 11/Jul/17 9:00 11/Jul/17 18:00 Daily Qurterly Maint.Work MSETCL MSETCL
312 400 400KV ISP-NAGDA 11/Jul/17 9:00 11/Jul/17 18:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
313 220 220 KV GWALIOR(PGCIL)-MALANPUR - I 11/Jul/17 9:00 11/Jul/17 17:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
HOTSPOT ATTEND AND BAY MAINTENANCE(Bus shutdown required for attending the
314 400KV VINDHYACHAL-SATNA#1 LINE ALONGWITH BUS-4 11/Jul/17 9:00 12/Jul/17 18:00 Continuous NTPC NTPC
Hot spot)
315 400KV VINDHYACHAL-SATNA#1 LINE REACTOR 11/Jul/17 9:00 13/Jul/17 18:00 Continuous REACTOR MAINTENANCE NTPC NTPC
for Overhead Stringing of U/C 765KV D/C Raipur- Sundargarh Transmission line(of
316 400 400KV S/C Korba- Bhilai-I 11/Jul/17 7:00 12/Jul/17 17:00 Daily PGCIL OGPTL C
OGPTL) at OGPTL Location numbers AP 22/0- AP23/0(PGCIL tower Nos: 406-407)
Replacement of Conventional Insulators with Polymer insulators in major crossings line
317 400 400 kV Bhadrawati - Parli # 01. 11/Jul/17 8:00 11/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
318 400 MAIN BUS 1_KOTRA PS 11/Jul/17 9:00 11/Jul/17 18:00 Daily AMP 2017 - 2018 WRTS-I WRTS-I R
319 400 400kv Tie bay (417)of Kalwa & ict # 3 at Talegaon 11/Jul/17 9:00 11/Jul/17 18:00 Daily For AMP works WRTS-I WRTS-I R
320 765 765kV PUNE(GIS)-SOLAPUR 11/Jul/17 8:00 11/Jul/17 18:00 Daily For attending Tightening of Jumper, VD, Corona, etc. WRTS-I WRTS-I R
321 765 Main bay of Bus reactor #2 712 at wardha 11/Jul/17 9:00 11/Jul/17 18:00 Continuous AMP works related to Bay WRTS-I WRTS-I R
Replacement of Conventional Insulators with Polymer insulators in major crossings line
322 400 400 KV Wardha Akola Line 1 11/Jul/17 9:00 11/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
323 765 765kV D'JAIGARH-BILASPUR 11/Jul/17 9:00 11/Jul/17 18:00 Daily For attending open spacer cum damper, Arcing horn, bird nest etc. WRTS-I WRTS-I R
324 400 HVDC Pole-2 at BVT 11/Jul/17 9:00 12/Jul/17 18:00 Daily Six monthly AMP WRTS-I WRTS-I R
325 400 Bus-Sectionalizer BS-2 at JPL Stage-1 11/Jul/17 9:00 11/Jul/17 18:00 Daily Annual Bay Maintenance JPL JPL
326 400 Mundra Bhachau Line-2 11/Jul/17 9:00 12/Jul/17 18:00 Daily Protection testing and trials PGCIL CGPL
327 765 712,Gwalior-1 main bay at Bina 12/Jul/17 9:30 12/Jul/17 18:00 Daily For AMP works DCRM & Timing POWERGRID WR-II R
328 400 VINDHYACHAL -2 TIE BAY(405) at Jabalpur 12/Jul/17 9:00 12/Jul/17 17:00 Daily AMP WORK POWERGRID WR-II R
329 400 Khandwa -Rajgarh -Ckt.2 12/Jul/17 9:00 12/Jul/17 18:00 Daily Line Terminal Equipment maintenance work.AMP POWERGRID WR-II R
330 220 Navsari- Navsari GETCO 1 12/Jul/17 9:00 12/Jul/17 18:00 Daily AMP work POWERGRID WR-II R
331 400 315MVA ICT-II at Shujalpur 12/Jul/17 10:00 13/Jul/17 18:00 Continuous Replacement and testing of 2 Nos. Relays & AMP works POWERGRID WR-II C
332 220 220KV Vapi-Bhilad-2 12/Jul/17 9:00 12/Jul/17 16:00 Daily Main-1 relay replacement work POWERGRID WR-II C
333 765 INDORE - VADODARA LINE 12/Jul/17 10:00 12/Jul/17 18:00 Daily CHECKING OF NGR BYPASS SCHEME POWERGRID WR-II C
334 765 703 bay at Vindhyachal PS 12/Jul/17 9:00 12/Jul/17 18:00 Daily FOR AMP WORK POWER GRID WR-II R
335 400 400kV Main Bus-II at CGPL 12/Jul/17 9:00 13/Jul/17 18:00 Daily Main Bus-2 isolator maintenance CGPL CGPL
400 KV Chorania-2 Line+Main+Tie Bay+Line Reactor at
336 400 12/Jul/17 8:00 12/Jul/17 18:00 Daily Half Yearly maintenance & testing activity
Kosamba end
Jhabua Power
337 400 400 KV GT main & tie bay 401 & 402 at Jhabua 12/Jul/17 9:00 12/Jul/17 18:00 daily Preventive Maintenance of Generator transformer Jhabua Power
Switchyard
338 400 kV Thaptitanda - Ektuni -I @ Taptitanda 12/Jul/17 10:00 12/Jul/17 17:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL
339 400kV Parli-Solapur @ Parli 12/Jul/17 9:00 12/Jul/17 17:00 Daily Dignostic Testing Work (C & Tan Delta measurement of CTs) MSETCL MSETCL
340 400/220/2 3*100MVA, ICT-1 @KORADI-1 12/Jul/17 9:00 12/Jul/17 17:00 Daily Diagnostic testing & maintenance work MSETCL MSETCL
0KV
Diagnostic Testing & Replacement of broken / damaged disc insulatorsFitting & tighting of
341 400KV Chandrapur 2 - Warora Ckt-1 12/Jul/17 8:00 12/Jul/17 18:00 Daily MSETCL MSETCL
jumper cone bolts, conductor and earthwire hardware.
STATION T/F 8A (Main Bay 410 & TIE Bay 411) at 400 KV
342 400KV 12/Jul/17 9:00 12/Jul/17 18:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL element not clear
Switching Substation
343 220 220 KV GWALIOR(PGCIL)-MALANPUR - II 12/Jul/17 9:00 12/Jul/17 17:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
344 220 220KV DAMOH-TIKAMGARH (PGCIL) - I 12/Jul/17 8:00 12/Jul/17 18:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
345 765/400 765kV ICT-1 at Aurangabad 12/Jul/17 8:00 12/Jul/17 18:00 Daily for RTV coating on Trench Bushings WRTS-I WRTS-I C
Replacement of Conventional Insulators with Polymer insulators in major crossings line
346 400 400 kV Dhariwal TPP- Parli # 02. 12/Jul/17 8:00 12/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
347 765 ICT#2_721_Main Bay at Bilaspur PS 12/Jul/17 9:00 12/Jul/17 18:00 Daily AMP works (CB Timings and CT tan delta measurement.) WRTS-I WRTS-I R
348 400 MAIN BUS 2_KOTRA PS 12/Jul/17 9:00 12/Jul/17 18:00 Daily AMP 2017 - 2018 WRTS-I WRTS-I R
349 220 220kV Main bay (208) of Urse-2 at Talegaon. 12/Jul/17 9:00 12/Jul/17 18:00 Daily For AMP works WRTS-I WRTS-I R
350 765 SOLAPUR_765KV BUS#2 12/Jul/17 8:00 12/Jul/17 18:00 DAILY AMP WORKS WRTS-1 WRTS-1 R
351 400 765/400 kV ICT #1 Main bay 404 at wardha 12/Jul/17 9:00 12/Jul/17 18:00 Daily AMP works related to Bay WRTS-I WRTS-I R
Replacement of Conventional Insulators with Polymer insulators in major crossings line
352 400 400 KV Wardha Akola Line 2 12/Jul/17 9:00 12/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
353 765 765 kV Wardha# 3 L/R at Durg PS 12/Jul/17 8:00 13/Jul/17 18:00 Daily NGR Bypassing WRTS-I WRTS-I C
354 400 400kV Ranchi-Sipat I 12/Jul/17 8:00 12/Jul/17 17:00 Daily replacement of insulator,VD,CC etc. ERPC ERPC
355 400 400Kv Sundargarh-Raigarh -II 12/Jul/17 8:00 12/Jul/17 18:00 ODB For Tree/Bamboos cutting in the span of 426-427 by providing local administration / police ERPC ERPC
Online permit for installation of Bird divertors on earthwire as per the directions of Bird
356 400 Bachau - Ranchodpura Ckt.1 13/Jul/17 8:00 13/Jul/17 20:00 Daily POWERGRID WR-II R
Sanctuary authorities. A/R of Ckt-1to be kept in non auto mode during outage period
357 765 765kV Sasan - Vchal line 13/Jul/17 9:00 13/Jul/17 18:00 Daily For replacement of defective LA at Vchal POWER GRID WR-II C
358 400 400 KV S/S NAGDA 400KV INDORE LINE MAIN CB 13/Jul/17 9:00 27/Jul/17 18:00 cont. FOR REPLACEMENT OF MAIN CB & MAIN CT MPPTCL MPPTCL R
359 765 765kV Gwalior-Bina#3 Line 13/Jul/17 10:00 13/Jul/17 16:00 Daily AMP work of Line reactor POWERGRID WR-II R
360 400 Bus 2 at Raipur SS 13/Jul/17 9:30 13/Jul/17 17:30 Daily Relay testing and AMP work at Raipur WRTS-I WRTS-I R
361 765 715,Gwalior-2 main bay at Bina 13/Jul/17 9:30 13/Jul/17 18:00 Daily For AMP works DCRM & Timing POWERGRID WR-II R
765KV Jabalpur-Bina#1 switchable Reactor along with
362 765 13/Jul/17 10:00 13/Jul/17 18:00 Daily Erection of Circuit Breaker & BPI for implementation of NGR Bypass Scheme POWERGRID WR-II C
Reactor bay(815 Reactor Bay) at Jabalpur PS
363 400 Asoj-Indore Ckt#2 at Asoj (GETCO) end 13/Jul/17 10:00 13/Jul/17 17:00 Daily PLCC Panel ETL41 Retrofitting POWERGRID WR-II C
364 220 220KV Vapi-Bhilad-3 13/Jul/17 9:00 13/Jul/17 16:00 Daily Main-1 relay replacement work POWERGRID WR-II C
365 220 220kv Bus -2 at Pirana 13/Jul/17 8:00 13/Jul/17 18:00 Daily AMP work POWERGRID WR-II R
Power line crossing of 400 KV S/C Vindhyachal-Korba line Ckt-II at Tower No.51 & 52 by
366 400 kV 400 KV S/C Vindhyachal-Korba line Ckt-II 13/Jul/17 8:00 13/Jul/17 19:00 Daily PGCIL CWRTL
765 kV S/C Sasan - UMPP - Vindhychal pool line at Loc. No. AP3/0 - AP 4/0
367 400 kV A Bus and bus coupler @ chakan 13/Jul/17 9:00 13/Jul/17 18:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL
Load will be on 400
368 400KV Jejuri-Lonikand I @ Jejuri 13/Jul/17 9:00 13/Jul/17 17:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL KV Jejuri-Koyna ST
IV line
400/220K
369 315MVA ICT-2 @ Girwali 13/Jul/17 9:00 13/Jul/17 17:00 Daily Dignostic Testing Work MSETCL MSETCL
V
408-Bay & 409-Bay (Main Bay and Tie Bay of Chandrapur
370 400KV 13/Jul/17 11:00 13/Jul/17 14:00 Daily Quarterly Maintenance of bays equipment MSETCL MSETCL
Line-2) at Kumbhargaon
371 400KV 400 KV Parli- Lonikand-1 Line 13/Jul/17 10:00 13/Jul/17 17:00 Daily Routine Line Maintenance Maintenance by Lamboti Line S/dn. MSETCL MSETCL
372 400KV Babhaleshwar-Dhule-Ckt-1 @BBLR 13/Jul/17 9:00 13/Jul/17 17:00 Daily Routine Maintenance & Servicing and allignment of PG isolators work MSETCL MSETCL
373 400 400KV INDORE-NAGDA 13/Jul/17 7:00 13/Jul/17 18:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
374 220 220 KV BADOD-KOTA LINE 13/Jul/17 9:00 13/Jul/17 18:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
375 220 220KV PANDURAN-KALMESHWAR 13/Jul/17 9:00 13/Jul/17 18:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
376 400 KV 400KV Sipat-Raipur-3 TIE BAY-5 at Sipat 13/Jul/17 9:00 14/Jul/17 18:00 Continuous For Annual maint works NTPC NTPC
377 765/400 765kV ICT-2 at Aurangabad 13/Jul/17 8:00 13/Jul/17 18:00 Daily for RTV coating on Trench Bushings WRTS-I WRTS-I C
Replacement of Conventional Insulators with Polymer insulators in major crossings line
378 400 400 kV Bhadrawati - Parli # 01. 13/Jul/17 8:00 13/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
379 400 MAIN BUS 2_KOTRA PS 13/Jul/17 9:00 13/Jul/17 18:00 Daily AMP 2017 - 2018 WRTS-I WRTS-I R
380 765 ICT4_765/400kv_TAMNAR PS 13/Jul/17 10:00 13/Jul/17 18:00 Daily For commissioning of CSD of ICT4 through 400 kV Main and Tie Bays WRTS-I WRTS-I C
381 400 765/400 kV ICT #3 Main bay 410 at wardha 13/Jul/17 9:00 13/Jul/17 18:00 Daily AMP works related to Bay WRTS-I WRTS-I R
Replacement of Conventional Insulators with Polymer insulators in major crossings line
382 400 400 KV Wardha Akola Line 1 13/Jul/17 9:00 13/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
383 400 400kV KUDGI 2 MAIN BAY (404) AT KOLHAPUR 13/Jul/17 10:00 13/Jul/17 18:00 Daily For bay AMP works. WRTS-I WRTS-I R
384 765 765KV Champa-Kotra Main Bay (718) at Champa PS 13/Jul/17 9:00 14/Jul/17 17:30 Daily AMP/Warranty Tests WRTS-I WRTS-I R
385 400 Bhachau -Ranchodpura 1 Line 13/Jul/17 8:00 13/Jul/17 18:00 Daily RTV coating of Line Main bay & Tie Bay isolators, CB & CT. POWERGRID WR-II C
Online permit for installation of Bird divertors on earthwire as per the directions of Bird
386 400 Bachau - Ranchodpura Ckt.2 14/Jul/17 8:00 14/Jul/17 20:00 Daily POWERGRID WR-II R
Sanctuary authorities. A/R of Ckt-2 to be kept in non auto mode during outage period
387 765 765KV Vchal-Satna Line#1 Main Bay (713 Bay) at Satna SS 14/Jul/17 9:00 15/Jul/17 18:00 Daily For AMP work POWERGRID WR-II R
388 400kV NewKoyna-Dabhol -Ckt-1 14/Jul/17 8:00 14/Jul/17 18:00 Daily Routine Maintenance work & Relay testing Work MSETCL MSETCL
389 400 400KV BUS#1 AT INDORE 14/Jul/17 10:00 15/Jul/17 18:00 Daily FOR EQUIPMENT ERECTION WORK NEAR BUS POWERGRID WR-II C
765KV Jabalpur-Bina#2 switchable Reactor along with
390 765 14/Jul/17 10:00 14/Jul/17 18:00 Daily Erection of Circuit Breaker & BPI for implementation of NGR Bypass Scheme POWERGRID WR-II C
Reactor bay(818 Reactor Bay) at Jabalpur PS
391 765 765kV Bus Reactor at Gwalior 14/Jul/17 10:00 14/Jul/17 18:00 Daily AMP work POWERGRID WR-II R
392 765 765KV Vchal-Satna Line#1 Tie Bay (717 Bay) at Satna SS 14/Jul/17 9:00 15/Jul/17 18:00 Daily For AMP work POWERGRID WR-II R
Shifting of 220 Vapi- Magarwada D/C line between loc.no. 62-65 to facilitate clearance for
393 220 Vapi - Magarwada Ckt.1&2 14/Jul/17 6:00 19/Jul/17 15:00 Continuous POWERGRID WR-II C
DFCCI Railway line corrioder
394 400 400 KV Ukai-3 Main+Tie Bay Kosamba S/S 14/Jul/17 8:00 14/Jul/17 18:00 Daily Half Yearly maintenance & testing activity
395 400KV Station - 4B at 400kV Deepnagar 14/Jul/17 8:00 14/Jul/17 17:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL
396 220 Kv Chitegaon- Chitepimpalgaon Ckt II @Chitegaon 14/Jul/17 8:00 14/Jul/17 18:00 Daily Testing , Maintenance of Line Isolator MSETCL MSETCL
397 400 kV 315MVA , ICT I @ Waluj 14/Jul/17 8:00 14/Jul/17 17:00 Daily Annual Maintenance & Diagonostic Testing MSETCL MSETCL
398 400KV Babhaleshwar-Dhule-Ckt-2 @BBLR 14/Jul/17 9:00 14/Jul/17 17:00 Daily Routine Maintenance & Servicing and allignment of PG isolators work MSETCL MSETCL
During the proposed outage following works will be carried out :-
399 400 KV KORADI-KHAPERKHEDA I 14/Jul/17 8:00 14/Jul/17 17:00 Daily Line signature test, broken disc replacement work,tightning and fixing of jumper nutbolts & MSETCL MSETCL
hardwares on line and earthwire
Diagnostic Testing & Replacement of broken / damaged disc insulatorsFitting & tighting of
400 400KV Chandrapur 2 - Warora Ckt-2 14/Jul/17 8:00 14/Jul/17 18:00 Daily MSETCL MSETCL
jumper cone bolts, conductor and earthwire hardware.
400 kV Tie Bay 415 (Tie Bay of Yelwan CKt- I) at 400 kV
401 400KV 14/Jul/17 9:00 14/Jul/17 17:00 Daily Routine Maintenance & testing work MSETCL MSETCL
Akola SS
402 220 220 KV BADOD-MODAK LINE 14/Jul/17 9:00 14/Jul/17 18:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
403 765 765kV Padghe-1 switchable LR at Auranagabad 14/Jul/17 8:00 14/Jul/17 18:00 Daily for RTV coating on Trench Bushings WRTS-I WRTS-I C
404 400 400kV Raipur-2 Main Bay at BVT 14/Jul/17 9:00 14/Jul/17 18:00 Daily AMP WRTS-I WRTS-I C
Replacement of Conventional Insulators with Polymer insulators in major crossings line
405 400 400 kV Dhariwal TPP- Parli # 02. 14/Jul/17 8:00 14/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
406 765 ICT#1_724_Main Bay at Bilaspur PS 14/Jul/17 9:00 14/Jul/17 18:00 Daily AMP works (CB Timings and CT tan delta meas.) WRTS-I WRTS-I R
407 765 ICT1_765/400_D'JAIGARH 14/Jul/17 9:00 14/Jul/17 18:00 Daily RTCC checking from SAS WRTS-I WRTS-I C
408 400 Bus 3 at Raipur SS 14/Jul/17 9:30 14/Jul/17 17:30 Daily Relay testing and AMP work at Raipur WRTS-I WRTS-I R
Replacement of Conventional Insulators with Polymer insulators in major crossings line
409 400 400 KV Wardha Akola Line 2 14/Jul/17 9:00 14/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
410 765 765kV Aurangabad-Solapur-2 14/Jul/17 8:00 15/Jul/17 18:00 Continuous For swapping of 765kV Solapur line in solapur bays and pending construction points WRTS-I WRTS-I C
411 765 765 kV Wardha# 4 L/R at Durg PS 14/Jul/17 8:00 15/Jul/17 18:00 Daily NGR Bypassing WRTS-I WRTS-I C
412 400 Bhachau Ranchodpura 2 Line 14/Jul/17 8:00 14/Jul/17 18:00 Daily RTV coating of Line Main bay & Tie Bay isolators, CB & CT. POWERGRID WR-II C
For adjustment of rigid spacer in the span of 63-64 of 765KV Sundergarh-Dharamjaygarh-I
413 765 765KV Sundergarh-Dharamjaygarh-I 14/Jul/17 9:00 14/Jul/17 18:00 ODB ERPC ERPC
and jumper tightening
414 400 400 KV Bus 2 at wardha 15/Jul/17 9:00 16/Jul/17 18:00 Continuous Bus extension for Aurangabad bays WRTS-I WRTS-I C
765KV Jabalpur-Bina#3 switchable Reactor along with
415 765 15/Jul/17 10:00 15/Jul/17 18:00 Daily Erection of Circuit Breaker & BPI for implementation of NGR Bypass Scheme STERLITE WR-II C
Reactor bay(821 Reactor Bay) at Jabalpur PS
416 765 Main Bay of 765 kV ICT#2 (Bay 706) at Vadodara GIS 15/Jul/17 10:00 15/Jul/17 17:00 Daily for CB AMP POWERGRID WR-II C
417 400 BAY 415 (MAIN BAY FOR BR-II) at Indore 15/Jul/17 10:00 15/Jul/17 18:00 Daily BAY EQUIPMENT AMP POWERGRID WR-II C
418 400 400/220 KV 315 MVA ICT-1 at Vadavi 15/Jul/17 14:00 15/Jul/17 18:00 Daily Dismentaling of old busbar protection panel
419 400 400 KV S/S NAGDA 315MVA ICT-II 400/220/33 KV 15/Jul/17 8:00 15/Jul/17 17:00 daily FOR MAINTENANCE AND TESTING WORK MPPTCL MPPTCL R
420 765kV Solapur-2 Main Bay 710 at Aurangabad 15/Jul/17 9:00 15/Jul/17 18:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R
765KV BUS REACTOR #02 MAIN BAY(710) AT
421 765 15/Jul/17 9:00 15/Jul/17 18:00 Daily AMP WORKS OF BAY WRTS-I WRTS-I R
DHARAMJAYGARH(KORBA) SS
422 400 400KV Bhachau Versana 2 Line 15/Jul/17 8:00 15/Jul/17 18:00 Daily RTV coating of Line Main bay & Tie Bay isolators, CB. POWERGRID WR-II C
423 400 ACBIL-PGCIL (Bilaspur)-CKT# 1 15/Jul/17 7:00 22/Jul/17 18:00 Daily AMP ACBIL ACBIL
JP Nigri not to bid
424 400 J P NIGRIE-SATNA-1 15/Jul/17 8:00 22/Jul/17 18:00 Daily Fixing of additional Pilot String in DD type angle Towers JP NIGRIE JP NIGRIE
on PX
425 400 50MVAR Bina-II Line Reactor at Shujalpur 16/Jul/17 10:00 31/Jul/17 18:00 Continuous Construction of Reactor Switching Scheme By M/S Godrej Ltd. POWERGRID WR-II C
426 400 63MVAR Bus Reactor-I at Shujalpur 16/Jul/17 10:00 17/Jul/17 18:00 Continuous Replacement and testing of 2 Nos. Relays & AMP works POWERGRID WR-II C
427 765 765KV Vchal-Satna Line#2 Main Bay (716 Bay) at Satna SS 16/Jul/17 9:00 17/Jul/17 18:00 Daily For AMP work POWERGRID WR-II R
For converting Indore #2 Line Reactor to a Switchable Reactor under Western Region
Strengthening Scheme-17. Due to space constraints, all the existing terminal equipemnt
428 400 Itarsi-Indore #2 Line 16/Jul/17 9:00 16/Aug/17 17:00 Continouse POWERGRID WR-II C
shall be shifted towards bus side to faciliate space for new bay for switchable reactor at
Itarsi.
Bus will be
429 400kV Bus Coupler @ BBLR 16/Jul/17 9:00 16/Jul/17 17:00 Daily Routine Maintenance & Servicing and allignment of PG isolators work MSETCL MSETCL
seperated
430 400 400 KV S/S BINA 400 KV MAIN BUS-I 16/Jul/17 9:00 16/Jul/17 17:00 daily FOR MAINTENANCE AND TESTING WORK MPPTCL MPPTCL R
765KV Jabalpur-Bhopal switchable Reactor along with
431 765 16/Jul/17 10:00 16/Jul/17 18:00 Daily Erection of Circuit Breaker & BPI for implementation of NGR Bypass Scheme STERLITE WR-II C
Reactor bay(824 Reactor Bay) at Jabalpur PS
432 400 400/220 KV 315 MVA ICT-2 Vadavi 16/Jul/17 8:00 16/Jul/17 12:00 Daily Dismentaling of old busbar protection panel
433 400 400/220 KV 315 MVA ICT-3 Vadavi 16/Jul/17 14:00 16/Jul/17 18:00 Daily Dismentaling of old busbar protection panel
434 400 J P NIGRIE-SATNA-1 16/Jul/17 9:00 16/Jul/17 17:00 Daily Fixing of missing Arcing Horns,Twin Spacers & Rigid Spacers JP NIGRIE JP NIGRIE
Replacement of Conventional Insulators with Polymer insulators in major crossings line
435 400 400 KV Wardha Akola Line 2 16/Jul/17 9:00 16/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
436 400 400KV Bhachau-Versana 1 Line 16/Jul/17 8:00 16/Jul/17 18:00 Daily RTV coating of Line Main bay & Tie Bay isolators, CB. POWERGRID WR-II C
LILO of Mundra - Limbdi & Mundra Mansar lines at Bhachau SS. Outage required for
437 400 Mundra - Limbdi & Mundra - Mansar 17/Jul/17 8:00 23/Jul/17 18:00 Continuous dismantling of existing towers and erections new towers at LILO point for making line POWERGRID WR-II C
tapping.
438 400 Mundra Mansar Line 17/Jul/17 9:00 17/Jul/17 18:00 Daily Bay connection tightness PGCIL CGPL
Online permit for installation of Bird divertors on earthwire as per the directions of Bird
439 400 Mundra - Mansar 17/Jul/17 8:00 18/Jul/17 20:00 Daily POWERGRID WR-II R
Sanctuary authorities. A/R of Ckt-2 to be kept in non auto mode during outage period
Replacement of Conventional Insulators with Polymer insulators in major crossings line
440 400 400 KV Wardha Akola Line 1 17/Jul/17 9:00 17/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
441 765 718,Gwalior-3 main bay at Bina 17/Jul/17 9:30 17/Jul/17 18:00 Daily For AMP works DCRM & Timing POWERGRID WR-II R
765KV Jabalpur-DMJY#1 Line along with Reactor at Jabalpur
442 765 17/Jul/17 10:00 17/Jul/17 18:00 Daily Erection of Circuit Breaker & BPI for implementation of NGR Bypass Scheme POWERGRID WR-II C
PS
443 220 Kakrapar-Haldarwa 1 17/Jul/17 9:00 19/Jul/17 18:00 Continuous Circuit Breaker all three ploe overhauling Work AT haldarwa end POWERGRID WR-II R
444 400 400KV BUS#2 AT INDORE 17/Jul/17 10:00 18/Jul/17 18:00 Daily FOR EQUIPMENT ERECTION WORK NEAR BUS POWERGRID WR-II C
445 765 Bus-I at Vindhyachal PS 17/Jul/17 9:00 17/Jul/17 18:00 Daily FOR AMP WORK POWER GRID WR-II R
446 765 712 LRB (Bina#1 L/R Bay) at Gwalior 17/Jul/17 10:00 17/Jul/17 18:00 Daily AMP WORKS and NGR LA Replacement POWERGRID WR-II C
447 765 765KV Bus Reactor#2 Main Bay (718 Bay) at Satna SS 17/Jul/17 9:00 18/Jul/17 18:00 Daily For AMP work POWERGRID WR-II R
Providing 66KV HV Insulation on Gandhar - Kosamba & Gandhar- Navsari line between
448 400 Gandhar - Navsari Ckt.2 17/Jul/17 8:00 17/Jul/17 18:00 Daily loc.no. 92-93, to maintain electrical clearance at the crossing point of 220kV Gavasad - POWERGRID WR-II C
Mangrol GETCO line.
Providing 66KV HV Insulation on Gandhar - Kosamba & Gandhar- Navsari line between
Gujarat to consent
449 220 Gavasad - Mangrol D/C 17/Jul/17 8:00 18/Jul/17 18:00 Daily loc.no. 92-93, to maintain electrical clearance at the crossing point of 220kV Gavasad - POWERGRID WR-II
requried
Mangrol GETCO line. Outage required due to heavy induction during execution
450 400 400/220 KV 315 MVA ICT-4 Vadavi 17/Jul/17 8:00 17/Jul/17 12:00 Daily Dismentaling of old busbar protection panel
451 400 400 KV Dehgam - Vadavi line No. 1 17/Jul/17 12:00 17/Jul/17 18:00 Daily Dismentaling of old busbar protection panel
452 400KV 400KV Dhule-BBLR Ckt-I & II 17/Jul/17 9:00 18/Jul/17 17:00 Daily PID testing MSETCL MSETCL
80MVAR Reactor I
453 400kV 80MVAR Reactor 2 @ BBLR 17/Jul/17 9:00 17/Jul/17 17:00 Daily Routine Maintenance & Servicing and allignment of PG isolators work MSETCL MSETCL
will be in service
Diagnostic test, Replacement of broken / damaged disc insulators & tighting of conductor &
454 400KV Chandrapur - Parli Ckt-3 17/Jul/17 8:00 17/Jul/17 18:00 Daily MSETCL MSETCL
earthwire hardware
455 400 kV 400 kV Koradi- Bhusawal Line 17/Jul/17 12:00 19/Jul/17 18:00 Daily PID testing of insulator strings by Hot line Uint Akola. A/R shall be kept in non auto mode. MSETCL MSETCL
400 kV Main Bay 417 (Main Bay of Yelwan CKt- II) at 400
456 400KV 17/Jul/17 9:00 17/Jul/17 17:00 Daily Routine Maintenance & testing work MSETCL MSETCL
kV Akola SS
457 400KV Bus Coupler @ Talandge 17/Jul/17 9:00 17/Jul/17 18:00 Daily Qurterly Maint.Work MSETCL MSETCL
458 400 400 KV S/S BINA 400 KV MAIN BUS-II 17/Jul/17 9:00 17/Jul/17 17:00 daily FOR MAINTENANCE AND TESTING WORK MPPTCL MPPTCL R
HOTSPOT ATTEND AND BAY MAINTENANCE(Bus shutdown required for attending the
459 400KV VINDHYACHAL-SATNA#2 LINE ALONGWITH BUS-4 17/Jul/17 9:00 18/Jul/17 18:00 Continuous NTPC NTPC
Hot spot)
460 400KV VINDHYACHAL-SATNA#2 LINE REACTOR 17/Jul/17 9:00 19/Jul/17 18:00 Continuous REACTOR MAINTENANCE NTPC NTPC
461 400 KV 400KV Sipat-KORBA LINE 17/Jul/17 9:00 19/Jul/17 18:00 Continuous For Annual maint works NTPC NTPC
462 765 765kV Padghe-2 switchable LR at Aurangabad 17/Jul/17 9:00 17/Jul/17 18:00 Daily for RTV coating on Trench Bushings WRTS-I WRTS-I C
Replacement of Conventional Insulators with Polymer insulators in major crossings line
463 400 400 kV Dhariwal TPP- Parli # 02. 17/Jul/17 8:00 17/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
464 765 765/400 kV ICT#2 at Bilaspur PS 17/Jul/17 11:00 17/Jul/17 13:00 Daily Bushing DGA sampling WRTS-I WRTS-I R
465 765 765 kV Durg- Champa# 1 17/Jul/17 8:00 17/Jul/17 13:00 Daily for CSD commissioning WRTS-I WRTS-I C
765KV ICT #01 MAIN BAY(713) AT
466 765 17/Jul/17 9:00 17/Jul/17 18:00 Daily AMP WORKS OF BAY WRTS-I WRTS-I R
DHARAMJAYGARH(KORBA) SS
467 400 Tamnar 2 Tie Bay at Raipur SS 17/Jul/17 9:30 17/Jul/17 17:30 Daily AMP work at Raipur WRTS-I WRTS-I R
468 765 BILASPUR2-AT3_TIE_BAY_717 at seoni 17/Jul/17 8:00 17/Jul/17 18:00 Daily For AMP testing work WRTS-I WRTS-I R
469 400 Main Bay of Akola #2 416 at wardha 17/Jul/17 9:00 17/Jul/17 18:00 Daily AMP works related to Bay WRTS-I WRTS-I R
Replacement of Conventional Insulators with Polymer insulators in major crossings line
470 400 400 KV Wardha Akola Line 1 17/Jul/17 9:00 17/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
471 765 765KV Champa-Kotra Tie Bay (719) at Champa PS 17/Jul/17 9:00 18/Jul/17 17:30 Daily AMP/Warranty Tests WRTS-I WRTS-I R
ATC/TTC revision
472 765 765kV Aurangabad-Solapur-1 17/Jul/17 8:00 20/Jul/17 18:00 Continuous For swapping of 765kV Solapur line in solapur bays and pending construction points WRTS-I WRTS-I
in West-South
473 765 721,Jabalpur-3 main bay at Bina 18/Jul/17 9:30 18/Jul/17 18:00 Daily For AMP works DCRM & Timing POWERGRID WR-II R
765KV Jabalpur-DMJY#2 Line along with Reactor at Jabalpur
474 765 18/Jul/17 10:00 18/Jul/17 18:00 Daily Erection of Circuit Breaker & BPI for implementation of NGR Bypass Scheme POWERGRID WR-II C
PS
475 765 701LRB (Jaipur#2 L/R Bay) at Gwalior 18/Jul/17 10:00 18/Jul/17 17:00 Daily AMP work POWERGRID WR-II R
Providing 66KV HV Insulation on Gandhar - Kosamba & Gandhar- Navsari line between
476 400 Gandhar - Kosambha 18/Jul/17 8:00 18/Jul/17 18:00 Daily loc.no. 92-93, to maintain electrical clearance at the crossing point of 220kV Gavasad - POWERGRID WR-II C
Mangrol GETCO line.
477 400 400 KV Ukai-3 Main+Tie Bay Kosamba S/S 18/Jul/17 9:00 18/Jul/17 18:00 Daily Half Yearly maintenance & testing activity
478 400 400 KV Dehgam - Vadavi line No. 2 18/Jul/17 8:00 18/Jul/17 12:00 Daily Dismentaling of old busbar protection panel
479 400 400 KV BUS COUPLER Vadavi 18/Jul/17 14:00 18/Jul/17 18:00 Daily Dismentaling of old busbar protection panel
Jhabua Power
480 400 400 KV ST main & tie bay 404 & 405 18/Jul/17 9:00 18/Jul/17 18:00 daily Preventive Maintenance of Generator transformer Jhabua Power
Switchyard
TAN DELTA MEASUREMENT OF ICT2 BUSHING
400/220/3 Load will be shifted
481 501MVA ICT-1 at 400KV Koradi-2 Substation 18/Jul/17 9:00 19/Jul/17 18:00 Daily COOLING SYSTEM TRIAL MSETCL MSETCL
3KV to ICT-2
TAN DELTA MEASUREMENT OF 205CT
482 400KV Talandge - Karad 2 @ Talandge 18/Jul/17 9:00 18/Jul/17 18:00 Daily Qurterly Maint.Work MSETCL MSETCL
483 220 220KV SEONI - SEONI (PGCIL) - I 18/Jul/17 10:00 18/Jul/17 16:00 daily FOR JUMPER CONNECTION TO NEW CVT AND MAINTENANCE WORK MPPTCL MPPTCL R
for Overhead Stringing of U/C 765KV D/C Raipur- Sundargarh Transmission line(of
484 400 400KV S/C Kedhmara-RAITA(Raipur) Line 18/Jul/17 7:00 19/Jul/17 17:00 Daily CSPTCL OGPTL C
OGPTL) at OGPTL Location numbers AP 16/0- AP 17/0(CSPTCL tower Nos: 455-456)
485 765 765kV Solapur-1 Tie bay 708 at Aurangabad 18/Jul/17 9:00 18/Jul/17 18:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R
486 400 400kV EMCO -1 Main bay at BVT 18/Jul/17 9:00 18/Jul/17 18:00 Daily AMP WRTS-I WRTS-I R
487 400 400 kV Bus#1 at Bilaspur PS 18/Jul/17 9:00 18/Jul/17 18:00 Daily AMP works WRTS-I WRTS-I R
765KV ICT #01 TIE BAY(714) AT
488 765 18/Jul/17 9:00 18/Jul/17 18:00 Daily AMP WORKS OF BAY WRTS-I WRTS-I R
DHARAMJAYGARH(KORBA) SS
489 400 400/220 KV ICT #1 Main Bay 421 at wardha 18/Jul/17 9:00 18/Jul/17 18:00 Daily AMP works related to Bay WRTS-I WRTS-I R
Replacement of Conventional Insulators with Polymer insulators in major crossings line
490 400 400 KV Wardha Akola Line 2 18/Jul/17 9:00 18/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
491 400 1001,Bina-4 main bay at 400KV MPPTCL Bina 19/Jul/17 9:30 19/Jul/17 18:00 Daily For AMP works POWERGRID WR-II R
765KV Jabalpur-DMJY#3 Line along with Reactor at Jabalpur
492 765 19/Jul/17 10:00 19/Jul/17 18:00 Daily Erection of Circuit Breaker & BPI for implementation of NGR Bypass Scheme STERLITE WR-II C
PS
493 220 Kakrapar-Vapi#1 19/Jul/17 9:00 19/Jul/17 18:00 Daily For balance Ins Replacement Work POWERGRID WR-II C
494 765 704LRB (Jaipur#1 L/R Bay) at Gwalior 19/Jul/17 10:00 19/Jul/17 17:00 Daily AMP work POWERGRID WR-II R
495 765 765KV Bus Reactor#2 at Satna 19/Jul/17 9:00 19/Jul/17 18:00 Daily For AMP work POWERGRID WR-II R
496 400 400 KV 50MVAR BUS REACTOR at Vadavi 19/Jul/17 8:00 19/Jul/17 12:00 Daily Dismentaling of old busbar protection panel
497 400 400 KV TBC/125MVAR REACTOR Vadavi 19/Jul/17 14:00 19/Jul/17 18:00 Daily Dismentaling of old busbar protection panel
400/220k
498 501MVA, ICT 1 @ LAMBOTI. 19/Jul/17 10:00 19/Jul/17 18:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL
V
499 400 KV 167 MVA, Spare ICT Unit Khaperkheda 19/Jul/17 10:00 19/Jul/17 16:00 Daily Maintenance and predictive testing work. MSETCL MSETCL
500 400 400kV Wardha-2 Main Bay 410 at Autrangabad 19/Jul/17 9:00 19/Jul/17 18:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R
501 765 765kV WARDHA-AURANGABAD IV 19/Jul/17 8:00 20/Jul/17 18:00 Daily Line maintenance works for removing of conductor twist. WRTS-I WRTS-I R
502 765 765 kV Durg - Champa# 2 19/Jul/17 8:00 19/Jul/17 13:00 Daily for CSD commissioning WRTS-I WRTS-I C
765KV CHAMPA MAIN BAY(715) AT
503 765 19/Jul/17 9:00 19/Jul/17 18:00 Daily AMP WORKS OF BAY WRTS-I WRTS-I R
DHARAMJAYGARH(KORBA) SS
504 400 400kV RAIPUR-BHADRAVATI I 19/Jul/17 9:30 19/Jul/17 17:30 Daily Relay testing and AMP work at Raipur WRTS-I WRTS-I R
505 765 SOLAPUR_BAY 710_MAIN BAY OF AURANGABAD -2 19/Jul/17 9:00 19/Jul/17 18:00 DAILY AMP WORKS WRTS-1 WRTS-1 R
Replacement of Conventional Insulators with Polymer insulators in major crossings line
506 400 400 KV Wardha Akola Line 1 19/Jul/17 9:00 19/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
400kV MAPUSA I & KUDGI- II TIE BAY (405) AT
507 400 19/Jul/17 10:00 19/Jul/17 18:00 Daily For bay AMP works. WRTS-I WRTS-I R
KOLHAPUR
508 400 Mundra Mansar Line Reactor 19/Jul/17 8:00 20/Jul/17 20:00 Daily Reactor Maintenance and Testing CGPL CGPL
509 400 125MVAr Bus Reactor at Bhachau 20/Jul/17 8:00 20/Jul/17 18:00 Daily RTV coating of Reactor Main bay & Tie Bay isolators, CB. POWERGRID WR-II C
510 400 1002,Bina-4 tie bay at 400KV MPPTCL Bina 20/Jul/17 9:30 20/Jul/17 18:00 Daily For AMP works POWERGRID WR-II R
765KV Jabalpur-DMJY#4 Line along with Reactor at Jabalpur
511 765 20/Jul/17 10:00 20/Jul/17 18:00 Daily Erection of Circuit Breaker & BPI for implementation of NGR Bypass Scheme STERLITE WR-II C
PS
512 220 Kakrapar-Vapi#1 20/Jul/17 9:00 20/Jul/17 18:00 Daily For balance Ins Replacement Work POWERGRID WR-II C
513 400 RAPP#2 Main Bay(418) at Shujalpur 20/Jul/17 10:00 20/Jul/17 18:00 Daily For commissioning of CSD & SAS works POWERGRID WR-II C
514 400 400KV BUS#1 at MPPTCL, Indore 20/Jul/17 10:00 21/Jul/17 18:00 Continuous RETROFITTING OF BUS#1 ISOLATOR IN ITARSI #2 POWERGRID WR-II C
515 220 220Kv Bus-2 at Gwalior 20/Jul/17 10:00 20/Jul/17 17:00 Daily AMP WORKS POWERGRID WR-II R
516 765 765KV ICT#2 Main Bay (704 Bay) at satna ss 20/Jul/17 9:00 21/Jul/17 18:00 Daily For AMP work POWERGRID WR-II R
Replacement of all porcelain disc insulator strings with CLR Polymer insulators in complete
517 400 Navsari - Magarwada Ckt.2 20/Jul/17 8:00 22/Jul/17 18:00 Daily line to avoid tripping due to heavy pollution. A/R of Ckt.1 to be kept in non auto mode POWERGRID WR-II C
during outage period.
518 400 400 KV Bus Reactor Main+Tie Bay at Kosamba 20/Jul/17 8:00 20/Jul/17 18:00 Daily Half Yearly maintenance & testing activity
519 400 400 KV Vadavi-Halvad 1 (Line is under commissioning) 20/Jul/17 8:00 20/Jul/17 12:00 Daily Dismentaling of old busbar protection panel
520 400 400 KV Vadavi-Halvad 2 (Line is under commissioning) 20/Jul/17 14:00 20/Jul/17 18:00 Daily Dismentaling of old busbar protection panel
Load manage on
521 400 KV 400KV JAIGAD -II @ KARAD 20/Jul/17 10:00 20/Jul/17 17:00 Daily Quarterly. Maint. work MSETCL MSETCL
400 kV JAIGAD -1
Load will be on 400
522 400KV Jejuri-Koyna ST IV @ Jejuri 20/Jul/17 9:00 20/Jul/17 17:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL KV Jejuri-Lonikand
line
407-Bay & 406-Bay (Main Bay and Tie Bay of of ICT-2) at
523 400KV 20/Jul/17 11:00 20/Jul/17 16:00 Daily Quarterly Maintenance of bays equipment MSETCL MSETCL
Kumbhargaon
80MVAR Reactor II
524 400kV 80MVAR Reactor 1 @ BBLR 20/Jul/17 9:00 20/Jul/17 17:00 Daily Routine Maintenance & Servicing and allignment of PG isolators work MSETCL MSETCL
will be in service
525 400KV B Bus @Lonikand II 20/Jul/17 9:00 20/Jul/17 18:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL
526 400 400KV DAMOH-KATNI 20/Jul/17 8:00 20/Jul/17 18:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
527 400 400KV NAGDA-RAJGARH - I 20/Jul/17 9:00 20/Jul/17 18:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
528 220 220KV SEONI - SEONI (PGCIL) - II 20/Jul/17 10:00 20/Jul/17 16:00 daily FOR JUMPER CONNECTION TO NEW CVT AND MAINTENANCE WORK MPPTCL MPPTCL R
529 220 220 KV GWALIOR(PGCIL)-MAHALGAON - I 20/Jul/17 9:00 20/Jul/17 17:00 daily FOR CVT ERECTION COMMISSIONING & TESTING WORK MPPTCL MPPTCL R
530 400KV VINDHYACHAL-KORBA#1 LINE 20/Jul/17 9:00 21/Jul/17 18:00 Continuous HOTSPOT ATTEND AND BAY MAINTENANCE. NTPC NTPC
531 400KV VINDHYACHAL-KORBA#1 LINE REACTOR 20/Jul/17 9:00 22/Jul/17 18:00 Continuous REACTOR MAINTENANCE NTPC NTPC
532 400 KV 400KV Sipat-Ranchi-2 tie bay-20 20/Jul/17 9:00 21/Jul/17 18:00 Continuous For Annual maint works NTPC NTPC
533 400 400kV Wardha-2 Tie Bay 411 at Autrangabad 20/Jul/17 9:00 20/Jul/17 18:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R
534 400 LANCO#2 _422_Main Bay at Bilaspur PS 20/Jul/17 9:00 20/Jul/17 18:00 Daily AMP works (CB Timings and CT tan delta meas.) WRTS-I WRTS-I R
765KV ICT#02 TIE BAY(717) AT
535 765 20/Jul/17 9:00 20/Jul/17 18:00 Daily AMP WORKS OF BAY WRTS-I WRTS-I R
DHARAMJAYGARH(KORBA) SS
536 400 SOLAPUR_BAY 416_MAIN BAY_PARLI#2 20/Jul/17 9:00 20/Jul/17 18:00 DAILY AMP WORKS WRTS-1 WRTS-1 R
Replacement of Conventional Insulators with Polymer insulators in major crossings line
537 400 400 KV Wardha Akola Line 2 20/Jul/17 9:00 20/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
538 765 765KV ICT-5 Main Bay (720) at Champa PS 20/Jul/17 9:00 21/Jul/17 17:30 Daily AMP/Warranty Tests WRTS-I WRTS-I R
539 220 Kota-Badod(220 kV) 20/Jul/17 7:00 20/Jul/17 18:00 Daily To carry out the annual bay maintenance of the bay equipment. NRPC NRPC
Replacement of Conventional Insulators with Polymer insulators in major crossings line
540 400 400 kV Bhadrawati - Parli # 01. 21/Jul/17 8:00 21/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
541 400 ICT 1 at Bhachau 21/Jul/17 8:00 21/Jul/17 18:00 Daily RTV coating of ICT 1 Main bay & Tie Bay isolators, CB. POWERGRID WR-II C
765KV Jabalpur-Bina#3 switchable Reactor along with
542 765 21/Jul/17 10:00 22/Jul/17 18:00 Cont. For arrest the oil leakage from top cover & Butterfly valve of Radiator bank STERLITE WR-II R
Reactor bay(821 Reactor Bay) at Jabalpur PS
543 220 Kakrapar-Vav#2 21/Jul/17 9:00 21/Jul/17 18:00 Daily For balance Ins Replacement Work POWERGRID WR-II C
544 400 RAPP#2 Tie Bay(417) at Shujalpur 21/Jul/17 10:00 21/Jul/17 18:00 Daily For commissioning of CSD & SAS works POWERGRID WR-II C
545 400 400 KV Main Bus-1 Bay Kosamba 21/Jul/17 8:00 21/Jul/17 18:00 Daily Half Yearly maintenance & testing activity
Reactor painting work. Only reactor will be taken out of circuit. Line will be charged Reactor will be out
546 400kV 400kV Parli-Lonikand ckt I 21/Jul/17 9:00 23/Jul/17 17:00 Daily MSETCL MSETCL
subsequently. for three days.
Dignostic Testing Work ( Reactor Bushing& winding Tan Delta measurement work, CB
547 400kV 400kV Parli-Lonikand ckt I 21/Jul/17 9:00 21/Jul/17 18:00 Daily MSETCL MSETCL
DCRM & timing Test.)
548 400/220 501MVA, ICT 1 @ 400kV Deepnagar 21/Jul/17 8:00 25/Jul/17 18:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL
549 400KV Babhaleshwar-Ektuni-Ckt-1 @BBLR 21/Jul/17 9:00 21/Jul/17 17:00 Daily Routine Maintenance & Servicing and allignment of PG isolators work MSETCL MSETCL
400 kV Tie Bay 418 (Tie Bay of Yelwan CKt- II) at 400 kV
550 400 kV 21/Jul/17 9:00 21/Jul/17 17:00 Daily Routine Maintenance & testing work MSETCL MSETCL
Akola SS
551 400 400KV NAGDA-RAJGARH - II 21/Jul/17 9:00 21/Jul/17 18:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
552 220 220 KV GWALIOR(PGCIL)-MAHALGAON - II 21/Jul/17 9:00 21/Jul/17 17:00 daily FOR CVT ERECTION COMMISSIONING & TESTING WORK MPPTCL MPPTCL R
553 400 ICT#1_402_Tie Bay at Bilaspur PS 21/Jul/17 9:00 21/Jul/17 18:00 Daily AMP works (CB Timings and CT tan delta meas.) WRTS-I WRTS-I R
554 765 3X500MVA ICT#1 at Durg PS 21/Jul/17 8:00 21/Jul/17 18:00 Daily CSD comm in Tie Bay WRTS-I WRTS-I C
555 400 NSPCL 1 Main Bay at Raipur SS 21/Jul/17 9:30 21/Jul/17 17:30 Daily AMP work at Raipur WRTS-I WRTS-I R
400kV_BAY 420_TIE BAY_FUTURE__NTPC#1 AT
556 400 21/Jul/17 9:00 21/Jul/17 18:00 DAILY AMP WORKS WRTS-1 WRTS-1 R
SOLAPUR
557 765 765 KV ICT#1 Main bay 703 AT WARDHA 21/Jul/17 9:00 21/Jul/17 18:00 Daily AMP works related to Bay WRTS-I WRTS-I R
Replacement of Conventional Insulators with Polymer insulators in major crossings line
558 400 400 KV Wardha Akola Line 1 21/Jul/17 9:00 21/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
Replacement of Conventional Insulators with Polymer insulators in major crossings line
559 400 400 kV Bhadrawati - Parli # 01. 22/Jul/17 8:00 22/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
560 220 Kakrapar-Vav#1 22/Jul/17 9:00 22/Jul/17 18:00 Daily For balance Ins Replacement Work POWERGRID WR-II C
561 400 RAPP#1 Main Bay(413) at Shujalpur 22/Jul/17 10:00 22/Jul/17 18:00 Daily For commissioning of CSD & SAS works POWERGRID WR-II C
562 765 765KV Bina#2 Reactor Bay (709R Bay) at satna ss 22/Jul/17 9:00 22/Jul/17 18:00 Daily For AMP work POWERGRID WR-II R
400/220k
563 315MVA, ICT 1 @ BBLR 22/Jul/17 9:00 22/Jul/17 17:00 Daily Routine Maintenance & Servicing and allignment of PG isolators work MSETCL MSETCL
V
for providing earth switch female contacts, corona rings to line isolator and CT jumper
564 400 400kV Aurangabad(MS)-Aurangabad(PG)-1 22/Jul/17 8:00 22/Jul/17 18:00 Daily WRTS-I WRTS-I R
replacement at Msetcl, waluj SS
Replacement of Conventional Insulators with Polymer insulators in major crossings line
565 400 400 KV Wardha Akola Line 2 22/Jul/17 9:00 22/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
Replacement of Conventional Insulators with Polymer insulators in major crossings line
566 400 400 kV Dhariwal TPP- Parli # 02. 23/Jul/17 8:00 23/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
765KV Jabalpur-Bhopal switchable Reactor along with
567 765 23/Jul/17 10:00 24/Jul/17 18:00 Daily For arrest the oil leakage from Bottom Gate Valve & Butterfly valve of Radiator bank STERLITE WR-II R
Reactor bay(824 Reactor Bay) at Jabalpur PS
Replacement of all porcelain disc insulator strings with CLR Polymer insulators in complete
568 400 Navsari - Magarwada Ckt.1 23/Jul/17 8:00 24/Jul/17 18:00 Daily line to avoid tripping due to heavy pollution. A/R of Ckt.1 to be kept in non auto mode POWERGRID WR-II C
during outage period.
569 400 ACBIL-MCCPL-CKT# 2 23/Jul/17 7:00 25/Jul/17 18:00 Daily AMP ACBIL ACBIL
JP Nigri not to bid
570 400 J P NIGRIE-SATNA-2 23/Jul/17 8:00 30/Jul/17 18:00 Daily Fixing of additional Pilot String in DD type angle Towers JP NIGRIE JP NIGRIE
on PX
Replacement of Conventional Insulators with Polymer insulators in major crossings line
571 400 400 kV Bhadrawati - Dhariwal TPP# 02. 24/Jul/17 8:00 24/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
408-Bay AND 409-Bay (Main Bay &Tie Bay of Chandrapur
572 400KV 24/Jul/17 11:00 24/Jul/17 14:00 Daily Quarterly Maintenance of bays equipment MSETCL MSETCL
Line-1) at Kumbhargaon
Online permit for installation of Bird divertors on earthwire as per the directions of Bird
573 400 Mundra - Jetpur Ckt.1 24/Jul/17 8:00 26/Jul/17 20:00 Daily POWERGRID WR-II R
Sanctuary authorities. A/R of Ckt-1 to be kept in non auto mode during outage period
574 400 63MVAr Bus Reactor at Bhachau 24/Jul/17 8:00 24/Jul/17 18:00 Daily RTV coating of Bus Reactor Main bay & Tie Bay isolators, CB & CT. POWERGRID WR-II C
Spare reactor will be taking in service without line shutdown . Line will be in service without
575 765 Gwalior-3 Line reactor at Bina (Switchable reactor) 24/Jul/17 9:30 24/Jul/17 18:00 Daily POWERGRID WR-II R
LR at Bina
576 220 Jhanor Haldarwa 1 24/Jul/17 9:00 26/Jul/17 18:00 Continuous Circuit Breaker 03 Drive overhauling Work POWERGRID WR-II C
577 400 400KV BUS#2 AT MPPTCL Indore 24/Jul/17 10:00 25/Jul/17 18:00 Continuous RETROFITTING OF BUS#2 ISOLATOR IN ASOJ#1 POWERGRID WR-II C
578 765 711 bay ( 765kV Bina#1 Tie bay) at Gwalior 24/Jul/17 10:00 24/Jul/17 18:00 Daily AMP WORKS POWERGRID WR-II R
579 765 765KV Bina#2 Main Bay (709 Bay) at satna ss 24/Jul/17 9:00 25/Jul/17 18:00 Daily For AMP work POWERGRID WR-II R
Shifting of 220 Vapi-Sayali & Vapi-Khadoli lines between loc.no. 56-61 to facilitate
580 220 Vapi - Sayali & Vapi - Khadoli 24/Jul/17 6:00 29/Jul/17 18:00 Continuous POWERGRID WR-II C
clearance for Sayali Sports complets of PWD-Silvassa under DNH
Shifting / modifiction of 400lV D/C Jablapur-Itarsi Ckt.3&4 towers for four lanning of
581 400 Jabalpur-Itarsi Ckt.3&4 24/Jul/17 8:00 31/Jul/17 18:00 Continuous POWERGRID WR-II R
Obedullaganj - Betul (NH-69)
Load manage on
582 400 KV 400/220KV 315 MVA ICT-I @ Karad 24/Jul/17 10:00 24/Jul/17 17:00 Daily Quarterly. Maint. work MSETCL MSETCL
other Two ICT'S
583 400 400KV Dhule-BBLR Ckt-I & II 24/Jul/17 9:00 25/Jul/17 17:00 Daily PID testing MSETCL MSETCL
584 400kV 400kV Parli- PGCIL ckt II @ Girwali 24/Jul/17 9:00 24/Jul/17 18:00 Daily Dignostic Testing Work (CB DCRM & timing Test. & C & Tan Delta measurement of CVTs) MSETCL MSETCL
585 220KV Talandge - Chikodi @ Talandge 24/Jul/17 9:00 24/Jul/17 18:00 Daily Quarterly Maintenance work MSETCL MSETCL
586 400 400KV RAJGARH SSP - I 24/Jul/17 7:00 24/Jul/17 19:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
587 220 220KV ANNUPUR-KOTMIKALA - I 24/Jul/17 10:00 24/Jul/17 17:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
588 400 VINDH BUS SECTION#3 24/Jul/17 9:00 25/Jul/17 18:00 Continuous HOTSPOT ATTEND AND BAY MAINTENANCE NTPC NTPC
589 400 400kV Bus_1 at Aurangabad 24/Jul/17 8:00 24/Jul/17 18:00 Daily For STATCOM works at Aurangabad WRTS-I WRTS-I C
590 765 3X500MVA ICT#2 at Durg PS 24/Jul/17 8:00 24/Jul/17 18:00 Daily CSD commissioing WRTS-I WRTS-I C
591 220 Urla Bay(20452) at Raipur SS 24/Jul/17 9:30 24/Jul/17 17:30 Daily AMP work at Raipur WRTS-I WRTS-I R
592 400 SOLAPUR_BAY 421_MAIN BAY_NTPC#1 AT SOLAPUR 24/Jul/17 9:00 24/Jul/17 18:00 DAILY AMP WORKS WRTS-1 WRTS-1 R
593 765 765 KV Tie bay of ICT #3 708 at wardha 24/Jul/17 9:00 24/Jul/17 18:00 Daily AMP works related to Bay WRTS-I WRTS-I R
594 400 400kV KOLHAPUR 1 MAIN BAY (407) AT KOLHAPUR 24/Jul/17 10:00 24/Jul/17 18:00 Daily For bay AMP works. WRTS-I WRTS-I R
595 765 765/400KV ICT-6 at Champa PS 24/Jul/17 9:00 25/Jul/17 17:30 Daily AMP/Warranty Tests WRTS-I WRTS-I R
Tower location No. 454 main legs are damaged due to flood, it is required to shift to safe
596 400 400kV KORBA-RAIPUR III 24/Jul/17 9:00 29/Jul/17 18:00 Continuous WRTS-I WRTS-I C
place.
Tower location No. 454 main legs are damaged due to flood, it is required to shift to safe
597 400 400kV KORBA-RAIPUR IV 24/Jul/17 9:00 29/Jul/17 18:00 Continuous WRTS-I WRTS-I C
place.
Replacement of Conventional Insulators with Polymer insulators in major crossings line
598 400 400 kV Bhadrawati - Parli # 01. 25/Jul/17 8:00 25/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
599 400 400KV INDORE-ASOJ#1 25/Jul/17 10:00 25/Jul/17 18:00 Daily RETROFITTING OF BUS#2 ISOLATOR IN ASOJ#1 & PLCC POWERGRID WR-II C
600 765 713 bay ( 765kV Satna#1 Main bay) at Gwalior 25/Jul/17 10:00 25/Jul/17 18:00 Daily AMP WORKS POWERGRID WR-II R
Replacement of all porcelain disc insulator strings with CLR Polymer insulators in complete
601 400 Navsari - Magarwada Ckt.1&2 25/Jul/17 8:00 26/Jul/17 18:00 Daily line to avoid tripping due to heavy pollution. Outage required in both circuits to replace in POWERGRID WR-II C
Multi Circuit towers due to heavy induction.
602 400 400 KV Main Bus-2 Bay Kosamba 25/Jul/17 8:00 25/Jul/17 18:00 Daily Half Yearly maintenance & testing activity
765 kV Aurangabad-III Akola-II Line-1 non switchable reactor For changeover of Rph- Line reactor against Spare reactor of 706 bay of 765 kV
603 765 25/Jul/17 10:00 25/Jul/17 18:00 Daily MSETCL MEGPTCL
at MSETCL 765/400KV Aurangabad-III Ektuni SS Aurangabad-III Akola- at MSETCL 765/400KV Aurangabad-III Ektuni SS
604 400 400KV HVDC ckt. No.-I bay @400KV S/S Chandrapur 25/Jul/17 8:00 25/Jul/17 18:00 Daily 1) Attending the hot spot on PG Isolators. 2) Routine maintenance of the bay. MSETCL MSETCL
605 400 400KV RAJGARH SSP - II 25/Jul/17 7:00 25/Jul/17 19:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
606 220 220KV DAMOH-DAMOH (PGCIL) - I 25/Jul/17 8:00 25/Jul/17 18:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
607 220 220 KV BINA(PGCIL)-SHIVPURI 25/Jul/17 9:00 25/Jul/17 17:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
608 400 Korba-Raipur Line-3 25/Jul/17 8:30 25/Jul/17 17:30 Continuous For annual maintenance of bay equipments and hot spot attending NTPC NTPC
for Overhead Stringing of U/C 765KV D/C Raipur- Sundargarh Transmission line(of
609 400 400KV D/C Korba-Raipur CKT 3&4 25/Jul/17 7:00 26/Jul/17 17:00 Daily PGCIL OGPTL C
OGPTL) at OGPTL Location numbers AP 25/0- AP 26/0(PGCIL tower Nos: 464-465)
610 765 765kV Wardha-3 Main Bay 718 at Aurangabad 25/Jul/17 9:00 25/Jul/17 18:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R
611 400 LANCO#2 _423_Tie Bay at Bilaspur PS 25/Jul/17 9:00 25/Jul/17 18:00 Daily AMP works (CB Timings and CT tan delta meas.) WRTS-I WRTS-I R
SOLAPUR__LINE REACTOR_BAY_713R (Switchable LR of RTV COATING OF TRENCH MAKE BUSHINGS AND SPARE REACTOR
612 765 25/Jul/17 8:00 26/Jul/17 18:00 DAILY WRTS-1 WRTS-1 C
Raichur - 2) COMMISSIONING WORKS
613 400 Korba 2 Main bay at Bhilai (Khedamara) SS 25/Jul/17 9:30 31/Jul/17 17:30 Continuous CT replacement work at Bhilai ss WRTS-I WRTS-I R
Dismantling of Tower Loc 375 and erection of New Tower in place of NEW foundation and
614 400 400Kv Sundargarh-Raigarh -II 25/Jul/17 9:00 14/Aug/17 18:00 Continuous ERPC ERPC
Stringing through Multi Ckt with 220kv Budhi Padhar Korba Line .
Dismantling of Tower Loc 375 and erection of New Tower in place of NEW foundation and
615 400 400kv Sterlite -Raigarh-II 25/Jul/17 9:00 14/Aug/17 18:00 Continuous ERPC ERPC
Stringing through Multi cKt with 220kv Budhi Padhar Korba Line .
Replacement of Conventional Insulators with Polymer insulators in major crossings line
616 400 400 kV Dhariwal TPP- Parli # 02. 26/Jul/17 8:00 26/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
617 400 ICT 2 at Bhachau 26/Jul/17 8:00 27/Jul/17 18:00 Daily RTV coating of ICT 2 Main bay & Tie Bay isolators, CB. POWERGRID WR-II C
618 400 400KV INDORE-ASOJ#2 26/Jul/17 15:00 26/Jul/17 17:00 Daily RETROFITTING OF PLCC PANEL POWERGRID WR-II C
619 400 404 bay ( 400kV B/R-1 Main bay) at Gwalior 26/Jul/17 10:00 26/Jul/17 18:00 Daily AMP WORKS POWERGRID WR-II R
620 400 400KV Nigri#1 Main Bay (401 Bay) at Satna SS 26/Jul/17 9:00 26/Jul/17 18:00 Daily For AMP work POWERGRID WR-II R
GT#8 will be
621 400 KV 425-Bay (Main Bay of GT#8) at 400KV Koradi-2 Substation 26/Jul/17 9:00 26/Jul/17 18:00 Daily DCRM TIMING CRM & IR of CB 425-Q52 MSETCL MSETCL operation through
Tie Bay 426
Chandrapur II-Switching-Ckt-2(Bay 404 & 405) @
622 400KV 26/Jul/17 9:00 26/Jul/17 18:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL
Chandrapur- II S/S
623 400 ICT#1 _401_Main Bay at Bilaspur PS 26/Jul/17 9:00 26/Jul/17 18:00 Daily AMP works (CB Timings and CT tan delta meas.) WRTS-I WRTS-I R
624 400 400 kV Main Bay 418 of Raipur # 1 at Durg PS 26/Jul/17 8:00 26/Jul/17 18:00 Daily AMP of Bay WRTS-I WRTS-I R
625 400 MCCPL-PGCIL (Bilaspur)-CKT# 1 26/Jul/17 7:00 31/Jul/17 18:00 Daily AMP ACBIL ACBIL
626 400KV Chandrapur 2 - Nanded Ckt-I 27/Jul/17 8:00 27/Jul/17 18:00 Daily Diagnostic Testing & Replacement of broken / damaged disc insulators MSETCL MSETCL
To attend opened spacer dampers with non auto operation of Auto reclosure of Mundra -
627 400 Mundra - Jetpur Ckt.2 27/Jul/17 8:00 27/Jul/17 18:00 Daily POWERGRID WR-II R
Jetpur ckt-1
Replacement of Conventional Insulators with Polymer insulators in major crossings line
628 400 400 kV Dhariwal TPP- Parli # 02. 27/Jul/17 8:00 27/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
629 400 Mundra Jetpur-2 Line Reactor 27/Jul/17 9:00 27/Jul/17 18:00 Daily Reactor Maintenance and Testing CGPL CGPL
Spare reactor will be out off service without line shutdown . Line will be in service without
630 765 Gwalior-3 Line reactor at Bina (Switchable reactor) 27/Jul/17 9:30 27/Jul/17 18:00 Daily POWERGRID WR-II R
LR at Bina
Replacement of all porcelain disc insulator strings with CLR Polymer insulators in complete
631 400 Ukai-Navsari 27/Jul/17 9:00 27/Jul/17 18:00 Daily POWERGRID WR-II C
line to avoid tripping due to heavy pollution
400KV Side of 765 kV ICT#1 Main Bay (403 Bay) at Satna
632 400 27/Jul/17 9:00 27/Jul/17 18:00 Daily For AMP work POWERGRID WR-II R
SS
633 400 426 (Bhachau-2 Tie breaker) bay at CGPL 27/Jul/17 8:00 27/Jul/17 14:00 Daily 426 CT testing CGPL CGPL
634 400 408 (GT20 Tie breaker) bay at CGPL 27/Jul/17 15:00 27/Jul/17 20:00 Daily 408 CT testing CGPL CGPL
635 400KV Spare line -III @Chakan 27/Jul/17 9:00 27/Jul/17 18:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL
ICT 1 will remain in
636 400KV 401-Bay (Main Bay ICT 1) at 400 KV Jejuri 27/Jul/17 9:00 27/Jul/17 17:00 Daily Annual Maintenance of bays equipment MSETCL MSETCL service through Tie
CB 402
637 400kV 400kV Parli- PGCIL ckt I @ Girwali 27/Jul/17 9:00 27/Jul/17 17:00 Daily Dignostic Testing Work (C & Tan Delta measurement of CVTs) MSETCL MSETCL
638 400kV TBC @ BBLR 27/Jul/17 9:00 27/Jul/17 17:00 Daily Routine Maintenance & Servicing and allignment of PG isolators work MSETCL MSETCL TBC is free
639 400 400KV ISP-INDORE - I 27/Jul/17 9:00 27/Jul/17 16:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
HOTSPOT ATTEND AND BAY MAINTENANCE(Bus shutdown required for attending the
640 400KV VINDHYACHAL-JABALPUR LINE#4 ALONGWITH BUS-2 27/Jul/17 9:00 28/Jul/17 18:00 Continuous NTPC NTPC
Hot spot)
641 765 765kV B/R Main Bay 701 at Aurangabad 27/Jul/17 9:00 27/Jul/17 18:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R
642 400 ICT#2_404_Main Bay at Bilaspur PS 27/Jul/17 9:00 27/Jul/17 18:00 Daily AMP works (CB Timings and CT tan delta meas.) WRTS-I WRTS-I R
643 400 400KV Parli-Pune-2 (Reliance) Line with Reactor 27/Jul/17 10:00 27/Jul/17 18:00 Daily For AMP works of line terminating equipments at Parli WRTS-I WRTS-I R
644 400 ICT3_400/220kv_SOLAPUR 27/Jul/17 9:00 27/Jul/17 18:00 DAILY CSD COMMISSIONING WORKS WRTS-1 WRTS-1 C
Replacement of Conventional Insulators with Polymer insulators in major crossings line
645 400 400 kV Bhadrawati - Parli # 01. 28/Jul/17 8:00 28/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
Replacement of Conventional Insulators with Polymer insulators in major crossings line
646 400 400 kV Bhadrawati - Parli # 01. 28/Jul/17 8:00 28/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
Replacement of Conventional Insulators with Polymer insulators in major crossings line
647 400 400 kV Dhariwal TPP- Parli # 02. 28/Jul/17 8:00 28/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
648 400 400KV Essar -1 Line Reactor including Line 28/Jul/17 8:00 29/Jul/17 18:00 Daily RTV coating of Essar 1 Line & Line Reactor Main bay & Tie Bay isolators, CB & CT. POWERGRID WR-II C
649 765 BAY 707 (MAIN BAY FOR BR-1) at Indore 28/Jul/17 10:00 29/Jul/17 18:00 Daily AMP OF BAY EQUIPMENT POWERGRID WR-II R
650 400 400KV Vchal#2 Main Bay (412 bay) at Satna SS 28/Jul/17 9:00 28/Jul/17 18:00 Daily For AMP work POWERGRID WR-II R
651 400 416 (Limbdi-1 Main brekaer) at CGPL 28/Jul/17 8:00 28/Jul/17 14:00 Daily 416 CT Testing CGPL CGPL
652 400 422 (Jetpur-1 Main breaker) at CGPL 28/Jul/17 15:00 28/Jul/17 20:00 Daily 422 CT Testing CGPL CGPL
400/220k
653 501MVA, ICT 2 @ 400kV Deepnagar 28/Jul/17 8:00 28/Jul/17 18:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL
V
654 400KV Babhaleshwar-Ektuni-Ckt-2 @BBLR 28/Jul/17 9:00 28/Jul/17 17:00 Daily Routine Maintenance & Servicing and allignment of PG isolators work MSETCL MSETCL
Line signature test, broken disc replacement work,tightning and fixing of jumper nutbolts &
655 400 KV KORADI-KHAPERKHEDA II 28/Jul/17 8:00 28/Jul/17 17:00 Daily MSETCL MSETCL
hardwares on line and earthwire
656 400KV 400KV HVDC ckt. No.-II bay @400KV Chandrapur 28/Jul/17 8:00 28/Jul/17 18:00 Daily 1) Attending the hot spot on PG Isolators. 2) Routine maintenance of the bay. MSETCL MSETCL
657 220 220KV ANNUPUR-KOTMIKALA - II 28/Jul/17 10:00 28/Jul/17 17:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
658 220 220KV DAMOH-DAMOH (PGCIL) - II 28/Jul/17 8:00 28/Jul/17 18:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
659 400 400 kV Main Bay 419 of GMR # 1 at Durg PS 28/Jul/17 8:00 28/Jul/17 18:00 Daily AMP of Bay WRTS-I WRTS-I R
660 400 SOLAPUR_BAY 415_ KOLHAPUR#1 AT SOLAPUR 28/Jul/17 9:00 29/Jul/17 18:00 CONTINUOUS SF6 LEAKGAE RECTIFICATION WORKS WRTS-1 WRTS-1 R
661 400 400kV Bus_2 at Aurangabad 29/Jul/17 8:00 29/Jul/17 18:00 Daily For STATCOM works at Aurangabad WRTS-I WRTS-I C
662 400 400KV Bina#1 Tie Bay (414 bay) at Satna SS 29/Jul/17 9:00 29/Jul/17 18:00 Daily For AMP work POWERGRID WR-II R
663 400 423 (Jetpur-1 Tie breaker) at CGPL 29/Jul/17 8:00 29/Jul/17 14:00 Daily 423 CT Testing CGPL CGPL
664 400 425 (Bhachau-2 Main breaker) at CGPL 29/Jul/17 15:00 29/Jul/17 20:00 Daily 425 CT Testing CGPL CGPL
665 400 400/220 KV 315 MVA ICT-1 at Vadavi 29/Jul/17 8:00 29/Jul/17 18:00 Daily Termination of connecttion in new busbar protection panel
666 400 400 KV Kansari-Vadavi-1 at vadavi 29/Jul/17 8:00 29/Jul/17 18:00 Daily Termination of connecttion in new busbar protection panel
667 400/220 315MVA, ICT 2 @ BBLR 29/Jul/17 9:00 29/Jul/17 17:00 Daily Routine Maintenance & Servicing and allignment of PG isolators work MSETCL MSETCL
for providing earth switch female contacts, corona rings to line isolator and CT jumper
668 400 400kV Aurangabad(MS)-Aurangabad(PG)-2 29/Jul/17 8:00 29/Jul/17 18:00 Daily WRTS-I WRTS-I R
replacement at Msetcl, waluj SS
669 400 400KV Parli-Pune-1 (Reliance) Line with Reactor 29/Jul/17 10:00 29/Jul/17 18:00 Daily For AMP works of line terminating equipments at Parli WRTS-I WRTS-I R
670 400 400KV Sipat-Ranchi-2 LINE 30/Jul/17 9:00 31/Jul/17 18:00 Continuous For Annual maint works NTPC NTPC
671 400 400KV Essar -2 Line Reactor including Line 30/Jul/17 8:00 31/Jul/17 18:00 Daily RTV coating of Essar 2 Line & Line Reactor Main bay & Tie Bay isolators, CB & CT. POWERGRID WR-II C
672 400 400/220 KV 315 MVA ICT-2 at vadavi 30/Jul/17 8:00 30/Jul/17 18:00 Daily Termination of connecttion in new busbar protection panel
673 400 400 KV Kansari-Vadavi-2 30/Jul/17 8:00 30/Jul/17 18:00 Daily Termination of connecttion in new busbar protection panel
674 400 J P NIGRIE-SATNA-2 30/Jul/17 9:00 30/Jul/17 17:00 Daily Fixing of missing Arcing Horns,Twin Spacers & Rigid Spacers JP NIGRIE JP NIGRIE
675 400KV 400KV Bus Coupler Bay @ 400KV S/S Chandrapur 30/Jul/17 8:00 30/Jul/17 18:00 Daily 1) Measurement of Tan delta & capacitance of CT's. 2) Testing & maintenance of CB. MSETCL MSETCL
676 400 400KV ISP-INDORE - II 30/Jul/17 9:00 30/Jul/17 16:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
677 400 400kV Bhilai bay at Koradi(MSETCL) 30/Jul/17 9:00 30/Jul/17 18:00 Daily AMP works related to Bay, Line will be in service through TBC WRTS-I WRTS-I R
678 220 220kV ICT-2 Main Bay (201 bay) at Satna SS 31/Jul/17 9:00 31/Jul/17 18:00 Daily For AMP work POWERGRID WR-II R
679 400 426 (Bhachau-2 Tie breaker) at CGPL 31/Jul/17 8:00 31/Jul/17 14:00 Daily 426 CT Testing CGPL CGPL
680 400 428 (Bhachau-1 Main breaker) at CGPL 31/Jul/17 15:00 31/Jul/17 20:00 Daily 428 CT Testing CGPL CGPL
681 400 400/220 KV 315 MVA ICT-3 at vadavi 31/Jul/17 8:00 31/Jul/17 18:00 Daily Termination of connecttion in new busbar protection panel
682 400 400 KV Chorania-Vadavi-1 31/Jul/17 8:00 31/Jul/17 18:00 Daily TERMINATION OF NEW BUSBAR PANEL CONNECTION
683 400 400 kV Main Bay 420 of GMR # 1 at Durg PS 31/Jul/17 8:00 31/Jul/17 18:00 Daily AMP of Bay WRTS-I WRTS-I R
684 400 400 KV Parli (PG)-2 Main Bay(412) at MSETCL Girawli 31/Jul/17 10:00 31/Jul/17 18:00 Daily For Bay AMP works at MSETCL Girawli WRTS-I WRTS-I R
Anaulagnak 3.3
jaUna 2017 AaOr jaulaa[- 2017 maah ko ilayao Apoixat maMaga evMa }jaa- kI AavaSyakta
ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR JUNE 2017 AND JULY 2017
1 gaujarat GUJARAT
3 C<aIsagaZ, CHHATISGARH
4 maharaYT/ MAHARASHTRA
5 gaaovaa GOA
6 dmana dIva DD
1
765 -I 765kV Seoni to Wardha-I 744:00:00
2
765 -II 765kV Seoni to Wardha-II 744:00:00
3
765 -I 765kV Seoni to Bilaspur-I 629:00:00
4
765 -II 765kV Seoni to Bilaspur-II 634:00:00
5
765 -I 765kV Durg to Wardha I 726:00:00
6
765 -II 765kV Durg to Wardha II 555:00:00
7
400 400kV Bhilai to Koradi 741:00:00
400
8 400kV Bhilai to Bhadravati 744:00:00
9
400 -I 400kV Raipur to Bhadravati-I 744:00:00
10
400 –II 400kV Raipur to Bhadravati-II 743:00:00
11
400 –III 400kV Raipur to Bhadravati-III 744:00:00
12
400 केवी सातपुरा से कोराडी 400kV Satpura to Koradi 714:04:00
13
400 केवी खंडवा से धुले-I 400kV Khandwa-Dhule-I 734:33:00
14
400 केवी खंडवा से धुले-II 400kV Khandwa-Dhule-II 743:58:00
15
400 केवी इंदौर से असोज-I 400kV Indore to Asoj-I 744:00:00
16
400 केवी इंदौर से असोज-II 400kV Indore to Asoj-II 744:00:00
17
400 केवी इंदौर से असोज-III 400kV Indore to Asoj-III 744:00:00
18
400 -I(GIS) 400kV Kolhapur-Mapusa-I(GIS) 676:09:00
19
400 -II(GIS) 400kV Kolhapur-Mapusa-II(GIS) 690:29:00
20
400 केवी वापी से बोईसर 400kV Vapi-Boisar 744:00:00
21
400 केवी रायगढ़ से आयबीईयूएल 400kV Raigarh to IBEUL 744:00:00
22
400 400kV Raigarh to Sterlight 743:22:00
23
400 400kV Sterlight to Rouerkela 744:00:00
24
400 केवी रायगढ़ से झरसुगुड़ा 400kV Raigarh to Jharsuguda 744:00:00
25
400 केवी नागदा से दे हगाम-I 400kV Nagda to Dehgam 729:29:00
26
400 केवी नागदा से दे हगाम-II 400kV Nagda to Dehgam 744:00:00
27
400 –I 400kV Raipur to Wardha-I 723:00:00
28
400 –II 400kV Raipur to Wardha-II 720:00:00
29
400 –III 400kV Raipur to Wardha-III 708:32:00
30
400 –IV 400kV Raipur to Wardha-IV 702:25:00
ivavarNa Particulars
gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL ena eca DI saI NHDC maraiva]kM ila MSEGCL
kmaaMk
Sl. No. ]ka[- Ukai gaaMQaIsaagar Gandhisagar [Midra saagar Indira Sagar kaoyanaa Koyna
Tripping of
1. 400KV Satna-JP NIGRI circuit-I
2. 400KV Satna-JP NIGRI circuit-II
3. 765KV SATNA-GWALIOR-II
Heavy winds reported near satna area
4. 765KV SATNA BUS-II
4 WR POWERGRID/MPPTCL 09/05/2017 16:19 09/05/2017 17:06 0:47 and several 765kv/400kv/220kv lines 1083 378 GD-1 0.3087
5. 220KV SATNA-SATNA-I tripped on various single phase faults
6. 220KV SATNA-SATNA-II
7. 220KV SATNA-SATNA-III
8. JP Nigrie U#1
9. JP Nigrie U#2
Tripping of
Tripping of the 400 kV Jabalpur - Jhabua
1.400KV Jabalpur - Jhabua I
5 WR Jhabua Power Limited 12/05/2017 13:39 12/05/2017 15:04 1:25 D/C on Earth faults leads to loss of 550 NIL GD-1 NIL
2.400KV Jabalpur - Jhabua II Evacuation path
3.600MW Jhabua Unit 1
Tripping of
1.220 kV Gadchandur-Virur-I
6 WR 2. 220 kV Gadchandur-Virur-II MSETCL 13/05/2017 23:44 14/05/2017 0:20 0:36 Earth wire fallen on ckts resulting in fault Nil 60 GD-1 0.0095
3. 220 kV Gadchandur-Grav
Tripping of
1. 400 kV Aurangabad –Bhusawal S/C
2. 400 kV Aurangabad –Bableshwar S/C
Bus bar protection of Main Bus-II optd at
3. 400 kV Aurangabad –Aurangabad(PG)-II 400kV Aurangabad(MSETCL) S/S and all
4. 400 kV Aurangabad –Pune(PG)-I the connecting elements tripped due to
7 WR MSETCL 19/05/2017 10:56 19/05/2017 11:53 0:57
blasting of Y-Phase Circuit Breaker of
Nil Nil GI-2 Nil
5. 400 kV Aurangabad –Taptitanda
400kV feeder Aurangabad(MSETCL)
6. 400 kV Aurangabad –Deepnagar
–Bhusawal (MSETCL) S/C occurred.
7. 400/220 ICT-I at Aurangabad
8. 400/220 ICT-II at Aurangabad
9. 400 kV Aurangabad Main bus-II
Tripping of
1.400kV Ektuni-Bableshwar-II
2. 400kV Dhule-Bableshwar-I
3. 400kV Dhule-Bableshwar-II
4. 400kV Bableshwar-Padghe-I
5. 400kV Bableshwar-Padghe-II
Bus isolator of 400/220kV ICT-4 at
6. 400kV Bhusawal-Bableshwar S/C
8 WR MSETCL 25/05/2017 16:30 25/05/2017 17:35 1:05 Bableshwar fell down and created Bus Nil 900 GD-1 0.225
7. 400kV Aurangabad-Bableshwar S/C fault
8. 400/220kV ICT-1 at Bableshwar
9. 400/220kV ICT-2 at Bableshwar
10. 400/220kV ICT-3 at Bableshwar
11. 400/220kV ICT-4 at Bableshwar
12. 400kV Bus-1 at Bableshwar
13. 400kV Bus-2 at Bableshwar
Tripping of
1.500 MW VSTPP Unit : 8
2.500 MW VSTPP Unit : 9 Tripping of VSTPS Unit Number 8 on
Differential protection of Generator
3.500 MW VSTPP UNIT :10
9 WR NTPC / POWERGRID 23/05/2017 17:43 23/05/2017 19:02 1:09 Transformer and at the same time 1400 Nil GI-2 Nil
4.400 KV Vindhyachal – Jabalpur- I multiple trippings happened around
5.400 KV Vindhyachal – Satna- III VSTPS
6.400 KV Vindhyachal – Satna- IV
7. 500 kVHVDC Vindhyachal Block –I
Tripping of
1.220KV Raita – Gurur
2.220KV Raita - Siltara Tripping of Bhilai -Khedamara I & II
10 WR CSEB 25/05/2017 20:35 25/05/2017 20:59 0:24
causes the interupption of power
Nil 740 GD-1 0.296
3.220KV Bhilai – Khedamara I
4.220KV Bhilai – Khedamara II
5.220KV Bhilai – Raipur PG
Tripping of
1. HVDC Champa-Kurushetra Pole-1
2. 400 kV KWPCL-Raigarh PS(Kotra)-II POWERGRID / DB Tripping due to Heavy wind and bad
11 WR 27/05/2017 18:35 27/05/2017 19:15 0:40 Nil Nil GI-2 Nil
3. 400 kV Kotra(PS)-Lara-I & II Power/ NTPC /SKS weather condition at Kotra.
4. 400 kV SKS-KOTRA-II
5. 400 kV DB Power-Kotra-I & II
Tripping of
Tripping of evacuation on fault lines
12 WR 1. 400 kV Mouda-Wardha 2 (Ckt 1 already tripped) Mouda 28/05/2017 19:04 28/05/2017 19:45 0:41 580 Nil GD-1
causing blackout of Mouda
2. Mouda Unit 1 and 2 Nil
Annexure-8.2A
WESTERN REGION SCHEMES FUNDED FROM PSDF
(Amount in Rupees Crores)
( Amount in Rs. Crores) (As on 31.05.2017)
Sr. State / UT No. of Scope of Work (Scheme) Approved Grant Date of Funds % of fund Status
No. Schemes Cost Sanctioned Sanction Released Disbursed against
grant Sanctioned
***************
Annexure -8.2 B
2 work details
2.1
2.2
….
3 Others
KSK Mahanadi
24 Power Co Ltd AKALTARA TPS Chhattisgarh WR 1 600 13/08/2013 3 N N Y Y N 30/06/2022
KSK Mahanadi
25 Power Co Ltd AKALTARA TPS Chhattisgarh WR 2 600 22/08/2014 2 N N Y Y N 31/03/2022
M/s Lanko
26 Amarkantak Ltd, PATHADI TPP Chhattisgarh WR 1 300 04/06/2009 8 N N N N N 31/12/2020TO BE PHASED OUT
M/s Lanko
27 Amarkantak Ltd, PATHADI TPP Chhattisgarh WR 2 300 25/03/2010 7 N N N N N 31/12/2020TO BE PHASED OUT
28 M/s O.P.Jindal OP JINDAL TPS Chhattisgarh WR 1 250 02/09/2007 9 N N Y Y N 31/03/2022
29 M/s O.P.Jindal OP JINDAL TPS Chhattisgarh WR 2 250 10/02/2008 9 N N Y Y N 31/03/2022
30 M/s O.P.Jindal OP JINDAL TPS Chhattisgarh WR 3 250 06/03/2008 9 N N Y Y N 30/06/2022
31 M/s O.P.Jindal OP JINDAL TPS Chhattisgarh WR 4 250 17/06/2008 9 N N Y Y N 30/06/2022
32 M/s O.P.Jindal TAMNAR TPP Chhattisgarh WR 1 600 10/03/2014 3 N N Y Y N 31/03/2021
33 M/s O.P.Jindal TAMNAR TPP Chhattisgarh WR 2 600 30/03/2014 3 N N Y Y N 31/12/2021
34 M/s O.P.Jindal TAMNAR TPP Chhattisgarh WR 3 600 07/01/2015 2 N N Y Y N 31/03/2022
35 M/s O.P.Jindal TAMNAR TPP Chhattisgarh WR 4 600 28/03/2015 2 N N Y Y N 30/06/2022
Maruti Power
36 Limited BANDAKHAR TPP Chhattisgarh WR 1 300 31/07/2015 1 N N Y Y N 31/03/2020
37 NTPC KORBA STPS Chhattisgarh WR 1 200 28/02/1983 34 N N N N Y 31/03/2021TO BE PHASED OUT
38 NTPC KORBA STPS Chhattisgarh WR 2 200 31/10/1983 33 N N N N Y 31/03/2021TO BE PHASED OUT
39 NTPC KORBA STPS Chhattisgarh WR 3 200 17/03/1984 33 N N N N N 31/03/2021TO BE PHASED OUT
40 NTPC KORBA STPS Chhattisgarh WR 4 500 31/05/1987 30 N N N N Y 31/03/2021TO BE PHASED OUT
41 NTPC KORBA STPS Chhattisgarh WR 5 500 25/03/1988 29 N N N N Y 31/03/2021TO BE PHASED OUT
42 NTPC KORBA STPS Chhattisgarh WR 6 500 26/02/1989 28 N N N N N 31/03/2021TO BE PHASED OUT
43 NTPC KORBA STPS Chhattisgarh WR 7 500 25/11/2010 6 N N Y Y N 31/03/2022
44 NTPC SIPAT STPS Chhattisgarh WR 1 500 27/05/2007 10 N N Y Y N 31/03/2022
45 NTPC SIPAT STPS Chhattisgarh WR 2 500 13/08/2008 8 N N Y Y N 31/12/2022
46 NTPC SIPAT STPS Chhattisgarh WR 3 660 27/06/2011 6 N N Y Y N 31/03/2022
47 NTPC SIPAT STPS Chhattisgarh WR 4 660 24/12/2011 5 N N Y Y N 31/12/2022
48 NTPC SIPAT STPS Chhattisgarh WR 5 660 02/06/2012 5 N N Y Y N 31/12/2023
49 NTPC & Sail BHILAI TPS Chhattisgarh WR 1 250 20/04/2008 9 N N N N N NORMS COMPLIANT
50 NTPC & Sail BHILAI TPS Chhattisgarh WR 2 250 12/07/2009 7 N N N N N NORMS COMPLIANT
RKM Powergen
51 Private Ltd. UCHPINDA TPP Chhattisgarh WR 1 360 28/10/2015 1 N N Y Y N 31/03/2022
RKM Powergen
52 Private Ltd. UCHPINDA TPP Chhattisgarh WR 3 360 28/01/2016 1 N N Y Y N 31/12/2021
53 S V Power Ltd SVPL TPP Chhattisgarh WR 1 63 07/12/2011 5 N Y N/A N/A N
Spectrem Coal
54 & Power Ltd RATIJA TPS Chhattisgarh WR 1 50 04/02/2013 4 N Y N/A N/A N
Spectrem Coal
55 & Power Ltd RATIJA TPS Chhattisgarh WR 1 50 10/11/2016 0 N Y N/A N/A N
57 Vandana Vidyut SALORA TPP Chhattisgarh WR 1 135 10/04/2014 3 N N N N N NO PLAN GIVEN(ELECTRICALLY ISOLATED FRO
Adani Power
58 Ltd. MUNDRA TPS Gujarat WR 1 330 04/08/2009 7 N N Y Y N 31/03/2022
Adani Power
59 Ltd. MUNDRA TPS Gujarat WR 2 330 17/03/2010 7 N N Y Y N 31/03/2022
Adani Power
60 Ltd. MUNDRA TPS Gujarat WR 3 330 02/08/2010 6 N N Y Y N 31/12/2021
Adani Power
61 Ltd. MUNDRA TPS Gujarat WR 4 330 20/12/2010 6 N N Y Y N 30/09/2021
Adani Power
62 Ltd. MUNDRA TPS Gujarat WR 5 660 26/12/2010 6 N N Y Y N 30/06/2021
Adani Power
63 Ltd. MUNDRA TPS Gujarat WR 6 660 20/07/2011 5 N N Y Y N 31/03/2021
Adani Power
64 Ltd. MUNDRA TPS Gujarat WR 7 660 07/11/2011 5 Y N N/A N/A N
Adani Power
65 Ltd. MUNDRA TPS Gujarat WR 8 660 03/03/2012 5 Y N N/A N/A N
Adani Power
66 Ltd. MUNDRA TPS Gujarat WR 9 660 09/03/2012 5 Y N N/A N/A N
Bhavnagar
Energy
67 Company Ltd Bhavnagar Lignite TPP Gujarat WR 1 250 16/05/2016 1 N Y N/A N/A N
68 Essar Gujarat SALAYA TPP Gujarat WR 1 600 04/01/2012 5 N N Y Y N 30/06/2021
69 Essar Gujarat SALAYA TPP Gujarat WR 2 600 15/06/2012 5 N N Y Y N 31/03/2021
70 GIPCL SURAT LIG. TPS Gujarat WR 1 125 16/01/2000 17 N Y N/A N/A N
71 GIPCL SURAT LIG. TPS Gujarat WR 2 125 06/11/1999 17 N Y N/A N/A N
72 GIPCL SURAT LIG. TPS Gujarat WR 3 125 12/04/2010 7 N Y N/A N/A Y 30/09/2020
73 GIPCL SURAT LIG. TPS Gujarat WR 4 125 23/04/2010 7 N Y N/A N/A Y 31/12/2020
74 GMD Corpn. AKRIMOTA LIG TPS Gujarat WR 1 125 31/03/2005 12 N Y N/A N/A Y 30/09/2020
75 GMD Corpn. AKRIMOTA LIG TPS Gujarat WR 2 125 19/12/2005 11 N Y N/A N/A Y 31/12/2020
76 GSECL GANDHI NAGAR TPS Gujarat WR 3 210 20/03/1990 27 N N Y Y N PARTIAL FGD
77 GSECL GANDHI NAGAR TPS Gujarat WR 4 210 20/07/1991 25 N N Y Y N PARTIAL FGD
78 GSECL GANDHI NAGAR TPS Gujarat WR 5 210 17/03/1998 19 N N Y Y N PARTIAL FGD
79 GSECL KUTCH LIG. TPS Gujarat WR 1 70 29/03/1990 27 N N Y Y Y PARTIAL FGD
80 GSECL KUTCH LIG. TPS Gujarat WR 2 70 25/03/1991 26 N N Y Y Y PARTIAL FGD
81 GSECL KUTCH LIG. TPS Gujarat WR 3 75 31/03/1997 20 N N Y Y Y PARTIAL FGD
82 GSECL KUTCH LIG. TPS Gujarat WR 4 75 01/10/2009 7 N Y N/A N/A Y 31/12/2020
83 GSECL SIKKA REP. TPS Gujarat WR 2 120 31/03/1993 24 N N N N N 30/06/2017TO BE PHASED OUT
84 GSECL SIKKA REP. TPS Gujarat WR 3 250 29/03/2015 2 N N Y Y N FGD POSSIBLE
85 GSECL SIKKA REP. TPS Gujarat WR 4 250 25/09/2015 1 N N Y Y N FGD POSSIBLE
86 GSECL UKAI TPS Gujarat WR 3 200 21/01/1979 38 N N Y Y Y FGD POSSIBLE
87 GSECL UKAI TPS Gujarat WR 4 200 28/03/1979 38 N N Y Y Y FGD POSSIBLE
88 GSECL UKAI TPS Gujarat WR 5 210 30/01/1985 32 N N Y Y Y FGD POSSIBLE
89 GSECL UKAI TPS Gujarat WR 6 500 05/03/2013 4 N N Y Y Y 31/03/2022
90 GSECL WANAKBORI TPS Gujarat WR 1 210 23/03/1982 35 N N Y Y Y FGD POSSIBLE
91 GSECL WANAKBORI TPS Gujarat WR 2 210 15/01/1983 34 N N Y Y Y FGD POSSIBLE
92 GSECL WANAKBORI TPS Gujarat WR 3 210 15/03/1984 33 N N Y Y Y FGD POSSIBLE
93 GSECL WANAKBORI TPS Gujarat WR 4 210 09/03/1986 31 N N Y Y Y FGD POSSIBLE
94 GSECL WANAKBORI TPS Gujarat WR 5 210 23/09/1986 30 N N Y Y Y FGD POSSIBLE
95 GSECL WANAKBORI TPS Gujarat WR 6 210 18/11/1987 29 N N Y Y Y FGD POSSIBLE
96 GSECL WANAKBORI TPS Gujarat WR 7 210 31/12/1998 18 N N Y Y Y FGD POSSIBLE
Tata Power
97 (CGPL) MUNDRA UMTPP Gujarat WR 1 800 07/03/2012 5 N N Y Y N 30/06/2020
Tata Power
98 (CGPL) MUNDRA UMTPP Gujarat WR 2 800 30/07/2012 4 N N Y Y N 31/03/2021
Tata Power
99 (CGPL) MUNDRA UMTPP Gujarat WR 3 800 27/10/2012 4 N N Y Y N 30/06/2021
Tata Power
100 (CGPL) MUNDRA UMTPP Gujarat WR 4 800 21/01/2013 4 N N Y Y N 31/03/2022
Tata Power
101 (CGPL) MUNDRA UMTPP Gujarat WR 5 800 22/03/2013 4 N N Y Y N 31/03/2022
Torrent Power
102 Generation Ltd,. SABARMATI Gujarat WR 1 120 12/10/1978 38 N N Y Y N PARTIAL FGD
Torrent Power
103 Generation Ltd,. SABARMATI Gujarat WR 2 121 31/12/1984 32 N N Y Y N PARTIAL FGD
Torrent Power
104 Generation Ltd,. SABARMATI Gujarat WR 3 121 28/09/1988 28 N N Y Y N PARTIAL FGD
Torrent Power
105 Generation Ltd,. SABARMATI Gujarat WR 15 30 25/02/1962 55 N N N N N 31/12/2017TO BE PHASED OUT
Torrent Power
106 Generation Ltd,. SABARMATI Gujarat WR 16 30 19/05/1963 54 N N N N N 31/12/2017TO BE PHASED OUT
107 BLA Pvt Limited NIWARI TPP Madhya Pradesh WR 1 45 10/12/2013 3 N N N N N NORMS COMPLIANT
108 BPSCL BINA TPS Madhya Pradesh WR 1 250 12/08/2012 4 N N N N N NORMS COMPLIANT
109 BPSCL BINA TPS Madhya Pradesh WR 2 250 31/03/2013 4 N N N N N NORMS COMPLIANT
110 ESSAR power MAHAN TPP Madhya Pradesh WR 1 600 24/02/2013 4 N N Y Y N 31/12/2020
Jaipraksh
Power Venture
111 Ltd NIGRI TPP Madhya Pradesh WR 1 660 29/08/2014 2 N N Y Y N 30/06/2020
Jaipraksh
Power Venture
112 Ltd NIGRI TPP Madhya Pradesh WR 2 660 27/02/2015 2 N N Y Y N 30/09/2020
Jhabua Power
113 Ltd. SEIONI TPP Madhya Pradesh WR 1 600 22/03/2016 1 N N Y Y N 31/03/2020
114 MB Power ANUPPUR TPP Madhya Pradesh WR 1 600 20/04/2015 2 N N Y Y N 31/03/2022
115 MB Power ANUPPUR TPP Madhya Pradesh WR 2 600 30/03/2016 1 N N Y Y N 30/06/2022
AMARKANTAK EXT
116 MPPGCL TPS Madhya Pradesh WR 5 210 15/06/2008 9 N N Y Y Y PARTIAL FGD
117 MPPGCL SANJAY GANDHI TPS Madhya Pradesh WR 1 210 26/03/1993 24 N N Y Y Y PARTIAL FGD
118 MPPGCL SANJAY GANDHI TPS Madhya Pradesh WR 2 210 27/03/1993 24 N N Y Y Y PARTIAL FGD
119 MPPGCL SANJAY GANDHI TPS Madhya Pradesh WR 3 210 28/02/1999 18 N N Y Y Y 30/06/2021
120 MPPGCL SANJAY GANDHI TPS Madhya Pradesh WR 5 500 18/06/2007 10 N N Y Y Y 31/03/2021
121 MPPGCL SATPURA TPS Madhya Pradesh WR 10 250 22/03/2013 4 N N Y Y Y 30/09/2020
122 MPPGCL SATPURA TPS Madhya Pradesh WR 11 250 25/12/2013 3 N N Y Y Y 30/06/2020
123 MPPGCL SHRI SINGHAJI TPP Madhya Pradesh WR 1 600 18/11/2013 3 N N Y Y N 31/03/2020
124 MPPGCL SHRI SINGHAJI TPP Madhya Pradesh WR 2 600 15/10/2014 2 N N Y Y N 31/12/2019
125 NTPC VINDHYACHAL STPS Madhya Pradesh WR 1 210 10/10/1987 29 N N N N Y 31/03/2021TO BE PHASED OUT
126 NTPC VINDHYACHAL STPS Madhya Pradesh WR 2 210 23/07/1988 28 N N N N Y 31/03/2021TO BE PHASED OUT
127 NTPC VINDHYACHAL STPS Madhya Pradesh WR 3 210 03/02/1989 28 N N N N Y 31/03/2021TO BE PHASED OUT
128 NTPC VINDHYACHAL STPS Madhya Pradesh WR 4 210 26/12/1989 27 N N N N Y 31/03/2021TO BE PHASED OUT
129 NTPC VINDHYACHAL STPS Madhya Pradesh WR 5 210 31/03/1990 27 N N N N Y 31/03/2021TO BE PHASED OUT
130 NTPC VINDHYACHAL STPS Madhya Pradesh WR 6 210 01/02/1991 26 N N N N Y 31/03/2021TO BE PHASED OUT
131 NTPC VINDHYACHAL STPS Madhya Pradesh WR 7 500 03/03/1999 18 N N N N N 31/03/2021TO BE PHASED OUT
132 NTPC VINDHYACHAL STPS Madhya Pradesh WR 8 500 26/02/2000 17 N N N N N 31/03/2021TO BE PHASED OUT
133 NTPC VINDHYACHAL STPS Madhya Pradesh WR 9 500 27/07/2006 #### N N Y Y Y FGD POSSIBLE
134 NTPC VINDHYACHAL STPS Madhya Pradesh WR 10 500 08/03/2007 9.82 N N Y Y Y FGD POSSIBLE
135 NTPC VINDHYACHAL STPS Madhya Pradesh WR 11 500 14/06/2012 4.55 N N Y Y N FGD POSSIBLE
136 NTPC VINDHYACHAL STPS Madhya Pradesh WR 12 500 22/03/2013 3.78 N N Y Y N FGD POSSIBLE
137 NTPC VINDHYACHAL STPS Madhya Pradesh WR 13 500 06/08/2015 1.41 Y N N/A N/A N
Reliance Power
138 Ltd SASAN UMTPP Madhya Pradesh WR 1 660 30/05/2013 4 N N Y Y N 30/09/2021
Reliance Power
139 Ltd SASAN UMTPP Madhya Pradesh WR 2 660 18/12/2013 3 N N Y Y N 30/06/2021
Reliance Power
140 Ltd SASAN UMTPP Madhya Pradesh WR 3 660 21/05/2014 3 N N Y Y N 31/03/2022
Reliance Power
141 Ltd SASAN UMTPP Madhya Pradesh WR 4 660 25/03/2014 3 N N Y Y N 31/03/2022
Reliance Power
142 Ltd SASAN UMTPP Madhya Pradesh WR 5 660 24/08/2014 2 N N Y Y N 31/12/2021
Reliance Power
143 Ltd SASAN UMTPP Madhya Pradesh WR 6 660 19/03/2015 2 N N Y Y N 30/09/2021
Abhijeetb
MADC Nagpur
144 Enery P L MIHAN TPS Maharashtra WR 1 246 09/02/2012 5 N Y N/A N/A N
Adani Power
145 Maharashtra Ltd TIRORA TPS Maharashtra WR 1 660 11/09/2012 4 N N Y Y N 31/03/2022
Adani Power
146 Maharashtra Ltd TIRORA TPS Maharashtra WR 2 660 25/03/2013 4 N N Y Y N 31/12/2021
Adani Power
147 Maharashtra Ltd TIRORA TPS Maharashtra WR 3 660 10/06/2013 4 N N Y Y N 30/09/2021
Adani Power
148 Maharashtra Ltd TIRORA TPS Maharashtra WR 4 660 23/03/2014 3 N N Y Y N 30/06/2021
Adani Power
149 Maharashtra Ltd TIRORA TPS Maharashtra WR 5 660 25/09/2014 2 N N Y Y N 31/03/2021
150 BSES Pvt. DAHANU TPS Maharashtra WR 1 250 06/01/1995 22 Y N N/A N/A N
151 BSES Pvt. DAHANU TPS Maharashtra WR 2 250 29/03/1995 22 Y N N/A N/A N
Dhariwal
152 Infrastructure DHARIWAL TPP Maharashtra WR 1 300 03/11/2013 3 N N Y Y N FGD POSSIBLE
Dhariwal
153 Infrastructure DHARIWAL TPP Maharashtra WR 2 300 28/05/2014 3 N N Y Y N 31/03/2022
GMR emco
154 ENERGY ltd EMCO WARORA TPS Maharashtra WR 1 300 07/02/2013 4 N N Y Y N 31/03/2022
GMR emco
155 ENERGY ltd EMCO WARORA TPS Maharashtra WR 2 300 27/08/2013 3 N N Y Y N 31/03/2022
Gupta Energy P
156 L GEPL TPP Ph-I Maharashtra WR 1 60 28/04/2012 5 N N N N Y 31/03/2018TO BE PHASED OUT
Gupta Energy P
157 L GEPL TPP Ph-I Maharashtra WR 2 60 08/09/2012 4 N N N N Y 31/03/2018TO BE PHASED OUT
Ideal Energy
158 Projects Ltd. BELA TPS Maharashtra WR 1 270 20/03/2013 4 N N Y Y Y 31/03/2022
JSW
Energy(Ratnagir
159 i) JSW RATNAGIRI TPP Maharashtra WR 1 300 24/08/2010 6 Y N N/A N/A N
JSW
Energy(Ratnagir
160 i) JSW RATNAGIRI TPP Maharashtra WR 2 300 09/12/2010 6 Y N N/A N/A N
JSW
Energy(Ratnagir
161 i) JSW RATNAGIRI TPP Maharashtra WR 3 300 06/05/2011 6 Y N N/A N/A N
JSW
Energy(Ratnagir
162 i) JSW RATNAGIRI TPP Maharashtra WR 4 300 08/10/2011 5 Y N N/A N/A N
163 MAHAGENCO BHUSAWAL TPS Maharashtra WR 2 210 30/08/1979 37 N N Y Y Y PARTIAL FGD
164 MAHAGENCO BHUSAWAL TPS Maharashtra WR 3 210 18/09/1982 34 N N Y Y N PARTIAL FGD
165 MAHAGENCO BHUSAWAL TPS Maharashtra WR 4 500 07/03/2012 5 N N Y Y Y PARTIAL FGD
166 MAHAGENCO BHUSAWAL TPS Maharashtra WR 5 500 30/03/2012 5 N N Y Y Y PARTIAL FGD
167 MAHAGENCO CHANDRAPUR STPS Maharashtra WR 3 210 03/05/1985 32 N N Y Y N FGD POSSIBLE
168 MAHAGENCO CHANDRAPUR STPS Maharashtra WR 4 210 08/03/1986 31 N N Y Y N FGD POSSIBLE
169 MAHAGENCO CHANDRAPUR STPS Maharashtra WR 5 500 22/03/1991 26 N N Y Y N FGD POSSIBLE
170 MAHAGENCO CHANDRAPUR STPS Maharashtra WR 6 500 11/03/1992 25 N N Y Y N FGD POSSIBLE
171 MAHAGENCO CHANDRAPUR STPS Maharashtra WR 7 500 01/10/1997 19 N N Y Y N FGD POSSIBLE
172 MAHAGENCO CHANDRAPUR STPS Maharashtra WR 8 500 29/03/2015 2 N N Y Y Y 31/12/2021
173 MAHAGENCO CHANDRAPUR STPS Maharashtra WR 9 500 21/03/2016 1 N N Y Y N 31/03/2020
174 MAHAGENCO KHAPARKHEDA TPS Maharashtra WR 1 210 26/03/1989 28 N N Y Y Y FGD POSSIBLE
175 MAHAGENCO KHAPARKHEDA TPS Maharashtra WR 2 210 08/01/1990 27 N N Y Y Y FGD POSSIBLE
176 MAHAGENCO KHAPARKHEDA TPS Maharashtra WR 3 210 31/05/2000 17 N N Y Y Y FGD POSSIBLE
177 MAHAGENCO KHAPARKHEDA TPS Maharashtra WR 4 210 07/01/2001 16 N N Y Y N FGD POSSIBLE
178 MAHAGENCO KHAPARKHEDA TPS Maharashtra WR 5 500 05/08/2011 5 N N Y Y N FGD POSSIBLE
179 MAHAGENCO KORADI TPS Maharashtra WR 6 210 30/03/1982 35 N N Y Y N PARTIAL FGD
180 MAHAGENCO KORADI TPS Maharashtra WR 7 210 13/01/1983 34 N N Y Y Y PARTIAL FGD
181 MAHAGENCO KORADI TPS Maharashtra WR 8 660 30/03/2015 2 N N Y Y N FGD POSSIBLE
182 MAHAGENCO KORADI TPS Maharashtra WR 9 660 15/03/2016 1 N N Y Y N FGD POSSIBLE
183 MAHAGENCO NASIK TPS Maharashtra WR 3 210 26/04/1979 38 N N Y Y N PARTIAL FGD
184 MAHAGENCO NASIK TPS Maharashtra WR 4 210 10/07/1980 37 N N Y Y Y PARTIAL FGD
185 MAHAGENCO NASIK TPS Maharashtra WR 5 210 30/01/1981 36 N N Y Y Y PARTIAL FGD
186 MAHAGENCO PARAS TPS Maharashtra WR 3 250 31/05/2007 10 N N N N Y NORMS COMPLIANT
187 MAHAGENCO PARAS TPS Maharashtra WR 4 250 27/03/2010 7 N N N N Y NORMS COMPLIANT
188 MAHAGENCO PARLI TPS Maharashtra WR 4 210 26/03/1985 32 N N Y Y Y PARTIAL FGD
189 MAHAGENCO PARLI TPS Maharashtra WR 5 210 31/12/1987 29 N N Y Y N PARTIAL FGD
190 MAHAGENCO PARLI TPS Maharashtra WR 6 250 16/02/2007 10 N N Y Y Y PARTIAL FGD
191 MAHAGENCO PARLI TPS Maharashtra WR 7 250 10/02/2010 7 N N Y Y Y PARTIAL FGD
192 MAHAGENCO PARLI TPS Maharashtra WR 8 250 30/03/2016 1 N N Y Y N PARTIAL FGD
193 NTPC MOUDA TPS Maharashtra WR 1 500 19/04/2012 5 N N Y Y N 31/12/2021
194 NTPC MOUDA TPS Maharashtra WR 2 500 29/03/2013 4 N N Y Y Y 30/06/2021
195 NTPC MOUDA TPS Maharashtra WR 3 660 28/03/2016 1 N N Y Y Y 31/12/2020
196 Ratan Power AMARAVATI TPS Maharashtra WR 1 270 25/03/2013 4 N N Y Y N
197 Ratan Power AMARAVATI TPS Maharashtra WR 2 270 17/02/2014 3 N N Y Y N
198 Ratan Power AMARAVATI TPS Maharashtra WR 3 270 29/01/2015 2 N N Y Y N
199 Ratan Power AMARAVATI TPS Maharashtra WR 4 270 04/03/2015 2 N N Y Y N
200 Ratan Power AMARAVATI TPS Maharashtra WR 5 270 12/03/2015 2 N N Y Y N
201 Ratan Power NASIK (P) TPS Maharashtra WR 1 270 25/02/2014 3 N N Y Y N PARTIAL FGD
202 Ratan Power NASIK (P) TPS Maharashtra WR 2 270 15/02/2017 3 N N Y Y N
TATA Power
203 Co. TROMBAY TPS Maharashtra WR 5 500 25/01/1984 33 Y N N/A N/A Y
TATA Power
204 Co. TROMBAY TPS Maharashtra WR 8 250 26/03/2009 8 Y N N/A N/A N
Vidarbha
205 Industries Ltd BUTIBORI TPP Maharashtra WR 1 300 17/08/2012 4 N N Y Y N 30/06/2021
Vidarbha
206 Industries Ltd BUTIBORI TPP Maharashtra WR 2 300 19/03/2013 4 N N Y Y N 31/03/2021
WARDHA WARORA
207 Wardha P C P L TPP Maharashtra WR 1 135 05/06/2010 7 N N Y Y N 31/12/2021
WARDHA WARORA
208 Wardha P C P L TPP Maharashtra WR 2 135 10/10/2010 6 N N Y Y N 31/12/2021
WARDHA WARORA
209 Wardha P C P L TPP Maharashtra WR 3 135 21/01/2011 6 N N Y Y N 30/09/2021
WARDHA WARORA
210 Wardha P C P L TPP Maharashtra WR 4 135 30/04/2011 6 N N Y Y N 30/09/2021
ANNEXURE 9.2
WR - I WR-II
Type of
Phone Type of Phone Nearest PDH / Nearest
Sr No Owner Station Name WRLDC Remarks POWERGRID Reply Orange Remark Sr No Owner Station Name VOIP Numbers WRLDC Remarks Phone POWERGRID Reply Orange Remark
Numbers envisaged SDH PDH/SDH
Envisaged
1 PG Raipur 400 kV 20221370 WORKING VOIP WORKING Done 1 PG Jabalpur 400 kV 20221360 WORKING VOIP WORKING Done
2 PG Bhadrwathi 20221380 WORKING VOIP WORKING Done 2 PG khandwa 20221361 WORKING VOIP WORKING Done
3 ISGS RGPPL 400 20220430 NOT INTEGRATED Analog EXTN created in Mumbai 3 PG Damoh 20221357 WORKING VOIP WORKING Done
6 ISGS SIPAT 400 20221368 WORKING VOIP WORKING Done 6 PG Satna 20221352 WORKING VOIP WORKING Done
8 PG SEONI 765 20221376 NOT WORKING VOIP WORKING Done 8 PG Indore 765 20221351 Working till Tejas PDH VOIP WORKING Done
EXTN created in
9 PG BHATAPARA 20220432 NOT INTEGRATED VoIP In Process In Process 9 ISGS SSP 20220355 WORKING Analog WORKING
Mumbai
Phone has been
10 PG RAIGARH 400 20220382 Working till Tejas PDH VOIP WORKING Done 10 PG Dehgham 20221402 NOT INTEGRATED VOIP In Process
delivered
Channel created from Raipur Phone has been
11 ipp JINDAL 400 20220433 NOT INTEGRATED Analog Raipur EXTN created in Mumbai 11 PG Pirana 20220403 NOT INTEGRATED VOIP In Process
to WRLDC delivered
13 PG SHOLAPUR 400 20221359 WORKING VOIP WORKING Done 13 PG Rajgarh 20221371 Working till Tejas PDH VOIP WORKING Done
38 PG PUNE 765 20221378 WORKING VOIP WORKING Done 38 IPP MB POWER 400 20220424 NOT INTEGRATED Analog JABALPUR Channel created from Jabua Power to WRLDC EXTN created in
POOL Mumbai
Channel created from Kotra EXTN created in
39 ipp DB POWER 20220450 NOT INTEGRATED Analog KOTRA EXTN created in Mumbai 39 ISGS tarapur 400 20220424 NOT INTEGRATED Analog Boisar Channel created from Boisar to WRLDC
to WRLDC Mumbai
VoIP Phone handed over to
EXTN created in
40 IPP JPL STG II 20220397 Working till Tejas PDH VOIP TAMNAR M/s JPL. Distance between Done 40 ISGS tarapur 220 20220426 NOT INTEGRATED Analog
Mumbai
Control Room & Comm.
41 PG CPCC - Nagpur 20221451 WORKING VOIP WORKING Done 41 PG Betul 20220427 NOT INTEGRATED Analog KHANDWA In Process In progress
Channel created from Kotra
42 ISGS NSPCL 20220452 Analog Raipur 400 EXTN created in Mumbai 42 PG CPCC - Baroda 20221428 WORKING VOIP WORKING Done
to WRLDC
43 PG Champa hvdc 20220444 WORKING VOIP WORKING Done