KPI List
KPI List
KPI List
5
6
BSC
Total Sites (Active)
Total Cells (Active)
EDGE Enabled TRXs
Total No. of Dedicated Data TS(Active)
Equipped Radio Network Capacity (Active)
7
8
9
Installed Capacity
HLR (K)
No of GMSCs & MSCs
Total MSC Capacity (Erls)
10
11
12
SUBSCRIBERS DATA
HLR Subs (at 00:00 hrs)
Registered
Un-Registered
Total HLR
13
14
15
16
17
IN Subs. (Prepaid)
Installed
Active
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
2
3
4
VOICE KPIs
34
35
36
Network Availability
Network Availability (Switch)
37
38
39
40
MSC Utilisation
Peak Processor Load (during 24 hrs)
41
42
43
44
45
46
47
48
49
50
51
52
53
54
TCH Drop
Handover Success Rate
Cell Wise Retainability
55
56
57
58
59
60
61
62
63
64
65
66
SDCCH Congestion
SDCCH Drop Call Rate
TCH Congestion
TCH Assignment Success Rate
TCH Setup Success Rate
TCH HO Success Rate
TCH Drop Call Rate
67
68
69
DATA KPIs
Data Network Availability (24 Hrs)
Data Network Accessibility (24 Hrs)
Attach Success rate excluding Unregistered subs
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
KNOW
FR
HR
AMR FR
AMR HR
AVAILABLE
SDCCH
SDCCHDR
TCH_Cong
TCH_ASR
CSSR
HOSR
DCR