KPI Improvement Process
KPI Improvement Process
KPI Improvement Process
Degradation
Check Payload
No
Check Service
Impacting Alarms in
Source & Target
Cells
Yes
Check for PCI Need to change PCI of
Collision/Confusion particular cells
Check Overshooting
of Source/Target
Cell
X2 link Availability
and health check
X2 link Availability
and health check
Parameter Tuning in
special cases
CSSR
Is RRC
Success rate
Good
Is S1_C
Success rate
Good
Is ERAB
Success rate
Is ERAB
Success rate
CSSR
Check Service
Impacting Alarms
Segregate success
rate of RRC-S1_C-
ERAB stages.
Poor
Is S1_C Check for Transport
Success rate Issues
If Payload < 500 MB in 24 hrs & radio condition is good. Then low Payload is a concern.
If MIMO usage is < 25/50 % then check for possible diversity cable swap in RF module and Connections issue, MIMO Param
If CQI/MCS is poor, it indicates poor RF condition
Check for Optimization possibilities if RF condition is poor.
Check CIO, Overshooting,coverage foot print, PCI/RSI collision/confusion.
Check with tranmission team regarding router table configurations and other issues.
Alarms like VSWR, Transport related Alarms, BFD all group down, etc.
Check CIO, Overshooting,coverage foot print, PCI/RSI collision/confusion.
Check with tranmission team regarding router table configurations and other issues.
If CQI/MCS is poor, it indicates poor RF condition
Check for Optimization possibilities if RF condition is poor. Check Report RSLTE058
Check Report RSLTE254 for PCI & other Alarms
Check Report RSLTE031
Alarms like VSWR, Transport related Alarms, BFD all group down, etc.