Design Forces
Calculate
d1 = 1400 mm 55.12 inch
d2= 1310 mm 51.57 inch
d3= 1220 mm 48.03 inch
d4= 1130 mm 44.49 inch
d5= 1040 mm 40.94 inch
∑dn= 6100 mm 240.16 inch
h1= 1395 mm 54.9 inch
h5= 1035 mm 40.7 inch
γr = 1.25 for flush connections
Maxial= P/2*(h-tf)
= 50 kNm 442.13 k-in
M= M+Maxial
= 1650 kNm 14604 kips
Mu= 1.5*(M+Maxial)
= 2475 kNm 21905.59 k-in
Flange Force, Ff= M/(h-tf)
= 1221 kN 274.56 kips
s= 1/2*(bp*g)^0.5
= 59 mm 2.33 inch
pf = 50.00 mm 1.97 inch ≤s 50.00 mm = pf, use
Y= bp/2*(h1/pf+h2/s)+2/g*(h1*(pf+0.75pb)+h2*(s+0.25*pb)) + g/2
= 25086 mm 987.6 inch
Pt= ∏*db *Ft/4
2
tp,reqd = sqrt(1.1*γr*(φMnp)/(φb*Fpy*Y))
= 14.2 mm 0.559 inch
Use, tp = 15.0 mm
3. Check for Shear
4. Weld design
a) Top Flange to end plate weld
Dreqd= Ff/((2*(bf -tf)-tw)*0.928)
= 20.3 sixteenths
Use 21 /16 inch fillet welds
Nominal Dia
Bolt
Nominal
Allowable Shear
of Bolt (A325N)
ShearArea
Stress (Spec -- TableJ3.2)
( mm( )Kips( )sq in) ( ksi)