2 Meshing
2 Meshing
Job No : BG-P-1275
Job Name : Japan Metal Building
Building : 01
DESIGN CALCULATIONS
Table of Contents
Introduction .................................................................................................................................. 3
CONNECTION DESIGN.................................................................................................................. 31
2
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
Introduction
This Design Calculation package has been prepared using the international codes that stated in the
next clause (Applicable Design Codes) and the latest developments in engineering practices. A competent
design engineer prepared the calculations which were checked by another engineer .The initials of both
engineers are shown on most pages.
Computer program verified and tested by "Bestgrid structural consultants India Pvt. Ltd ". STAAD
Pro has been used mainly in structural design and requirements. The output of this program and any
other one has been incorporated in this package together with explanation text where possible.
For your easy reference, all pages have been numbered and a table of contents has been provided. We
have divided the package into two sections as follows:
1. Design Information: This section contains the description of the building designed, design codes
and material specifications used, design assumptions, loads and design sketches showing
building components layouts and members sizes.
2. Computer Software Analysis & Design: This section includes the output of computer program
STAAD Pro used in the design along with explanations for the output where possible.
Please use this calculations package in conjunction with the drawings provided. You can resubmit this
Engineering Department package with the drawings to other parties for their approval as required, or,
keep this package for future reference. “Bestgrid structural consultants India Pvt. Ltd " does not require
these calculations to be returned.
For any questions regarding this package please do not hesitate to contact our sales office.
“Bestgrid structural consultants India Pvt. Ltd” keeps records of reference on design calculations for each
building designed as a part of “Bestgrid structural consultants India Pvt. Ltd " total quality system.
Engineering Department
Bestgrid structural consultants India Pvt. Ltd
3
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
SECTION ONE
DESIGN INFORMATION
4
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
The structure described in these calculations was designed under the applied loads as
described in the Design Summary Sheet in accordance with the Buildings Design Codes
mentioned below:
2. Hot rolled sections and built up components have been designed in accordance with:
AISC 1989 “American Institute of Steel Construction” Manual of Steel Construction -
Allowable Stress Desig.1 East Wacker Drive, Suite 3100, Chicago, Illinois 60601-2001.
5
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
Fu=42.0 KN/cm2
5 Rods ASTM A615M Grade 280
Fy=28.0 KN/cm2
6
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
7
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
• The main frame rafters and exterior columns are rigidly connected to each other
(using moment type connections).
• The exterior columns are pin connected to the foundations.
• The lateral stability of the building is provided through the frame action of the main
frames.
• The longitudinal stability of the building is provided through the truss action &portal
action in the braced bays of the building.
• Bearing frame is considered at the ends.
• Building is designed for FULLY enclosed condition.
• The roof purlins are continuous beams supported at rigid frame locations and span
the bay spacing of the building.
• The sidewall and endwall girts are continuous beams supported at rigid frame
location and span the bay spacing of the building.
• The roof and wall sheeting provide lateral support for purlins and girts.
8
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
CLADDING
Roof Panel Sheeting is not in our scope
Wall Panel Sheeting is not in our scope
Partition Walls Nil
9
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
CANOPY
Refer Drawing
FRAMED OPENING
Refer Drawing
OTHERS
Sky light panel Nil.
Turbovent Nil.
Bracing 24 Dia rod bracing @ Roof & Wall. Portal bracing upto framed opening.
Purlins and Girts Refer Drawing
10
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
11
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
12
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
13
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
Roof Purlins:
Maximum spacing : 1500 mm
Lap : 770 mm minimum (385mm on Either Side)
: 200Z25
14
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
G F E D C B A
350 350
49900 OUT TO OUT OF STEEL LINE
330
350
350 350
08 08
OPENING
PORTAL PORTAL
1200(w) x 2700(h)
EB(4)20B
EB(4)20B
EB(4)20B
EB(4)20B
EB(4)20B
EB(4)20A
EB(4)20A
200
CL FRAMED
8700
8370
CANOPY
6000
FRAMED OPENING
C
5200(w) x 6000(h) L
2800
4350
NB(4)20A
07 SB(4)20A SB(4)20A
07
4350
2600
CANOPY
FRAMED OPENING
CL
6475
52000(w) x 6000(h)
PORTAL
11000
11000
PORTAL
200
R.C.C BUILDING
NB(4)20A
05 SB(4)20A SB(4)20A
05
48400 OUT TO OUT OF STEEL LINE
9500
200
FRAMED OPENING
C
L 2000(w) x 2700(h)
4120
CANOPY
2320
NB(4)20A SB(4)20A
04 SB(4)20A
04
4350
281 23919 25419 281
CRITICAL DISTANCE CRITICAL DISTANCE
PORTAL
PORTAL
11500
11500
R.C.C BUILDING
FRAMED OPENING C
1200(w) x 2700(h) L
1270
7350
FRAMED OPENING
2000(w) x 2700(h)
EB(4)20D
EB(4)20D
EB(4)20D
EB(4)20D
EB(4)20D
EB(4)20C
EB(4)20C
PORTAL PORTAL
01 01
200 200
350 3240
350
350
CANOPY
15
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
02 02
02
CL OF COLUMN CL OF COLUMN CL OF COLUMN
CRITICAL DISTANCE
CRITICAL DISTANCE
CRITICAL DISTANCE
225 250
200
200
300 200
15
15
281
50 50 50 50 350
283
50 50 50 50
350
350
15
15
50 50
15
CL OF COLUMN
CL OF COLUMN
CL OF COLUMN
81
83
G G
50 50 115
50 50 115
105
100
292
100
296
A A
CRITICAL DISTANCE
CRITICAL DISTANCE
360
360
340
100
D D
CRITICAL DISTANCE
CRITICAL DISTANCE
CRITICAL DISTANCE
BASE PLATE BASE PLATE
16mm THICK 16mm THICK
50 50 BASE PLATE 50 50 BASE PLATE 50 50 BASE PLATE 50 50 BASE PLATE 50 50 BASE PLATE
16mm THICK 16mm THICK 16mm THICK 16mm THICK 16mm THICK
R.L(+) 100.20 M R.L(+) 100.20 M R.L(+) 100.20 M R.L(+) 100.20 M R.L(+) 100.20 M
75
75
75
75
75
SB(4)20A SB(4)20B NB(4)20A NB(4)20B NB(4)20C
08 01 08 01
350 350 350 350
SW STEEL LINE SW STEEL LINE
CL OF COLUMN
BASE PLATE BASE PLATE BASE PLATE 15 83 100 BASE PLATE
350
350
350
350
G G
50 50
50 50
50 50
50 50
200
225
250
225
A A
EW STEEL LINE
EW STEEL LINE
75
75
+VE
R
C
FX 60 FX 57 65 FX 60 FX 57 65
FX FX
FY FY FY FY FY FY
SEISMIC WIND
4 kN 40 kN WIND: ± 3.662 kN
DL+LL: ± 208 kN
30 kN
30 kN
CANOPY COL. C1 REACTION CANOPY COL.C2 REACTION CANOPY COL. C3&C5 REACTION
FX FX FX
1 1 1
FY FY FY
16
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
24321 25828
3041 3720 400+4@1500+1400+1
4@1500+400 600+9@1500+2
8@1500+1600+1400+ 6020 6020 @974+900+80
80+901+2@970+
6016 RF RAFTER 6016
RF RAFTER 600-750x5(W)
6016 FR-02 750-670x6(W) FR-04 6016
FR-01 RFRAFTER 200x12(F) 200x10(F) RFRAFTER
3228 4056
RFRAFTER 650-750x5(W)
750-650x5(W) FR-05
200x6(F) RF RAFTER
750-650x5(W) 200x6(F) 10
650-750x5(W) RF RAFTER
RFRAFTER 175x6(F) 1
750-850x6(W)
850-750x6(W) 175x6(F)
175x6(F) "H" "J" 175x8(F)
"G"
"B"
1000 1230
1000 1230
"B"
"A" "A"
CLEAR HEIGHT
CLEAR HEIGHT
FC-09
RF COLUMN
4200
300x8(w)
4050
1500
1500
300x15(f)
EAVE HEIGHT
EAVE HEIGHT
CABLETRAY&PIPERACK CABLETRAY&PIPERACK
(SUPPORT BYOTHERS)
8794
T.O.C(+103.80M (SUPPORTBYOTHERS)
8644
1500
1500
TOP OF FLOOR
1630
RFCOLUMN MEZZ.COLUMN RF COLUMN
(TYP.) (TYP.)
3600
B/W 170
(4) M20 ANCHORBOLT
(4) M20ANCHORBOLT (4) M20ANCHORBOLT R.L(+100.2M w/350x16THK. PL. (4) M20ANCHORBOLT
1200
1200
B/W
49900 OUTTOOUTOFSTEELLINE
350 350
G F E D C B A
FRAMECROSSSECTION@GL-02
=DENOTESDOUBLE SIDEFLANGEBRACEL40x40x4 (TYP.)
24321 25828
3012 3745 400+4@1500+1400+1
400
1400+4@1500+ 600+9@1500+2
8@1500+1600+ 6020 6020 @974+900+80
80+901+2@970+
6016 6016
RFRAFTER RFRAFTER
6016 FR-07 750-672x6(W) 600-750x5(W) FR-09 6016
RFRAFTER 200x12(F)
3257 FR-06 650-750x5(W)
200x8(F) 10
RFRAFTER
FR-10 4031
RF RAFTER 10 750-650x5(W) RF RAFTER
200x6(F) 1
200x6(F)
1
RFRAFTER 750-650x5(W) 650-750x5(W)
850-750x5(W) 175x6(F) 175x6(F)
175x12(F) "D" "E"
"C"
"B"
1000 1230
1000 1230
"F"
"A" "A"
4372
251+3@1207+5
00
RF COLUMN
1500
EAVE HEIGHT
EAVE HEIGHT
300x6(w)
CLEAR HEIGHT
CABLETRAY&PIPERACK CABLETRAY&PIPERACK
CLEAR HEIGHT
250x15(f) 1500
8794
278
10
7800
7651
1500
1222
(6) M20x80HSB 1
w/ 200x16THK. PL.
RFCOLUMN
4350
CANOPY CLR HT.
250-800x5(w)
175x6(f) RF COLUMN
1630
1630
CANOPYRAFTER
250-800x5(w)
400-300x5(w)
3200
175x6(f) 175x10(f)
170
B/W 170
1200
B/W
49900 OUTTOOUTOFSTEELLINE
350 350
G D A
17
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
24321 25828
3012 3745
00 400+15@150
70+14@1500+4 6020 0+2@974+900
80+899+2@9 6020 +80
6016
RF RAFTER RF RAFTER 6016
)
6016 750-672x6(W 600-750x5(W) 6016
RF RAFTER 200x12(F) 200x8(F) RF RAFTER
3257 650-750x5(W) 10
750-650x5(W 4031
RF RAFTER 10 200x6(F) 1
200x6(F)
) RF RAFTER
) 1
RF RAFTER 750-650x5(W 650-750x5(W
175x6(F) )
850-750x5(W) 175x6(F)
175x12(F) "D" "E"
"C"
"B"
1000 1230
1000 1230
"F"
"A" "A"
RF COLUMN
1500
1500
EAVE HEIGHT
EAVE HEIGHT
300x6(w)
CLEAR HEIGHT
CLEAR HEIGHT
250x15(f)
8794
8644
7800
7651
1500
1500
RF COLUMN
250-800x5(w) RF COLUMN
175x6(f)
1630
1630
250-800x5(w)
175x6(f)
170
B/W 170
(4) M20 ANCHOR BOLT
(4) M20 ANCHOR BOLT R.L(+100.2M w/300x16 THK. PL. (4) M20 ANCHOR BOLT
1200
1200
B/W
200 200
CL OF RIDGE
24200 OUT OF STEEL LINE TO CENTER OF COLUMN 25700 CENTER OF COLUMN TO OUT OF STEEL LINE
24200 OUT OF STEEL LINE TO RIDGE 25700 RIDGE TO OUT OF STEEL LINE
G D A
FRAME CROSS SECTION @ GL-05
= DENOTES DOUBLE SIDE FLANGE BRACE L40x40x4 (TYP.)
24321 25828
3012 3745
+400 400+15@1500
70+14@1500 6020 +2@974+900
80+899+2@9 6020 +80
6016 6016
RF RAFTER RF RAFTER
6016 750-672x6(W) 600-750x5(W) 6016
RF RAFTER 200x12(F) 200x8(F) RF RAFTER
3257 ) 10
RF RAFTER 10 650-750x5(W 750-650x5(W) 4031
1 200x6(F) 1 RF RAFTER
) 200x6(F)
RF RAFTER 750-650x5(W 650-750x5(W
)
) 175x6(F) 175x6(F)
4372 850-750x5(W 4372
+251 175x12(F) "D" "E" 500+3@1207
500+3@1207 "C" +251
10
10 1
"B"
1000 1230
1000 1230
1 "F"
"A" "A"
(8) M20x80HSB (8) M20x80HSB
w/ 200x16 THK. PL. w/ 200x16 THK. PL.
"X"
4350
RF COLUMN
1500
1500
EAVE HEIGHT
EAVE HEIGHT
CANOPY RAFTER 300x6(w)
CLEAR HEIGHT
8644
150x8(f) 350x5(w)
CANOPY CLR HT.
7651
CR-05
1500
1500
FC-06
RF COLUMN
6200
6200
RF COLUMN
250-800x5(w) 250-800x5(w)
175x6(f)
1630
1630
175x6(f)
170
B/W 170
(4) M20 ANCHOR BOLT
(4) M20 ANCHOR BOLT R.L(+100.2M w/300x16 THK. PL. (4) M20 ANCHOR BOLT
1200
1200
B/W
24200 OUT OF STEEL LINE TO RIDGE 25700 RIDGE TO OUT OF STEEL LINE
G D A
FRAME CROSS SECTION @ GL-07 = DENOTES DOUBLE SIDE FLANGE BRACE L40x40x4 (TYP.)
18
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
DET-"B3"
1008
350x5(w)
1230
1230
175x6(f) 1327 6850 1327
PORTAL FRAME PORTAL FRAME
222
DET-"X" DET-"X"
1000
1000
5200 FO9 FO9
HEADER
1500
1500
200C 25
EAVE HEIGHT
EAVE HEIGHT
8794
8794
1500
1500
4400 4400 FO JAMB
6850 200C 25
FO JAMB
FO JAMB
6000
200C 25
200C 25
3000mm HIGH
FO JAMB
FO JAMB
FO JAMB
FO JAMB
FO JAMB
200C 25
FO JAMB
BLOCK WORK
200C 25
200C 25
200C 25
200C 25
200C 25
200C 25
200C 25
200C 25
1500
1500
170
3000
HEADER HEADER HEADER
2700
200C 25 200C 25 200C 25 FO4
1200
1200
1200
B/W
R.L(+) 100.20 M
SIDE WALL GIRT SIDE WALL GIRT SIDE WALL GIRT SIDE WALL GIRT SIDE WALL GIRT
200Z25(TYP.) 200Z25(TYP.) 200Z25(TYP.) 200Z25(TYP.) 200Z25(TYP.)
8700 11000 9500 11500 7700
08 07 05 04 02 01
1230
222
PORTAL FRAME PORTAL FRAME
1000
1000
FO9 5200
FO HEADER
200C 25
1500
1500
DET-"B3" 350x5(w) DET-"B3"
EAVE HEIGHT
175x6(f)
SUBJAMB DET-"Y"
8644
278
950
1500
2300 4400 1800
2000 DET-"X" 2300
FO JAMB
FO JAMB
200C 25
6000
200C 25
FO7
R.C.C BUILDING
SUBJAMB
HEADER HEADER
SUBJAMB
1500
1500
1630
2700
200C 25
FO JAMB
FO JAMB
200C 25 200C 25
1500
1500
170
3550
RCC BUILDING
3450
FO JAMB
1200
1200
1200
1200
B/W
R.L(+) 100.20 M 200C 25
1240 1320 1125 455 7400 600 380 1280 510 330
350
3200
SIDE WALL GIRT SIDE WALL GIRT SIDE WALL GIRT SIDE WALL GIRT
SIDE WALL GIRT
200Z25(TYP.) 200Z25(TYP.) 200Z25(TYP.) 200Z25(TYP.) 200Z25(TYP.)
7700 11500 9500 11000 8700
01 02 04 05 07 08
19
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
EW RAFTER
24321 300x4(W) EW RAFTER
25828
175x6(F) 300x4(W)
R 175x6(F) EW RAFTE
EW RAFTE) 300x4(W)
R
10 300x4(W 10
175x6(F) 175x6(F)
1 1 EW RAFTE
EW RAFTER R
300x4(W) 300x4(W)
175x6(F) 175x6(F)
1500
700
700
-0 2 6850 550
BR
1230
1230
BR 550 6850 550
-01 BR
-03
G FO3 4
EW COLUMN CIN FO3
R -0 ING
1000
1000
250x4(w) RA 12mm Ø SAG ROD (TYP.) B AC
150x6(f) LB L BR
AL
W Y P.) WAL .)
m
Ø (T EW COLUMN(TYP.) FO JAMB mØ (T YP
24 m EW COLUMN
1500
1500
DET-"Y" 200C25
24m 250x5(w)
EAVE HEIGHT
FO JAMB 250x4(w)
EAVE HEIGHT
200C25 175x8(f) 150x6(f)
T.O.C(+)103.8M (UNO)
8794
8644
DET-B3 DET-"Y" DET-B3
1500
1500
PORTAL FRAME PORTAL FRAME
HEADER
200C25
2852 mm HIGH 2852 mm HIGH
3000
3000
FO4
2700
BLOCK WORK BLOCK WORK
FO JAMB
FO JAMB
200C25
200C25
R.L(+)100.2M
2000 1900
350 350
END WALL GIRT END WALL GIRT END WALL GIRT END WALL GIRT END WALL GIRT
END WALL GIRT
200Z25 (TYP.) 200Z25 (TYP.) 200Z25 (TYP.) 200Z25 (TYP.) 200Z25 (TYP.) 200Z25 (TYP.)
8300 7950 7950 7950 7950 9800
G F E D C B A
END WALL FRAMING ELEVATION @ GL-01 = DENOTES DOUBLE SIDE FLANGE BRACE L40x40x4 (TYP.)
R EW RAFTE
25829 EW RAFTE R 24321
300x4(W) 300x4(W)
R 175x6(F) 175x6(F) EW RAFTER
EW RAFTE 300x4(W)
10 300x4(W) 10
SPANNER 175x6(F) 175x6(F)
1 1
R (TYP.) EW RAFTER
EW RAFTE
300x4(W) 300x4(W)
175x6(F) 175x6(F)
A
1500
550 6850 BR
1230
1230
550 6850 550
-0 6 -07
BR
BR ING -08
AC
1000
1000
-05 EW COLUMN(TYP.) FO3 BR
BR FO3 250x6(w)
ALLYP.) 200x10(f) ING
Ø W (T AC
m (UNO) BR
24m LL
WA
1500
1500
EW COLUMN FO JAMB 12mm Ø SAG ROD (TYP.) EW COLUMN
Ø P.)
EAVE HEIGHT
250x4(w) FO JAMB
EAVE HEIGHT
8794
8644
613
1500
1500
FO JAMB
887
200C25
PORTAL FRAME PORTAL FRAME
FO JAMB
FO JAMB
FO JAMB
FO JAMB
FO JAMB
FO JAMB
1630
200C25
1630
200C25 200C25 200C25 200C25 200C25
200C25
200C25
200C25
200C25
200C25
200C25
1500
1500
1500
1500
FO FO FO2 FO2
FO JAMB FO JAMB
2700
170
170
FO1 200C25 200C25
FO JAMB FO JAMB 1200 mm HIGH 1200 mm HIGH
200C25 200C25
1200
1200
1200
1200
1200
1200
BLOCK WORK BLOCK WORK
B/W
B/W
R.L(+)100.2M
350 1600 2300 2580 2300 1840 1200 550 6850 470 6850 350
END WALL GIRT END WALL GIRT END WALL GIRT END WALL GIRT END WALL GIRT END WALL GIRT
200Z25 (TYP.) 200Z25 (TYP.) 200Z25 (TYP.) 200Z25 (TYP.) 200Z25 (TYP.) 200Z25 (TYP.)
9800 7950 7950 7950 7950 8300
A B C D E F G
END WALL FRAMING ELEVATION @ GL-08
= DENOTES DOUBLE SIDE FLANGE BRACE L40x40x4 (TYP.)
"FO" DENOTES FRAMED OPENING-2300(w)x1500(h)
"FO1" DENOTES FRAMED OPENING-1200(w)x2700(h)
"FO2" DENOTES FRAMED OPENING-6850(w)x1500(h)
"FO3" DENOTES FRAMED OPENING-6850(w)x1000(h)
20
01
02
04
05
07
08
350
48400 OUT TO OUT OF STEEL LINE
ROOF PURLIN ROOF PURLIN ROOF PURLIN ROOF PURLIN ROOF PURLIN
200Z25 (TYP.)(UNO.) 200Z25 (TYP.)(UNO.) 200Z25 (TYP.) 200Z25 (TYP.)(UNO.) 200Z25 (TYP.)(UNO.)
6000
CANOPY
4350
350
200
350
350
(ST)
G
(ST) B R-1
24m
5
mØ 24 m
RO mØ
(TYP D BR R
) (TYPOD BR
AC ING ) AC
ING
BR -0 BR
9 -09 BR -1
5
$ $ $ $
SLOPE
Job No
BR-1 BR -1
0
BR -1
6
BR
F
0 -16
$ $ $ $
Customer
(TYP.)
(TYP.)
SLOPE
SPANNER
SPANNER
BR-1 BR
0
BR -1
0 BR -1
6 -16
$ $ $ $
(TYP.)
(TYP.)
Building No : 01
EW RAFTER
EW RAFTER
BR-11 BR-1
7
E
BR-1 BR-1
1 7
$ $ $ $
: Acero
BR-1
12mm Ø SAG ROD(TYP.)
BR-1
2 8
BR-1
2 BR-1
: BG-P-1275
$ $ $ 8 $
B R-1
8
3500
Job Name : Japan Metal Building
21
CANOPY
BR-1 BR-1
2 8
BR-1
2
$ $
200
$ $
C
BR-11 BR-1
BR-1 7
DESIGN CALCULATIONS
$ $
BR-1 7
1 $ $
BR BR BR
-10 -10 BR -1 -16
$ $ $
6 $
B
SLOPE
BR-1 BR -1
0
BR -1
0 6
BR -1
6
SLOPE
$ $ $ $
BR BR BR BR
-14 -14 -20 -20
(ST) (ST)
A
Done
200 200
2750
350
350
Rev: 01
4350
4350
CANOPY CANOPY
4120 6475
02
04
05
07
08
01
Date :17/08/2016
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
G A
350 350
200
200
CR-04 CR-05 A
07 350
200C25
CP-08
CP-07
200C25
200
CR-03
SLOPE
G
200Z20(TYP.)(UNO)
CANOPY ROOF PURLIN
200C25
CP-06
CP-03(TYP.)(UNO)
C IN
200Z20(TYP.)(UNO)
) RA
CIN
5600
YP B
CP-02(TYP.)(UNO)
) RA
200Z20(TYP.)(UNO)
G
6475
6075
(T OD
Ø 3
CIN
YP B
m 2
R
m R-
(T OD
BR
BR
Ø 4
) RA
m -2
24 B
R
-2
-2
4120
3720
m R
YP B
24 B
(T OD
SLOPE
Ø 2
m -2
R
BR
m R
24 B
-2
2
SLOPE
07 4350
200
4350
CR-04 04
200
CR-05 4350
200
CR-02
D C
CP-05
200C25
CR-01 CR-01
IN 1
G
AC -2
P) BR B R
5050
(TY OD
R
BR
Ø
SLOPE
mm
-21
350
24
01
5075 4372
251+4@108
1++5 00 7+251
500+3@120
FB-61
4372
FB-56
PORTAL RAFTER
FB-60
FB-56
FB-56
FB-59
FB-56
10
FB-58
500+3@120
FB-57
1 7+25 1
10
1
FB-52
32
FB-53
FB-54
FB-55
10
1
4350
"P"
"N" CR-01 CR-04
(8) M20x80HSB CANOPY RAFTER CANOPY RAFTER
w/ 200x16 THK. PL. 450-300x5(w) 350x6(w)
175x10(f) 200x12(f) "N" 4350
CANOPY CLR HT.
5050
CANOPY CLR HT.
SC-01 SC-05
C-03&5 400-300x5(w)
CANOPY COLUMN(C1)
3200
200x10(f) 350x5(w)
250x10(f) CANOPY COLUMN(C2)
250x5(w)
EXPANSION BOLT 150x10(f)
EXPANSION BOLT
R.L(+) 100.20 M R.L(+) 100.20 M R.L(+) 100.20 M
350 333
350
A G
01 A
22
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
1.10 Reactions
23
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
24
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
25
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
26
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
27
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
28
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
F1
F2
F3 P1
P2
P3
P4
F4
Capacity (KN)
Size,Φ W/Wind
Rod 79
Detail #1 Detail #3
DESIGN CALCULATIONS
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
No. Average
Spacing
Height
(m)
Area
(2)
P=
WLX ( 4)
2 xN
∑P Rod
Length
Rod
Force
Size
Of
Purlin
Conn.
x(3) (KN)
(m) (KN) (m) (KN) Bracing (UNO)
(m2)
P1 4 11.245 45 8.21 8.21 11.4 8.13 24 DIA STD
ROD
30
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
SECTION TWO
CONNECTION DESIGN
31
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
32
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
33
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
34
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
35
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
36
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
37
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
38
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
39
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
40
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
41
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
42
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
SECTION THREE
STAAD OUTPUT
43
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
FRAME @ GL_02
1. STAAD PLANE
INPUT FILE: FRAME GL_02.STD
2. START JOB INFORMATION
3. ENGINEER DATE 23-MAR-12
4. END JOB INFORMATION
5. INPUT WIDTH 79
6. UNIT METER KN
7. JOINT COORDINATES
8. 46 26.4842 10.3701 0; 48 32.4525 9.75418 0; 50 38.4208 9.1383 0
9. 52 44.3891 8.52243 0; 56 22.804 10.68 0; 57 22.804 -0.0769739 0; 60 -1 0 0
10. 61 -1 6.35 0; 62 -1 6.65 0; 65 48.1 0 0; 66 48.1 6.35 0; 67 48.1 6.65 0
11. 69 47.5 6.65 0; 70 47.5 6.35 0; 71 -1 8.3 0; 72 48.1 8.14981 0; 73 -0.4 6.65 0
12. 74 -0.4 6.35 0; 75 19.8189 10.3815 0; 76 13.8486 9.78462 0
13. 77 7.87842 9.18769 0; 78 1.90818 8.59077 0
14. MEMBER INCIDENCES
15. 5 46 56; 51 46 48; 53 48 50; 55 50 52; 57 52 72; 61 56 75; 62 57 56; 65 60 61
16. 67 62 71; 68 61 62; 70 65 66; 72 67 72; 73 66 67; 74 69 67; 76 66 70; 77 62 73
17. 78 61 74; 79 75 76; 80 76 77; 81 77 78; 82 78 71
18. DEFINE MATERIAL START
19. ISOTROPIC STEEL
20. E 2.05E+008
21. POISSON 0.3
22. DENSITY 76.8195
23. ALPHA 1.2E-005
24. DAMP 0.03
25. END DEFINE MATERIAL
26. *
27. *
28. *
29. MEMBER PROPERTY AMERICAN
30. 65 70 TAPERED 0.266 0.005 0.766 0.2 0.008
31. 62 TAPERED 0.33 0.008 0.33 0.3 0.015
32. MEMBER PROPERTY AMERICAN
33. 51 TAPERED 0.62 0.005 0.78 0.2 0.01
34. 53 80 TAPERED 0.762 0.005 0.662 0.2 0.006
35. MEMBER PROPERTY AMERICAN
36. 55 81 TAPERED 0.662 0.005 0.762 0.175 0.006
37. 82 TAPERED 0.772 0.006 0.872 0.175 0.006
44
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
45
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
46
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
47
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
48
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
49
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
50
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
STEEL TAKE-OFF
--------------
51
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
52
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
53
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
54
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
55
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
56
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
57
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
58
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
59
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
60
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
61
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
62
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
63
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
64
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
65
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
66
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
67
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
68
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
69
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
70
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
71
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
-----------------
ALL UNITS ARE -- KN METE (LOCAL )
190. FINISH
FRAME @ GL_04,05,07
1. STAAD PLANE
INPUT FILE: FRAME GL_4,5,7.STD
2. START JOB INFORMATION
3. ENGINEER DATE 23-MAR-12
4. END JOB INFORMATION
5. INPUT WIDTH 79
6. UNIT METER KN
7. JOINT COORDINATES
8. 46 26.4842 10.3701 0; 48 32.4525 9.75418 0; 50 38.4208 9.1383 0
9. 52 44.3891 8.52243 0; 56 22.804 10.715 0; 57 22.804 -0.0769739 0
10. 58 52.45 6.65 0; 60 -1 0 0; 61 -1 6.35 0; 62 -1 6.65 0; 64 -5.35 6.65 0
11. 65 48.1 0 0; 66 48.1 6.35 0; 67 48.1 6.65 0; 69 47.5 6.65 0; 70 47.5 6.35 0
12. 71 -1 8.43441 0; 72 48.1 8.15 0; 73 -0.4 6.65 0; 74 -0.4 6.35 0
13. 75 19.8177 10.4289 0; 76 13.845 9.85667 0; 77 7.87237 9.28445 0
14. 78 1.89972 8.71222 0
15. MEMBER INCIDENCES
16. 5 46 56; 51 46 48; 53 48 50; 55 50 52; 57 52 72; 61 56 75; 62 56 57; 65 60 61
17. 67 62 71; 68 61 62; 69 62 64; 70 65 66; 71 67 58; 72 67 72; 73 66 67; 74 69 67
18. 76 66 70; 77 62 73; 78 61 74; 79 75 76; 80 76 77; 81 77 78; 82 78 71
19. DEFINE MATERIAL START
20. ISOTROPIC STEEL
21. E 2.05E+008
22. POISSON 0.3
23. DENSITY 76.8195
24. ALPHA 1.2E-005
25. DAMP 0.03
26. END DEFINE MATERIAL
72
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
27. *
28. *
29. *
30. MEMBER PROPERTY AMERICAN
31. 65 70 TAPERED 0.262 0.005 0.762 0.175 0.006
32. 62 TAPERED 0.33 0.006 0.33 0.25 0.015
33. MEMBER PROPERTY AMERICAN
34. 51 TAPERED 0.62 0.005 0.77 0.2 0.008
35. 53 80 TAPERED 0.762 0.005 0.662 0.2 0.006
36. MEMBER PROPERTY AMERICAN
37. 55 81 TAPERED 0.662 0.005 0.762 0.175 0.006
38. 82 TAPERED 0.774 0.005 0.874 0.175 0.012
39. UNIT METER KG
40. MEMBER PROPERTY AMERICAN
STAAD PLANE -- PAGE NO. 2
73
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
74
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
75
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
PROBLEM STATISTICS
-----------------------------------
76
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
77
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
78
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
STEEL TAKE-OFF
--------------
79
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
STEEL TAKE-OFF
--------------
80
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
81
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
82
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
83
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
84
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
85
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
86
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
87
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
88
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
89
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
90
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
91
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
92
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
93
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
94
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
95
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
96
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
97
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
98
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
99
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
100
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
101
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
102
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
103
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
104
Job No : BG-P-1275 Done : SAR
Job Name : Japan Metal Building Checked : ABR
Building No : 01 Approved : JOJ
Customer : Acero Rev: 01 Date :17/08/2016
DESIGN CALCULATIONS
192. FINISH
105