Annual Development Plan 2018 2019 PDF
Annual Development Plan 2018 2019 PDF
Annual Development Plan 2018 2019 PDF
MERU
MAY 2018
i
Vision
A United Prosperous Green Model County
Mission
Promotion of Sustainable Development, Socio - economic
Empowerment, Technological Innovations and Industrialization
Theme
Making Meru Great
ii
FOREWORD
The Annual Development Plan (ADP) 2018/19 is the first annual plan dedicated to the
implementation of the County Integrated Development Plan 2018-2022. It is intended to guide
the annual budgeting process and to facilitate the implementation/monitoring of projects and
programmes in each department or agency of the County Government. The ADP will enhance
the prudent allocation of resources as envisaged in the government policy on expenditure
prioritization to achieve the transformative development agenda spearheaded by Governor
Kiraitu Murungi.
On an annual basis, the County Government is obligated to prepare an Annual Development Plan
(ADP), which is a one year step towards implementation of the CIDP. This document is largely
aligned to the CIDP and other planning frameworks such as the Kenya Vision 2030, the
Sustainable Development Goals (SDGs) and the African Agenda 2063.
The Constitution of Kenya article 220(2) and the Public Financial Management Act lays emphasis
on Planning. The Public Finance Management act, 2012 Sec 125 and Sec 126 (1) emphasises
preparation of the Annual Development Plan as a link between the County Integrated
Development Plan and the overall budgeting Process. It outlines priority CIDP programmes and
projects to be implemented in the County in 2018/19.
The preparation of the ADP for Financial Year 2018/19 included a comprehensive consultation
process with all the departments and agencies, where priority projects and programmes were
considered and incorporated in the document. Due attention has been given to the
transformative, ongoing and new projects captured in the CIDP.
The aspirations of the people of Meru will remain at the centre of all ADPs and can only be
realised through effective implementation of the planned projects and programmes. Substantial
amount of resources amounting to KES. 12 Billion will be required to ensure full implementation
of this ADP. To meet this resource requirement the government will rely on equitable share from
the Exchequer, its own revenue, development partners and donors for support. In addition,
innovative approaches and strategies will be required to mobilise these resources. All
iii
stakeholders are called upon to collectively participate in resources mobilisation to implement
the ADP 2018/2019.
Proper implementation of this plan will lead to great improvement in the County economy. Some
of the specific benefits of implementation of this plan inter-alia include a) Improved household
access to adequate clean water and sanitation b) improved food security and promotion of
commercial agriculture c) Tourism development d) improved ECDE and Polytechnics
infrastructure e) Improved efficiency and effectiveness of infrastructure f) provision of quality,
affordable and accessible Healthcare g) Promotion of Youth Talents and Empowerment h)
Empowering our Women and i) Uplifting of Persons Living with Disabilities j) Improved
Environmental Conservation
Titus Ntuchiu
County Executive Committee Member
Finance, Economic Planning and ICT
Meru County
iv
ACKNOWLEDGEMENTS
The Annual Development Plan 2018/2019 has been prepared by a committed team of officers in
the County Government drawn mainly from the department of Finance, Economic Planning and
ICT. The Economic Planning Directorate provided the pivotal role of secretariat during the
preparation of this plan. To this end I wish to recognise the efforts of the following officers;
Kenneth N. Ruteere Director Economic Planning, Assistant Director, Ms Terry Kimonye, the team
of Economists/Statistician; Mr. Mukuria Gabriel, Mr Loyford Mputhia, Mr Eric Mutwiri, Mr
Dennis Mutwiri and Ms Doris Gakii; Mr. Darius Magiri and Mr. Bernard Mugambi (Researcher).
I also appreciate the efforts of the County Secretary Mr. Rufus Miriti, the Clerk of the Meru
County Assembly and all Chief Officers together with their respective technical teams led by
Directors for their invaluable inputs. Special thanks goes to the County Executive Committee
members for overseeing the preparation of this plan.
Special gratitude goes to Titus Ntuchiu the Deputy Governor and CECM for Finance Economic
Planning and ICT for his guidance and invaluable support during preparation of the ADP.
Utmost gratitude is to the Governor of Meru County Hon. Kiraitu Murungi for his great foresight,
dedication, commitment and overall leadership during preparation of this ADP which is the main
annual guide towards implementation of projects and programs to make Meru great.
Finally, our thanks go to all stakeholders including Community representatives and leaders who
gave the overall direction through their contributions captured in the County Integrated
Development Plan (CIDP) 2018-22.
v
TABLE OF CONTENT
FOREWORD .......................................................................................................................................................... iii
ACKNOWLEDGEMENTS .......................................................................................................................................... v
LIST OF TABLES ................................................................................................................................................... viii
ABREVIATIONS AND ACRONYMS ........................................................................................................................... x
EXECUTIVE SUMMARY .......................................................................................................................................... xi
LEGAL BASIS FOR THE PREPARATION OF THE ADP .............................................................................................. xiii
THE LINK WITH CIDP AND THE BUDGET .............................................................................................................. xiv
CHAPTER ONE: INTRODUCTION ............................................................................................................................. 1
1.1 Overview of Meru County ...................................................................................................................................1
1.2 Annual Development Plan Linkage with CIDP .....................................................................................................3
1.3 Preparation process of the Annual Development Plan .......................................................................................3
CHAPTER TWO: REVIEW OF THE IMPLEMENTATION OF THE PREVIOUS ADP ......................................................... 4
2.1 Developmental Overview ....................................................................................................................................4
2.2 Sector/ Sub-sector Achievements in the Previous Financial Year .......................................................................4
2.2.1 Office of the Governor .................................................................................................................................4
2.2.2 County Assembly..........................................................................................................................................5
2.2.3 County Treasury ...........................................................................................................................................7
2.2.4 Agriculture, Livestock Development and Fisheries ......................................................................................9
2.2.5 Water, Environment and Natural Resources .............................................................................................12
2.2.6 Trade, Investment, Industrialization, Tourism and Cooperatives Development .......................................14
2.2.7 Transport and Infrastructure .....................................................................................................................17
2.2.8 Lands, ICT and Economic Planning .............................................................................................................19
2.2.9 Education and Technology .........................................................................................................................22
2.2.10 Health .......................................................................................................................................................24
2.2.11 Public Service and Administration ...........................................................................................................28
2.2.12 Gender, Culture, Youth, Sports and Social Services .................................................................................31
2.3 Analysis of Capital and Non Capital projects of the Previous ADP ....................................................................34
2.3.1 County Treasury .........................................................................................................................................34
2.3.2 Trade, Investment, Industrialization, Tourism and Cooperative Development .........................................34
2.3.3 Health .........................................................................................................................................................35
2.3.4 Public Service and Administration .............................................................................................................36
2.4 Payments of Grants, Benefits and Subsidies .....................................................................................................36
2.5 Challenges Experienced during Implementation of the previous ADP .............................................................37
vi
2.6 Lessons learnt and Recommendations ..............................................................................................................38
CHAPTER THREE: COUNTY STRATEGIC PRIORITIES, PROGRAMMES AND PROJECTS ............................................. 40
3.1 Introduction ......................................................................................................................................................40
3.2 Sector/ Sub-sector .............................................................................................................................................40
3.2.1 County Assembly........................................................................................................................................40
3.2.2 Office of the Governor ...............................................................................................................................42
3.2.3 Finance, Economic Planning & ICT .............................................................................................................44
3.2.4 Education, Technology, Gender, Culture & Social Development ...............................................................47
3.2.5 Youth Affairs & Sports ................................................................................................................................49
3.2.6 Roads, Transport and Energy .....................................................................................................................50
3.2.7 Legal Affairs, Public Service Management & Administration ....................................................................52
3.2.8 Trade, Investment, Industrialization, Tourism & Cooperative Development ............................................54
3.2.9 Health Services ...........................................................................................................................................57
3.2.10 Agriculture, Livestock Development & Fisheries .....................................................................................60
3.2.11 Lands, Physical Planning, Urban Development & Public Works ..............................................................64
3.2.12 Water & Irrigation ....................................................................................................................................65
3.2.13 Environment, Wildlife & Natural Resources ............................................................................................67
3.3 Capital projects..................................................................................................................................................69
3.4 Payments of Grants, Benefits and Subsidies .....................................................................................................71
CHAPTER FOUR: RESOURCE ALLOCATION ............................................................................................................ 72
4.1 Introduction ......................................................................................................................................................72
4.2 Proposed budget by Programme ......................................................................................................................72
4.3 Financial and Economic Environment ...............................................................................................................74
4.4 Grants and revenue expectations in 2018/2019FY ...........................................................................................75
4.5 Risks, Assumptions and Mitigation measures ...................................................................................................76
CHAPTER FIVE: MONITORING AND EVALUATION ................................................................................................. 77
5.1 Introduction ......................................................................................................................................................77
5.2 Institutional framework to be adopted in monitoring the programmes ..........................................................77
ANNEXIES ............................................................................................................................................................ 84
ANNEX 1: Analysis of capital and non-capital projects of the previous ADP...........................................................84
ANNEX 2: Transformative Capital projects for 2018/2019 ....................................................................................108
ANNEX 3: Other Capital projects for 2018/2019 ...................................................................................................123
vii
LIST OF TABLES
Table 1: Governor’s Office Summary of Sector/ Sub-sector Programmes ................................................... 5
Table 2: County Assembly Summary of Sector/Subsector programmes ...................................................... 7
Table 3: County Treasury Summary of Sector/Subsector programmes ....................................................... 8
Table 4: Agriculture Summary of Sector/ Sub-sector Programmes ............................................................ 10
Table 5: Water Summary of Sector/ Sub-sector Programmes.................................................................... 13
Table 6: Trade Summary of Sector/ Sub-sector Programmes .................................................................... 15
Table 7: Transport and Infrastructure Summary of Sector/ Sub-sector Programmes................................ 18
Table 8: Lands Summary of Sector/ Sub-sector Programmes .................................................................... 20
Table 9: Education and Technology Summary of Sector/ Sub-sector Programmes ................................... 24
Table 10: Health Summary of Sector/ Sub-sector Programmes ................................................................. 26
Table 11: PSA Summary of Sector/ Sub-sector Programmes ..................................................................... 29
Table 12: Gender, Culture, Youth & Sports Summary of Sector/ Sub-sector Programmes ....................... 32
Table 13: Payments of Grants, Benefits and Subsidies ............................................................................... 36
Table 14: Sector/ Sub-sector programmes ................................................................................................. 41
Table 15: Governor Office Sector/ Sub-sector programmes ...................................................................... 43
Table 16: Finance Sector/ Sub-sector programmes.................................................................................... 45
Table 17: Education Sector/ Sub-sector programmes ................................................................................ 47
Table 18: Youth Affairs and Sports Sector/ Sub-sector programmes ......................................................... 50
Table 19: Roads and Energy Sector/ Sub-sector programmes ................................................................... 51
Table 20: LA & PSA Sector/ Sub-sector programmes ................................................................................. 52
Table 21: Trade Sector/ Sub-sector programmes ....................................................................................... 55
Table 22: Health Services Sector/ Sub-sector programmes ....................................................................... 58
Table 23: Agriculture, Livestock and Fisheries Sector/ Sub-sector programmes ....................................... 61
Table 24: Lands Sector/ Sub-sector programmes ....................................................................................... 64
Table 25: Water and Irrigation Sector/ Sub-sector programmes ............................................................... 66
Table 26: Environment and Wildlife Sector/ Sub-sector programmes ....................................................... 67
Table 27: Role of Stakeholders in ADP Implementation ............................................................................. 68
Table 28: Cross Sectoral Programmes ........................................................................................................ 69
Table 29: Summary of proposed budget by programme............................................................................ 72
Table 30: Summary of Funds required for ADP 2018/2019 ........................................................................ 73
Table 31: Revenue Projections.................................................................................................................... 75
Table 32: Risks, Assumptions and Mitigation measures ............................................................................. 76
viii
Table 33: Data collection, Analysis and reporting mechanisms ................................................................. 78
Table 34: Monitoring and Evaluation Performance Indicators Matrix ....................................................... 79
Table 35: Performance of Capital Projects for the previous year ............................................................... 84
Table 36: Performance of Non-Capital Projects for previous ADP ........................................................... 106
Table 37: Flagship Projects........................................................................................................................ 108
Education, Technology, Gender, Culture & Social Development ............................................................. 110
Youth Affairs & Sports............................................................................................................................... 112
Table 38: County Assembly ....................................................................................................................... 123
Table 39: Office of the Governor .............................................................................................................. 126
Table 40: Finance, Economic Planning & ICT ............................................................................................ 133
Table 41: Education, Technology, Gender, Culture & Social Development.............................................. 149
Table 42: Youth Affairs & Sports ............................................................................................................... 159
Table 43: Roads, Transport and Energy .................................................................................................... 163
Table 44: Legal Affairs, Public Service Management & Administration ................................................... 164
Table 45: Trade, Investment, Industrialization, Tourism & Cooperative Development ........................... 171
Table 46: Health Services .......................................................................................................................... 178
Table 47: Agriculture, Livestock Development & Fisheries ...................................................................... 185
Table 48: Lands, Physical Planning, Urban Development & Public Works ............................................... 193
Table 49: Water & Irrigation ..................................................................................................................... 195
Table 50: Environment, Wildlife & Natural Resources ............................................................................. 198
ix
ABREVIATIONS AND ACRONYMS
AI Artificial Insemination
ADP Annual Development Plan
AMS Agricultural Mechanization Services
ATC Agricultural Training Centre
BPO Business Process Outsourcing
CAR County Annual Report
CDLD County Director of Livestock Development
CGM County Government of Meru
CIDP County Integrated Development Plan
CRA Commission on Revenue Allocation
ECDE Early Childhood Education
EMU Efficiency Monitoring Unit
Ext. Extension
FY Financial Year
GDP Gross Domestic Product
HRH Human Resource for Health
ICT Information and Communication Technology
ICTA Information and Communication Technology Authority
IFMIS Integrated Financial Management System
KICOSCA Kenya Inter-Counties Sports and Culture Association
KRB Kenya Roads Board
LAPSSET Lamu Port Southern Sudan Ethiopia Transport
MEWASS Meru Water and Sewerage Services
MCADCB Meru County Alcoholic Drinks Control Board
MDGs Millennium Development Goals
MTEF Medium Term Expenditure Framework
MTP Medium Term Plan
MYS Meru Youth Service
No. Number
OCOB Office of the Controller of Budget
OVCs Orphans and Vulnerable Children
PFMA Public Finance Management Act
PPEs Personal Protective Equipment
PPP Public Private Partnership
PLWDs Persons Living with Disabilities
SAGAs Semi-Autonomous Government Agencies
SDGs Sustainable Development Goals
TVET Technical and Vocational Education Training
USAID United State Agency for International Development
x
EXECUTIVE SUMMARY
Preparation of an Annual Development plan is a statutory requirement of the PFM Act, 2012
which inter-alia lays emphasis on the County Integrated Development Plan as the overall guide
in the budget making process and that each County is expected to prepare on Annual
Development Plan (ADP) which derived from the CIDP.
The Annual Development Plan 2018/2019 details the development Projects and Programmes to
be implemented by departments within the County during that financial year. The
implementation of the plan is expected to contribute towards Making Meru Great. The Plan is
also expected to move the county towards realisation of the national Vision 2030 and the
sustainable development goals.
The Annual Development Plan has four chapters: Chapter one provides a short description of the
county in terms of its location; size; demographic profiles; administrative and political units. It
also highlights a summary of the socio-economic and infrastructural information that has a
bearing on the development of the county
Chapter two provides a review of department achievements in the year 2016/2017, the
challenges and lesson learnt in implementing the plan. It gives an insight into the direction the
county is headed in terms of planned versus allocated budget
Chapter three presents the sector/sub-sector strategic priorities, programmes and projects for
the 2018/2019. The programmes and projects are directly derived from the County’s broad
priorities and performance indicators. It also indicates the overall resource requirement in the
ADP.
Chapter four provides a summary of the resource requirement by departments. It also provides
a description of how the county government is responding to changes in the financial and
economic environment and total revenue and allocation patterns of budget.
Chapter five discusses the county monitoring and evaluation framework as outlined in the County
Integrated Monitoring and Evaluation System (CIMES).
In summary, the entire plan will cost approximately KES 12.0 billion towards realisation of a great
County of Meru. This will be met through the allocation from the consolidated fund, County
Government own revenue, Grants, PPPs, Joint ventures and other innovative strategies.
Departments will address strategic development priorities within their mandates as follows:
The office of the governor will prioritize the county development blue print V2040, county fire,
rescue and emergency services, strengthen efficiency monitoring unit and establishment of
external linkages. All these will be at a cost of KES 463.5 Million.
The County Assembly will be focussing mainly on building the capacity of MCA to perform their
mandates better. There will be efforts also to achieve a better working environment for MCAs
through construction of an office complex. These projects will cost of KES 421million
xi
The Department of Finance, Economic Planning and ICT will through the Investment Corporation
aim at constructing of the Meru rising tower on PPP basis, Meru County office block, promotion
of marketability of cereals across the county, other undertakings will include support to the Meru
Revenue Board to automate revenue systems and improvement of market structures. Under the
Microfinance Corporation it will be improving livelihood through lending of loans. The priority
under Economic Planning Directorate with the support of development partners will be
development of ward strategic plans, sector plans, Annual development plan and trainings of
community development committee members. ICT development will continue through
promotion of ICT literacy, structured cabling across the counties and installation of security
surveillance and CCTV systems. The department estimates the cost to be KES 1440.1 million out
of which the development partners will support approximately KES 870 million.
The Agriculture, Livestock Development and Fisheries department will undertake Agriculture,
Livestock and fisheries support projects, provision of 1M macadamia and 1M avocado trees is
top in the list, promotion of value addition of potatoes, Bananas and fruits, rehabilitation of
coffee and cotton, rice promotion, processing and value addition, the Livestock directorate will
be focusing on marketing, AI services, animal disease management, promotion of dairy goat,
poultry, bee and fish production, support to Agricultural Training Centre (ATC) and the
Mechanization Services unit(AMS) at an approximate cost of KES 435.9 million.
The Water and Irrigation: Drilling and equipping boreholes, construction of water pans and small
dams, water distribution systems, community water projects and coordination of water services
through the establishment of the Meru county water service board are the key projects to be
undertaken at an approximate cost of KES 3,615 million.
Trade, Investment, Industrialization, Tourism and Cooperatives Development department will
undertake programmes on cooperative development and promotion including capacity building
of cooperatives, revitalization of coffee (coffee cash model), development of markets and
utilities, satellite markets, promotion of trade fair, the Jua Kali sector and tourism development
including promotion of tourism products, marketing and the hike to our god’s home. These
projects and programmes will cost approximately KES 210 million.
Roads ,Transport and Energy department priorities will include roads routine maintenance and
bridge construction, transformers provision lighting the county through street and flood lights,
and also key is the coordination of all roads development under the county roads board
operationalization. In addition there will be promotion of renewable energy (solar, wind and
hydro). These are expected to cost approximately KES 1,530 million.
Department of Lands, Physical Planning, Urban Development and Public Works, for the FY
2018/19 land adjudication, land banking, digitization of county land information,
operationalization of a GIS lab, spatial planning and the construction of the Governor & Deputy
Governor’s residences are the core priorities of the department expected to cost approximately
488.5 million.
Priorities for Education, Technology, Gender, Culture and Social Development department
include, Construction of ECDE centres, provision of free milk to ECDE children, Recruitment of
xii
ECDE teachers, establishment of model vocational training centres, upscaling capitation for ECDE
learners, establishment of Njuri Ncheke cultural centre, county annual cultural extravaganza and
cultural promotion, Establishment of SGBV rescue centre, empowerment of PLWD & Women
among others. This will cost approximately KES 803.7 million.
Health services department priorities will be aimed at enhancing access to quality healthcare and
reducing mortality from preventable diseases and causes at a cost of KES 870 million. This
includes stocking of dispensaries, investing in health education and preventive health care, and
building of ICU & cancer Centre.
Legal Affairs, Public Service Management and Administration Department priorities will include;
establishment of ‘Utungati’ centres, capacity building and training of staff and construction of
Sub County & Ward offices an estimated cost of KES 529 million.
Youth Affairs and Sports Department will concentrate on youth empowerment through The Meru
Youth Service and sports development at an approximate amount KES 212.9 million.
Environment, wildlife and natural resources will be undertaking the ‘Bamboo ni pesa’ to
rehabilitate rivers, solid waste management and environmental conservation through tree
planting at an approximate cost of KES 148 million.
xiii
THE LINK WITH CIDP AND THE BUDGET
a. CIDP
The planning process in the county is an integral part of the development process. This implies
that without proper planning we cannot achieve our development goal. It is the first critical stage
of the budget process (PFM 35 and PFM 126)
The County Government Act 2012, 104 obligates a county to develop an integrated plan,
designate planning unit at all county administrative units and promote public participation and
engagement by non-state actors in the planning units.
The CIDP therefore gives a roadmap for development in the county over five year period. It
reflects the strategic medium term priorities of the county government. It contains the specific
goals and objectives, an implementation plan, provisions for monitoring and evaluation and a
clear reporting mechanism. Therefore this annual plan will help in the implementation of the
CIDP.
b. Annual Budget
A county annual budget is a spending plan for the year that is based on the priorities identified
in the county Annual Development Plan. The budget is expected to operationalize objectives
envisaged in the CIDP and as outlined in the Annual Development Plan.
Figure 1: ADP Linkage with other Plans
Medium Term
Plan (5 Years)
Kenya Vision
2030
County Annual Programme
Integrated Development Plan Based Budget
Development
(1 Year) (Annual)
Plan (5 Years)
xiv
CHAPTER ONE: INTRODUCTION
1
1.1.3 Administrative Units
The administrative structure for the County Government of Meru comprises of (10) sub-counties
namely; Imenti South, Meru Central, Imenti North, Buuri, Tigania East, Tigania Central, Tigania
West, Igembe Central, Igembe South and Igembe North. Besides there are 28 divisions, 133
locations and 351 sub-locations.
1.1.4 Political Units
Meru County comprises of nine parliamentary constituencies, 45 electoral wards and one special
ward. The nine parliamentary constituencies are; South Imenti, Imenti Central, North Imenti,
Buuri, Tigania East, Tigania West, Igembe Central Igembe South and Igembe North. There are
forty five (45) wards & one (1) special ward and three hundred and ninety two (392) villages.
2
1.2 Annual Development Plan Linkage with CIDP
The CIDP 2018-2022 is the legal development blueprint in the county for the five-year plan
period. It reflects the strategic long and medium term priorities of the county government. These
priorities will be implemented annually through the ADP. The following are the broad CIDP
priorities and strategies to be implemented in the ADP 2018/2019;
Strategic Priority I: To improve household access to adequate clean water and sanitation
Strategic Priority II: To improve food security and promote commercial agriculture
Strategic Priority III: To promote Tourism Development
Strategic Priority IV: To improve ECDE and Polytechnics infrastructure
Strategic Priority V: To improve efficiency and effectiveness of infrastructure
Strategic Priority VI: To provide quality, affordable and accessible Healthcare
Strategic Priority VII: To Modernize our Towns and Urban Centers
Strategic Priority VIII: To Promoting Entrepreneurship and Investments
Strategic Priority IX: To Promote Youth Talents and Empowerment
Strategic Priority X: To Empower Women
Strategic Priority Xi: To Uplift Persons Living with Disabilities
Strategic Priority Xii: To uphold Kimeru culture, traditions, songs and dances
Strategic Priority Xiii: To improve environmental conservation
3
CHAPTER TWO: REVIEW OF THE IMPLEMENTATION OF THE PREVIOUS ADP
Sector Goal:
Coordination and directing the County mission and vision towards making Meru Great.
Disaster Management.
Community Disaster Vulnerability Capacity Assessment.
Research.
Institutional results tracking.
Institutional performance appraisal.
Efficiency in Monitoring and Evaluation
Project and programmes appraisals.
Information Dissemination
Provision of sufficient and effective legal services to all County Departments.
4
2.2.1.3 Key achievements
Establishment of Efficiency Monitoring and Evaluation unit.
Timely and coordinated disaster management
Enhanced coordination and supervision of government functions.
Timely dissemination of information to the citizenry.
Full representation of the County in litigious matters and gave wise counsel to the various
county departments on legal issues
2.2.1.4 Analysis of planned versus allocated budget
During the FY 2016/17 the department had no development budget. A budget of KES
50,139,545.00 was used for capital intensive recurrent projects that included disaster
management and governor’s press.
Table 1: Governor’s Office Summary of Sector/ Sub-sector Programmes
Program1 : Adminstration Planning and Support Services.
5
authority of a County and the exercise of that authority in its County Assembly. The Assembly has
powers to make any laws that are necessary for, or incidental to, the effective performance of
the functions and exercise of the powers of the County Government under the fourth Schedule.
It also provides that a County Assembly may exercise oversight over the county executive
committee and any other county executive organs.
2.2.2.1 Other important functions of County Assembly include:
i) Vetting and approving nominees for appointment to county public offices;
ii) Approving the budget and expenditure of the county government in accordance with
Article 207 of the Constitution;
iii) Approving the borrowing by the county government in accordance with Article 212 of
the Constitution;
iv) Approving county development planning.
Vision
To be a proactive County Assembly that is responsive to public welfare and adheres to open
governance and ethics
Mission
Promoting principles of good governance to reflect the aspirations, interests and welfare of the
people of Meru County.
Values
Commitment to public service
Accountability
Cooperation and mutual respect
Integrity
Professionalism
Courtesy
Impartiality
2.2.2 Departmental Strategic priorities
In the FY 2016/2017 the department was allocated KES 6.5million against a planned budget of
KES 134million.
6
Departmental Goals
i. To formulate and approve the County Government laws
ii. To foster transparency and accountability in the use of public funds through oversight
role
iii. To ensure public participation in County affairs.
Mission
Coordinate mobilization and prudent utilization of available resources
7
Objectives
Improve annual revenue collection
Improve financial management system
Enhance accountability by disclosure of quarterly reports
Guarantee the accuracy of financial statements by obtaining unqualified audit report.
2.2.3.2 Strategic Priorities of the Sector/Sub Sector
8
Microfinance Increased access Amount of loans KES 111M KES 104.5M
Development to credit facilities disbursed disbursed
No. of Branches 4 branches 1 branch Inadequate
established funds
Mission
To promote livelihoods and sustainable competitive agriculture, livestock, veterinary, irrigation
and fisheries sub-sectors while conserving natural resources.
2.2.4.2 Sector Objectives
To create enabling environment for Agriculture sector development
Increase agriculture productivity, output and value
Promote market access and market development for all agricultural products
Enhance accessibility to affordable inputs and credits
Increase livestock production and productivity
Ensure thriving disease free livestock and safeguard human health
Increase land utilization through irrigation
Increase fish production through aqua-culture (Fish farming)
Promote environmental conservation
Create wealth and employment
Ensure food security and balanced nutrition
9
Sector Achievements in the Previous Financial Year
Table 4: Agriculture Summary of Sector/ Sub-sector Programmes
Programme 1: Agriculture development(crop)
Objective: To promote production high value crop production with have a high demand in the market
Outcome: Increased productivity and higher incomes
Sub Programme Key outputs Key Planned Targets Achieved Targets Remarks*
performance
indicators
Crop development 104 MT of Number of Tones 93 MT 39 MT On going
assorted grain produced
Promotion of tree Procurement Number of 122,000 Seedlings 122,007 seedlings Completed
crop production and distribution Assorted
of tree crop seedlings
seedlings distributed
(Avocado
Mango, and
banana)
Tree crop nurseries Development of Number of tree 1 - Not Initiated
a tree nursery at nurseries
Kaguru
Crop Value addition Value addition Number of sheds 32 horticultural 12 Sheds On going
facilities constructed sheds to be Completed and 20
(Horticultural constructed are on going
Sheds)
Programme 3:Livestock development
Objective: To enhance livestock productivity
Outcome: Improved livestock productivity
Sub Programme Key outputs Key Planned Targets Achieved Remarks*
performance Targets
indicators
Sp1. Livestock livestock No. of doses 150 000 320,000 On going
Disease Control vaccinations administered
Disease No. of labs 1 0 Not initiated
diagnostic lab
Sp2. Dairy Industry A.I scheme No. doses 12,500 7,800 On going
Development inseminated project
10
Sp 3. Beef Industry Market No. of markets 1 1 Completed
development construction constructed
SAGAs
The agriculture sectors boosts of two Semi-Autonomous Government Agencies (SAGAs). They
comprise of the Agricultural Mechanisation Services at Mitunguu and the Agricultural Training
Centre at Kaguru.
2.4.2.4.1 Agricultural Training Centre Achievements for FY 2016/2017
Programme 5: Agricultural Training services
Objective: To increase enrollment for training on appropriate agricultural practices
Outcome: Improved agricultural production
11
Sub Programme Key outputs Key performance Planned Achieved Remarks*
indicators Targets Targets
ATC infrastructural Conference hall No. of halls 1 0 Not initiated
development completed
Self-contained No. of self- 28 0 Not initiated
room contained rooms
ATC farm Water pan Water pan Liter 5,000,000 0 Not initiated
development capacity
Fence Length of fence(in 4 0 Not initiated
Kilo Meters)
Programme 6: Agricultural mechanization services
Objective: To promote the agricultural mechanization for crop production
Outcome: Improved crop production
Sub Programme Key outputs Key performance Planned Achieved Remarks*
indicators Targets Targets
AMS One pasture No. of bales 3000 0 Not funded
Infrastructural demonstration produced annually
development farm
One machinery No. of operation 1 0 Not funded
workshop machinery
workshop
The County has eleven permanent rivers with the major one being the Kathita River, a tributary
of River Tana. These form the major sources of water for domestic use and irrigation.
12
The County has three major water service providers but discussions on restructuring and merging
the providers is currently on going;-
MEWASS operating in Meru town and its environs.
IMETHAWASCO operating in the rural areas and other towns.
DOMWASS operating various schemes in the county rural areas.
2.2.5.1 Departmental Vision and Mission
Vision
A rich, productive and well maintained diverse environment.
Mission
To manage the environment and natural resources sustainably.
13
Sub- Key output Key Performance Planned targets Achieved Remark
programme Indicators Targets s
Rural & Urban 15,000 No. of households 15,000 10,000 ongoing
Water Supply households provided with water households households
provided with No. of water supply provided with provided with
water infrastructure in place. water water
No. of boreholes drilled 36 boreholes 31 boreholes
dug
Waste Water Improve Sewerage system in Maua 2 sewer system - ongoing
Management sanitation system Town, Makutano and there
Environs
Objective (s): To sustainably manage and conserve environment and natural resources
This department was constituted into two directorates, namely; Co-operatives and Trade,
Tourism & Enterprise development.
Through the Department, the County Government priorities diversification of the economy
through rigorous efforts of revitalizing the cooperative movement in Meru, preparing industrial
sites for development of SMEs, providing direct support to businesses as well as realizing the
potential of the tourism sector in the county. The department is undertaking an Economic
Revitalization Program for the County and has engaged a model of collaboration among the
stakeholders who are involved in managing and/or developing of development projects.
2.2.6.1 Departmental Vision and Mission
Vision:
A self-reliant county
Mission:
To facilitate orderly growth and development of co-operatives, enterprises and tourism in the
county.
14
2.2.6.2 Strategic Priorities of the Sector/Sub Sector
Trade and Investment
i.To undertake policy, legal and institutional reforms for the development of the
sector.
ii. To promote fair trade practices and protect consumers from any trade
malpractices
iii. To promote Research and Development (R&D) and adoption of innovation and
technology.
iv. To promote sustainable trade, industrial and entrepreneurship development.
Tourism Development
Cooperatives Development
15
complex and -Assorted -7,000 Continuous
instruments weights and weighing and -94 Certificates project
measures measuring of Verification
equipment instruments
-1 Double cabin -94
pick-up inspections
-Certificates of
Verification
Reports /cases
Investigated &
/or prosecuted
Trade Promotion Ensure SMEs Amount 3.0 M 2.2 M Underfunded
access to Disbursed
finance
Establishment of Upgrading of -No of markets -9 markets -9 markets Continuous
Markets markets upgraded upgraded upgraded project.
-No. of toilets -45 toilets -59 toilets Limited budget
upgraded -Document in constructed
-Mapping of place -1 document in
businesses and place
markets
Revitalization ofImparted Number trained 200 coffee - Complete
coffee sector) knowledge leaders per
and improved sub county
coffee
husbandry
practice
Programme Name: Tourism Development and promotion
Objective: To promote Trade and Tourism
Outcome: Promoted Trade and Tourism
Sub Programme Key outputs Key Planned Achieved Remarks*
performance Targets Targets
indicators
Nyambene Fully pledged - No. of -Stakeholders Nil
Conservancy conservancy Stakeholders consultation/Tr
Development consulted/Train ainings
ed -Recruitment
- No. of and training of
additional additional
rangers rangers
recruited and -Installation of
trained solar power
- No. of Conservancy
installations of headquarter
solar power buildings
Conservancy -Reforestation
headquarter -Development
buildings. of a
- No of trees conservancy
planted view point
16
- No. of
conservancy
viewpoints
developed
Tourism marketing & Marketing - No. of County -Profiling and Profiling and Tourism
Development Tourist sites hospitality mapping of all mapping of all marketing is a
facilities County County continuous
profiled and hospitality hospitality process
mapped facilities facilities
- No. of -Publishing, -Publishing,
Electronic and launching and launching and
print media distributing of distributing of
adverts Meru County Meru County
- No of hospitality hospitality
Brochures facilities guide facilities guide
- No of sites - Signage for - Signage for
marketed Tourist sites. Tourist sites.
17
The department had the following sections:-
Roads
Transport
Energy
Public Works
18
Upgrading of the market loop No of KM paved 11.515KM 8.625 km paved Slowed
roads to paving standards with cabro procurement
process
Purchasing of construction No. Of machines 2 No. Graders None No funding
equipment and plants procured 2No. dozer
Programme: Rural Electrification
Objective: Objective (s): Boost Economic activities
Outcome (s): Improved security in the region
Feasibility study and Engineering No of reports One feasibility 1 done Funds were
designs study reallocated
Installation of Lighting Equipment No. installed 31 floodlights 31 installed completed
Mission
To provide/offer high quality products and services to our stakeholders through evidence-based
planning, implementation, monitoring & evaluation leveraging on modern technology and
motivated employees for sustainable development.
2.2.8.2 The strategic priorities of the sector/sub-sector
During the review period, the sector received a budgetary allocation of KES. 247,098,171.61
Against a fund requirement of KES. 1,128,200,000. This resulted to a fund deficit of KES.
881,101,828.31. which adversely affected the realization of the sector priorities as planned.
19
Sourced for a successful project through proposal writing such as the SymbioCity
programme that is supported from Sweden with expected gain of over KES 40 million
grant.
Completed the Topographical mapping and preparation of integrated Strategic Urban
Development Plans for Timau Town and its environs, Tigania East.
Spatial plans for Nkubu town and its environs, Maua and Laare Town and its environs.
These plans are at various stages of completion.
Resolved long standing boundary dispute with neighboring Isiolo County.
Initiated discussions for resolution of Meru County and Tharaka Nithi Boundary
conflict.
Improved development approvals in Meru County.
Unlocking Ruiri Rwarera adjudication section.
Facilitated and supported various other adjudication sections in the county.
Development of ICT infrastructure connecting Sub Counties to the headquarter.
Installation of the Server room to enhance service delivery on an ICT platform.
Upgraded the County Website to enhance communication with the public.
Developed departmental Strategic Plan to enable the department offer quality and
cost effective services to public
County Bureau of Statistics establishment process. Drafted the baseline
socioeconomic survey and county development indicators to enable the county
undertake more responsive projects and programmes. The unit will enhance evidence
based planning.
Drafted the revised CIDP, the revised CIDP now awaiting final validation, approval and
implementation.
Prepared Annual Development Plan for 2016/2017 which guided the 2016/17
budgeting process.
Drafted the first Meru County Statistical Abstract in partnership with the KNBS awaiting
validation and launch.
Drafted the first Meru County M&E policy. Awaiting public participation and validation
Objective: To prepare Digital Topographical map and spatial Plan for major towns and their Environs
Outcome: A well planned county
Sub Programme Key outputs Key performance Planned Achieved Remarks*
indicators Targets Targets
Contracted Spatial Topographical Number of 6 maps/plans 1 map/plan Other plans
Planning map(s) and the Maps/Spatial are on-going
spatial plan(s) plans at various
stages of
completion
Planning and Market area plans Number of 18 markets 0 Not Initiated
survey of market Markets
centers
20
Land Adjudication Closure of active No. of 15 sections 4 Sections On-going
adjudication adjudication
sections sections
countywide completed
Programme 1: Housing Development
Objective: To provide affordable and safe county housing through adoption modern technologies
Outcome: Decent affordable county housing
Sub Programme Key outputs Key performance Planned Achieved Remarks*
indicators Targets Targets
Adoption of Adoption of Number of 3 Centres and 1 1 On going
alternative modern interlocking policy interlocking
technology technology blocks purchased document block making
machine
purchased.
Upgrade ofRedesign and No. of housing 300 county 0 Not Initiated
County housing value add to estates houses
existing county redesigned and
houses redeveloped
Information Communication and Technology Sub Sector
Programme 1: Automation of services and processes
Objective: Automate Processes for service delivery
Outcome: Effective and efficient service to public and operations
Sub Programme Key outputs Key performance Planned Achieved Remarks*
indicators Targets Targets
Wide Area County office % of completion 100% 0 Not initiated
Network Connectivity
Purchase of Audit Software Number of 1 0 Not initiated
Software software
purchased
Purchase of ICT Internet Number Mbs 20mbps 0 Not initiated
networking and bandwidth and outright upgrade outright
Communications connectivity upgrade
Equipment
Economic Planning Sub-Sector
Programme 1: Economic Survey, Data Collection and Community Empowerment
Objective: To enhance evidence based policy development
Outcome: Evidence based policies and plans
Sub Programme Key outputs Key performance Planned Achieved Remarks*
indicators Targets Targets
Pre-feasibility, Social-Economic Number of 1 report 1 report Completed
Feasibility and Survey reports generated
Appraisal Studies
Programme 2: ADP, CIDP and Sectoral Plans Updating
Objective: To enhance prudence in county resource utilization
Outcome: Improved Socio economic welfare for the people of Meru
Sub Programme Key outputs Key performance Planned Achieved Remarks*
indicators Targets Targets
CIDP, ADP and ADP 17/18 No. of Plans 1 1 Completed
Sectoral plans
21
Programme 3: County development coordination
Objective: To enhance address the challenge of duplication of resources
Outcome: Coordinated development initiatives countywide
Sub Programme Key outputs Key performance Planned Achieved Remarks*
indicators Targets Targets
Sub county & 9 sub county Number of 9 sub county 0 Not initiated
ward committees and committees committees
development 45 ward and 45 ward
committees committees committees
Tertiary, secondary and primary Education are not devolved function according to the
Constitution of Kenya 2010. However, the department of Education and Technology collaborates
with the national Government in supporting the same.
Facilitate provision of quality education, training, mentorship, research and innovation for
capacity building and prosperity.
22
Objectives
To ensure access, retention, transition and quality in all the sub sectors
To alleviate levels of illiteracy and promote acquisition of professionalism from early
stages
To promote county and national cohesion and integration
To promote research and innovation for social economic development
Realizing habits that the children form at a young age will stay with them for a lifetime,
instilling love for books and education is key to one’s personal development and
community empowerment. Meru County Government has laid down structures and plans
to support the education system.
23
Table 9: Education and Technology Summary of Sector/ Sub-sector Programmes
Programme Name: Basic Education
Objective: To facilitate learning and curriculum implementation
Outcome: Improved learning
Sub Programme Key outputs Key Planned Achieved Remarks*
performance Targets Targets
indicators
ECDE Classrooms Construction of No. of classes 90 ECDE 90 ECDE ongoing by
Construction -ward ECDE constructed classrooms to classrooms construction
project classrooms be committees
constructed
Educational Aids and ECDE centers No. of ECDE 850 ECDE 850 ECDE All ECDE
Related Equipment fully equipped centers Centers Centers fully centers
supported equipped equipped received sound
and read book
1&2
Programme Name: Technical and Vocation Education and Training
Objective: To facilitate learning and curriculum implementation
Outcome: Improved enrolment and enhanced employability of Youths
Construction of Construction of No. of workshop In 10 youth 5 workshops 4 workshops
Polytechnics workshops and constructed polytechnics on going by
Workshops/Hostels hostels in construction
youth committees.
polytechnics
Educational Aids and Adequate -No. of tools and 23 youth 23 youth More
Related Equipment for Equipment for equipment polytechnics polytechnics equipment
Polytechnics all youth procured required
polytechnics -No. of
polytechnics
supplied
2.2.10 Health
The Meru County Health Department ensures universal access to affordable quality health
services for all residents of Meru County. The County health care system is functional and seeks
to bring together the Public, Faith-based and the Private Sectors to provide health services to its
residents and those from neighboring counties.
This department has over the last four and half years continued to consume the highest amount
of Meru County resources in terms of budget allocation with bulky of the resources being spent
on remuneration of medical staff, buying of medicine and other medical suppliers as well as
expansion of health facilities across the County.
It has the following directorates:
a. Public health
b. Medical services
c. Health administration.
24
Vision
A healthy population in Meru County for sustainable social and economic development
Mission
To ensure residents of Meru County are healthy through implementation of promotive and
preventive health interventions, and improved access to and utilization of quality curative
services
Goal
To ensure Meru County residents have access to and utilize affordable quality health services to
improve health outcomes
2.2.10.2 The strategic priorities of the Sub Sector
The planned budget for FY 2016-2017 was KES. 369,000,000.00 while the allocated budget was
KES. 461,979,088.00 (supplementary). This resulted to a budget surplus of KES. 71,979,088.00
owing to recruitment new members of staff.
25
Table 10: Health Summary of Sector/ Sub-sector Programmes
Sub Programme Key outputs Key Planned Achieved Remarks*
performance Targets Targets
indicators
Programme 1:Curative Health Services
Objective: To strengthen delivery of quality health services
Outcome: Improved access and quality of health services
Specialized Services Increased Number of 3400 3246 Health care
access to specialized workers’ strike
specialized cases managed
care annually
26
Sub Programme Key outputs Key Planned Achieved Remarks*
performance Targets Targets
indicators
Disease Prevention communicable Positives in the
and Control diseases community not
identified fully;
Targets on viral
suppression
not achieved
No. of fully 40123 27126 HCW’s strike
immunized
children
Number of 1 0.9
standard Health
27
Sub Programme Key outputs Key Planned Achieved Remarks*
performance Targets Targets
indicators
centers per
30,000
population
Number of 1 1.61
standard Level 4
Hospitals (Sub-
County referral
Hospital) per
100,000
population
Number of 1 1
standard Level 5
Hospitals
(County Referral
Hospital) per
1,000,000
population
28
b. Impartiality
c. Efficiency
d. Social responsibility
e. Progressive
29
Administration Citizen- % reduction of Construction Nil Not funded
Services friendly and distance covered by of Governor’s
accessible Meru citizens residence
public seeking Construction
service government of an Nil
delivery services enforcement
outlets. line
Construction
of sub-county
offices Nil
(Imenti North
and Tigania
West)
Procurement
of five
Departmental
vehicles Nil
Programme Name: HUMAN RESOURCE MANAGEMENT
Objective: To ensure efficiency in public service delivery
Outcome: Efficient public service delivery
Human Resource A safe and % reduction of Procurement Nil Not funded
Management efficient time taken to and installation
record retrieve official of 5 bulk-filing
management information cabinets
system % reduction of
risk of loss
personnel
information
Programme Name: FIRE & EMERGENCY SERVICES
Objective: To efficient fire, rescue and emergency response
Outcome: An efficient fire and emergency response service
Fire and Emergency Timely Average response Construction Nil No budgetary
Services response to time (in minutes) of 2 fire sub- allocation
fire stations
emergencies (Maua and
Nkubu)
Procure of 2
new fire
engines
30
2.2.12 Gender, Culture, Youth, Sports and Social Services
This department was made up of the following directorates:
i. Youth and Sports, mandated to identify and nurture diverse talents and develop sports
facilities
ii. Culture, Recreation, Gender and Social Services, mandated to exploit culture for social-
economic empowerment, expand/ develop recreational facilities and gender
mainstreaming.
2.2.12.1 Departmental Vision and Mission
Vision
A leading provider of social services for quality life for the residents
Mission
To optimally exploit resources for empowerment and nurturing of talents
Objectives
Empower the marginalized and enforce affirmative action
Explore, exploit and nurture talents in the populace
Promotion and preservation of positive cultural practices and heritage
Eradicate retrogressive cultural practices
Promote youth empowerment and participation in economic and political development
Enhance sports facilities and youth participation in sports
Add objectives for youth and sports
2.2.12.2 Strategic Priorities
Inclusivity and Awareness (Gender/Social Development)
Cultural Conservation
Completion and Operationalization of cultural centers.
Development of requisite skills, identification and nurturing of talents among youth
Development of Sports Facilities
Campaigns against Drugs and Substance abuse
31
2.2.12.3 Key Achievements
KES. 20,095,185 was used to develop model cultural centere. Mitunguu cultural center
was completed while Mwariama Cultural center is 20% complete
3M was used to establish Kirwiro baseball complex in Imenti Central for promotion of
baseball game
To promote sporting activities within the county, KES. 164,109,705 was used for
rehabilitation of stadia and public playgrounds. Maili Tatu, Githongo, Nguthiri and Kieni
stadia are complete while Kinoru stadium is 80% complete and Timau stadium 90%
complete.
2250 youth were trained on business skills. Another 180 youths and 9 PLWDs with best
business ideas were awarded with startup capital.
During financial year 2016/2017 741Million was planned to be allocated to the sector. The actual
amount allocated was KES 348,105,425.7. Therefore the financial deficit was 392,894,574.3
which restrained proper implementation of planned projects.
Table 12: Gender, Culture, Youth & Sports Summary of Sector/ Sub-sector Programmes
Programme Name : SPORTS DEVEOPMENT
32
Establishment A complete facility A complete Nil Funds not
of Meru Golf and in use facility and in available
Course use
Establishment A functional sports A functional Nil Funds not
of sports academy sports available
Academy academy
33
Rehabilitation Complete and
Main public Nil No
and Equipping functional
library and budgetary
of community community allocation
libraries libraries in sub
county
headquarters
Programme Name: SOCIAL DEVELOPMENT & CHILDREN SERVICES
Objective: To reduce the number of street children and drug addicts
Outcome: Reduced Number of Street Children and Drug Addicts
Sub Programme Key outputs Key Planned Achieved Remarks*
performance Targets Targets
indicators
Rehabilitation of To rehabilitate Functional To rehabilitate Cluster of Centre not
street children the street center within 2 the street Street children constructed
children and years children and moved to
drug addicted drug addicted rehabilitation
youths centers
2.3 Analysis of Capital and Non Capital projects of the Previous ADP
2.3.1 County Treasury
The following is the summary of key achievements for this sector:
Prepared CBROP and CFSP
Provided affordable credit to the Meru residents in form of loans to the tune of KES
104,588,927 through the Meru County Microfinance corporation
Brought services closer to people in the sub-counties by establishing one Branch of the
Meru County Micro-finance at a cost of 2 Million
Achieved 85% automation on lending and micro-finance services at a cost of 15 Million
shillings
Trained all customers and super trainers on the County Micro-Finance Corporation
Products across the sub counties at a cost of 12 Million Shillings
Building a Three Star Hotel which is at 35.6% level of completion
A petrol station constructed at a cost of 21,047,000/ currently complete and operational
Establishment of one County Radio Station completed at a cost of 5 million shillings
Automation of the Local revenue collection; pay bill number acquired
5 capacity building and trainings held for the county revenue staff to enhance and
improve staff capacity at a cost of 1.2 Million.
34
200 coffee leaders per sub county trained on Governance and relevant legislations
governing the sector
200 leaders trained per sub county on revitalization of coffee
100% increment on the number of coffee societies and estates delivering coffee to the
central milling plant.
Capacity building of 30 leaders per ward on dairy promotion
30 dairy societies supported with cans
Re-forestation done in Nyambene Conservancy
Piped water connection to the Nyambene Conservancy rangers post
Profiling and mapping of all County hospitality facilities
Development and setting up of signage’s for Tourist sites
Publishing, launching and distributing of Meru County hospitality facilities guide
Capacity building for upgrading hospitality standards: 200 trained on community based
tourism and 60 local tour guides
Assorted weights and measures acquired
7,000 weighing and measuring machines calibrated and verified within the county.
94 inspections carried out on weighing and measuring machines
Capacity building of traders in each sub county on weighing and measures technical and
standards issues (9 sessions).
59 toilets constructed in the market centers
9 markets upgraded
Capacity building of 900 traders and entrepreneurs on business development and
promotion
3 Jua Kali sheds constructed
Businesses and markets profiled within the County
2.3.3 Health
The Department of Health Services recorded the following achievements:
i. Equipping of theatre at Timau hospital
35
ii. Construction of inpatient wards at Miathene hospital, Timau hospital, Mutuati
hospital, Kangeta hospital and Muthara hospital
iii. Construction of operating theater at Muthara hospital
iv. Construction of an X-Ray unit at Muthara hospital
v. Procurement and installation of two 500kva Generators at Meru Hospital
36
2.5 Challenges Experienced during Implementation of the previous ADP
Budget constraints
Delayed disbursement of devolved funds
Lack of public participation
Inadequate means of transport for monitoring the projects
Late disbursement of money from National treasury
Delayed appropriations from CGM
Lean loan book
Interdepartmental bureaucratic bottlenecks
Unmanaged public expectation
Limited capacity to provide training to entrepreneurs
Underdeveloped/undeveloped hospitality facilities
Undercapitalization - particularly in SACCOs, JLBS and other co-operative institutions
which access credit for onward lending
Marketing systems especially in Coffee industry bedeviled by Cartels that dictate on
producer prices without considering the farmers’ production costs
Limited management capacity in Irrigation –based co-operatives- Limited experience with
management of irrigation based cooperative
Exploitation of traders by middlemen
Inability to meet standards of market goods for international market
Fund reallocation during supplementary
In ability to monitor and evaluate projects and programs
Projects not initiated
Lack of adequate staff in all cadres
Competition for resources including financial and human.
Political interference in the implementation of health policies including running of health
facilities and public health interventions.
High morbidity and mortality from Non communicable diseases
High prevalence of communicable diseases
High maternal, neonatal and childhood mortalities and morbidities
Emerging diseases and resistance to current known treatment/management
Increased cost of healthcare
High risk of STI/HIV, teenage pregnancies, abortion, drug and substance abuse
Rising burden of injuries and violence
Poor health information management
Limited policies, enforcement and regulations (related to Public Health,)
Poor storm water drainage
37
Scarcity of land due to subdivisions (reducing of land sizes as a unit production per
household
Catchment areas degradation
Lack of adequate understanding of the nexus between human activities and climate
change among the policy makers, land users and the general public
High levels of poverty
Poor infrastructure
Conflicts over resources
Illiteracy levels
Declining amounts of forest cover, species and ecological diversity and increasing
ecological scarcities.
Human resource management and development plan that will address all HR needs.
The sub- sector has learnt that with delayed disbursement of funds, political interference
and a weak monitoring and evaluation system project implementation is delayed. The
sector recommends timely disbursement of funds, political discipline and a strong
monitoring and evaluation system to be put in place to ensure proper implementation of
projects.
There is need for proper review of achievements per every financial year quarter.
Need for sourcing of more funds from other development partners.
Need for decentralization of AIE.
Need for linking of budget to the Plan-most departments got funds below the planned
costs and others above the planed cost.
Capital investment requires funding from alternative sources other than ordinary
revenues.
Recommendations
38
More investment in public health.
Integrated planning.
Strengthen coordination and supervision at the Sub-County level.
Promote partnerships in all areas of health care provision.
Public participation is key in identifying projects that are priority to the people of Meru
County.
The County Government of Meru should engage the Water Resources Management
Authority to discuss and agree on the licensing and management of water supply in the
county to avoid over exploitation of the water surface.
The county government should move with speed to actualize the Monitoring and
Evaluation (M&E) function and develop measurable indicators to track performance. A
county-wide M&E framework should be developed, cascaded and customized to meet
each departments’ need.
Meru County Government should invest in succession planning to avoid interrupted
service delivery and ensure the retention of institutional memory and skills transfer.
Recruitment and replacement of retiring staff in the Cooperative sector should be given
priority.
39
CHAPTER THREE: COUNTY STRATEGIC PRIORITIES, PROGRAMMES AND PROJECTS
3.1 Introduction
This section provides a summary of what is being planned by the county. This include key broad
priorities and performance indicators. It also indicates the overall resource requirement in the
ADP 2018/2019.
The Assembly has powers to make any laws that are necessary for, or incidental to, the effective
performance of the functions and exercise of the powers of the County Government under the
fourth Schedule. It also provides that a County Assembly may exercise oversight over the county
executive committee and any other county executive organs.
Mission
Promoting principles of good governance to reflect the aspirations, interests and welfare of the
people of Meru County.
Values
Commitment to public service
Accountability
Cooperation and mutual respect
Integrity
Professionalism
40
Courtesy
Impartiality
Departmental Strategic priorities
41
3.2.2 Office of the Governor
The Office of the Governor continues to play a leadership role and provide overall vision in
facilitating implementation of planned projects and programmes in the Government. Following
the government restructuring by the County Executive, the Office of the Governor has adopted
additional directorates which have added a development budget which is a new feature in the
office. The projects in the ADP will include both capital and non-capital projects.
The Office of the Governor directs the overall county vision and is responsible for coordination
and directing the mission and vision towards making and creating a United Prosperous Green
Model County.
Vision:
A well-coordinated and inclusive County Government
Mission:
To provide strategic direction, policy information, accountability and external partnership to
Make Meru Great
Sector Goal:
Coordination and directing the County mission and vision towards making Meru Great.
i. Research and Efficiency Monitoring which is mandated to carry out feasibility studies,
generate proposals through collaboration with other Directorates in the Office of the
Governor for funding, improve on performance efficiency and to track the effective
implementation of projects/programmes
ii. Communication and Events which is mandated to develop and enhance media strategy in
the office of the Governor and across the County Government.
42
iii. Special programmes (disaster management and emergencies)
iv. Partnerships and External Linkages mandated to collaborate donor mobilization Creating
linkages that facilitate the achievement of County development plan
v. Administration which is mandated to provide services support for the Office of the
Governor.
Table 15: Governor Office Sector/ Sub-sector programmes
Programme Name1: Efficiency Monitoring
Objective: To ensure delivery of government key pledges.
Outcome: Effectiveness, efficiency and transparency in project implementation.
Sub Programme Key outputs Key performance Planned Targets
Capacity development Increased % of staff trained
indicators 50%
and training effectiveness in % of employees 100%
project verification appraised/year
Monitoring and Enhanced credibility, % of projects monitored 100%
Verification timely collaboration and verified
and information
dissemination for
decision making on
project
implementation.
Increased value for No. of project 1
money, quality project implementation status
and service delivery reports
and reduced risks to
County
Programme 2: Disaster Management
Objective (s): To have a safe and resilient Meru County
Outcome (s): reduced vulnerability
County disaster risk Increased availability % of early warning/action 100%
governance and of and access to messages disseminated
coordination disaster risk
information and
assessments
Improved disaster % response to emergencies 50%
response mechanisms related to natural disasters
Enhanced response to % of staff trained on 25%
disaster risks disaster management
Programme 3: Civil Education
Objective (s): To sensitize, educate, and inform citizens on devolved governance
Outcome (s): Adequately sensitized, educated and well-informed citizens on devolved governance
Face-to-Face, Mass Increased % increase of citizens 65
Media and ICT enabled accountability in public seeking/accessing
Civic Education service delivery government services
43
% increase of youth, people 40
in diaspora and community
seeking/accessing county
government services
Programme 4: Information dissemination
Objective(s): To offer timely and effective awareness creation
Outcome(s): - Well informed Citizenry
County Development Improved awareness No. of publications 12
Communication of County Government
operations
Programme 5: Partnerships and external linkages development
Objective(s): To enhance partnership for growth
Outcome(s): increased development partners involvement
Research Increased No. of funding proposals 20
development development partners for development projects
fund
Stakeholder relations Increased Amount of revenue from 1.2B
management development partners development partners
fund
Programme 6: Cohesion and Peace Building
Objective: To improve social cohesion and a culture of peace within and without the county
Outcome: Improved cohesion and peace within and without the county
Peace Building, Improved inter and Proportion of citizens that 65
Education, Advocacy intra county relations live in harmony in the
and Research county
% increase in population 60
Conflict management Improved security and
that feel safe in their
and resolution peace
communities
44
Offering prudent financial services, planning, gainful investment and state of art technology
Sector Goals
i. To harness service delivery
ii. Facilitation of evidence based planning
iii. To improve the living standards of the people of Meru
45
No. of containers installed 8 cess containers
ICT Literacy and Enhanced ICT literacy No. of ICT Training centers 2 Established ICT Training
capacity Building centres
Programme Name : Meru Investment Corporation
Objective: To increase investment in the county
Outcome: increased investments
Sub Programme Key outputs Key performance Planned Targets
indicators
Value addition to farm value addition plants % completion 25% completion
produce set up and operational
Infrastructure Gross built up area in % of completion 25% completion
development sq. Mtrs of
commercial space
Tourism and tourist sites master % completion 100% completion
Hospitality plan
46
3.2.4 Education, Technology, Gender, Culture & Social Development
Vision
A well-educated and skilled society that provides social services for quality life.
Mission
Composition
ECDE
Vocational Training
Culture
Gender and Social Development
Alcoholic Drinks Board
Strategic Priorities
47
Sub Programme Key outputs Key performance Planned Targets
indicators
Promotion of
Increased enrolment % of enrolment in VTC/ yr 10%
vocational training in VTCs
Implementation of
Improved completion % of trainees that graduate 80%
curriculum rate
Promotion of home Improved access to No. of people accessing 3,000
crafting home craft centres the centers
Education fund Improved access to No. of needy students 100,000
technical & vocational accessing the fund/yr
training
Programme Name: Gender and Social Development
48
Outcome: Increased revenue and compliance with regulations
Sub Programme Key outputs Key performance Planned Targets
indicators
Licenses automation Increased revenue Revenue generated 50M
collected
Rehabilitation Centre Improved health % addicts rehabilitated 50%
status
Public awareness and Increased awareness % equipped with 20%
education knowledge on alcoholic
drinks
Office Space Improved efficiency in % in people accessing 70%
service delivery regulatory services
Youth Affairs
Sports
Strategic Priorities
49
Table 18: Youth Affairs and Sports Sector/ Sub-sector programmes
Programme Name: Youth Development
50
Departmental Mission
To provide safe, quality and adequate transport and infrastructure facilities for social economic
development.
51
3.2.7 Legal Affairs, Public Service Management & Administration
Sector Composition:
a) Legal Affairs
b) Public Service Management
c) Administration
Sector Vision
To be the lead entity in quality and proficient service delivery.
Sector Mission
To provide leadership in professional, efficient and effective public service for the realization of
county development goals.
Sector Objectives
a) To coordinate county government functions
b) To provide and manage efficient and effective human resource
c) To coordinate town administrative functions
d) To provide professional legal service to the county
e) To sensitize, educate and inform citizens on devolved governance
Table 20: LA & PSA Sector/ Sub-sector programmes
Sub Programme Key outputs Key performance Planned Targets
indicators
Programme: County Governance
Objective: To strengthen the capacity to provide leadership and coordination required for successful
implementation of development plans
Outcome: Strengthened capacity to provide leadership and coordination for successful implementation of county
development plans
Administration and Increased citizen Proportion of county
support services satisfaction citizens participating in
county initiatives and 70
projects (%)
52
Sub Programme Key outputs Key performance Planned Targets
indicators
Administration Achieve operational % of urban residents 35
Support Services efficiency and satisfied by services
effectiveness offered by the town
administration
53
3.2.8 Trade, Investment, Industrialization, Tourism & Cooperative Development
Sector Composition: Trade, Weights &Measure, Tourism, Investment, Industrialization and
Cooperatives
Subsector Mission
To facilitate orderly growth and sustainable development of trade and enterprises.
Subsector Goal
a) To undertake policy, legal and institutional reforms for the development of the sector.
b) To promote fair trade practices and protect consumers from any trade malpractices
c) To promote Research and Development (R&D) and adoption of innovation and
technology.
d) To promote sustainable trade, industrial and entrepreneurship development.
COOPERATIVES DEVELOPMENT
Subsector Vision
Self-sustaining cooperatives.
Subsector Mission
To facilitate growth and development of economically viable cooperatives.
Subsector Goals
a) To enforce compliance to cooperative legislation.
b) To promote economically viable cooperatives.
c) To carry out capacity building
d) To promote a culture of savings and improve access to affordable credit.
e) To promote value addition and increase market access.
TOURISM DEVELOPMENT
Subsector Vision:
To be the preferred world class tourist destination
Subsector Mission:
Provision of thrilling tourist products and facilities in a fascinating sustainable environment
Subsector Goals:
i. Develop and diversify County tourism product
ii. Enhance accessibility to tourism products and facilities
iii. Standardize hospitality services
54
iv. Tourism promotion and marketing
TRADE
55
Capacity Building - No. of trained - No. of trained - 900 trainees
personnel personnel
- Exchange
programs
Tourism product - Support of - No. of domestic - 48,000 arrivals
enhancement operational and international
tourism tourist arrivals
attractions
- Mapped tourism
facilities
Tourism promotion - Increased - No. of domestic - 48,000 arrivals
and marketing participation in and international
Exhibitions tourist arrivals
- Exposure/
advertisement in
print and
electronic media
Tourism product - Accessible - No. of kilometers - grade 50 km
accessibility facilities, of road graded - Murram 50 km
- Affordable - No. of Km - tarmac 25 km
access fees to murramed
tourism facilities - No. of Km
tarmacked
Programme Name : Cooperative Development
56
- Banana - No. of banana
cooperatives cooperatives
a. Medical services
b. Public Health
i. To ensure a well Led and Coordinated Meru County Health System that is responsive to
the needs of residents
ii. To ensure quality health services are accessible to all residents of Meru County
iii. Ensure there is an adequate number of skilled HRH in Meru County to provide quality
services
57
iv. Ensure Meru County has adequate health commodities and devices to provide
effective/quality services
v. Ensure Meru County has the necessary evidence to inform planning and effective
implementation of
vi. To have all planned Meru County Health activities fully financed
% of health facilities 20
inspected annually
58
Sub Programme Key outputs Key performance Planned Targets
indicators
Youth Health Reduced incidences of % of youth accessing youth 10
drug abuse and friendly services
diseases among the
youth
Programme: Curative and Rehabilitative Services
59
Sub Programme Key outputs Key performance Planned Targets
indicators
Programme: Administration, Planning and Support Services
Objective: To Improve service delivery in the health sector
Outcome: Improved access to quality and affordable health services
SP 4.1 Health Increased access to Number of standard 1.3
Infrastructure basic Health and Dispensaries per 10,000
related services population
Number of standard 1
Health centers per 30,000
population
Number of standard Level 1.61
4 Hospitals (Sub-County
referral Hospital) per
100,000 population
Number of standard Level 1
5 Hospitals (County
Referral Hospital) per
1,000,000 population
SP 4.2 Human Improved competency % of staff trained per year 40
Resource for Health among staff
Attraction and (%) Retention Rate of 70
retention of health health professional
workers workers
60
Mission
To promote livelihoods and sustainable competitive agriculture, livestock, veterinary, irrigation
and fisheries sub-sectors while conserving natural resources.
Sector Objectives
61
Promotion of grain Number of MT of green Procure and distribute 100MT
production gram seed bought and of green gram certified seed
distributed
Promote on-Farm soil No of farms laid out Conserve one catchment area
and Water No of farms conserved in a ward
Conservation
Crop Value Fruit and grains value No of farmer groups One model grain cleaning,
addition supported sorting and warehousing store
Addition Volume of produce -One model fruit processing
value added facility
Livestock Genetic inseminate assorted Number of doses of semen Procure of doses of semen
upgrade doses of semen procured
Fodder development fodder grass seeds Kgs of fodder/grass seeds Procure 4000 Kgs of assorted
procured grass seeds
silage making machine machine acquired and in procure fodder silage making
and accessories use machine
Animal disease disease control No. of assorted doses of to procure 545,000 assorted
management /vaccines vaccines procured doses
62
Outcome: Enhanced household Income
Sub Programme Key outputs Key performance Planned Targets
indicators
Aquaculture Fingerling produced No. of fingerings produced At least 1,000,000 fingerlings
development annually
Fish Marketing and Kgs of fish sold and sales Procure 18 cooler boxes and 20
Value Addition deep freezers and support to
Countywide Meru county fisheries
cooperative
Fish nutrition, local Feed pelletizer, fishing 1 feed pelletizer with drier
fish feed formulation equipment procured and procured, feed store
and fishing equipment Kgs of fish feeds constructed and fishing
Countywide manufactured equipment acquired
63
AMS station infrastructure Construction of a septic Septic tank constructed 1 septic tank.
development tank.
3.2.11 Lands, Physical Planning, Urban Development & Public Works
This department was comprised of two directorates: Physical Planning & Urban Development;
Lands, Housing, and Public Works. With Meru County economy primarily dependent on
agriculture, the department ensures elaborate and adequate land management to maximize the
wealth from its use. The department in response to the trend of unsustainable development
being experienced county wide as a result of haphazard and uncontrolled development, urban
sprawl, environmental degradation plans to lay significant enhance spatial planning and urban
management. This is alongside automation of planning services and the development permit
application process in a move aimed at achieving efficiencies and ease to land use in the county.
During the fiscal year, department also plans to promote decent housing through the use of
modern and alternative technologies as a contribution to the achievement of the National
government BIG FOUR agenda.
Sector Vision:
A model center of excellence in planning, innovation & service delivery.
Sector: Mission:
To Promote planning, implementation, monitoring, evaluation and modern technology for
sustainable development
Sector Goal:
To improve the quality of life through land planning, administration and management.
Land Information and Public land catalogue % of county land data digitized 20%
Public Land Efficient County land
Management registry
Land Banking Secured public land Acreage of land available for 100 acres
public use
Programme Name: Physical planning & Urban development
Objective: To Provide well planned, coordinated settlements harmonious with their natural environment
64
Outcome: Secure, accessible and conducive environment for living and working
Sustainable growth and development of our urban and rural settlements
Sub Programme Key outputs Key performance indicators Planned Targets
The County has eleven permanent rivers with the major ones being the Kathita River, a
tributary of River Tana. These form the major sources of water for domestic use and irrigation.
The County has three major water service providers but discussions on restructuring and merging
the providers is currently on going;-
65
Departmental Vision and Mission
Vision
A Healthy Population in Sustainable Environment
Mission
Provision of safe and adequate water and sanitation services
Sector Goals:
i. To improve availability and access to sustainably managed water and sanitation for all
through rehabilitation, conservation and protection of water resources.
ii. To improve water quality by reducing pollution, eliminating dumping and minimizing
release of hazardous chemicals and materials.
iii. To enhance effective, accountable and participatory governance structures for sustaining
water and sanitation services.
Table 25: Water and Irrigation Sector/ Sub-sector programmes
Programme1: Domestic Water Supply and Waste Water Management.
Objective (s): To increase access to clean and safe water to international level standards
Outcome (s) Improved access to clean, safe and adequate water
Rural Water Supply of safe and adequate No. of households with 6,000
Supply water to households
access to clean water
Urban water
supply No of water connections in all major 1,000
towns
66
Rural sanitation Improved sanitation and % of population using safely managed 10%
and hygiene hygiene facilities in the rural sanitation services in the rural areas
areas
Surface water Increased water levels % population with access to sustainable 66%
management fresh water
Sector Goal:
Ensure conservation, restoration and sustainable use of natural resources in particular forest,
wetland, mountains and dry lands in line with obligation with national government.
67
Rehabilitation of catchment and Well managed catchment No of catchment and 5
riparian areas areas riparian areas
rehabilitated
Programme 2: Research and Development in Environmental Management
Objective (s): To generate new knowledge, technologies and innovations that enhance informed decision
making in development
Outcome: Availability of knowledge based environmental management system
Sub-program Key Output Key Performance Planned
Indicators targets
Natural Resource Research Centre Improved data base on % of mapped natural (5%)
natural resource resources
Availability of knowledge % Real- time data 20%
Information and Data Management based environmental retrieved
System management system
Program 3: Environmental Management and Protection
Objective (s): To sustainably manage and conserve environment and natural resources well
Outcome (s) Availability of natural resources
Sub-programme Key Output Key Performance Planned
Indicators targets
Forest Ecosystem Management Increased forest cover county % increase in 0.5%
wide forest cover
Fresh Water and Wetland Ecosystem Increased No. of households No. of households with 6,000
with access to water access to clean water
Waste Management Controlled waste reduction % of waste reduction 10%
from sources from sources
No of environmental 20
cases prosecuted and
convicted
Pollution Control Reduced air and water borne % reduction in air and To
diseases water borne diseases conduct a
Baseline
survey
68
Policy direction
Secondment of qualified personnel
69
Programme Sectors/ Cross-sector Impact Cross-sector Measures to Harness or
Name Sub-sectors (Synergies) Adverse impact Mitigate the Impact
conducive working
environment
Disaster All sectors Improved resilience Poor responses to In collaboration with sector
Management and economic natural-based actors establish disaster
empowerment of disasters and response mechanisms
county residents emergencies
Communicatio All sectors Improved information Lack of ownership Engaging PPP; Capacity
n and Events sharing and flow of development building; Automation of key
projects government services and
operations
External All sectors Resources gap Stalling and delay in Engage national government,
partnerships addressed and new implementation of development partners and
ways of public service projects PPP in county development
delivery agenda
Public Finance All sectors Compliance to public Non adherence to Efficient public finance
Management finance frameworks, standards; high management, mainly through
accounting standards recurrent policy-led planning and
(IPSAS) and efficient expenditure; low programme-based budgeting
resource allocation absorption of
development
budget and
corruption
Youth women Education, Training on ICT, Poor living Adequate funding and
and PWDs Agriculture, agribusiness standards among curriculum reforms to suit
development Roads, Land, activities, access to the youth; market driven skills; funding
Finance and finance for dependency and to youth enterprises; relevant
Trade businesses, high rate of training on political, social-
Availability of lands unemployment economic opportunities;
for youths in training on value addition;
agriculture land zooning
Increased
engagement of
youths in
construction industry
Increased job
opportunities for
youths in building of
roads infrastructure
County All sectors Improved information Poor service Engaging PPP; Capacity
Governance and the sharing and flow in all delivery and bad building; Automation of key
Assembly county government governance government services and
departments operations
Reproductive Education Improved Civil court cases for Enhance county reproductive
Health and Social reproductive health non-conformers health policies; create public
Developmen and enhance school sensitizations on the
t health program reproductive health
requirements; partnership
among health sector State
and Non Sector Actors
70
Programme Sectors/ Cross-sector Impact Cross-sector Measures to Harness or
Name Sub-sectors (Synergies) Adverse impact Mitigate the Impact
Environmental Water, Rehabilitation of Threats to animal Collaboration with sector
conservation Roads & catchment and and plant species, actors ad enactment of
and protection Legal riparian areas and change in environmental conservation
increase in proportion vegetation and protection policies
of land area covered composition and
by forest structure, and
depletion of water
quality and
quantity through
the destruction of
catchments and
underground
aquifers. creates a
window for
invasive species,
new pests and
diseases
71
CHAPTER FOUR: RESOURCE ALLOCATION
4.1 Introduction
This section presents a summary of the planned allocations by department. It also provides a
description of how the county government is responding to changes in the financial and
economic environment.
72
ECDE 288.8
Technical and Vocational development 250.4
Cultural & Arts Development 80
Gender and Social Development 141.5
Regulation of alcoholic drinks 43
Preventive Health Care 160
Curative and Rehabilitative Health Care 510
Administration, Planning and Support Services 200
County Governance 130
Legal Services 90
Town Management and Transformation 124
Public Service Management and Transformation 30
County Law Enforcement Service 105
Office Accommodation Management 50
Youth Development 167.9
Sports Development 45
Ward Development projects 920
The programmes are implemented by the county government to realize the county vision of a
united, prosperous, green model county thus making Meru County great. The full
implementation of this plan will cost approximately KES.12.0 Billion as summarized on Table 29
and 30. It is anticipated that about Ksh5.5 Billion of these resources will be realized through Public
Private Partnerships, Development partners, donors and other partners including the National
Government, bilateral agencies and the Private sector. To this extent, various memorandums of
understanding have been entered between the County Government Agencies and respective
organizations.
73
10. Agriculture Livestock Development and Fisheries 250 185.9 435.9
11. Lands, Physical Planning, Urban Development and Public 200 288.5 488.5
Works
12. Water & Irrigation 820 2795 3,615
13. Environment, Wildlife and Natural Resources 25 123 148
14. Ward Development projects 920
Grand Total 12,087.6
An analysis of the table above table 30 above shows that the community based flagship projects, arrived
through a participatory approach costed at Ksh.920million will be implemented in our Wards. This will be
in addition to other projects to be implemented by departments and agencies of the County Government.
The agencies and departments plan to implement flagship projects of about Ksh.2.5Billion with the largest
chunk going to other projects valued at Ksh.8.6 Billion.
74
in key capital projects that have a potential to improve revenue generation in the medium term
as well as create employment in the county.
Establishing and reviewing legal provisions such as the Finance Act & Revenue Administration
Act, including a robust taxation policy to support revenue collection, identifying new revenue
streams, conducting regular/timely revenue assessment to give trends and review targets in
revenue collection, training of revenue staff to enhance their capacity are among are the key
interventions that the county will focus on. The County Government should also continue to
exploit areas that leverage the private sector generate the much-anticipated wealth and
employment opportunities through the innovative financing , trade between counties especially
the economic blocks will go a long way in funding the gap.
In conclusion direct investment, great governance aimed at curbing corruption, a strict financial
system that promotes savings, external debt reduction and public finance management through
improved audits, and simplified filling system will all go a long way in securing funds so as
reduce the funding gap in the ADP 2018/2019
75
vii. GoK-SIDA -
Sub-Total 387,083,948.00
TOTAL 10,260,327,505.00
76
CHAPTER FIVE: MONITORING AND EVALUATION
5.1 Introduction
This chapter presents the monitoring and evaluation framework that will be used to track
progress on implementation of programmes and projects at the county level. This will be
conducted through Meru County Integrated Monitoring and Evaluation System (CIMES) whose
main aim is to improve the effectiveness in tracking the implementation of various development
policies, strategies and programmes. To ensure that there is a clear way of measuring
performance; Meru County will develop a Performance Management Plan that will see that all
commitments made in the ADP are translated into performance contracts with public officers in
the county.
Evaluation will be conducted with project improvement and policy enlightenment hence acting
as “decision-oriented” evaluation. This will provide valuable insights into how the project is
operating, the extent to which it is serving the intended beneficiaries, its strengths and
weaknesses, its cost – effectiveness and potentially productive directions for the future. This
evaluation will also provide the information for decision – thus helping to set priorities, guides
the allocation – of resources, facilities the modification and refinement of project structures and
activities; and signal the need for additional personnel & resources. Finally, it is also intended
to determine a change of course for a project. Actual results of development projects shall be
measured in relation to the planned outcomes.
All projects will have a component on monitoring and evaluation right from the initial stages.
Project planning accountability will entail an effort to meet the diverse information interests
and expectations of all those who have a stake in a project – e.g. beneficiaries, managers, staff,
donors, public at large.
The county will undertake two types of evaluations for various projects namely mid-term and
end of project evaluations: Mid-term will be undertaken to review progress and propose
alterations to project design during the remaining period of implementation while end of
project evaluation will be conducted at the completion of the project period. The specific types
and timing of evaluations for various projects will be determined at the design and planning
stage of each project. The matrix for implementation, monitoring and evaluation is detailed in
77
each of the sector sub programmes in chapter 6. The matrix details the names of sub
programmes, costs, timeframes, monitoring indicators, monitoring tools, implementing
agencies, source of funds and implementation status for the various sectors. For effectiveness,
participatory methods and tools will be used throughout the project stages from design to
evaluation. Monitoring will entail continuous collection of data, collation and analysis of data
for decision and for use in subsequent evaluation events.
78
This details actual performance
against target contained in the
performance contract
79
Tourism and Capacity building of traders and
1800 1800
Cooperatives entrepreneurs
Development No. of cooperative societies members
20,000 20,000 Members
empowered
No. of new cooperatives formed
9 new cooperatives 12 new cooperatives
(Bananas, Potato, Miraa & PWDs)
No. of community members trained 900 900
No. of youths and women trained 1,000 4,500
Agriculture, Livestock No of Macadamia seedlings distributed 123,900 619,500 seedlings
and Fisheries planted
No. of Avocado seedlings distributed 134,000 400,000 seedlings
planted
Kgs of green gram seeds bought and - 100T
distributed
A well-coordinated - Formation of a
agriculture sector functional County,
Sub County and
Ward Agricultural
Board
Number of dairy goat procured - procure 110
upgrading dairy
goats
Number of doses of semen procured 12500 doses 12500 doses
Kgs of fodder/grass seeds procured - Procure 4000 Kgs of
machine acquired and in use - 2 machines
No. of assorted doses of vaccines 120 000 to procure 545,000
procured vaccinations assorted doses
80
freezers Nil support freezers and support
to Meru county to Meru county
fisheries fisheries cooperative
cooperative 1,000
Kg
Value KES. 380,000
Feed pelletizer, fish feeds procured I pelletizer, 1 feed pelletizer with
and Kgs of fish feeds manufactured 6,000Kgs of fish drier procured, feed
feeds and Zero Kg store constructed
of fish feeds and fish feeds
manufactured procured and fish
feed manufactured.
No. of fish ponds established 155 fish ponds 100 fish ponds
established and 24 constructed, 150 fish
renovated ponds renovated
no of fishing net acquired 10 fishing nets procure 30 fishing
procured nets
no of fish liners procured 24 fish pond liners procure 28 pond
procured liners
refrigerated truck procured No truck procured procure 1
refrigerated truck
Roads ,Transport and No. of KMs of roads maintained annually 450 Km 675 Km
Energy No. of transformers installed 49 90
No. of floodlights installed 45 46
Lands, Physical % of adjudication sections registered - 10%
Planning, Urban % of county land data digitized - 20%
Development, Housing Acreage of land available for public use - 100 acres
and Public Works No. of operation boards 1 5
% of completion of the County GIS Lab - 50%
established
No. of strategic urban spatial plans 1 2
completed
% of Meru residents with ease of access 5% 20%
to urban services and structures
No. of urban areas piloting the 1 5
Symbiocity approach of sustainable
urban development
% of members of staff accessing - 6%
adequate housing
81
Culture and social No. of ECDE classes constructed 161 90
development No. of ECDE teachers recruited 0 300
No. of ECDE teachers trained 4,000 4,000
Amount used to procure learning and
680,000 40M
teaching materials for ECDE learners
Amount disbursed to PWDs 5M 8M
No. of women empowered 2,000 2,000
No. TVET model centers established 0 3
No of VTC trainees 400 720
Amount used to procure Equipment for
800,000 5M
VTCs
No. of schools participating in co-
25 35
curricular activities
Amount of capitation Disbursement to
10M 40M
VTCs
Amount of capitation Disbursement for
0 10M
exams to VTCs
No. of instructors recruited 0 100
Amount disbursed for bursary 144,250,000 150,000,000
No. of Cultural centre constructed and
0 1
equipped
No. of Kimeru dictionary copies
0 10,000
published
No. of cultural extravaganza 0 1
No. of PWDs and Street children 0 30,000
No. of PWDs benefiting from
0 10,000
entrepreneurship empowerment
No. of TUNAWEZA program
0 255,500
beneficiaries
No. of licenses issued by alcohol board 4000 4000
Health Services Mortality Rate per 1000 population 6-8 6
Infant Mortality Rate per 1000 live 39 per 1000 live 36
births births
Maternal Mortality Rate per 100,000 98.7 (facility based 95
live births rate)
% of reduction in disease burden 50% (MOH) 45
% of the population with access to 25 (MOH) 35
affordable medicines and vaccines on a
sustainable basis
Legal Affairs, Public Proportion of county citizens 40 55
Service Management participating in county initiatives and
and Administration projects (%)
No. of court cases closed 700 active cases 40
% of urban population with access to 59 70
proper sanitation
Proportion of citizens satisfied with 54 59
service delivery among staff
No. of officers recruited, trained and 114 250
kitted
% of offices developed 30 45
No. of youths recruited under MYS 2250 2,000
82
Youth Affairs and No. of teams equipped NIL 90
Sports No. of staff trained 15 25
No of stadia upgraded 1 3
No. of youth centers upgraded - 9
No. of sensitization campaigns - 45
83
ANNEXES
Meru Rising Tower To provide 15 Final designs % Completion Ongoing 200 CGM
storey office ready for tender
block at Angaine process to begin
Meru county Hotel To build a three Full completion % of completion Ongoing 187 66 CGM
Refurbishment star Hotel of Meru county
Hotel
Mugambo Jwetu To Taking the One radio Level of completion Radio Operational 5 5 CGM
Radio station radio on air station
Maua Mall To get an Feasibility done, One mall constructed Not initiated 50 Investors
investor to put Land transfer funds
up the mall and SPV
registration
Processing of To get an Feasibility study, Feasibility studies and Financial Ongoing 200 Investors
Bananas, Potatoes investor to put Land transfer analysis and potato plant funds
and fruits, up the mall SPV registration
Mini Tannery
84
Loans To provide 111m Amount of Loans issued Continuous 111 104.58892 CGM
affordable 7
credit to the
Meru residents
MCMC Capacity To train Train all No. of Customers trained 100% achievement 7 12 CGM
building customers and customers and
super trainers super trainers
on MCMC
products
SMS query and To enhance One Mpesa Authorization and Approval Ongoing 1M 0 CGM
MPESA payment revenue letters
system collection
Query system
Direct banking and E To enhance Develop one Number of system in place Not developed 1M 0 CGM
banking revenue direct banking
and E banking
85
Revenue Board To enhance and 5 capacity Number of training/capacity Completed 1M 1.2M CGM
Capacity Building improve staff building and building held
capacity trainings held
Project Name Objective Output Performance Indicators Status Planned Cost Actual Cost Source of
in Million in Million funds
(KES.) (KES.)
Capacity building of Impart 200 members Number trained 100% 13.5 M 14,702,238 CGM
members and knowledge of and leaders per
leaders of newly Saccos on the ward
promoted Saccos new members
(Youth, Women and and leaders
traders Saccos).
Seed capital to Enable 0.5 million per Amount disbursed 100% 67.5 M 67.5 M CGM
Saccos members access ward per Sacco
No of Saccos funded
affordable
credit
Governance and Impart 200 coffee Level of compliance with the 104.4% 6.7 M 6,997,480 CGM
Compliance to knowledge on leaders per sub relevant legislations
legislation prudent Sacco county
governance and
compliance with
relevant
legislation
86
governance and
improved coffee
husbandry
practice
Revitalization of To mill and All coffee Number of coffee societies and 100% 1M 10M CGM
Coffee Sector-Coffee market Meru societies and estates delivering coffee to the
mill County coffee estates across central milling plant.
centrally the county.
Dairy Promotion – To increase milk 30 leaders per Quantity of milk produced 3M 10 M CGM
capacity building productivity and ward
No. trained
achieve best
practices in
Dairy
cooperatives
Dairy Promotion-milk To increase milk 30 Dairy Number of cans given out. 90 % 5M 7,278,500 CGM
cans productivity and Societies
achieve best
practices in
Dairy
cooperatives
126,478,21
Sub Total 104.7 8
87
Project Name Objective Output Performance Indicators Status Planned Cost Actual Cost Source of
in Million in Million funds
(KES.) (KES.)
Establishment of Nyambene Enhance Fully pledged -Stakeholders Some projects carried 15 CGM
conservancy conservation conservancy consultation/Trainings. out 387,257.06
and reduce
-Recruitment and training
human-Wildlife
of additional rangers
conflict
-Installation of solar
power
Conservancy headquarter
buildings
-Reforestation
-Development of a
conservancy view point
Tourism Marketing Publicity of Marketing -Profiling and mapping of Some projects achieved 20 5.4 CGM
Meru County Tourist sites all County hospitality others not
Tourism facilities
Potential
-Publishing, launching and
distributing of Meru
County hospitality
facilities guide
- Brochures
No of sites marketed
88
Upgrading the hospitality Ensuring the Compliance -Training reports Not carried out due to 2 1.6 CGM
standards through capacity county with industry limited allocation
- Training on hospitality
building hospitality standards
standards No. trained
comply with
national
standards
County Weights and Encouraging fair Weights and - 2 Acre land within Meru Land not yet bought 10 1.1 CGM
measures trade practices measures town
laboratory/Complex and consumer complex
-Assorted weights and
protection.
measures equipment
Technical Services Accurate ALL Technical Record register of Record Register 0.5 0.1 CGM
working equipment maintenance of Technical established
standards Serviced & equipment.
repaired.
Inspection and Accurate 7,000 Certificates of Verification Continuous project all 2 1 CGM
Calibration/verification of weighing and year round
weighing and
weighing and measuring measuring
measuring
instruments instruments Reports /cases
instruments
Investigated & /or
94 inspections prosecuted
Training/capacity building Create 9 sessions , 1 in Reports on trainings Trainings carried out 1.5 CGM
awareness each sub conducted
about weights county
and measures
mandate
89
Trade Development Joint Ensure SMEs 3.0 M Amount Disbursed Not wholly completed 3.0 2.2 PPP
Loan Board access to
finance
Market Toilets construction Ensure sanitary 45 toilets No. of toilets constructed Completed 22.5 19.35 CGM
and Health
standards are
maintained
Market Upgrading Provide a 9 markets No. of markets upgraded complete 180 CGM
conducive upgraded
business
operating
environment
Training of Traders Trained Traders 900 traders No. of traders Trained Achieved 14 14 CGM
Promotion of Juakali Provide sheds -9 sheds -No. of sheds constructed Achieved 20 13.5 CGM
and equipment
- 9 sets of -No. of equipment
to Juakali
equipment disbursed
traders
Mapping of Businesses and Document 1 document -Business and market Achieved 6 5 CGM
markets businesses and profile document
profiles and
markets
90
Routine Transform them 450km No of KM of improved roads completed 136 million 130 million CGM
maintenance of to all weather (grading, gravelling etc.)
feeder roads roads
Construction of To link roads 3km improved No of km of Probase covered 60% done- 93 million 55 million CGM
roads Probase std within Maua
roads town
Upgrading of bus To decongest Improve bus No of improved bus parks Stalled 72 million 0 CGM
parks main stage parks
Upgrading of the To improve 9 markets Upgrade to paved standards 2 ongoing 107.7million 102.6 KRB
market loop roads accessibility improved million
to paving standards within the
markets
Purchasing of To maintain roads 2.Graders No of machines procured completed 100 million 0 CGM
construction 2.Dozers
equipment and
plants Electrification
P2.Rural
Street lighting and To have well-lit All major urban Street lighting installation and Ongoing 15.5 million 15.5 million CGM
floodlight mast markets to areas and electricity connections
improve security market centers
Feasibility study and For project One feasibility No of reports 1 done 2.5 million 0.4 million CGM
engineering designs appraisal study
Digital To prepare digital Topographical Inception report Not Started 400 0 County
topographical map topographical map maps and the Reconnaissance report government
and preparation of and spatial plan spatial plan for Notice of preparation of the of Meru
Meru County for Meru County Meru county spatial plan
Spatial Plan Stakeholders meetings
proceedings/minutes
Data collection
report/instruments
Data analysis reports
91
Draft plan and report
Final plan and report
Notice of completion of plan
Digital To prepare Digital Topographical Inception report Complete/Awaiting 30 43.8 County
topographical map Topographical maps and Reconnaissance report approval government
and integrated map and spatial integrated Notice of preparation of the of Meru
strategic spatial Plan for Timau and strategic spatial spatial plan
plan for Timau and its Environs plan for Timau Stakeholders meetings
environs and its environ proceedings/minutes
Data collection
report/instruments
Data analysis reports
Draft plan and report
Final plan and report
Notice of completion of plan
Digital To prepare Digital Topographical Inception report Final draft plan 30 24.5 County
topographical map Topographical maps and Reconnaissance report complete government
and integrated map and spatial integrated Notice of preparation of the of Meru
strategic spatial Plan for Maua and strategic spatial spatial plan
plan for Maua and its Environs plan for Maua Stakeholders meetings
environ and its environ proceedings/minutes
Data collection
report/instruments
Data analysis reports
Draft plan and report
Final plan and report
Notice of completion of plan
Digital To prepare Digital Topographical Inception report Final draft plan 30 22.9 County
topographical map Topographical maps and Reconnaissance report complete government
and integrated map and spatial integrated Notice of preparation of the of Meru
strategic spatial Plan for LAARE and strategic spatial spatial plan
plan for Laare and its Environs plan for LAARE Stakeholders meetings
environ and its environ proceedings/minutes
Data collection
report/instruments
Data analysis reports
Draft plan and report
Final plan and report
92
Notice of completion of plan
Digital To prepare Digital Topographical Inception report Ongoing. 30 31.7 County
topographical map Topographical maps and Reconnaissance report government
and integrated map and spatial integrated Notice of preparation of the of Meru
strategic spatial Plan for Nkubu strategic spatial spatial plan
plan for Nkubu and its Environs plan for Nkubu Stakeholders meetings
and environs and its environ proceedings/minutes
Data collection
report/instruments
Data analysis reports
Draft plan and report
Final plan and report
Notice of completion of plan
Digital To prepare Digital Topographical Inception report Not started 30 0 County
topographical map Topographical maps and Reconnaissance report government
and integrated map and spatial integrated Notice of preparation of the of Meru
strategic spatial Plan for Kangeta strategic spatial spatial plan
plan for Kangeta and its Environs plan for Kangeta Stakeholders meetings
and environs and its environ proceedings/minutes
Data collection
report/instruments Data analysis
reports
Draft plan and report
Final plan and report
Notice of completion of plan
Planning and Controlled Topographical Plans in place Not started 90 0 County
survey of market development and maps and government
centres conferring of integrated of Meru
leases strategic spatial
plan for all and
its environs
ICT development
Project Name Objective Planned Performance Indicators Status Planned Cost Actual Cost Source of
Targets/Output in millions in Millions funds
s (KES .) (KES )
93
Establishment of Establishment of 3 Centres and 1 -No. of centres Ongoing 15 3.8 CGM
appropriate centres on policy document
-No equipment’s procured -Policy
technology centres material and
developed
technology
Policy
development
process
Modernization and Redesign and value 300 county No. of housing estates Not started 30 0 CGM/PPP
design of Houses add to existing
houses redesigned and redeveloped
county houses
An online 0% Not Initiated 11 - CGM
Automation of system to run
development county
plans approval development
Gokibali process approval
An online 0% Not Initiated 20 CGM
Automation of system to run
Lands county Lands -
GIS system management and GIS.
An online 0% Not Initiated 4.5 CGM
storage with
indexing for all -
Document documents
management Automation - including
system paperless county registry
An online HR 0% Not Initiated 10 CGM
management
system -
HR System Automation of HR
Critical 15 CGM
Infrastructure
requirement for Tier II data 0% Not Initiated -
servers housing,
centre.
information
storage, security,
systems hosting
Data centre and data sources.
94
Infrastructure - Ward offices local 22.5 CGM
WARD LAN area networks
IEEE 802 0% Not Initiated -
network
standards
5 CGM
95
A team for web 5
presence
management, 2 Officers 0% Not Initiated -
online web
CGM
portals, websites
analysis and social
ICT online team media
-
CGM +
County Youth 0% Not Initiated 25 PARTNERS
Empowerment
and Innovation
Youth An incubation and
empowerment & support centre for centre
innovation centre young people.
This is a ICT
ticketing and
efficient 0% Not Initiated 9 -
management of
CGM
ICT requisitions
ICT inventory and and complaints
Help desk system resolution systems
provide efficient Not Initiated
allocation and
Project and task monitoring of 0% 3 -
management assignments and
CGM
system projects allocated
Provide a common
secure and reliable
platform of 0% Not Initiated 5 -
communication in
CGM
Email system the county
acquire
Equipment,
Hardware and 0% Not Initiated 9.5 -
Software to
CGM
Servers support all the
96
systems in the
county
Provide a common
secure and reliable
platform of 0% Not Initiated 20 -
IP telephony communication in
S CGM
provisioning the county
Increase and
0% Not Initiated 3.5 -
ICT Capacity refresh ICT skills
building and Knowledge CGM
Provide guidelines
on how to manage
0% Not Initiated 1.5 -
and secure county
ICT Security policy Data CGM
ensure availability
0% Not Initiated 5.5 -
ICT service of ICT Service
delivery charter Charter CGM
ensure availability
of Teleconference
0% Not Initiated 10 -
Teleconference facility at HQ and
and CCTV Sub county offices Not Funded
ICT centres and 60 -
Wi-Fi hotspots Not Funded
(MERU, MAUA, Provide free 0% Not Initiated
NKUBU) and all internet access to
planning units the communities
Economic Planning
97
County bureau of To improve data Equipped and operational centre Not started 23 0 Lack of
statistics collection and funding
No of documents reviewed
planning linkages
,published and disseminated
Improve public
access to
data/information
Economic survey Establish county No of surveys conducted Perception survey 10 5.1 Sector based
base information completed economic
and improve survey not
planning done
Construction of -To provide 90 ECDE No. of classes constructed 90 ECDE classrooms 54 108 CGM
ECDE Centres conducive learning classrooms to
across the county environment be constructed
Construction of -to provide 5 workshops to -No. of workshop constructed 5 workshops on going 10 4 CGM
workshops and conducive training be constructed
hostels in youth environment in youth
polytechnics polytechnics
Retention and - to improve 10,000 students -List of beneficiaries over 10,000 students 90 135 CGM
enhancement fund access and
98
retention to -amount disbursed
learners
Employment of ECDE to facilitate 300 ECDE -Advertisements 518 ECDE 36 99.5m Education
Teachers learning and teachers teachers engaged department
- Interview report
curriculum
implementati - Minutes
on
- Appointment letters
Purchase of teaching To facilitate 773 ECDE Reports 773 ECDE centres 5 5 CGM
and learning materials effective Centres
No. of ECDE centres supported
for ECDE teaching and
learning in
ECDE centres
Capacity building for To improve 1500 ECDE -no. of ECDE teachers trained 2010 ECDE 4 5 CGM
ECDE Teachers learning and Teachers teachers trained
training in trained
ECDE centres
Introduction of feeding -To increase 59,000 children -no .of learners 59,000 learners 50 0 CGM
programs in ECDE enrolment in ECDE centres
and
improved
99
health for
learners
Procurement of tools To facilitate No. of No. of tools and equipment procured 23 youth 20 10 CGM
and equipment for effective Equipment polytechnics
-No. of polytechnics supplied
youth polytechnics training in supplied in supplied with
youth youth equipment
polytechnics polytechnics
Capacity building for To improve 200 youth -No. of instructors trained 320 ECDE 4 2 CGM
youth polytechnic learning and polytechnic teachers
instructors training in instructors
ECDE centres
and in youth
polytechnics
Health Services
Project Name/ Objective/ Output Performance Status (based on Planned Cost Actual Cost Source of funds
Indicators the indicators) (KES.) (KES.)
Location Purpose
100
Construction of To strengthen delivery Improved access to Inpatient number 0% 22 NIL CGM
inpatient wards of quality health inpatient services admitted
Timau hospital services
Construction and To strengthen delivery Improved access to Number of On-going at 95% 12 10 CGM
equipping of quality health specialized health operations done
operating theater services services
at Muthara
hospital
Construction and To strengthen delivery Improved access to Number of Imaging On-going at 95% 10 NIL CGM
equipping X-Ray of quality health diagnostic/imaging exposures
unit Muthara services health services
hospital
Construction of To strengthen delivery Improved access to Inpatient number On-going at 95% 22 20 CGM
inpatient wards of quality health inpatient services admitted
Kangeta hospital services
101
Construction of To strengthen delivery Improved access to Inpatient number Not initiated 60 NIL CGM
extra wards at of quality health inpatient services admitted
Meru Hospital services
Construction of the To reduce government Citizen-friendly and Certificates of Not initiated 185 0 CGM
Governor’s expenditure on rentals accessible public service completion
residence/ Meru delivery outlets.
town
102
Conversion and An efficient county Citizen-friendly and Certificates of Not initiated 5 0 CGM
Renovation of one enforcement services accessible public service completion
county residential delivery outlets.
house to serve as
control for
enforcement unit
Procurement of Efficient and effective Citizen-friendly and Procurement Not initiated 30 0 CGM
five departmental service delivery accessible public service documents
vehicles delivery outlets.
Log books
Procurement of 5 Provide Safety for Citizen-friendly and Procurement Not initiated 0 CGM
bulk filing cabinets personnel records accessible public service documents
for personnel delivery outlets.
records
Construction of An efficient fire, rescue An efficient fire, rescue Certificates of Not Initiated 14 0 CGM
Nkubu and Maua and emergency service and emergency service completion
Fire stations/
Nkubu and Maua
town
Procurement of An efficient fire, rescue An efficient fire, rescue Log Books Not Initiated 50 0 CGM
fire engines/Meru, and emergency service and emergency service
Nkubu and Maua
299
103
Project Name/ Objective/ Output Performance Status (based on Planned Cost Actual Cost Source of funds
Location Purpose Indicators the indicators) (KES.) (KES.)
Rehabilitation and To establish a model Develop model cultural Functional and -Mwariama is 16M 20,095,185 CGM
completion South cultural centres for centres improved cultural 20% complete
Imenti and preservation of our centers -Mitunguu 100%
Mwariama cultural heritage. complete
Cultural Centres
Erection of heroes To preservation and Erecting and Number of erected N/A 50M - CGM
monument and honour heroes. maintaining heroes monuments
renaming of Meru monuments and Number of erected
streets Easy identification of labeling of streets street signs/ labelled
streets a streets.
Renovations of Njuri ncheke shrines in To promote and Complete and 0 50M - CGM
Njuri Ncheke each sub county preserve Meru culture functional shrines
shrines and alternative dispute
resolution mechanisms
Rehabilitation and Main public library and To provide wide range Complete and 0 25M NA CGM
Equipping of community libraries of reading materials functional
community
libraries
Development of One park in each Sub- Provide recreation Recreation parks Not done 10M None CGM
public parks County centres open to public
Establishment of To Promote base ball Establish a sports Functional complex 20% complete 50 M 3M CGM
baseball complex game complex
Rehabilitation of To promote sporting complete stadias in use Number of stadia in Kinoru -80% 84M 164,109,70 CGM
stadia and public activities within the by the public use by the public complete 5
play county Timau 90%
complete
Maili Tatu 100%
complete
Githongo 30 %
complete
Nguthiru 100%
complete
Kieni 100%
complete
104
Establishment of To provide a centre for Establish facilities Number of facilities - 50M - CGM
sports clubs, social sports talent for in each of nine sub in use by the public
and cinema halls engagement of youth counties
Upgrading of Meru Promotion of talents renovating one the A complete facility - 1M - CGM
Golf Course and sports tourism facilities and in use
Establishment of Promotion of talents Establishing sports A functional sports - 400M - CGM
sports Academy within the county academy academy
Governors youth To train the youth on Train 50 youths in each 2250 youths trained 2250 youths KES 19M KES 24 M CGM
Business challenge various business ward and engage them trained
105venue and equip in business activities.
them with necessary
skills, tap the
knowledge and talent
in our youth in all
sectors so as to deter
them from engaging in
alcohol and drug abuse
105
Table 36: Performance of Non-Capital Projects for previous ADP
A. Office Of The Governor
Project Name/ Objective/ Output Performance Status (based Planned Cost Actual Cost Source of funds
indicators on the (KES.) (KES.)
Location Purpose
indicators)
Purchase of To facilitate mobility Enhanced service No. of motor vehicle Done CGM
Motor Vehicles delivery procured 13,630,000 13,601,150
Grants for To reduce vulnerability Improved disaster Response time Done CGM
Management of response mechanisms
No. of beneficiaries
Natural Disasters
of food and non-food
items 35,171,395.00 30,343,678
106
Upgrade our web portal Increase web ratings 0% Not Initiated 2 CGM
to enhance usability, improvement, County
visibility and projects visibility -
Portal upgrade management of content.
2
Sub-total
Economic Planning
Economic To enhance the capacity No of planning units Not started 20 0 CGM
Planning units of communities to operationalized
mobilize resources for No of units
their own development constructed
No of community
members
empowered
Monitoring and No of M&E reports Not done 50 0 CGM
evaluation No of field visits
Support to No of committees Not done 20 0 CGM
development operational and
coordination trained
No of equipment
procured
Sub-total 90 0
107
ANNEX 2: Transformative Capital projects for 2018/2019
Table 37: Flagship Projects
Sub Project name Descriptio Green Estimated Source Time Performa Target status Impleme Other
Progr Location n of Econom cost in of frame nce s nting stakeho
amme activities y Millions funds indicators Agency lders
conside (Ksh.)
ration
County Assembyly
1.1 Headquarters - Sensitiz 2 CGM 2018/19 No. of 110 Yet to start County The
Media procureme ation on Live Live Assembl Public
broad nt climate broadcast broad y
cast - change s casts
installation
-
commissio
n
Office of the Governor
Vision Countywide -Formation Mainstr 80 CGM 2018/19 1 Opera Ongoing Office of MESC
2040 of eam and Operation tional the
secretariat Gender MESC al Vision draft Governo
-Collation and 2040 by r.
of inputs climate strategy. June
-Launch. change 2019
issues.
Economic Planning
Planni Ward Strategic Data Conside 27.6 CGM 2018-19 Plans in 23 Transformative - Consult
ng Plans (Countywide) collection r Develop place plan Economi ant
through gender ment prepa c
public and partner red Planning
participatio PWD s Director
n mainstr ate
analysis eaming -Ward
and Develop
collation of ment
108
informatio Committ
n ees
Compiling -County
the plan Assembl
y
109
Coffee milling & Processing, N/A 37 PPP 2018- % 25% Transformative MCIDC Other
marketing packaging 2019 increase increa patners
investment/count and in Metric se
wide Marketing tonnes
Meru cofee processed
and
marketed
Construction of Constructio N/A 75 PPP 2018- % of 50% Transformative MCIDC JV
Banana Processing n the plant completio compl
plant- Imenti South 2019 n etion
Process
Banana to
frozen
flour and
crisps.
Potato processing Constructio N/A 40 PPP 2018- % of 50% Transformative MCIDC Develop
factory/Buuri n the 2019 completio compl ment
factory n etion partner
processing s
of potatoes
ICT ICT Literacy and Established 8 CGM 2018- No. of ICT 2 Transformative ICT,
Litera Capacity Building- ICT 2019 Training Establi FINANCE
cy County Wide Training centres shed
centers ICT
Traini
ng
centre
s
110
and milk free milk and 65,224 Technology, BOM
nutrition (200mls) free learners in Culture,
/ education every public Gender and
County ECDE Centre Social
wide Developmen
t.
VTC Model Constructio Use of 50 2018/1 No of VTC 720 trainees Not started Department Public
Develop vocation n and environmental 9 trainees of
ment al equipping friendly Education,
training construction Technology,
centers materials Culture,
Gender and
Social
Developmen
t.
Culture Njuri- - Site -Solar Heating 30 CGM 2018/1 Cultural One fully Not started Department UNESC
and Nceke identificati system 9 centre equipped and of O
heritage Cultural on Establishment of constructed operational Education,
promotio Centre/ - Contracts botanical garden and Cultural Technology,
n Nchiru - Tender equipped Centre Culture,
Awards Gender and
- Social
Supervision Developmen
s t.
-
Constructio
n
- Equipping
and staffing
Culture Meru -Formation 50 CGM 2018/1 No. of 50,000 Not started Department public
promotio County of 9 extravaganz attendees of
n Annual organizing a done Education,
Extravag committee No of Technology,
anza -Resource attendees Culture,
mobilizatio Gender and
n Social
Developmen
t.
111
Women Meru Constructio Adherence to 50 CGM 2018/1 No rescued 100 Not started Department Public
empower County n and AGPO 9 beneficiaries/ of
ment SGBV/F equipping year Education,
GM Technology,
Rescue Culture,
Centre Gender and
Social
Developmen
t.
Youth Affairs & Sports
Meru Establish Establish 150 CGM 2018- No. of 2000 Transforma Youth and Other
Youth ment of fully 2019 youths tive/Ongoin sports develo
Service Meru pledged recruited g pment
youth MYS and trained partner
Service/ s
County Recruitmen
wide t of youths
112
centers Equipping Ensure Proper centres
(one- Staffing drainage systems established
stop around the
shop for centres
county Put up an
govern adjacent
ment sanitation facility
center)/
Maua
,timau,
muriri
Trade, Investment, Industrialization, Tourism and Cooperative Development
Meru Meru Undertake Utilization of 5 CGM 2018- No. Reports 1 Feasibility Transforma Dept. of County
Special Special feasibility locally available 2019 Study report tive project Trade Depart
Economic Economi study on resources SEZ 1 SEZ ments
Zones c Zones SEZ implementat locations/Zon Concept of
(SEZ) (SEZ – ion es paper Public
County framework works,
wide Procureme Legal &
nt stage public
service
&Agric
ulture
Satellite Satellite Identificati Reduced 10 CGM 2018- No. of 3 Established Transforma Trade, County
Markets Markets on of resource wastage 2019 Market Satellite tive project Public Govern
(SMs) Nairobi, land/113oo outlets for markets Works, Legal ments
Mombas perat/go- meru Go downs in Cabinet & of
a, downs for products the three Paper stage Administrati Momb
Nakuru setting up -Jobs created towns/cities on, asa,
the SM -Quality and Agriculture Nakuru
- Entering market and
Nairobi
into
113
agreement competitive Traders
with products
respective -Reduced
counties agro
identificati resource
on of wastage
products to
be traded in
the SMs
Coffee Coffee Data 7 CGM 2018- Rate of 18m KGS Transforma Cooperative Nation
Develope Cash collection, 2019 increase in tive Directorate al
mt Model farmers & coffee 30 million Govern
/County leaders cherry ment,
wide sensitizatio production Cooper
n, Amount of ative
Stakeholde cash paid Bank,
rs MOUs, out Saccos,
coffee
unions
Industrial Construc Feasibility Reduce wastage 5 CGM 2018- No. of 3 industrial New Trade, Nation
parks tion of study on Gender 2019 industrial parks Public al
Meru Youth Govern
industrial parks Works, Legal
Industri PLWD
parks & ment
al Parks/ mainstreaming–
Imenti Industrial Ensuring Administrati
south, parks buildings are on
Buuri,tig Installation accessible
ania of
west
processing
machines-
Acquisition
of Land
114
Tourism Hike to Open a 10 CGM 2018- Number of 1000 local New CGM KWS
Develop our KWS gate at KWS 2019 tourists visitors KTB
ment homes- Themwe KTB 200 KFS
God’s Upgrading KFS International
mountai the visitors Touris
n. Mt. Themwe Touri m Fund
Kenya/ Road and sm
Abogeta Bridge Fund
West- constructio
South n
Imenti Lake Ellis
Camp basic
facilities ie
water and
sanitation
New road
from Lake
Ellis to
Lenana
Build a
camp 5Km
from the
peak (Along
Themwe
route)
Promotion
activities to
market this
route
Partnership
building
with
115
stakeholder
s
Health Services
Specialize “Fukuza Pre- Special groups 100 CGM 2018- No. of fully 1 Ongoing Health
d Services Saratani feasibility consideration 2019 equipped Services
” na studies; and Department
Cancer/
preparation operational ; PPPs
Gastroin of designs centres
testinal and plans;
Center/ ground-
MTRH breaking
and
constructio
n works;
developme
nt of PPP
proposals
Communi Generati Immunizati Gender balance 80 CGM 2018- Number of 31296 Ongoing Health
cable and on plus on services 2019 children fully Services
Non- Special groups immunized Department
Vitamin A
communi County- and consideration
cable wide nutritional number of 3000
Disease supplement children
Preventio ation & dewormed
n and Deworming
Control % of mothers
Family
planning accessing FP
services 80
Testing and
counseling Number
for
counselled
HIV/AIDS/
116
Screening and tested 23400
for TB, for HIV
cancers and
other
Number
NCDs;
Toilet/latrin screened for
e in every TB
household
number of
Hand clients
washing
screened for
Health cancer and
Education other NCDs
and public
awareness number of
villages that 500
have
attained ODF
status
100
number of
health
education/a
wareness
sessions
conducted
117
County
wide
Fodder fodder Increase 10 CGM July kgs of seed procure Livestock
developm establish quality 2018- assorted Directorate
ent ment feeds June seeds
2019
County Kilimo Mapping of Mordern 40 Coun July Number of Training of New Agriculture Grain
agricultur na capacity technologies ty 2018- youth/farme 4,000 projects Directorate Traders
e Vijana gaps, Gove June rs youth/farmer Cereal
developm Conduct of rnme 2019 empowered s Grower
ent trainings, nt of s
workshops Meru Associa
tio
(CGA)
and
EAGC
NARIG
P
ASDSP
Crop Promoti Procure Environmental 20 Coun July Kgs of seed Procure and Continous Agriculture Grain
Develop on of and conservation ty 2018- bought distribute Directorate Traders
ment green distribute Gove June No of 100T of Cereal
grams certified rnme 2019 farmers assorted Grower
‘ndegu Seed nt of reached certified seed s
pesa’ Meru -Groups of Associa
producti Link farmer farmers tio
on- groups to linked to (CGA)
county markets markets and
wide EAGC
NARIG
P
ASDSP
118
Tree Crop Miraa Train Environmental 20 Coun July No. of Capacity build Directorate Kenya
farmers Farmers on conservation ty 2018- farmers Farmers on of Agricul
Develop empowe good Gove June reached good Agriculture ture
rment rnme 2019 agricultural and and
ment agricultural
on good nt of practices Research Livesto
agricultu practices/p Meru institutions ck
ral est Resear
practice manageme ch
s(gap)- nt in Miraa Organi
(Igembe zation
and (KALRO
Tigania) )
Univers
ities
Promoti Establish Environmental 120 Coun July No of vines Establish 3 Not Agriculture Caritas
on of Grape vine Conservation ty 2018- propagated grape vine initiated Directorate (Catholic
tree Nurseries Gove June and planted propagation Diocese
crop and rnme nurseries
2019 of Meru)
producti demonstrat nt of
on: ion sites Meru No of
Grapes, farmers
macada Train trained
mia and framers on
avocado Grape
- production
County
wide
Lands, Physical Planning, Urban Development and Public Works
119
Spartial Function Purchase of 50 CGM 2018/1 No. of GIS 1 GIS New Lands, Consult
planning al GIS GIS 9 software/lab laboratory at housing ancy
( laborato software No. of the county physical
ry and equipment headquarters planning,
equipment computers 10 no. urban
desktop developmen
Recruitmen No. of t and public
t of GIS Trained works
experts officers
Staff No. of
training on officers
GIS recruited
Land Facilitati Facilitation Mainstream for 30 CGM 2018 No. of 5 On-going Department NLC,
Adjudicati on of of gender, climate to adjudication project of lands, Nation
on land completion change and PWDs 2019 sections Physical al
adjudica of all open Plan for closed Planning, ministr
tion adjudicatio wetlands, fragile Housing, y of
countyw n sections; ecosystems, No. of tittle Urban Lands
ide opening public spaces etc deeds issued 10,000 developmen and
and t & Public Physica
completion Works l
of new Plannin
adjudicatio g, CGM
n sections
Land Acquire Mapping/s Mainstream for 100 CGM 2018 No. of 1 Not started Department NLC,
banking Land for urveying gender, climate to county land of lands, Ministr
public Data change and PWDs 2019 registry Physical y of
and collection Ensure land is Planning, lands
investm Developme planned for Housing, and
ent nt of land harmony, Urban Physica
purpose register efficiency, developmen l
s Fencing environment, t & Public Plannin
Land health etc Works g, CGM
acquisition
Renovati Renovat Design Install solar 20 CGM 2018/2 % of 1 public works Not started Lands,
on of all e and Tendering system 019 completion office housing
public refurnis physical
120
works h public Procureme Use of bio planning,
offices works nt digesters, use of urban
offices- For repairs recycled water developmen
Imenti and for greening t and public
North- maintenanc Rain water works
Meru e harvesting
town Implement
ation
Water & Irrigation
Rural & Maji Constructio Construction of 200 CGM 2018- 5 dam / transformativ Water and 5 dam /
Urban Kwa n of dams dams and 2022 reservoirs e Irrigation reservoirs
Water Wote’ and reservoirs constructed department constructed
Supply initiative reservoirs
Kithino
Thingith
u
Mariara
Kathita
Thangat
ha
Ura, Iria
ria
Mbacing
ira
Develop Drilling Drilling and Drilling and 620 CGM 2018- 80 boreholes Transformativ Water and 100
ment of of equipping equipping of 2019 in the whole e irrigation boreholes in
Ground borehol of boreholes county department the whole
water es boreholes
resources
.
Environment, Wildlife and Natural Resources
Environm Bamboo To increase Pegging, Bamboo 25 CGM 2018- 2 river lines transformativ Number of CGM,
ent ni Pesa the volume planting, capacity 2019 e rivers National
conservat along of water building conserved. Government
ion river level .
lines
121
downstrea
m
To improve
the quality
of water
Total 2563
122
ANNEX 3: Other Capital projects for 2018/2019
Table 38: County Assembly
Programme 1: Legislative and Committee Services
Objective: To formulate and approve County Laws
Outcome: improved legislation and oversight services
Sub Project Description Green Estimat Sourc Time Performance Targets status Implementi Other
Programm name of activities Economy ed cost e of frame indicators ng Agency stakeholde
e Location considerati in funds rs
on Millions
(Ksh.)
Legislative County Drafting of -Train and 60 CGM 2018/1 No. of Bills - 10 Bills Ongoi County The public
and Wide Bill create 9 drafted approved ng Assembly
Oversight -Public awareness -No. of fora - 100
participation on cross -No. of Acts Motions
- Assembly cutting implemente
approval issues d
- Assent into - Ensure
Law policies and
laws are
responsive
to cross
cutting
issues
Subtotal 60
Programme 2: Staff Management and Development
Objective: To improve on proficiency and competency of Members of and staff
Outcome: Improved performance, staff satisfaction and members satisfaction
2.1 Headquart -Identify -Train MCAs 100 CGM 2018/1 -No. of Train 100% Yet to County -
Capacity ers trainers in climate 9 training staff start Assembly Governme
Building -Provide change, carried out members nt training
for MCA & training to DRR, and 100% centers
Staff the environmen MCAs -Training
members tal consultants
and staff conservatio
n and
conflict
123
sensitivity
programmin
g
Subtotal 100
Programme 3: Citizens Participation and Social Accountability
Objective: To enhance citizen engagement in decision making and strengthen partnerships
Outcome: informed citizenry and enhanced service delivery
3.1 Public County - Media Train public 36 CGM 2018/1 -No. of fora Hold at Ongoi County -The public
Participati wide engagement on climate 9 least ten ng Assembly -
on Forums -Identify change public Developme
target participatio nt partners
groups n forums
-Conduct
seminars
and
workshops
on county
policies
3.2 County -Capacity 1 CGM 2018/1 -No. of Provide County -The public
Partnershi wide Building on 9 contracts training Assembly - Donor
ps participatory signed and skill organizatio
Developed developmen developme ns
t nt to 100%
staff and
100% MCAs
Subtotal 37
Programme 4: General Administration, Planning & Support
Objective: To reduce recurrent expenditure and enhance a conducive working environment
Outcome: Employee satisfaction, Members satisfaction, cost reduction and enhance county assembly performance
4.1 Headquart - Solar 100 CGM 2018/1 No. of staff Working Yet to County Technical
Constructi ers Procuremen powered 9 and MCAs space for start Assembly personnel
on of t heating accommodat 100% staff
office -Design lighting and ed 50- seater
block and - system, restaurant
Restaurant Commissioni construction
ng and of Bio
handover digester
124
-Installation
of rainwater
harvesting
structures
- proper
ventilation
to minimize
daytime
power
lighting
4.2 Headquart - Solar 60 CGM 2018/1 Provide Yet to County Technical
Speakers ers Procuremen powered 9 adequate start Assembly personnel
Residence environs t heating housing
-Design system, space for
- construction the Speaker
Commissioni of Bio per Design
ng and digester and BQ
handover
4.3 CCTV Headquart - Energy 6 CGM 2018/1 -No. of CCTV Functional Yet to County Technical
system ers Procuremen efficient 9 cameras security start Assembly personnel
t equipment installed cameras in
-Installation all the
offices
4.4 - - Energy 6 CGM 2018/1 -No. of electrical Yet to County Technical
Electrical Procuremen efficient 9 meters of fence start Assembly personnel
fence t fencing electric fence round ½
-Installation equipment installed acre
of electrical -use of solar perimeter
fence round powered wall
the fencing
perimeter equipment
wall
4.5 Headquart Procuremen Energy 50 CGM 2018/1 100% Yet to County Technical
Hansard ers t efficient 9 Functional start Assembly personnel
Equipment -Installation equipment voting, card
-Testing identificati
on, data
segregation
125
- and
Commissioni audiovisual
ng system for
68 MCAs
and
Speaker
Subtotal 222
Grand total 419
CIMES County -M &E Mainstream 8 CGM 2018/19 1 Operational Coordinati Ongoin All KDSP
Wide software Gender and CIMES on of g departments
Worl
climate Monitoring .
-Laying of M d
change and
&E Bank
issues. Evaluation
backbone
across all
framework
departmen
-Establish M ts
&E
framework
& E reports.
Performan Countywi - -Include 5 CGM 2018/19 Number of Employee Ongoin Research, KDSP
ce de Developmen appraisal on employees appraisal g Efficiency
Managem t of understandi appraised/ye Monitoring
ent ng and ar and
126
appraisal mainstream Worl Evaluation
system. ing of the d Unit.
cross Bank
-Signing of
cutting
contracts.
issues
-Employee
appraisal.
Monitorin Countywi -Field visits Develop 10 CGM 2018/19 % of projects Effective Ongoin Research, KDSP
g and de M&E monitored utilization g Efficiency
-Appraisal of Worl
Verificatio indicators and verified of Monitoring
project d
n that are resources. and
Bank
-Reports responsive Evaluation
to cross Unit.
cutting
issues
climate
change,
DRR, etc.
Capacity Countywi -Enrollment 20 CGM 2018/19 Number of Enhanced Ongoin Research, KDSP
Developm de for short staff productivit g Efficiency
Worl
ent and professional trained/year y Monitoring
d
Training. courses and
Bank
Evaluation
-Refresher
Unit.
courses.
Institution Countywi -Field visits - Tracking of 10 CGM 2018/19 Number of Effective Ongoin Research, KDSP
al Result de cross county utilization g Efficiency
-Appraisal of Worl
Tracking cutting institutional of Monitoring
project d
issues and tracking resources. and
Bank
-Reports mainstream reports/year Evaluation
ing tracking Unit.
127
Data Countywi - -Collect 5 CGM 2018/19 Number of Reliable Ongoin Research, KDSP
Software de Procuremen data on analysis content g Efficiency
Worl
t, cross reports analysis Monitoring
d
installation cutting generated and
Bank
and issues to from the Evaluation
commissioni help in software/yea Unit.
ng of 1 data planning r
analysis. and
decision
making
Research Countywi -Field visits Support 8 CGM 2018/19 Number of To upscale Ongoin Research, KDSP
Developm de research on feasibility efficiency. g Efficiency
-Proposal Worl
ent resilience studies Monitoring
developmen d
and climate undertaken/y and
t. Bank
change, and ear Evaluation
- other cross Unit.
Department cutting
al approval. issues
Subtotal 66
PROGRAMME: Special Programmes.
Objective: To have a safe and resilient Meru County
Outcome: Reduced vulnerability
Fire Countywi Procuremen Accessible 120M CGM, 2018/20 Number of Timely Ongoin Directorate Red Cross
Engines de t of 2 fire to all areas Red 19 fire engines response g. of special
engines. of the Cross procured to programmes
county emergenci
Recruit and
es
deploy
qualified
staff.
128
Food and Countywi Repositionin -Proper 50M CGM, 2018/20 Number of To Ongoin Directorate Red cross
non-food de g of enough storage and Red 19 beneficiaries minimize g. of special
items stocks. treatment Cross / Year citizen programmes
vulnerabilit
-proper use
y from
and
disasters
managemen
t
Civic Countywi Ward-based Gender 30M CGM 2018/20 Citizens 100,000 Ongoin Directorate Red cross
education de civic 19 satisfaction adults g. of special
Youth
education index (10% of programmes
forums Disabled voting
population
Radio/TV
)
Programmes
County Countywi - Capacity 5M CGM, 2018/20 Number of Fully Ongoin Directorate Red cross
Disaster de Construction building Red 19 coordinated operationa g. of special
Command of Centre staff on Cross responses/ye l Command programmes
Center. climate ar Centre
-Equipment
change and
and
gender
Personnel
related
issues
Advanced Countywi Procuremen Ensure that 14M CGM, 2018/20 Number of Timely Ongoin Directorate Red cross
Life de t 2 advanced vehicles Red 19 life support response g. of special
Support life support procured Cross ambulances to programmes
Ambulanc ambulances. are fuel procured. emergenci
es. efficient es
and have
minimized
emissions.
129
Pastures Wards -Formation Create 5M NDM 2018/20 Social To ensure Ongoin Directorate Red cross
and Water Bordering and support awareness A 19 cohesion passive g. of special
Conflict- Isiolo and of peace on cross index resource programmes
Peace Tharaka committees cutting sharing
Initiative Nithi. issues. among
-Conduct
citizens
peace
meetings
Inter- Meru- -Formation Create 10M NDM 2018/20 Social To Ongoin Directorate Red cross
County Isiolo and and support awareness A 19 cohesion promote g. of special
boarder Meru- of inter- on cross index peaceful programmes
protection Tharaka county cutting coexistenc
Nithi. peace issues. e with
committees neighborin
g counties
-
Consultation
with
relevant
National
bodies e.g.
IEBC
Linda Tigania Establishme Create 20M NDM 2018/20 Social To Ongoin Directorate Red cross
Wanyama West, nt of awareness A 19 cohesion promote g. of special
Tigania additional on cross index peaceful programmes
East, police posts cutting coexistenc
Igembe issues. e with
-Community
Central neighborin
sensitization
and g counties
on outdated
Igembe
cultural
North.
practices
-Alternative
IGA;s
130
Subtotal 254
PROGRAMME: Communication and Events.
Objective: To ensure delivery of government key pledges.
Outcome: Effectiveness, efficiency and transparency in project implementation.
Media Countywi Liaise with Enlighten 4.3 CGM 2018/20 County Wide Ongoin Directorate Local
Outreach de print and the 19 development audience g. of Media
electronic community Index reach Communicat
media on issues of ion and
outlets. climate Events.
change,
Procure
environmen
communicat
tal
ion gadgets.
conservatio
n and
conflict
sensitive
County Countywi Publication Carry out 10 CGM 2018/20 Number of To Ongoin Directorate
Magazine de and publication 19 publications document g. of
issuance. on the County Communicat
climate achieveme ion and
change and nts Events.
other cross
cutting
issues
create
awareness
on the same
131
t of
equipment
and staff
hiring
Subtotal 31.3
PROGRAMME: Partnerships and External Linkages Development
Objective: To ensure delivery of government key pledges.
Outcome: Effectiveness, efficiency and transparency in project implementation.
Donor Countywi Proposals Create 2 CGM 2018/19 Amount of To ensure Ongoin Directorate Donors
Mobilizatio de awareness revenue from sufficient g. of
Donor
n on development funding for Partnership
identificatio
importance partners/ projects. and External
n
of cross year Linkages
Presentation cutting
s. areas and
funding
opportuniti
es
-train teams
on cross
cutting
issues
132
Stakeholde Countywi -Organizing Create 10 CGM 2018/19 Number of Continued Ongoin Directorate MESC
rs relations de forums awareness Stakeholder stakeholde g. of
manageme on cross forums/year r Partnership
nt cutting partnershi and External
issues. ps. Linkages
Subtotal 32
133
CFSP and and other
budget county plans
estimates
134
Sub total 21
Economic Planning
Programme: ECONOMIC PLANNING & CORDINATION SERVICES
Sub Project Descriptio Green Estimate Source Time Performanc Targets statu Implementi Other
Programm name n of Economy d cost of frame e indicators s ng Agency stakeholders
e Location activities consideratio (Ksh. funds
n/ cross millions)
cutting
issues
Planning Sectoral Data N/A 429 CGM, 2018- Plans in 4 plan New Economic Consultant.
plans collection 19 place prepared Planning Members of
(county through Develo Directorate the public
wide) public pment
participati Partne Donor
on rs
Compiling
report
ADP Data N/A 3 CGM, 2018- Plan in one plan New Economic Members of
2019/2020 collection 19 place prepared Planning the public
(County HQ) through Develo Directorate
public pment
participati Partne
on rs
Compiling
report
Department Data N/A 5 CGM 2018- Plan in One New Economic Consultant
al Strategic collection, 19 place departmen Planning
Plan report/ analysis tal plans Directorate
and
compilatio
n.
Disseminat
ion of the
survey
report
135
Planning at - Establi N/A 4 CGM, 2018- No. of sub 5 sub New Economic Development
decentralize shmen Develo 2019 county county planning partners
d t of pment planning planning and other
levels/count planni partne units offices relevant
ywide ng r establishe sectors
offices d
Public -Collection N/A 5 CGM, 2018- No of public 45 fora New Economic other relevant
participatio of data Develo 2019 participatio planning sectors
n on Disseminat pment n for a
plannning ion of partne
(ADP) reports r
/countywid and plans.
e
Economic Update on Data N/A 5 CGM 2018- No. of One On Economic Consultant
survey Socio- collection, 2019 survey survey going Planning
Economic analysis Report Directorate
Indicators and
(county compilatio
wide) n.
Disseminat
ion of the
survey
report
County Procure 3 CGM 2018- No. of 1 On Economic KNBS
Bureau of equipment 2019 statistical statistical going Planning
Statistics/co , N/A software software Directorate Consultant
untywide Installation No. of Assorted
of data statistics statistics
software equipment equipment
and -No. of -1
collection statistical statistical
of data, & abstracts abstracts
compilatio
n of
statistical
abstracts
136
County County Procureme N/A 1 CGM 2018- No. of -1 CIDC On- Economic National
Informatio information nt of 19 CIDCs operationa going Planning government
n and and Library l Directorate
statistics documentat materials
ion and Assorted
Centre/hea purchase No. of equipment
dquarter of Library equipment
equipment
Monitorin Monitoring -Field visits N/A 2 CGM 2018/ No of M&E One On Economic The public
g and and - 19 reports annual going planning
evaluation evaluation - Procureme Develo M&E directorate Head of
County nt of pment No of field report departments
wide vehicles Partne visits 4 quarterly
Communit rs M&E
y based M reports
&E 12 field
visits
County Data N/A 3 CGM 2018- No of one report On Economic Members of
Annual collection 2019 reports prepared going Planning the public
Report Analysis Develo Directorate
(CAR)- Compiling pment
2017/18 disseminat Partne
ion of rs
(county report
wide)
Projects Data N/A 2 CGM 2018/ Report in One report On- Economic Consultant
Appraisal collection, 19 place prepared going Planning
reports/Cou viability Directorate
ntywide assessmen
t, Impact
assessmen
t and
preparatio
n of
appraisal
report
137
Evaluation Undertake N/A 5 CGM 2018/ Report in One report On- Economic Consultant
of Data 19 place prepared going Planning
implementa Collection, Directorate
ion of the forums ,
CIDP/Count field visits,
ywide meetings
and
workshop
to Review
CIDP
Meru -M &E N/A 5 CGM 2018/ Operational One New Economic Development
County software 19 CIMES operationa planning partners
Intergrated -Laying of Develo l CIMES and other
Monitoring M & E pment relevant National
and backbone Partne sectors government
Evaluation framework rs
Data bank
System -Establish for all
(CIMES)/Co M &E projects
untywide framework and
-reports programme
Proper s
budgetary
allocation
to projects
and
programm
es
County Capacity Short N/A 1.5 CGM 2018- No. of staff All Ongo Economic Kenya School
Developm Building Trainings/c 2019 appraised members ing Planning of
ent and ourses on of staff Directorate Government
Coordinati Training of specific attend at
on staff target least one Other relevant
/countywid areas as training stakeholders
e per Annual session
Training
Assessmen
t
138
Operational Capacity N/A 5 CGM No. of One On Economic Professionals
ization of building of 2018- developme operationa going Planning
the Meru the 2019 nt agendas l council Directorate donors
Economic & members and policies
Social Consultant
Council
county
wide)
Capacity Community - Traini Consider 8 CGM 2018- - No of 180 sub New Economic Development
developm Empowerm ngs gender and 2019 develo counties planning partners-
ent ent -Proposal PWD Develo pment 920 wards and other world bank
/countywid developme mainstreami pment commit dev. relevant
e nts ng Partne tees committee sectors
rs membe s
rs members’
trained trained
Proposal
developme
nts
66.5
SUB-TOTAL
County Structured Procureme 10 CGM 2018- -No of new Complete Ongo ICT
Connectivi Cabling for nt of 2019 connections 10 ing
ty Sub equipment connection
counties -Level of s
,
and County service
Installation
Hospitals/c uptake
of LANs
ountywide and WAN
139
Completion - 9 CGM 2018- No. of 1 Call Ongo ICT
and Operation 2019 operational Center ing
Expansion alize the call centre
of Call Call
Center/hea Center,
dquarter -Procure
exchange
system,
-Equip the
call center,
Provide
and extend
Intercom
Services to
sub-
counties
140
Establishm
ent of
Responsive
Communic
ation
Channels
Communic Installation Wireless 4 CGM 2018- % wifi 100% wifi Ongo ICT
ation of wifi at local area 2019 coverage at coverage ing
systems network the at the
HQ headquarte headquart
that is
r and its er and its
unified campuses campuses
and Configurati
controlled on and
from a coverage
central
point
Unified ICT Motor Procureme 6.5 CGM 2018- No. of 1 vehicle New ICT/FINANC
wireless Vehicle/hea nt of a 2019 vehicles E
LAN (wifi) dquarter Double
Cabin
Motor
Vehicle
Establishme Identificati 3 CGM 2018- No. of ICT 1 ICT lab New ICT/FINANC
nt of ICT on of the 2019 lab E
Lab location,
/headquart Renovatio
er n of
Rooms,
and
procureme
nt of the
working
141
toolkits,
Hardware
and
Software
Completion Provi 4.5 CGM 2018- No. of 1 Call Ongo ICT
and de 2019 operational Center ing
Expansion and call centre
exten
of
d
telephony Interc
/headquart om
er Servi
ces
to
sub-
count
ies
SUB-TOTAL 51
Meru County Microfinance Corporation
Programme 1: Lending
Call for
loan
proposals,
Biashara
Evaluation
Sub- Loan 2018- % of loan On Microfinanc
s, Loan n/a 25 CGM 100% n/a
program Entire 2019 disbursed going e
advancing
County
and
Recovery
followups
Mali yangu Call for
loan loan 2018- % of loan 100% On Microfinanc
n/a 25 CGM n/a
Entire proposals, 2019 disbursed going e
Lending County Evaluation
Kilimo loan s, Loan
2018- % of loan 100% On Microfinanc
Entire advancing n/a 20 CGM n/a
2019 disbursed going e
County and
142
Pambazuka Recovery
loan-youth followups
2018- % of loan 100% On Microfinanc
focused n/a 11 CGM n/a
2019 disbursed going e
Entire
County
Soma loan n/a
2018- % of loan 100% On Microfinanc
Entire n/a 9 CGM
2019 disbursed going e
County
Individual n/a
product 2018- % of loan 100% On Microfinanc
n/a 20 CGM
Entire 2019 disbursed going e
County
Soko loan-
Women
2018- % of loan 100% On Microfinanc
focused n/a 10 CGM n/a
2019 disbursed going e
Entire
County
Sub Total 120
Training
for 2018 On
capacity No of staff
trainers/ n/a 4 - 30 staff goin n/a
building trained
Headquart 2019 g
ers
Count
Member Training y No of
2018 On
capacity Training/ and gover member/g 300 Microfinan
6 - goin n/a
building Entire educating nmen roups groups ce
2019 g
County loanees t of trained
Meru
SUB-TOTAL 130
143
Sub Project Descriptio Green Esti Source of Time Performan Target Status Impleme Other
Program name n of Economy mat funds fram ce s nting stakeholder
me Location activities considerati ed e indicators Agency s
(Ward/Sub on cost
county/ (Ksh
county .)
wide)
Infrastruct Meru Rising Constructi N/A 200 PPP 2018- % of 10% Transformati MCIDC Developmen
ure Tower on of completion comple ve t Partners
Developm Mixed use 2019 tion
ent Imenti commercia ongoing
North l building
and
premier
conference
facility
144
Massionat
e into
decent
office and
commercia
l space
Special Constructi N/A 100 PPP 2018- % 30% New MCIDC Other
Economic on of 2019 Completion Partners
zones modern
industries/
145
/countywid Warehousi
e ng spaces
Cereal Procure N/A 200 MCIDC and 2018- 10,000 50% On-going MCIDC Other
project cereals Partners 2019 Partners
Tonnes of
/countywid from the
cereals
e farmers to
procured
sell; mainly
Ndengu
Pesa
Tourism Explore Establish N/A 5 PPP 2018- % 100% New MCIDC Other
Tourism ownership 2019 completion comple Partners
developme of assets in tion
these
nt projects
facilities
in Nkunga with a
forest, Mt. view of
Kenya developing
a master
146
plan for
the same.
Renewabl Hydro, solar Full N/A 60 PPP 2018- % 50% On-going MCIDC Other
e energy power, feasibility 2019 Completion partners
wind power study for
& waste to Hydro,
energy solar
Power power,
projects/Co wind
untywide power &
waste to
energy
plant in
Meru
County
879
No. of
generators
147
-Purchase 2 World Bank
of No. of generators (KDSP)
generators containers
installed
Purchase
and 8 cess
installation containers
of
Fabricated
container
offices
CCTV
Survelianc
e and
Access
Control
Physical Capacity Fencing, 10 CGM 2018 No. of 15 markets Ongo MCRB Department of
infrasture building Murramin – Markets ing Cooperatives
developm County HQ, g and 2019 maintained
ent Sub County and
general
Level Repaired
repairs of
the
Markets
148
Sub Total 45
149
Recruitment of To enhance - Ensure 57.6 CGM 2018/ 15,00 300 ECDE
ECDE Teachers quality Advertisemen gender 19 Learners teachers
education t equality
-Shortlisting and fair
-Interviewing opportunit
and hiring y to
-Posting PLWDs
Up scaling To enhance -Data capture Ensure 26 CGM 2018/ 65,224 65,224 NGOs,
capitation in quality and gender 19 learners to learners BOMs,
ecde centres education verification inclusivity benefit suppliers
preparation and
of vouchers disability
and payment considerat
ions
Ict integration To ensure Procurement, Adherenc 8 CGM 2018/ 155 Centres 7,750 NGOs,
in ECDE ICT tendering and e to AGPO 19 learners BOMs,
centres integration distribution suppliers
in ECDE
curriculum
Technica Construction To create -Develop Use of 40 CGM 2018/ 20 -20 BOMS,
l of workshops a architectural environme 19 workshops’ workshop Parents,
Vocation in all existing conducive design ntal constructed s in manager
al VTCs/ youth -Develop bills friendly 20VTCs and
Educatio countywide training of quantities constructi -300 instructo
n and environme -Advertise on trainees rs
Training nt and and award materials
enhance tenders
retention -Construction
works
150
-Construction
works
Capacity To enhance Planning and Training 2 CGM 2018/ 173 3500 TVETA
building of quality training on gender 19 Instructors/ trainees and KICD
youth education and PLWD officer to be to benefit
polytechnic and s trained
instructors and training mainstrea
officers ming.
Evaluation for To ensure Planning, Check 1 CGM 2018/ 30 VTCs 3,500
standards/mo quality monitoring complianc 19 trainees
nitoring curriculum and e to to be
implement evaluation/re environme benefit
ation porting ntal
standards
Equipping of To provide -Tendering Adherenc 15 CGM 2018/ 1 course -18 VTCs NGOs
VTCs quality -Procurement e to AGPO 19 equipped equipped BOMS,
training -Distribution -640 Parents,
and trainees manager
installation s and
instructo
rs
Recruitment of To provide Advertisemen Ensure 62.4 CGM 2018/ 200 117 VTC BOMS,
VTCs quality t gender 19 instructors instructio Parents,
Instructors training -Shortlisting equality employed n manager
-Interviewing and fair s
and hiring opportunit
-Posting y to
PLWDs
Up scaling of to enhance -Data capture Ensure 41 CGM 2018/ 3500 -30 VTCs national
subsidized access and and gender 19 trainees -3500 governm
tuition quality verification inclusivity trainees ent
training preparation and
of vouchers disability
and payment considerat
ions
151
Subsidized To enhance Data capture Ensure 7 CGM 2018/ 3,200 3,200 parents
exam fees for access and and gender 19 trainees to trainees
VTCs quality verification; inclusivity benefit
training preparation and
of vouchers disability
and payment considerat
ions
ICT Integration To -Tendering Adherenc 5 CGM 2018/ 1500 -15 VTCs NGOs
in VTCs integrate -Procurement e to AGPO 19 trainees -1500
ICT in VTCs -Distribution trainees
Community To enhance -Tendering Use of 2 CGM 2018/ 3 resource 3 NGOs
Resource technical -Procurement environme 19 centres resource
Centres and life - Construction ntal centres/
skills and equipping friendly 300
constructi persons
on accessing
materials per year
Culture Kimeru To -Conduct - 1 CGM 2018/ A dictionary 1000
and Dictionary promote research and 19 published copies of
heritage and learn collate all the published
promoti Kimeru inputs on dictionary
on language Kimeru
language
-Writing of
manuscripts
-Edit and
Publish
Kimeru To -Development - 20 CGM 2018/ Website 300
Institute promote of a website 19 developed visitors
Ameru -awareness and content per year
culture campaigns uploaded
-sourcing of
content
-Advertising
152
Kenya music Regional -capacity - 6 CGM 2018/ A regional 1,200 -State
and cultural festivals building 19 festivals participan departm
festivals held workshops held ts ent of
(county wide) County County culture
festivals -Publicity festivals -
held held National
Winning -Mobilization museum
participant of s
sponsored participants -
to the permane
national nt
festivals. presiden
tial
music
commiss
ion
KICOSCA County -capacity - 2 CGM 2018/ Teams 70
(county wide) teams building 19 participating participan
formed and workshops in games ts
trained
-Publicity
-Mobilization
of
participants
153
Children Children and
and OVCs OVCs
Entrepreneurs To - Provide - 5 CGM & 2018/ No. of PWDs 10,000/ye
hip empower training on Developme 19 benefiting ar
empowerment women entrepreneurs nt partners
for PWD and PWDs hip
on business - Expert
skill sourcing
TUNAWEZA- To Prevention of 50 CGM, 2018/ No. of 2500
Pregnant promote Maternal and National 19 pregnant women
women and access to New Born First Lady’s women and and 2000
newborns quality Death Office, new born newborns
MCH and -Adopt a Departmen benefiting
HIV Ward- MCH t of
services ward of External
excellence at Affairs
the Meru &Communi
Referral cation
Hospital Departmen
t
TUNAWEZA- To -Use MOH at CGM, 2018/ 150,000
Infants and promote the county National 19 infants
Children nutrition platform for First Lady’s and
within Early messages on Office, children
Childhood dietary Departmen
Developme practices t of
nt - External
Programme Affairs
s &Communi
cation
Departmen
t
TUNAWEZA- To enhance -Advocacy, CGM, 2018/ 67,500
Adolescents life skills using H.E. National 19 teenagers
among platform to First Lady’s
teenagers meet and Office,
dialogue with Departmen
adolescent t of
154
girls and boys External
in the county Affairs &
on teenage Communica
pregnancy/FG tion
M and the Departmen
importance of t
Education
-
alcohol and
drugs abuse )
TUNAWEZA- To -Train women CGM, 2018/ -9000
Women empower on National 19 women in
women Financial/Eco First Lady’s start ups
comprehen nomic Office, -10000
sively Empowermen Departmen women
t, Social and t of trained on
Personal External politics
Development, Affairs
parenting, &Communi
cation
Departmen
t
To Advocacy for CGM, 2018/ Countywi
promote prevention, National 19 de
Cervical early First Lady’s
and Breast detection and Office,
Cancer management Departmen
Screening of breast and t of
cervical External
cancer Affairs
&Communi
cation
Departmen
t
To reduce Advocacy CGM, 2018/ Countywi
Gender against National 19 de
First Lady’s
155
Based Gender Based Office,
Violence Violence Departmen
t of
External
Affairs &
Communica
tion
Departmen
t
TUNAWEZA- To engage -Advocacy at CGM, 2018/ 4500 men
Men men as community National 19
partners level for Early First Lady’s
and agents Marriages and Office,
of change stop of FGM. Departmen
in the roll Men are t of
out of the agents change External
MeruTuna -Nurturing Affairs &
weza men Communica
Program champions tion
Departmen
t
TUNAWEZA- To -Champion CGM, 2018/ 10,000
Dignified Old promote focus on the National 19 persons
Age the elderly health First Lady’s
wellbeing needs and co Office,
of the morbidities Departmen
elderly t of
External
Affairs &
Communica
tion
Departmen
t
Rehabilitation To resettle -Screening -Create 2 CGM 2018/ No of street 300 street Departm CGM
of street children to and friendly State 19 children children ent of
children normalcy placement and Developme rehabilitate Educatio
and welcomin nt of d n,
provide g Children & Technolo
156
caring environme National gy,
environme nt Police Culture,
nt Service Gender
and
Social
Develop
ment.
Alcoholic Rehabilitation To help Construct Solar 20 CGM/ July20 Identificatio 10 Alcoholic CGM
Drinks centers for addicts rehab centers powered alcoholic 18- n of sites rehabilitat board
Control alcohol addicts recover with standard lighting board June Tender ion
(In all sub BQ and water 2019 awarded centers
counties) heating Mapping
system and fencing
157
June
2019
158
Table 42: Youth Affairs & Sports
PROGRAM 1: SPORTS DEVEOPMENT
Sub Project name Description Green Estimat Sourc Time Performan Targets status Implementi Other
Programm Location of activities Economy ed cost e of fram ce ng Agency stakeholde
e consideratio in funds e indicators rs
n Millions
(Ksh.)
Sports Upgrading of Fencing, Use of 9 CGM 2018 Number of 4 stadia New Youth and NGCDF
developme stadia Nkubu grass environment - stadia sports
nt and Urru, Maua planting, friendly 2019 upgraded
, Timau Leveling and construction
stadium. goal posts. materials.-
Sidelines Adherence
dozing to AGPO
Upgrading Construction Use of 2 CGM 2018 No. of 3 ongoin Youth and National
Kirwiro baseball of changing environment - rooms changing g sports governme
complex rooms and a friendly 2019 constructe rooms nt
diamond construction d
materials. 100% World
% of completio fund
Adherence completion n
to AGPO of the
diamond
Equipping of Procurement PWD 6 CGM 2018 No. of Assorted New Youth and
Kinoru Stadium of sports mainstreami - equipment equipmen sports
Equipping for ng 2019 procured t
the stadium
Sports Procurement PWD 5 CGM 2018 No. of -10 teams ongoin Youth and
equipment/cou and mainstreami - teams per g sports
nty wide distribution ng 2019 supported year/war
of sports s d
equipment supported
159
Number of -1 set per
equipment team
procured
Local, regional Participation PWD 13.1 CGM 2018 Number of 5 ongoin Youth and
and national in KICOSCA, mainstreami - events activities g sports
championships Athletics, ng 2019 participate
Football, d
Volleyball,
Rugby,
Basketball
KYICSA
Sitting
Volleyball,
Archery.
County football Establishing a - 5 CGM 2018 Number of 1 county new Youth and
team/county county - team football sports
wide football team 2019 team
and
participation
in
championshi
p
Talent Hiring of 4.9 CGM 2018 No. of 1000 On Youth and Kenya
Development scout and - participati youth going sports Academy
identification 2019 ng youths of Sports
of training
camps
(hatchery)
Subtotal 45
PROGRAMME 2: YOUTH DEVELOPMENT
Sub Project name Description Green Estimat Sourc Time Performan Targets status Implementi Other
Programm Location of activities Economy ed cost e of fram ce ng Agency stakeholde
e (Ward/Sub consideratio in funds e indicators rs
county/ county n Millions
wide) (Ksh.)
160
Youth Youth Identification Train on 2 CGM 2018 No. of 1,000 New Youth and
Outreach recreation and , support and climate - participati youth sports
program talent nurture of change, 2019 ng youths
development. talents gender
/countywide equity and
AGPO
Youth savings Issuance of Ensure 1 CGM 2018 Amount 5M New Youth and
and investment seed capital gender and - disbursed sports
scheme to youth PWD 2019
Saccos and inclusivity
Investment
schemes
Youth training Conduction Train on 1 CGM 2018 Amount Conduct New Youth and
and capacity of seminars climate - disbursed 10 no. sports
development change, 2019 trainings
gender
equity and
AGPO
Youth Conduct a PWD 9 CGM 2018 No. of 9 NO. New Youth and National
Development baseline mainstreami - centers centers sports governme
Centers. survey ng 2019 rehabilitat nt
/countywide ed
Rehabilitatio
n and
equipping
youth centers
Inter-county Conduct PWD 1 CGM 2018 No. of 100 New Youth and
Youth Exchange inter-county mainstreami - youths youths sports
Youth ng 2019
Exchange No. of 5
Programmes counties neighbori
Meetings, ng
workshops, counties
sports
161
Promotion of Trade fairs, Train on 1 CGM 2018 No. of 4500 New Youth and
youth implementati climate - youths youths sports
employability on of youth change, 2019 participati
skills/countywid apprenticeshi gender ng
e p, equity and
attachments, AGPO No. of
internship, trade fairs
mentorship
and
volunteer
programmes
Support and Trainings on PWD 1.3 CGM 2018 No. of 900 New Youth and
nurture of labor market mainstreami - youths youths sports
youth information ng 2019 participati
innovations in access points ng
ICT & for youth e.g.
SMEs/countywi an SMS No. of
de platform, trainings
digital mobile
application
Health and sensitization Train on 1.6 CGM 2018 No. of 45 No. New Youth and
Social campaign climate - sensitizatio sports
development and creation change, 2019 n campaign
promotion of youth gender campaigns s
/countywide health equity and
friendly AGPO
centres/
services
Subtotal 17.9
Grand Total 62.9
162
Table 43: Roads, Transport and Energy
Programme 1: Roads Works
Objective (s): Boost trade, communication and economic activities in the region
Outcome (s): Reduce travel time and operational costs by the road users
Sub Project name Descripti Green Estimat Source of Time Performa Targets status Implemen Other
Program location on of economy ed cost funds frame nce ting Stakehold
me (Ward/Sub activities considerat indicators agency ers
county/Count ion
y
Road Routine Road Use of 1000 CGM/part 2018/2 No. Of -Road opening Ongoi Transport Public,KR
Transpor maintenance grading local ners 019 KM 450 Km ng and B
t of county Gravelling materials maintaine -Grading 900km infrasructu
roads/county d -450 Km re
wide graveled roads departme
-Tarmacking of nt
10KM
Drainage Culvert Use of 200 CGM/part 2018/2 No of Bridges/box Ongoi Transport Public,KR
works/county installatio local ners 019 culverts culverts/drifts/6, ng and B
wide ns, bridge materials and other 300m of culverts infrasructu
constructi drainage and protection re
on, structures works departme
Gabion installed nt
installatio
n,
Construct
ion of
drifts
Subtotal 1,200
Programme 2: County Lighting
Objective (s): Boost Economic activities
Outcome (s): Improved security in the region
Energy Installation of Procuring Use of 30 CGM/part 2018/2 No. Of 90 transformers Ongoi Transport REA,KPLC
Transformers/ and energy ners 019 transform installed ng & energy
46 wards installatio efficient ers
n of methods installed
transform
ers
163
Lighting Installation of Procuring 30 CGM/part 2018/2 No of 46 floodlights Ongoi Transport REA,KPLC
flood , ners 019 lights installed ng & energy
lights/county installatio installed
wide n and
maintena
nce of
flood
lights
Installation of Procuring 10 CGM/part 2018/2 No. Of 1 street lighting Ongoi Transport REA,KPLC
street , ners 019 streets ng & energy
lightings in installatio lightened
each sub- n of
counties street
lightings
Subtotal 70
Grand total 1,270
164
Sub Project Descriptio Green Estimate Source Time Performanc Targets status Implementin Other
Programm name n of Economy d cost of frame e indicators g Agency stakeholders
e Location activities consideratio (Ksh.) in funds
n Millions
Put up an
adjacent
sanitation
facility
Operational Leasing 50 CGM 2018- A fully 392 New Public service
ization of offices for 2022 functional village project department
the Village village village offices
Administrat
administra Administrat
ors offices/
Countywide tors or’s office
Recruitme
nt of
village
Administra
tors
165
Sub Project Descriptio Green Estimate Source Time Performanc Targets status Implementin Other
Programm name n of Economy d cost of frame e indicators g Agency stakeholders
e Location activities consideratio (Ksh.) in funds
n Millions
sanitation
facility
County Feasibility Ensure 50 CGM 2018- An 50% New LA,PSM&A
Court/count study and Proper 2022 established done project
y design waste county court
Headquarte Build/acqu
disposal
rs ire
buildings Ensure
Equipping Proper
Staffing drainage
Operation system in the
alization facility
Erect an
adjacent
sanitation
facility
Total programme cost 90 44
Programme: Town Management and Improvement
Town Specialized Purchase 35 CGM 2018- Number of New LA,PSM&A
Infrastruct garbage and of trucks Develo 2019 trucks project Developmen
ure exhauster Staffing pment purchased t partners
Developm trucks/all
invest
ent sub-county
Support headquarte ors
rs
Sewer Design, 45 CGM 2018- Number of 18KM New LA,PSM&A
lines/All 9 procure Develo 2019 sewer lines done project
sub-county and pment implemente
headquarte
implement invest d
rs
sewer lines ors
166
Sub Project Descriptio Green Estimate Source Time Performanc Targets status Implementin Other
Programm name n of Economy d cost of frame e indicators g Agency stakeholders
e Location activities consideratio (Ksh.) in funds
n Millions
Recycling Feasibility 15 CGM 2018- The 0.2% New LA,PSM&A
plant/Meru study and Develo 2019 percentage done project Developmen
Town Designs pment of work t partners
partne done
rs
Setting
and
negotiatin
g of
targets
167
Sub Project Descriptio Green Estimate Source Time Performanc Targets status Implementin Other
Programm name n of Economy d cost of frame e indicators g Agency stakeholders
e Location activities consideratio (Ksh.) in funds
n Millions
Performan
ce
contracts
signing
Vetting
and
performan
ce
appraisal
Total programme cost 30
Programme: County Law Enforcement Service
County County Recruit 90 CGM 2018/ Number of 100 New LA,PSM&A
Enforceme Enforcemen 100 2019 recruited project
nt Service t enforceme and trained
Service/Cou nt officers
enforcemen
nty wide
Train and t officers
kit the
enforceme
nt officers
Develop a
communic
ation
system
Procure
vehicles
Build
enforceme
nt lines
168
Sub Project Descriptio Green Estimate Source Time Performanc Targets status Implementin Other
Programm name n of Economy d cost of frame e indicators g Agency stakeholders
e Location activities consideratio (Ksh.) in funds
n Millions
County County Recruit 50 15 CGM 2018- Number of 40
Conservati Conservatio conservati 2022 recruited
on Service n on rangers and trained
Service/cou
conservatio
ntywide Training
and kitting n rangers
Procure
vehicles
Construct
a rangers
camps
Develop a
communic
ation
system
Total programme cost 105
Programme : Office Accommodation Management
Office Infrastructu Construct 50 CGM 2018/ Number of 13 New LA,PSM&A
space ral Tigania 2019 sub counties project
creation developme West, and ward
and Imenti
nt/countywi offices
maintenan North and
ce de Imenti constructed
Central and
Sub- equipped.
County
Offices
169
Sub Project Descriptio Green Estimate Source Time Performanc Targets status Implementin Other
Programm name n of Economy d cost of frame e indicators g Agency stakeholders
e Location activities consideratio (Ksh.) in funds
n Millions
Construct
10 ward
offices
Refurbish
ment/main
tenance of
offices
install
internet
connection
and build
related
networks
in all the
county
offices
Connect
electricity
in all
offices
Total programme cost 50
GRAND TOTAL 499
170
Table 45: Trade, Investment, Industrialization, Tourism & Cooperative Development
Trade Sector
Programme Name (As per the Programme Based Budget):
Sub Project Description Green Estimate Source Time Performanc Targets Status Implement Other
Programm name of activities Economy d cost of frame e indicators ing Agency stakeholders
e Location considera (Ksh.) funds
tion millions
Establishm Imenti Identification Reduction 5 CGM 2018- No. Weights 1 Weights Plannin Dept. of County
ent of North/Coun of services to of 2019 & Measures & g stage Trade Depts. Of
Legal ty HQ be offered at substanda Meru Lab Measures public works,
metrology the Lab rd goods Meru Lab.
(New) Legal &
Laboratory being
Imenti Identification traded public
north of Lab Site service
Environment National
al Impact Governmeno
Assessment oper. Of
(EIA)
weights &
measures
Developm Meru Development Regulated 5 CGM 2018- No. of trade 1 Trade New Dept. of Public
ent of County of Concept trade that 2019 policy policy and Project Trade Works, Legal
Trade and paper protects document Act in &
Industrializ -Collection of the and Act place
Plannin Administrati
ation views environme
policy and -Analysis of nt g stage on, Revenue,
Acts existing trade Economic
regulations Planning
-Development
of trade policy
171
Constructi Meru Town -Sourcing of -Planned 20 CGM 2018- No. of Kiosks -60 New Dept of Administrati
on of (Pilot) Container town 19 Market project Trade/ on & Legal,
modern -Fabrication - kiosks in Ward dept
kiosks and Reduction place
implem Developme
construction in town
of kiosks littering entation nt initiative Traders &
phase Entrepreneu
rs, Hawkers
Capacity County wide -Conducting - Training 5 CGM 2018- - Increased 4000 Dept. of Revenue
Building Training on 2019 profitability Entrepren Ongoing Trade/ Board, Legal
(County Needs better of traders eurs & project & Public
wide) Assessment utilizatio - Increase in Traders Administrati
- n of volume of Trained Implem on,
Development resourc business entation
of training e, - Increased
manuals Reducti revenue
on on collection
-Training of
resourc
entrepreneur
e
wastage
Market County Development -Well 5 CGM 2018- - No. of -1Trade Ongoing Trade, Traders,
research Wide of a database, document 2019 database and Economic Revenue
and Trade conducting of ed - % Market Planning Board
Database a resources improved Databas
developm survey/resear reducing trade e in
ent ch and time to facilitatio place
market locate n and - 10%
profiles networki improv
ng ed
trade
172
Upgrading County - Boundar - Well 70 CGM 2018- -No. of - Nee Ongoing Dept of Public
of market Wide y walls plann 19 Boundary d Trade/War Works,
infrastruct and ed walls base d Traders,
ure and related dispo -No. of d Developme Ward
Maintenan utilities sal of market nt initiative Administrato
ce of - Market mark sheds rs Revenue
market sheds et -No. of Board,
utilities - Gravellin wast markets Elected
g & es graveled & leaders
Murrami Murramed
ng of -No. of
markets Toilets
- Market constructed
Toilets
SUB TOTAL 110
Cooperatives
Programme Name Cooperative development
Sub Project Description of Green Estimate Source Time Performanc Targets status Implementin Other
Programm name activities Econo d cost of frame e indicators g Agency stakeholders
e Location my (Ksh.) funds
consid millions
eratio
n
Cooperativ Miraa Promote 6 CGM 2018- No. of 4 Transfo Cooperative National
e cooperative formation of 2019 cooperative coopera rmative Directorate Government,
developm /Nyambene cooperative tives AFA,
ent region & societies, Local
Buuri Farmers & Leadership
Leaders
Sensitization,
Stake holders
MOUs, Trainings
173
Capacity Appropriate 10 CGM 2018- No. of 100,000 Ongoin Cooperative Partners
building for Trainings, 2019 cooperators coopera g Directorate
cooperative Seminars, Short capacity tors
societies courses, built National
and SACCO Workshops to Government
/County cooperators and -Nachu
wide staff and SACCO -NHC
Promotion of
Housing Sector
cooperatives
Dairy sector Milk Equipment 7 CGM 2018- No. of dairy Support New Cooperative -National
Promotion (milk cans, 2019 cooperators 34 dairy Directorate Government
/County cooling tanks, supported coopera -
wide pasteurizer tives Developmen
machines, % Increase 30% t partners
Generators etc), in milk Increase
conversion of production d
Self-help groups & formation uptake
& CBOs into of new of milk
cooperatives, cooperative from
Market s new
accessibility, societie
Capacity building s by the
on good animal dairy
husbandry and Union
milk production
Revitalizatio -Support in 6 CGM 2018- Increase in 18m New Cooperative -National
n of the coffee milling, 2019 quantity of kilogra Directorate Government
Coffee branding coffee ms of
sector packaging, milled, cherry
/County market refurbished producti
wide accessibility, factories, on
support in factory
174
upgrading, Increased
support Meru membershi 55
coffee millers p coopera
Union to upgrade tives
milling facilities,
Establishment of
a coffee Fund
Promotion Conversion 7 CGM 2018- No. of New 5 Potato New Cooperatives -National
of Potato, of CBOs to 2019 cooperative coopera Directorate Government
bananas Cooperatives societies tives, -
and Miraa formed 2miraa Developmen
Support in
Co- coopera t partners
Market
operatives.
linkages tives &
Others
Support in
cooling
facilities
Value addition.
Meru -Registration 7 CGM 2018- No. of loan 5,000 New Cooperatives -
County Loans application 2019 beneficiarie Benefici Directorate Developmen
PWD Sacco s aries t partners
/Headquart -Directorate
er of gender &
social
Developmen
t
Subtotal 43
TOURISM DIRECTORATE
Programme Name TOURISM MARKETING & DEVELOPMENT:
Sub Project Descriptio Green Estimate Source Time Performanc Targets status Implementin Other
Programm name n of Economy d cost of frame e indicators g Agency stakeholders
e Location activities funds
175
consideratio (Ksh.)
n millions
Tourism Capacity exchange 5 Nation 2018- No. of 900 New CGM Hospitality
programmes
Developm Building al 2019 Trained trainee Establishmen
ent / county- training govern personnel s ts
wide materials, ment
events and
Count Kenya Utalii
standards College
competition y
refresher govern
coursese ment Tourism fund
176
/countywid attractions touris mapped attracti TF
e , develop m attraction on sites
the minist sites comple
mapped ry and
ted
facilities, its
agenci
es-
KTB,
TF,
SUB TOTAL 20
177
Table 46: Health Services
Sub Project Descriptio Green Estimate Source Time Performanc Targets status Implementin Other
Programm name n of Economy d cost of frame e indicators g Agency stakeholders
e Location activities consideratio (Million funds
n Ksh.)
Environme School Installation Gender 50 CGM 2018- Number of 1000 New Health
ntal and hygiene & of consideratio 2019 schools Services
communit sanitation/ handwash n visited Department
facilities
y health County wide and
constructio
n of
toilets/latri
nes
Health
education
sessions,
distributio
n of health
messages
(posters/br
ochures) in
schools
To educate
both
teachers
and
students
on
menstrual
hygiene
178
manageme
nt
Supply
sanitary
towels to
girls
Environme Community Training of Special 15 CGM 2018- Number of 1000 New Health
ntal and Sanitation PHOs, Groups 2019 villages Services
communit Marketing/ APHTs and Consideratio verified and Department
CHEWs on
y health County n certified
CLTS
wide implement ODF status
ation
process
Pre-
triggering
/social
mobilizatio
n of the
communit
y
Improving
communit
y hygiene
through
targeted
messages
Supporting
communit
y units in
health
outreaches
Training of
County
179
team on
certificatio
n of ODF
villages
Triggering,
claiming
and
verification
of ODF
villages at
sub-county
levels
Certificatio
n of ODF
villages by
the County
team
Health Media PWD (use of 15 CGM 2018- % of 30 New Health
education messages sign 2019 population Services
and creating language reached Department
promotion awareness
and Braille)
/countywid on ways to
e prevent
diseases at
household
level
Public
barazas,
churches
and
meetings
on health
awareness
180
Programme Total 80
Programme: Curative and Rehabilitative Health care
Sub Project Descriptio Green Estimate Source Time Performanc Targets status Implementin Other
Programm name n of Economy d cost ( of frame e indicators g Agency stakeholders
e Location activities consideratio Million funds
n Ksh.)
181
Procureme
nt
arrangeme
nts
182
facilities in available
20 wards materials
Operation
alization
Health Universal Awareness Gender 15 CGM 2018- Number of 50000 Ongoing Health
Infrastruct Health creation at balance 2019 House-holds Services
ure Coverage communit covered Department
y level Special
(NHIF)/Cou groups
ntywide Enrolment consideratio
to the n
NHIF
programm
e
Equipping
facilities
with
medical
supplies
183
Staff
rationalizat
ion
Harness
green
energy
Constructi
on of 1
mortuary
per
subcouty
184
Hiring of
mortuary
staff
Acquiring
mortuary
equipment
Programme Total 200
Grand Total 870
185
Crop Promotion Procure Environmen 20 CGM July No. of Procu On- Agricultur AVCD
Develop of clean tal 2018- MT of re and going e
ment potato potato conservatio June seed distrib Directorate
production 2019 bought ute
seed, n
- Buuri and and 160T
Imenti Sub distribu distribut of
Counties te and ed seed
train
farmers
Soil Promote Laying Promote 10 CGM July No of Conse Not Agricultur Department
Manage on-Farm out on- soil 2018- farms rve Initiate e of
ment soil and farm conservatio June laid out one d Directorate Environme
Water 2019 No of catch
soil and n nt and
Conservati farms ment
on-county water conserv area natural
wide conserv ed in a resourcrs
ation No of ward
structur trees NARIGP
es planted
on ASDSP
farms
Crop Fruit and Promot 20 CGM July No. of One Not Agricultur National
Value grains e grain 2018- Value model initiate e Governmen
addition value and June addition grain d Directorate t and
addition in facilitie cleani
fruit 2019 private
two s ng,
selected value constru sortin investors
sub additio cted g and
counties n wareh
ousin
186
g
store
-One
model
fruit
proce
ssing
facilit
y
Input Distribution Transpor 10 CGM July No. of To Not Directorate National
Supply of Subsidized t 2018- bags distrib initiate Agriculture Government
Support fertilizer – subsidize June distribute ute at (NCPB)
countywide d least
d 2019
No. of 20,000
fertilizers farmer bags of
to beneficia fertilize
farmers ries r to
at Ward farmer
Level s
County Agricultural Hold 10 CGM July A Suppor Initiated Department Representativ
Agricultura Sector consultat 2018- functiona t in of es of
l coordination ive June l board Operati 2017/18 Agriculture, agricultural
–countywide A well- ons of Livestock
developme meeting 2019 FY stakeholders
coordinat the Developmen
nt at ed County t and operation in
County, agricultur Agricul Fisheries Meru County
Sub e sector tural
County Board
and
Ward
Level
187
Sub Project name Descripti Green cost in M Sourc Time Performa Targets status Implementin Other
Program Location on of Economy (Ksh.) e of frame nce g Agency stakeholde
me (Ward/Sub activities consideration funds indicator rs
county/ s
county wide)
Livestock upgrading of importati 5.5 CGM July no. of 110 goats not yet Livestock
Breeds local/exotic on of 2018- goats intiated Directorate
Improvem breeds of upgradin June procured
ent dairy goat g goat 2019
188
Animal disease To 9.0 CGM July No. of -120 000 Livestock
disease control control 2018- assorted vaccinatio Directorate
managem /vaccines- and June doses of ns
ent countywied eradicate 2019 vaccines
livestock procured
diseases
rehabilitation To 6.0 CGM July no of 15 cattle
of cattle dips control 2018- cattle dips
(Igembes and and June dips revived
tigania eradicate 2019 revived
subcounties livestock
diseases
Sub total 34
Programme 3: Fisheries development
Sub Project name Descripti Green cost in M Sourc Time Performa Targets status Implementin Other
Program Location on of Economy (Ksh.) e of frame nce g Agency stakeholde
me activities consideration funds indicator rs
s
Aquacultu Fish breeding Increase Use of solar 1 CGM June No. of At least Ongoing Department
re -County wide supply of energy in the 2019 fingerings 1,000,000 of ALF
developm quality hatcheries to produced fingerling
ent fingerling regulate s annually
s temperatures
189
Fish Increase Use of 6 CGM June Feed 1 feed Ongoing Department
Nutrition- access to hydroelectric 2019 pelletizer pelletizer of ALF
County wide affordabl power and , fishing with drier
e quality solar energy nets procured,
fish procured feed
feeds and kgs store
and of fish construct
improve feeds ed and 30
fishing in manufact fishing
dams ured/pro nets
cured acquired
Fish To Use of 4 CGM June No. of 100 fish Ongoing Department
production- construct hydroelectric 2019 fish ponds of ALF
County wide new and solar ponds construct
demo energy and establish ed, 150
ponds biogas ed fish
and ponds
renovate renovate
existing d
ponds
Fishing To 1.5 COM June No. of 30 fishing On going Department
equipment- enhance 2019 nets nets of ALF
County wide fish procured procured
catch
190
Completion Rain water 1000 Directorate
of harvesting capacit Tenderin CGM of land,
Training Hall conference system 2018- % y sitting g stage housing
Hall and 19 completion hall. and public
construction installatio works.
n of solar CG
system for 8 M
lighting
ATC Facility and water
Improvement heating
191
Sub Programme Project name Description Green cost in Sour Time Performanc Targets status Implementin Other
Location of activities Economy M ce frame e indicators g Agency stakeholde
(Ward/Sub considera (Ksh.) of rs
county/ tion fun
county wide) ds
SUBTOTAL 10.7
192
Table 48: Lands, Physical Planning, Urban Development & Public Works
Programme 1: Physical Planning and Urban Development
Sub Project name Description of Green cost Sour Time Performance Target status Implementing Other
Programme Location activities Economy in M ce of frame indicators s Agency stakeholder
considera (Ksh fund s
tion .) s
Spatial Planning Preparation of Reconnaissanc Policy 60 CG 2018/ Inception 1 Not Department of Partners
Spatial Plans for e survey guidelines M 2019 report started lands, Physical
Sub-County Intention to economy- Notice of Planning,
Headquarters: plan parks, intention to Housing Urban
Kangeta, Visioning and recreation plan development &
Mikinduri & objective al, open Planning Public Works
gatimbi setting spaces Data
Development Stakeholders
of data meetings
collection Base map
instruments Thematic
Data collection data report
Data collation Thematic
and tallying data analysis
Data analysis report
Development Draft plans
alternatives Notice of
Final draft plan publication
Publications Approval and
ascent
Urban Symbiocity -Preparation 10 CG 2018/ No. of pilot 4 New Department of CoG
Development approach pilot in of urban M 2019 towns for the project lands, Physical
the gateway sustainability symbiocity Planning,
towns report approach Housing Urban
-Implement an development &
integrated Public Works
urban area
improvement
project
193
Automation of Operationalizatio Procuring Reduction 10 CG 2018/ % of county 20% New Lands, housing Partners
County land n of automation appropriate of paper M 19 land data physical
Information of land software work automated planning, urban
system information Procure Cost development
systems consultancy cutting and public
Cataloging old works
records of the
defunct local
Authorities
Digitizing
these records
Archiving the
same
194
Use of distributed g Housing Urban
locally block making machi development
available machines nes
material
Training and Conduct of Soil 2.5 CG 2018/ No. of 200 Not Lands, housing
capacity building trainings conservati M 19 trainings Youths started physical
on building on. conducted Traine planning, urban
technology No, of d development
Headquarters houses built and public
works
195
Sub - Project Objectiv Descriptio Green Cost Source Timefr Performa Targets Status Impleme Other
program Name/ es n of Econom (Kshs. of ame nce nting stakeholders
me Location Activities y ) funding indicators Agency
consider M
ation
domestic portabl EIA report. Govern construct Developm
water pans e water Implemen ment ed ent
Buuri - To tation NDMA , No of partners
Igemb reduce caritas household
e north resourc and and
Igemb e based other livestock
e conflict NGOs accessing
central water
Tigania
east
Tigania
west
Igemb
e south
Rural & Maji kwa -To Feasibility 1,000 CGM 2018/2 No of 6 New CGM, Tana Water
Urban Wote reduce studies Nationa 019 dams National Service Board
Water Constructio water Design l construct Governm
Supply n of Small trekking report Govern ed ent
dams. distance EIA report. ment No of &Develop
County -To Implemen NDMA , household ment
wide reduce tation caritas accessing partners
resource and water
based other
conflict NGOs
196
Sub - Project Objectiv Descriptio Green Cost Source Timefr Performa Targets Status Impleme Other
program Name/ es n of Econom (Kshs. of ame nce nting stakeholders
me Location Activities y ) funding indicators Agency
consider M
ation
Urban Water To -Provision - 300 CGM 2018/2 -reduction County Ongoing CGM & Diocese of
Water treatment/ reduce of water Planting 019 of water wide NDMA Meru
Supply countywide the treatment of trees borne (DOMWASS)
water infrastruct in diseases
toxicity ure catchme
in water nt areas
supply
Rural River To River - 5 CGM, 2018/2 -no of County New CGM & -Mount Kenya
Water scouting protect scouting Planting Nationa 019 cases wide NDMA Ewaso Water
Supply water through of trees l prosecute Water Partnership(
catchme empoweri in Govern Resource MKEWP)
nt areas ng WRUAs catchme ment in Authority
nt areas collabor (WRA)
-Water ation
Rotation with
program NDMA
s
Rural Water & To Baseline -Adopt 100 Nationa 2018- -No of 3 water New CGM -National
Water Irrigation Increase survey drip l 2019 water irrigatio Irrigation
Supply Projects/ water Constructi irrigatio Govern projects n Board
County for on of n ment in commissio scheme
Wide irrigatio water collabor ned. s
n projects ation
Piping with
NDMA
Rural Water & To Baseline Use of 250 CGM 2018- No of No of ongoing Redcross
Water Irrigation Increase survey solar and 2019 water borehol and
Supply Projects/ water Constructi energy. Redcros projects es and departme
Laare, for on of s commissio water nt of
Ruiri, domesti water ned supply water and
Mutuati c use. projects systems Irrigation.
Piping
197
Sub - Project Objectiv Descriptio Green Cost Source Timefr Performa Targets Status Impleme Other
program Name/ es n of Econom (Kshs. of ame nce nting stakeholders
me Location Activities y ) funding indicators Agency
consider M
ation
and
Mikinduri
Waste Sewerage To Survey - 900 Nationa 2018/2 -Distance Meru Ongoing CGM
Water system/ improve Trench l 019 covered town Tana
Manage -Meru sanitatio digging Govern Water
ment Town and n Constructi ment in Service
Environs on of collabor Board
sewerage ation
disposal with
unit NDMA
Sub- 2,795
Total
198
Sub- Project Objective Descript Green Cost Source Timefra Targets Stat Performa Implemen Other
program Name/ s ion Of Econom (Kshs.) of me us nce ting Stakehol
Location Activitie y Millions) Funding Indicator Agency ders
s conside
rations
Bamboo -Drafting
development manage
/County ment
wide plan
-Signing
and
launchin
g
Environm Acquisition To - Gender 10 CGM 2018/2 10 acres New Acres of CGM Public
ent of land for enhance Procure equality 019 land
managem dumpsite/Im proper ment bought
ent enti North disposal
protectio and Buuri of waste
n
Environm Purchase of To Procure Gender 3 CGM 2018/2 For New No. of CGM -
ent /PPEs, enhance ment equality 019 county PPEs
managem the wide purchase
ent capacity d
protectio of
n environm
ental
protection
teams
Environm Purchase of To Procure Gender 50 CGM 2018/2 1 New No. of CGM Business
ent waste enhance ment equality 019 waste communi
managem management proper managem ty
ent equipment’s disposal ent
protectio of waste equipmen
n ts
purchase
d
199
Sub- Project Objective Descript Green Cost Source Timefra Targets Stat Performa Implemen Other
program Name/ s ion Of Econom (Kshs.) of me us nce ting Stakehol
Location Activitie y Millions) Funding Indicator Agency ders
s conside
rations
Wildlife Human To curb Awaren Use of 10 CGM 2018/2 County New No. of CGM KWS
managem wildlife human ess solar 019 wide meetings LEWA
ent conflict wildlife creation. fence conducte Northern
mitigation/ conflict Electric d Rangelan
Kiirua Naari Fencing d, Trust
ward/Ruiri (NRT)
Rwarera/Nti
ma East
Wildlife Conservancy To Identific Use of 10 CGM 2018/2 Igembe New Establishe CGM KWS
managem development promote ation, solar 019 North d
ent tourism procure fence. conserva
ment ncy
and
fencing
Natural Greening of To Planting County 10 CGM 2018- County New Number CGM Public
Resource hills and preserve of trees wide 2019 wide of tree
s. schools the on hills seedlings
/community environm and planted
based ent and schools.
nurseries. improve Reclaimi
forest ng hills.
cover
TOTAL 123