SIGNIFICANT PROJECTS COMPLETED

BETARA COMPLEX DEVELOPMENT


OPERATOR – Petrochina Company Ltd (Indonesia)
EPCC CONTRACTOR – Sembcorp Engineers & Contractors (Singapore)
Project Description
Five additional on-shore fields are been developed and
the refined products (gas & Condensate) will be exported
via offshore terminals.
The project including on-shore Gathering lines, Refining &
Fractionating unit onshore Trunk lines, HDD at shore, 3
Submarine pipelines, 2 offshore Offloading Terminals
including Process platform.
ZEE’s Scope of Work
• 3 Submarine Pipelines,
• Design of Process Platform,
• Design of Mooring Dolphins,
• Mooring Analysis,
- Design of Mooring System including Anchor Piles.
• Model Testing of FPSO, Supervision,
• FPSO Mooring Handling System Design,
• Transporting and Installation Engineering.
HEERA REDEVELOPMENT PROJECT
OPERATOR – ONGC (India)
EPCC CONTRACTOR – Punj Lloyd (India)
Project Description
Heera Redevelopment project included the installation of 4
new Well-Head Platforms, 8 new Rigid Pipelines, 3 Flexi
lines, 3 cables and modification to 7 existing platforms.
The project was executed via Sempec/ZEE office in Jakarta
and the fabrication of the Platforms were carried in
Kencana Yard in Lumut, Malaysia.
ZEE’s Scope of Work
• Design of the 4 new platforms,
• Modification of 7 existing platforms,
• Design of 8 rigid pipelines,
• Design of 3 flexi lines,
• Design of 3 cables,
• Construction supervision at Malaysian Yard,
• Transport and Installation Engineering.
RELOCATION OF TUBAN TERMINAL
OPERATOR – Petrochina Company Ltd (Indonesia)
Project Description
It was required to relocate the Crude Oil Offloading
Facilities to deeper water to facilitate Offloading from
larger tankers. The new terminal was relocated
approximately 1.5km from the existing position. The
project involved the installation of a new PLEM, submarine
pipeline from existing PLEM to new PLEM, Installation
(Mooring) of SPM and FSO.
ZEE’s Scope of Work
ZEE was asked to carry out FEED Study Detail Engineering
and prepare the technical documents for RFQ.
The study involved the design of
• Submarine Pipeline,
• New PLEM,
• Mooring Analysis,
- Check the integrity of System and the design of
Anchor Piles.
• Cost Estimation,
• Compiling Technical documents for RFQ.
ENHANCEMENT & REFURBISHMENT OF
FPSO SEAGOOD
OPERATOR – Santos (Sampang) Pte Ltd (Indonesia)
FPSO PROVIDER – PT Pulau Kencana Raya (Indonesia) & Labroy (Singapore)
Project Description
Santos required an FPSO to operate in their fields in Indonesia.
The Contract was awarded to PT Pulau Kencana Raya and
Labroy. The proposed FPSO, SEAGOOD I was required to
undergo major enhancements to meet with Santos
specifications. To accommodate the 3 phase separation
equipment the FPSO required to be jumbonized by 20meters.
The works were carried out I n Labroy Shipyard in Batam.
ZEE’s Scope of Work
• To carry out facility design (Process, E&I)
• Naval Architecture including producing revised stability
booklet, assisting in getting ABS Certification.
• Structural Engineering for deck strengthening and design of
supports, walkways etc.
• Mooring design.
• Construction supervision at Batam Shipyard.
PIPELAY FIRING LINE DESIGN FOR 1000T
DLB HAMIZAKU
PRINCIPAL DESIGN CONSULTANT – OME Synergy Sdn Bhd (Malaysia)
Project Description
A new DLB HAMIZAKU with 1000Ton Crane was to be built in
Malaysia. The principal consultant to this project was OME
Synergy Sdn Bhd.
ZEE’s Scope of Work
ZEE’s scope was to design the pipelay “firing line” including
the floating stinger.
• Conceptual and detail engineering to achieve top cord
curve and stinger configuration,
• Floating Design & Stability,
• Detail design,
• Hitching methodology,
• Hitch design,
• Barge deck strength design,
OTHER STINGER DESIGNS COMPLETED
• Assisting in 3rd party certification.
• DLB Enterprise III, TL Offshore
(Malaysia)
• DLB KUBER, Punj Lloyd (India)
• DLB MAHESH, Punj Lloyd (India)
ARCO LL4A
OPERATOR – ARCO (Indonesia)

Project Description
ARCO Was looking into ways of reducing pipeline installation
costs specially for infield short lengths.
In LL4A project ZEE proposed the Rentis Method.
A pipeline bundle 8” & 4” was assembled on-shore. The length
of the bundle was 2.1 km. The bundled was towed 65 km
offshore and installed between 2 platforms.
ZEE’s Scope of Work
• Conceptual study,
• Detail Engineering,
- Inplace Engineering
- Installation Engineering
• Project management,
• Cost Estimation,
• Offshore Installation supervision.
RIG LEEN
OPERATOR – MANSAL OFFSHORE (Doha)
Project Description
Mansal Offshore wanted a self elevating Jack-up Rig for
offshore support work in the GULF. As this Project was on fast
track it was decided to convert a conventional 2,000 Ton DWT
landing craft as the hull for the Jack-up Rig which was of
length 60 meters, 32 meters wide and a draft of 4.8 meters.
The rigs 4 legs each measured 75 meters enabling to work in
water depth up to 50 meters.
ZEE’s Scope of Work
ZEE’s scope included the Detail Design including
• Naval Architecture, floatation stability,
• Structural design,
• Process and facility design,
• Mechanical Hydraulics,
• Fabrication supervision,
• Assistance in Project Management.

Concept design was carried out by


Gusto Engineering (Netherland)
EARLY PRODUCTION SYSTEM
OPERATOR – ARCO (Qatar)
RIG PROVIDER – Mansal Offshore (Doha)
Project Description
Mansal Offshore was requested by ARCO (Qatar) to provide an
Early Production System for 35,000 bbl/day output. The
proposal by Mansal was a Rig at the Well Head with
interconnected skid mounted process units, a pipeline to SBM
and FPSO.
ZEE’s Scope of Work
• Conversion of Rig Muna Deck for the accommodation of
the process units, piping, E&I.,
• Structural Modification to Deck,
• Design of new Heli Deck,
• Design of Pipeline,
• Design of PLEM,
• Installation Engineering of SBM,
• Mooring Analysis – SBM, FPSO & Tanker.
BLOCK B SUBSEA DEVELOPMENT
OPERATOR – Conoco Philips

Project Description
The overall objective of the Block B Subsea Development was
to install facilities for the economic production of gas reserves
from a number of reservoirs. This marginal field was
developed in an optimized and efficient manner.

ZEE’s Scope of Work


• To carry out FEED Study of Subsea facilities including
- Flow lines,
- Subsea Controls,
- Subsea manifolds,
- Existing facilities modifications to Platform & FPSO.
• Compiling Specifications,
• Development of EPCC tender package.
MARGINAL FIELD DEVELOPMENT
OPERATOR – Repsol YPF Maxus
Project Description
Currently the company is developing marginal fields with a
“guardian” monopod solution. A number of fields has been
developed using this option. For future development the
company is looking into a possible more efficient and cost
effective solution.
ZEE’s Scope of Work
To carry out a conceptual study to provide an optimized
solution for a typical marginal field development. Various
development options were considered and cost models were
completed for each option. Advantages/Disadvantages and
cost benefits (CAPEX, OPEX) for each option was compared
with the company marginal field philosophy.
Options compared were:-
- Braced Monopod - Template
- Guyed Caisson - Remote Well
- Tripod - Mini FSO
- Isolated well
MARGINAL FIELD DEVELOPMENT (cont.)

Y2K Single Braced Monopod


PLATFORM RECERTIFICATION
OPERATOR – REPSOL YPF Maxus

Project Description
The company has a number if platforms which has exceeded
the design life. The company needs to keep these platforms
operative, in some cases with enhancement for additional
output. A structural integrity audit was to be carried out on
these platforms for third party certification.
ZEE’s Scope of Work
• Carry out structural survey to establish “as it is” state,
• Build accurate model,
• Carry out standard analysis,
• If failure was encountered carry out push-over analysis to
establish the reserve strength,
• Carry out fatigue analysis,
• If required carry out remedial engineering to make the
platform fit for use,
• Lease with Certifying Authorities.
ZEE has completed approximately 35 Platforms.
20” TRUNK LINE, TMP TO GTS-A
OPERATOR – Total (Indonesia)
EPCC CONTRACTOR – PT Istana Karang Laut (Indonesia)

Project Description
As a part of an EPCC Contract, a 20” Pipeline needed to be
installed from TMP to GTS-A platform. The pipeline routing is
in swampy terrain in very shallow water.
ZEE’s Scope of Work
To carry out Detail and Installation Engineering.
• Detail Pipeline Design in Swampy Conditions,
• Detail Design of Converted Lay Barge
(Flat Top Barge to Pipelay Mode),
• Installation Engineering,
• Construction and Installation Supervision.
POLENG FIELD REHABILITATION
OPERATOR – Kodeco Energy Co. Ltd.
Project Description
Kodeco Energy required Poleng Field which has been
decommissioned to be activated and the operational life of
the field to be extended. As a part of the rehabilitation
process PLEM, SPM and an FPSO needed to be added for
processing and offloading.
ZEE’s Scope of Work
ZEE scope included the multidisciplinary work related to
rehabilitation.
• Structural integrity of the platforms and remedial
engineering to bring the field fit for use condition,
• Process Simulation,
• Facility Design (E&I),
• Design of PLEM,
• Design appraisal of existing pipelines and the design of
new lines,
• SBM & FPSO Mooring Design,
• Loading, Offloading Flexi hose design,
• Assisting company in getting Certification by third party.
PERTAMINA LIMA DECK RAISING PROJECT
OPERATOR – Pertamina (Indonsia)
EPPC CONTRACTOR – TIMAS
Project Description
Lima Filed Assets are approximately 30 years old. Due to the
heavy extraction of Oil/Gas the complete field has subsided
approximately 12 meters. PERTAMINA wishes to prolog the
production life of the field and decide to carry out the lifting
of the 4 platforms in the field simultaneously. This is the first
time such a project has been undertaken.
Scope included the relocation of existing equipment, modify
all piping and E&I works, Structural re-analysis and structural
modification. The complete project was undertaken by
Synergy / ZEE (JV Partners)
ZEE’s Scope of Work
• Structural modifications and re-analysis,
• Structural Integrity of the Hydraulic Jacking System,
• Local F.E. Analysis.
GG NEW FIELD DEVELOPMENT
OPERATOR – PHE ONWJ (Indonesia)
EPCC CONTRACTOR – PT MEINDO & PT SWIBER (Indonesia)
Project Description
GG New Field Development Project is a gas
development strategically aimed at delivering gas to
support PHE ONWJ Gas Sales and Purchase agreement
to Costumer.
ZEE’s Scope of Work
• Loadout, Grillage and Seafastening Design
• Topside
• Jacket
• Piles
• Barge Ballasting and Stability during Loadout
• Loadout Procedure
SMK3 NEW FIELD DEVELOPMENT
OPERATOR – TOTAL (Indonesia)
EPCC CONTRACTOR – PT MEINDO (Indonesia)
Project Description
The South Mahakam field is located approximately 35km
to the south east of Balikpapan. The water depth ranges
between 45 and 60 meters with 46.7 meters at location
of Jumelai field.
The JM1 platform consists of 3 legged conventional jacket
(installed by lift) supporting minimum facility wellhead
topside.
ZEE’s Scope of Work
• Loadout, Grillage and Seafastening Design
• Topside
• Jacket
• Piles
• Vent Boom
• Jacket Buoyancy Tanks Design
• Barge Ballasting and Stability during Loadout
• Loadout Procedure
KL GAS LIFT FIELD DEVELOPMENT
OPERATOR – PHE ONWJ (Indonesia)
EPCC CONTRACTOR – PT MEINDO (Indonesia)
Project Description
KLA flow station is one of the major gas producers in the
PHE ONWJ area with a normal gas production of 40-60
MMSCFD and a normal crude oil production up to 4000
BOPD. The crude oil from KLA and KLB platforms are
produced by using in-situ gas lift from gas source wells.
The EPCI CONTRACT will consist of the engineering,
procurement, construction, modification and installation
in KL Field on existing COMPANY facilities.
ZEE’s Scope of Work
• In-service and Pre-service Analysis for Modification
• KLA Platform
• KLB Platform
• KLC Platform
• Transportation and Installation Design
• Flare Boom
• Compressor Module
• Stair Towers
• Riser Guard
• Deck Extensions
• Helideck Removal
INDONESIA DEEPWATER DEVELOPMENT
BANGKA TOPSIDE EPCI
OPERATOR – Chevron (Indonesia)
EPCC CONTRACTOR – PT MEINDO (Indonesia)
Project Description
Bangka Field is a deepwater gas field located in offshore
East Kalimantan, Indonesia in 3200’ of water. The original
hydrocarbon in place is 179.5 BSCF of gas and 2,766
MSTBO of condensate.
The field will be developed with two well subsea
completion, tie in the production to existing West Seno
(WS) Floating Production Unit (FPU) through a new 9.5”
ID Flexible Flow line. A new umbilical will be installed for
remote subsea controls from the FPU. Modifications will
be made to the existing WS FPU as a part of Bangka
Topside Project for processing and handling of the
Bangka gas and condensate.

ZEE’s Scope of Work


• Complete Hull Structure Modification (void tank
conversion)
• Complete naval/Marine Engineering including FPU
Motion, stability, longitudinal strength, mooring re-
assessment etc.
• Assist Company for Class Approval (ABS)
INDONESIA DEEPWATER DEVELOPMENT
BANGKA TOPSIDE EPCI
OPERATOR – Chevron (Indonesia)
EPCC CONTRACTOR – PT MEINDO (Indonesia)
INDONESIA DEEPWATER DEVELOPMENT
BANGKA TOPSIDE EPCI
OPERATOR – Chevron (Indonesia)
EPCC CONTRACTOR – PT MEINDO (Indonesia)
Project Description
Bangka Field is a deepwater gas field located in offshore
East Kalimantan, Indonesia in 3200’ of water. The original
hydrocarbon in place is 179.5 BSCF of gas and 2,766
MSTBO of condensate.
The field will be developed with two well subsea
completion, tie in the production to existing West Seno
(WS) Floating Production Unit (FPU) through a new 9.5”
ID Flexible Flow line. A new umbilical will be installed for
remote subsea controls from the FPU. Modifications will
be made to the existing WS FPU as a part of Bangka
Topside Project for processing and handling of the
Bangka gas and condensate.

ZEE’s Scope of Work


• 3D Finite Element Analysis Modification for
• FPU Hull
• Flexible and Umbilical Riser Support
• Others Supports
• Fatigue Analysis for Modification
• Living Quarter, Production & Utility Modules
• Others Supports
INDONESIA DEEPWATER DEVELOPMENT
BANGKA TOPSIDE EPCI
OPERATOR – Chevron (Indonesia)
EPCC CONTRACTOR – PT MEINDO (Indonesia)
ZEE’s Scope of Work (Cont’d)
• FPU Global Performance Analysis
• Motion Analysis
• Stability Analysis
• Mooring Analysis
• Towing Arrangements
• Bollards Design
• Transportation and Seafastening All Equipments
TRANSPORT AND INSTALLATION
ENGINEERING
EPCC OPERATOR – Heerema Marine Contractors Nederland B.V.

Project Description
HMC requires T&I Engineering for International projects. HMC
appointed ZEE as an Engineering Contractor to undertake T & I
Engineering for various projects.
ZEE’s Scope of Work
• Dynamic Lift Analysis using HMC In-House LIFTDIN
Software. Various Jacket & Topside heavy lifts were carried
out,
• Jacket Launch Analysis (8,000 MT),
• Various Jacket Topside Piles Grillage and Seafastening
Design,
• Mooring Analysis,
• Bollard Pull Analysis,
• Load out Ballasting Design.
MAFUMEIRA SUL
OPERATOR – CABGOC (Angola)
T&I CONTRACTOR – HMC (Singapore)
Project Description
The Mafumeira field is located off the Angolan coast
within the CABGOC Block 0, in the southern portion of
the concession Area A. CABGOC plans to provide
additional platforms, infrastructure and facilities to
develop the Mafumeira field through the Mafumeira Sul
Project (MSP).

As the EPCI contractor for the MSP project, Daewoo


Shipbuilding & Marine Engineering Co. Ltd. (DSME) has
awarded the Transportation and Installation Contract to
Heerema Marine Contractors (HMC).
ZEE’s Scope of Work
• Grillage and Seafastening Design
• Flare Boom Jacket, Deck and Piles
• LQP Jacket and Piles
• WHP-C Jacket and Piles
• WHP-Sul Jacket and Piles
SPM POLENG REPLACEMENT PROJECT
OPERATOR – PHE WEST MADURA OFFSHORE
Project Description
PT Pertamina Hulu Energi West Madura Offshore (PHE WMO) is the operator of the West Madura
and Poleng asset located in offshore East Java. Floating Storage and Offloading (FSO) is connected
to Single Point Mooring (SPM) as a final storage of the oil production from WMO Field. In the
periodic time, the shuttle tanker picks up the oil from FSO and delivers to the customer.
SPM POLENG REPLACEMENT PROJECT
OPERATOR – PHE WEST MADURA OFFSHORE

SPM Integrity
Check FSO

Mooring System Mooring


Integrity Check Hawser Check

Mid-Arc
Buoyancy Tank New Additional
Modification Submarine Hose
Integrity Check

PLEM
Modification
GLOBAL DYNAMIC ANALYSIS OF FSO
ABHERKA DURING OFFLOADING PROCESS
OPERATOR – PHE WEST MADURA OFFSHORE

The scope of this project is to study and establish the limiting criteria for various shuttle tanker
sizes.
DESIGN OF TEMPORARY MOORING
SYSTEM FOR 30,000 DWT TANKER
PROJECT
OPERATOR – PHE WEST MADURA OFFSHORE
Pertamina Hulu Energi West Madura Offshore (PHE WMO) the operator of the west Madura
and Poleng assets located in offshore East Java plans to replace the existing SPM at Poleng
field. In order to avoid lost of production due to shut down, the temporary mooring for approx.
30,000 DWT Tanker is required.
DESIGN OF TEMPORARY MOORING
SYSTEM FOR 30,000 DWT TANKER
PROJECT
OPERATOR – PHE WEST MADURA OFFSHORE

Mooring Hawser
Buoy Integrity Integrity Check
Check

Buoy Integrity
Check

Mooring System Integrity Tanker Motion


Check (Typical) Study
DESIGN OF TEMPORARY MOORING
SYSTEM FOR 30,000 DWT TANKER
PROJECT
OPERATOR – PHE WEST MADURA OFFSHORE
STORAGE TERMINAL AND DOLPHIN
MOORING SYSTEM
OPERATOR – PT PETROSINDO ENERGI
Project Description
Scope consist of 75000 cbm diesel storage terminal and dolphin mooring system at Sangatta, Kutai
Timur, East Kalimantan, Indonesia including Pipeline, PLEM, Submarine Hose and Umbilical.
Subsea Hose
In-Place and Complete Subsea
Installation Check Pipeline Design
and Installation

PLEM Design
and Installation
Check

Umbilical
Design and
Installation
Check
PIPELINE RELOCATION PROJECT
OPERATOR – PHE WEST MADURA OFFSHORE

Complete
Pipeline Design
and Installation
KRA PROJECT
OPERATOR – STAR ENERGY
Project Description
Star Energy (Kakap) Ltd (Company) is developing the KAKAP Field which consist KG, KRA, KH, and
KF field, located in West Natuna Sea, Indonesia. It is producing sales gas that is sold to Singapore
through 14” pipeline that connects to the main West Natuna Transmission System (WNTS)
pipeline. Company intends to further develop the field by adding two new infill wells, namely KRA-
South 2 and 3, to be tied back to KRA Platform via subsea pipelines.

Subsea Pipeline
and Spool Design

PLEM Design
HOT TAP PROJECT
OPERATOR – PHE ONWJ
Project Description
The existing 24-inch MGL APNA-MMC was locally damaged at around subsea tee location from
APND Platform due to dragged anchor. PHEONWJ intends to repair this local damage pipeline by
using Hot Tap method in order to maintain continuous gas supply from APN to MIKE-MIKE.

Pipeline Hot Tap


Design and
Temporary Constructability
Bypass Spool Study
Stress Analysis
BREASTING DOLPHIN PROJECT
OPERATOR – PETROCHINA

Breasting
Dolphin
Tanker Motion Integrity Check
Study
AAL DEVELOPMENT PROJECT
OPERATOR – SANTOS

• Flexible Jumper Dynamic


FPSO Motion
Analysis
Study
• Flexible Jumper
Installation study
• Flexible Jumper
Interference Analysis
AAL DEVELOPMENT PROJECT
OPERATOR – SANTOS
5 YEARS TRACK RECORD
ZEE ENGINEERING LIST OF PROJECTS

FEED Studies

No. Project Name Client / Company Discipline Project Location Year Partner / Contractor

Potable Water Submarine Pipeline In “Greater Male' Water &


1 Pipeline Maldives 2014 -
Male’ Region” (Maldives) Project Sewerage Company

2 Conceptual Study rerouting L-Parigi Pertamina EP Pipeline Indonesia 2013 PT Synergy Engineering

Pertamina Hulu
3 MMF to Junction Hot Tapping Pipeline Indonesia 2012 PT Synergy Engineering
Energy ONWJ

4 Tropik Pandan FEED Tropik Energi Pipeline Indonesia 2013 PT Synergy Engineering

Pertamina Hulu Enegy


5 UL FEED Development Pipeline & Structure Indonesia 2011 PT Synergy Engineering
ONWJ

Pertamina Hulu
6 KE -38 MOPU TPF FEED Structure Indonesia 2012 PT Synergy Engineering
Energy ONWJ

7 FEED for KRA South Field Star Energy Pipeline Indonesia 2013 PT Synergy Engineering

Pertamina Hulu
8 MNC Hot Tap Pipeline Pipeline Indonesia 2013 PT Synergy Engineering
Energy ONWJ

REKIN PROVISION OF 16 OFFSHORE SECTIONAL


9 PT rekayasa Industri Pipeline Indonesia 2013 PT Synergy Engineering
PIPELINE

10 Santos Pipeline Free Span and Mooring Analysis Santos Energy Pipeline & Marine Indonesia 2013 PT Synergy Engineering

11 Santos AAL FPSO Santos Energy Structure Indonesia 2013 PT Synergy Engineering

Pertamina Hulu
12 FEED For FPU-2 Development (Greenfield) Structure Indonesia 2011 PT Synergy Engineering
Energy ONWJ

Peluang Subsea Development FEED (Santos


13 Santos Energy Pipeline Indonesia 2011 PT Synergy Engineering
(Madura Offshore) Pty Ltd)

Subsea Pipeline Sectional Relocation PPP - ORF Pertamina Hulu


14 Pipeline Indonesia 2011 PT Synergy Engineering
(PHE WMO) Energy WMO

PT Indonesian Services
15 South Sumatra NGL Project PT E1-Pertagas Pipeline Indonesia 2010
Bureau
ZEE ENGINEERING LIST OF PROJECTS

Detail Engineering Design

No. Project Name Client / Company Discipline Project Location Year Partner / Contractor

Centro & Sul WHP Jackets Grillage and Heerema Marine Contractors
1 Chevrom Structure Angola 2014
Seafastening Nederland SE

LIMA Complex Subsidence Remediation Pertamina Hulu Energy


2 Structure Indonesia 2013 PT Synergy Engineering
(Deck Raising) Detail Design ONWJ
Flare Tipod, Deck and Piles Grillage and
Heerema Marine Contractors
3 Seafastening Design – Mafumeira Sul Chevron Structure Angola 2013
Nederland SE
Project
LQP Jacket and Piles Grillage and
Heerema Marine Contractors
4 Seafastening Design – Mafumeira Sul Chevron Structure Angola 2013
Nederland SE
Project
PLNB UBE Pipeline Pemping To Tanjung
5 PT PLN Batam - UBE Pipeline Indonesia 2013 PT Synergy Engineering
Uncang
Rigging platform, DSF, North Deck and
Gujerat State Heerema Marine Contractors
6 Jacket Detail Design Engineering - DDFD Structure India 2012
Petroleum Corporation Nederland SE
Project
Alen CPP 8000 Ton Jacket and Pile Grillage Noble Energy Heerema Marine Contractors
7 Structure Equatorial Guinea 2012
and Seafastening Design Equatorial Guinea Ltd Nederland SE

Tanzania Port Pipeline, SPM,


8 Tanzania SPM Replacement Project Tanzania 2012 Leighton Offshore Pvt Ltd
Authority Marine & Structure

Indian Oil Corporation Leighton Welspun (India) Pvt


9 IOCL Storm Water Outfall To Sea Project Pipeline India 2012
Ltd (IOCL) Ltd

Pertamina Hulu Energy


10 Poleng SPM Replacement Project Pipeline & Marine Indonesia 2012 PT Synergy Engineering
WMO

Temporary Mooring System for 30,000 Pertamina Hulu Energy


11 Marine Indonesia 2012 PT Synergy Engineering
DWT Tanker WMO

Submarine Pipeline Project - GSPC / Deen Gujerat State Pipeline, SPM & PT Sempec (Punj Lloyd
12 India 2012
Dayal West / Pipelines India Petroleum Corporation Marine Group)

Premier PT Indonesian Services


13 AGX Platform Deck Extension Structure Indonesia 2011
Oil Natuna Sea Bv Bureau

Subsea Pipeline And Onshore Receiving PT Indonesian Services


14 PT Nusantara Regas Pipeline Indonesia 2011
Facility (P/L & ORF) - West Java Bureau

PT Indonesian Services
15 Kakap Block Platform Modifications Star Energy Structure Indonesia 2010
Bureau

KJO-Relocation Of Ex-Loading Dock Al-Khafji Joint


16 Pipeline Saudi Arabia 2009 -
Pipelines Operations

Oil Natural Gas Pipeline, Marine &


17 Heera Redevelopment Project (Phase I) India 2009 Punj Lloyd Ltd
Corporation (ONGC) Structure

18 DLB Enterprise III Fixed Stinger Design TL Offshore Sdn Bhd Marine & Structure Malaysia 2009 -

19 DLB Hamizaku Floating Stinger Design OME Synergy Sdn Bhd Marine & Structure Malaysia 2009 -

20 DLB Kuber Stinger Design Punj Lloyd Ltd Marine & Structure India 2009 -

Development Of Floating LPG Storage PT Bukaka Teknik PT Indonesian Services


21 Marine & Structure Indonesia 2009
Facilities Utama Bureau
Camar Resources
Design / Analysis Of FSP-SPM Mooring PT Indonesian Services
22 Canada Inc Oil Marine & Structure Indonesia 2009
System Bureau
and Gas
PT Indonesian Services
23 Pageruan Utara Development Project Kangean Energy Marine Indonesia 2009
Bureau
ZEE ENGINEERING LIST OF PROJECTS

Transportation & Installation Engineering

No. Project Name Client / Company Discipline Project Location Year Partner / Contractor

Jacket Dynamic Lift Analysis – Hejre Heerema Marine Contractors


1 DONG Energy Marine Denmark 2014
Development Project Nederland SE

Riser Support System Arc Dynamic Lift McDermott Australia Heerema Marine Contractors
2 Marine Australia 2013
Analysis – Ichthys Development Project Pty Ltd Nederland SE

Mid Depth Buoy Installation Analysis – McDermott Australia Heerema Marine Contractors
3 Marine Australia 2013
Ichthys Development Project Pty Ltd Nederland SE

Riser Support System Tower Launch McDermott Australia Heerema Marine Contractors
4 Marine Australia 2013
Analysis – Ichthys Development Project Pty Ltd Nederland SE
Riser Support System Tower
McDermott Australia Heerema Marine Contractors
5 Transportation Analysis – Ichthys Marine Australia 2013
Pty Ltd Nederland SE
Development Project
SSCV Thialf Mooring Analysis – DolWin North Sea, Heerema Marine Contractors
6 ABB Marine 2013
Alpha Project Norway Nederland SE

SSCV Hermod Mooring Analysis – ALBA ConocoPhillips North Sea, Heerema Marine Contractors
7 Marine 2013
Topside Removal Project Skandinavia AS Norway Nederland SE

Balder Manifold Installation Analysis – Anadarko Petroleum Heerema Marine Contractors


8 Marine Mexico 2013
LUCIUS Subsea Project Corporation Nederland SE

Union Manta SUP Piles Installation Anadarko Petroleum Heerema Marine Contractors
9 Marine Mexico 2013
Analysis – LUCIUS Subsea Project Corporation Nederland SE

Alpha Forties Satellite Platform Topside Heerema Marine Contractors


10 Apache North Sea Ltd Marine United Kingdom 2013
Installation Analysis - Lift Analysis Nederland SE

IVRR Subsea Manifold Removal Analysis Heerema Marine Contractors


11 Hess Limited Marine United Kingdom 2013
(Lift Analysis) Nederland SE
SSCV Hermod Mooring Analysis –
Heerema Marine Contractors
12 Martin Linge Platform Installation Total E&P Norge AS Marine Norway 2013
Nederland SE
Project
Jacket and Piles Transport Analysis – Trinidad and Heerema Marine Contractors
13 BP Trinidad and Tobago Marine 2013
Juniper Project Tobago Nederland SE

British Gas Exploration Pipeline, SBM, Marine


14 Panna Field Development Project India 2013 Punj Lloyd Ltd
& Production (India) Ltd & Structure

Sealine Project – Crude Oil Export Pipeline, SPM, Marine


15 Iraq South Oil Company Iraq 2013 Leighton Offshore Pvt Ltd
Facilities Reconstruction Project & Structure

Pipeline, Marine &


16 Shell Bukom Project (Phase I) Shell Singapore 2013 Leighton Offshore Pvt Ltd
Structure

17 Filanovski Field Development Project Lukoil Russia Pipeline & Marine Russia 2013 Bumi Armada Berhad

Pipeline, SPM, Marine


18 Tanzania SPM Replacement Project Tanzania Port Authority Tanzania 2012 Leighton Offshore Pvt Ltd
& Structure

Submarine Pipeline Project - GSPC / Gujerat State Pipeline, SPM & PT Sempec (Punj Lloyd
19 India 2012
Deen Dayal West / Pipelines India Petroleum Corporation Marine Group)
Transportation, Grillage & Seafastening
Woodside Petroleum, Heerema Marine Contractors
20 Engineering - North Ranking Marine & Structure Western Australia 2011
BHP, Chevron & SHELL Nederland SE
Redevelopment Project
Malaysia Water
21 Labuan Water Pipeline Project Pipeline Malaysia 2011 Leighton Offshore Pvt Ltd
Ministry
ZEE ENGINEERING LIST OF PROJECTS

Transportation & Installation Engineering

No. Project Name Client / Company Discipline Project Location Year Partner / Contractor

Pipeline From BPCR / HPCR, Mumbai To Indian Oil Corporation PT Sempec (Punj Lloyd
22 Pipeline India 2011
BPCL, Uran Project Ltd (IOCL) Group)
Jacket and Topside Transportation,
Kebabangan Petroleum
23 Grillage & Seafastening Engineering - Marine & Structure Malaysia 2011 Aker Solutions (Malaysia)
Operating Company
KBB KE Project
Oyong Development - Oyong Floating PT Indonesian Services
24 Santos Energy Marine & Structure Indonesia 2011
Production Unit Bureau

PT Dwisatu Mustika PT Indonesian Services


25 KLO Pipeline Installation Pipeline Indonesia 2010
Bumi Bureau

PT Indonesian Services
26 PTT Riser Platform, Thailand PTT Public Company Ltd Pipeline & Structure Indonesia 2010
Bureau

Colombo Port Expansion Project, Sri Colombo South Hyundai & Engineering
27 Pipeline Sri Lanka 2009
Lanka Harbour Construction Co Ltd

Muthurajawala SBM And Second Ceylon Petroleum


28 Pipeline & Marine Sri Lanka 2009 Leighton Offshore Pvt Ltd
Offshore Pipeline Project Storage Terminals Ltd

Zelan Saudi Arabia Co


29 Shuqaiq 2-Fuel Import Pipeline Project Pipeline & Marine Saudi Arabia 2009 Leighton Offshore Pvt Ltd
Ltd

Oil Natural Gas Pipeline, Marine &


30 Heera Redevelopment Project (Phase I) India 2009 Punj Lloyd Ltd
Corporation (ONGC) Structure

Enhancement And Refurbishment Of


31 Labroy Singapore Ltd Marine & Structure Indonesia 2009 -
FPSO Seagood 1

BEDB SPM System, PLEM And Pipeline Pipeline, Marine &


32 Brunei Shell Brunei 2009 Leighton Offshore Pvt Ltd
Installation Structure