All Metal Deck Panels Are ASSENT'S 45-150, THICKNESS 1 MM: B9 B10 B11 B12 B13 B14 B15 B16 B17 B18 B19 B20 B21 B22 B23

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

ARCHITECT & ENGINEER OF RECORD

B9 B10 B11 B12 B13 B14 B15 B16 B17 B18 B19 B20 B21 B22 B23
8400 8400 8400 8400 8400 8400 8400 8400 8400 8400 8400 8400 8400 8400

Sim
M112
5650 4850 750 2100 400 2300 585 4800 515 2600
S-39-ZZ-032
ALL METAL DECK PANELS ARE LEAD CONSULTANT

M2CA16

M2CA4

M2CA4
TH=300 ASSENT'S
TH=330 45-150, THICKNESS = 1 mm
M2B79 M2B79 M2B79
45
TH=330 MATCH LINE FOR CONTINUATION DESIGN CONSULTANT
REFER DWG NO. S-22-02-003

MATCH LINE FOR CONTINUATION


+12.150 m
M2B68

M2B24

M2B24

8500
REFER DWG NO. S-22-02-008
265mm HOLLOW CORE
+ 65mm TOPPING MASTER PLANNING & INFRASTRUCTURE CONSULTANT
+10.390

44
SUBCONSULTANT
M2B68

2BB11

2BB11

8500
KEY PLAN

P01 P02 P03 P04


43

+12.150 m P05 P06 P07 P08


M2B68

2BB11

2BB11

8500
+12.150 m 265mm HOLLOW CORE
+ 65mm TOPPING
TH=300 TH=330 P09 P10 P11 P12

VIDA HOTEL AND SERVICED APARTMENTS


M2B21 M2B21 M2B21

M2B21 M2B21 M2B21 M2B21 M2B21


42 P13 P14 P15 P16
M2B23 Sim
TH=300
M3
MATCH LINE FOR CONTINUATION

3480
+12.150 m
M2B44
2BB11

S-39-ZZ-020
REFER DWG NO. S-22-02-006

M2B25*
TH=300

M2B25*

M2B25*

M2B25*
2BB14*

2BB14*

2BB14*

2BB14*
M2B68

2BB11

8500
1920
M2B44 M2B41

M2B41
1850 4750 1800 Qibla
TH=200
41 NOTES
Sim Sim
M1 M1

M2B41
+12.150 m +12.150 m 1. FOR GENERAL NOTES AND TYPICAL DETAILS REFER DRAWING NO.
+12.150 TH=300 1800342-MAL-PC-ZZ-S-00-ZZ-011 TO 1800342-MAL-PC-ZZ-S-00-ZZ-020

M2B24
S-39-ZZ-020
265mm HOLLOW CORE 265mm HOLLOW CORE +12.150 m S-39-ZZ-020 +12.150 m 2. SOLID PART ADJACENT TO PRECAST SLABS ARE 330mm (265 HOLLOW CORE + 65
+ 65mm TOPPING + 65mm TOPPING

2BB15*

2BB15*

2BB15*

2BB15*

2BB15*
M2B68

M2B24

M2B24
TOPPING) THICK CAST-IN-SITU SLABS U.N.O
2BB11

2BB11

8500
3. ALL BEAMS MARKED THUS ( * ) ARE SIMILAR BUT HANDED U.N.O
Sim Sim
M132 M2B23 265mm HOLLOW CORE
+ 65mm TOPPING
265mm HOLLOW CORE
+ 65mm TOPPING
M132 4. THE CONTRACTOR SHALL COORDINATE SIZE & LOCATION OF ALL THE OPENINGS
IN SLAB & WALLS REQUIRED FOR SERVICES WITH ARCHITECTURAL & SERVICES
DRAWINGS. OPENINGS IN SLABS FOR ESCALATORS SHALL BE CO-ORDINATED WITH
S-39-ZZ-033 TH=330 S-39-ZZ-033 THE SUPPLIER. THE CONTRACTOR SHALL PREPARE ENGINEERED SHOP DRAWINGS
M2B41 M2B23
FOR ALL THE OPENINGS AND SUBMIT IT TO THE ENGINEER FOR REVIEW & APPROVAL
M2B38* BEFORE CASTING.
40 5. THE CONTRACTOR SHALL COORDINATE WITH OTHER BID PACKAGES AND SUBMIT
CO-ORDINATED SHOP DRAWINGS FOR THE LOCATIONS & SIZE OF ANCHORS / INSERT
+12.150 m PLATES FOR THE FACADE SYSTEM, GLAZING, SKYLIGHTS & ETFE ROOF TO THE

M2B37*
M2B72*

M2B37*

M2B37*

M2B37*

M2B37*

M2B37*

M2B37*

M2B37*

M2B37*

M2B37*

M2B37*
M2B45

ENGINEER FOR REVIEW & APPROVAL BEFORE CASTING OF THE CONCRETE.

5800
TH=300 6. ALL THE BEAMS SUPPORTING PLANTED COCNRETE WALLS AND COLUMNS SHALL
BE KEPT PROPPED WITHOUT ANY DISTRUBANCE UNTIL THESE WALLS/COLUMNS
1000 DEEP BEAM

(TYP)

400 THICK LEDGE AT +11.55


2500

ARE CAST AND HAVE ATTAINED THE REQUIRED STRENGTH.


M2B57 M2B42 B141-04
B502-03
400

M2B42 7. ALL CAST-IN-SITU BEAMS AND SLABS SHALL BE PRECAMBERD SPAN/240 AT MID
39.1 SPAN AND ALL CANTILEVER SLABS AND BEAMS SHALL BE PRECAMBERED LENGTH/120

400
400

400
AT END.

1000
200 1470 1470 1470

(TYP)
2500

2700
HE240A 8. ALL OPENINGS FOR SERVICES IN THE PRECAST SHALL BE COORDINATED AND PROVIDED
M2CA5

M2CA5
HE300A
M2CA5

M2CA5

M2CA5

M2CA5

M2CA5

M2CA5

M2CA5

M2CA5
400 THICK LEDGE AT +11.55 BY THE PRECAST MANUFACTURE BEFORE FABRICATION OF THE PRECAST PANELS.

M2CA5
HE240A Remove this beam 39

3975
Sim Sim

7500
300 THICK LEDGE AT+11.75
M123 M123HE300A
1450

HE240A TH=330 TH=330 TH=330 TH=330 TH=330 TH=330 TH=330 TH=330 TH=330 TH=330
S-39-ZZ-033 300 S-39-ZZ-033

HE300A

HE300A
1950 1950 1950 1950 1950 300 150 Thick Conc. Metal Deck

2525
Sim Sim

8500
Sim 560
M112 M112 HE300A M112

BU1000x12/300x20
B/U1000x400x12x30

200
6050

6050
5900

150 THICK CONC. METAL DECK


S-39-ZZ-032 S-39-ZZ-032

HE800A

HE800A

HE800A
HE800A
S-39-ZZ-032 HE300A

HE300A
HE800A

HE800A

HE800A

HE800A

HE800A

3250

3650

3650
Sim Sim Sim Sim
Sim
M112 M112 HE300A
M132 M112 38 1 16.02.2019 STAGE 2 ISSUED FOR CONSTRUCTION
200

M132 1650 800 2265 2265 2265 800 1255 0 23.10.2018 STAGE 1.B-LOD 200 ISSUED FOR CONTRACT
HE300A

HE300A
S-39-ZZ-032 S-39-ZZ-032 S-39-ZZ-032
3350

3350
S-39-ZZ-033

2775
S-39-ZZ-033 NO DATE DESCRIPTION
300
200

HE240A
ISSUES & REVISIONS
HE300A
1540
1600

300 THICK LEDGE AT+11.75 TH=330 TH=330 TH=330 TH=330 TH=330 TH=330 TH=330 TH=330

8500
TH=330
HE240A

M2CA5
3975 CLIENT

M2CA5
M2CA5

M2CA5
M2CA5

M2CA5

M2CA5

M2CA5

M2CA5

M2CA5
M2CA5
1600

HE240A Remove this beam


400 THICK LEDGE AT+11.55 HE300A
1000 DEEP BEAM

(TYP)
2500
1600

1000
400

400

M2B42
400

400

B502-04
37
M2B58 M2B42 B141-05
(TYP)
2500

400 THICK LEDGE AT +11.55

M2B37
M2B45

M2B37

M2B37

M2B37

M2B37

M2B37

M2B37

M2B37

M2B37

M2B37

M2B37
M2B25*

8500
TH=300 +12.150 m +12.150 m
PROJECT TITLE
TH=330
MARASSI AL BAHRAIN - PLOT 1
C:\Users\nadeem.darekhan\Documents\1800342-MAL-PC-ZZ-S-ZZ9-ZZ-01_nadeem.darekhan.rvt

M2B26* MARASSI GALLERIA


36
+12.150 m Sim
M1
265mm HOLLOW CORE S-39-ZZ-020
M2B24

M2B24

+ 65mm TOPPING
2BB11

2BB11

2BB11

2BB11

2BB11

2BB11

2BB11

2BB11

2BB11

2BB11
PROJECT NUMBER STAGE

8500
TH=300 1800342-MAL-PC-ZZ 2
M2B26*

PROJECT MANAGER DIVISION HEAD


AS Adel Tawab
M2B26* M2B21 M2B21 CHECKED APPROVED
+12.150 m
35 YS/CA AT
2810

Sim TH=200 180 7600 0 DRAWN JOB CAPTAIN


TH=330
M1 M2B28 (TYP)
MA YS
M2B18

S-39-ZZ-020 DATE SCALE


M2B25*

TH=300
M2B24

M2B24

M2B24

M2B24

M2B24
2120
2BB11

2BB11

2BB11

2BB11

2BB11

2BB11

2BB11

2BB11

8500
M2B28 24.07.2018 1 : 200@A1
SHEET TITLE
500 7400 500
TH=200 MATCH LINE FOR CONTINUATION
LEVEL 02
M2B60 M2B21 REFER DWG NO. S-22-02-011
M2B13 M2B13 RETAIL 1 CARPARK 2 FRAMING PLAN
34
2/16/2019 7:39:40 PM

PART 7
TH=330

DRAWING NUMBER REVISION NUMBER

S-22-02-007 1

Page 52
ARCHITECT & ENGINEER OF RECORD

B9 B10 B11 B12 B13 B14 B15 B16 B17 B18 B19 B20 B21 B22 B23

M2B18
8400 8400 8400 8400 8400 8400 8400 8400 8400 8400 8400 8400 8400 8400

M2B25*
M2B24

M2B24

M2B24

M2B24

M2B24
2BB11

2BB11

2BB11

2BB11

2BB11

2BB11

2BB11

2BB11
M2B28
500 7400 500
TH=200 MATCH LINE FOR CONTINUATION LEAD CONSULTANT
M2B60
M2B13 M2B13
M2B21 REFER DWG NO. S-22-02-007
34
TH=330
DESIGN CONSULTANT
M2B61

TH=300

2BB14*
M2B24

2BB11
2BB11

2BB11
2BB11

2BB11

2BB11

2BB11

2BB11

2BB11

2BB15

2BB11

2BB11

2BB11

8500
MASTER PLANNING & INFRASTRUCTURE CONSULTANT
M2B64
33
Sim
2 M40 SUBCONSULTANT

M2B24
M2B24

2BB11

2BB16

2BB11
2BB11

2BB11

2BB11

2BB11

2BB11

2BB11

2BB14

2BB14

2BB11

2BB11
S-39-ZZ-025

8500
TH=300 +12.150 m +12.150 m

600
MPC18
265mm HOLLOW CORE 265mm HOLLOW CORE 265mm HOLLOW CORE 265mm HOLLOW CORE 265mm HOLLOW CORE 300 300
+ 65mm TOPPING + 65mm TOPPING + 65mm TOPPING + 65mm TOPPING + 65mm TOPPING

3810
KEY PLAN
M2B64
M2B21 M2B21
32 P01 P02 P03 P04

2BB13
Sim
M1 M2B18

S-39-ZZ-020

2BB11
P05 P06 P07 P08

2BB14
M2B24

M2B24
2BB11

2BB11
2BB11

2BB11

2BB11

2BB11

2BB11

2BB11

2BB11

8500
TH=300 TH=200

(TYP)
1200
P09 P10 P11 P12
M2B64
M2B13
M2B13 M2B13 31
TH=330 TH=330
P13 P14 P15 P16
+12.150 m M2B28
265mm HOLLOW CORE

2BB14*
M2B24

M2B24

2BB14*
+ 65mm TOPPING
M2B24

M2B24
M2B24
2BB11

2BB11

2BB11

2BB11

2BB11

M2B24
M2B24

2300

8500
2750 300

N
TH=300 M2B28
+12.150 m +12.150 m

M2B41
TH=300 TH=300

3300
TH=330

Q
i
b
l
a
M2B64
30

M2B18

TH=330
NOTES
Sim

MATCH LINE FOR CONTINUATION


M40
Sim
M3 1. FOR GENERAL NOTES AND TYPICAL DETAILS REFER DRAWING NO.
1800342-MAL-PC-ZZ-S-00-ZZ-011 TO 1800342-MAL-PC-ZZ-S-00-ZZ-020

REFER DWG NO. S-22-02-012


M2B24
M2B23

2BB15*

2BB15*
M2B24

M2B24
M2B24
2BB15

2BB15

2BB11

2BB11

2BB11

2BB11

2BB11

2BB11
S-39-ZZ-020

8500
2. SOLID PART ADJACENT TO PRECAST SLABS ARE 330mm (265 HOLLOW CORE + 65
TH=300 S-39-ZZ-025 TOPPING) THICK CAST-IN-SITU SLABS U.N.O
+12.150 m 3. ALL BEAMS MARKED THUS ( * ) ARE SIMILAR BUT HANDED U.N.O
265mm HOLLOW CORE 4. THE CONTRACTOR SHALL COORDINATE SIZE & LOCATION OF ALL THE OPENINGS
+ 65mm TOPPING IN SLAB & WALLS REQUIRED FOR SERVICES WITH ARCHITECTURAL & SERVICES
M2B64 Sim M2B21 M2B21 Sim DRAWINGS. OPENINGS IN SLABS FOR ESCALATORS SHALL BE CO-ORDINATED WITH
M132 M132 29 THE SUPPLIER. THE CONTRACTOR SHALL PREPARE ENGINEERED SHOP DRAWINGS
FOR ALL THE OPENINGS AND SUBMIT IT TO THE ENGINEER FOR REVIEW & APPROVAL
S-39-ZZ-033 TH=330 300 S-39-ZZ-033 BEFORE CASTING.
M2B82

2600 4950 400


5. THE CONTRACTOR SHALL COORDINATE WITH OTHER BID PACKAGES AND SUBMIT
CO-ORDINATED SHOP DRAWINGS FOR THE LOCATIONS & SIZE OF ANCHORS / INSERT

600
PLATES FOR THE FACADE SYSTEM, GLAZING, SKYLIGHTS & ETFE ROOF TO THE
Sim

M2B37*
TH=150
M32
M2B37*

M2B37*

ENGINEER FOR REVIEW & APPROVAL BEFORE CASTING OF THE CONCRETE.

M2B37*

M2B37*

M2B37*

M2B37*

M2B37*
M2B37*

M2B37*

M2B37*

M2B37*
2BB15*

M2B37*
M2B24

TH=300

8500
M2B82 6. ALL THE BEAMS SUPPORTING PLANTED COCNRETE WALLS AND COLUMNS SHALL
BE KEPT PROPPED WITHOUT ANY DISTRUBANCE UNTIL THESE WALLS/COLUMNS
S-39-ZZ-024

600
ARE CAST AND HAVE ATTAINED THE REQUIRED STRENGTH.
7. ALL CAST-IN-SITU BEAMS AND SLABS SHALL BE PRECAMBERD SPAN/240 AT MID
TH=330

590
400 THICK LEDGE AT +11.55 400 THICK LEDGE AT +11.55
1000 DEEP BEAM

1000 DEEP BEAM

1000 DEEP BEAM


SPAN AND ALL CANTILEVER SLABS AND BEAMS SHALL BE PRECAMBERED LENGTH/120
(TYP)

(TYP)

(TYP)
2500

2500

2500
M2B64 B141-04 Sim B141-04
M2B42 AT END.
M2B42 M39
B502-03 TH=330
600

28 8. ALL OPENINGS FOR SERVICES IN THE PRECAST SHALL BE COORDINATED AND PROVIDED

400

1450 1450 1450 600


500
600

BY THE PRECAST MANUFACTURE BEFORE FABRICATION OF THE PRECAST PANELS.

1000
1000

S-39-ZZ-025
(TYP)

(TYP)

(TYP)
2500

2500

2500
3650

HE300A HE300A

M2CA5
HE300A
2BB12*

M2CA5

M2CA5

M2CA5

M2CA5

M2CA5
M2CA5

M2CA5

M2CA5
M2CA5

M2CA5

M2CA5
M2B26

M2CA5
4630

HE300A

3975
3955

Remove this beam Remove this beam

8500
580 1580

HE300A TH=330 TH=330 TH=330 TH=330 TH=330 TH=330 TH=330 TH=330 TH=330 TH=330 TH=330 TH=330
HE300A HE300A
580

HE300A

HE300A
560
HE300A

HE300A

2775

2375
860

B/U1000x300x12x20
1120
3350

3350
M132
2940

560 Sim 500 650 Sim


Sim HE300A
M112
SLAB EDGE SHALL BE FULLY COORDINATED
WITH RELEVANT ARCH. DRAWINGS (TYP)
HE300A M112 M112

550
S-39-ZZ-033 27

HE800A
HE800A

HE800A

HE800A
S-39-ZZ-032 S-39-ZZ-032

HE300A
2 27.02.2019 REVISED AS CLOUDED, ISSUED FOR CONSTRUCTION

HE300A
HE300A
HE800A

HE800A

HE800A

HE800A

HE300A

S-39-ZZ-032

3960
8820

2940
8390

3010
1 16.02.2019 STAGE 2 ISSUED FOR CONSTRUCTION
Sim Sim Sim Sim Sim Sim 0 23.10.2018 STAGE 1.B-LOD 200 ISSUED FOR CONTRACT
M132 M112 M112 M132
500
HE300A
650
M132 M112
6050

6050
NO DATE DESCRIPTION
HE300A
HE300A

HE300A

1600 800 2265 2265 2265 800 1600

HE300A

HE300A
S-39-ZZ-032 800 2265 2265 2265 800755 S-39-ZZ-032 S-39-ZZ-032

8500
2940

S-39-ZZ-033 S-39-ZZ-033 S-39-ZZ-033 ISSUES & REVISIONS

3015

2615
275 325 540 515
HE300A HE300A
300

HE300A TH=330 TH=330 CLIENT


1140

TH=330 TH=330 TH=330 TH=330 TH=330 TH=330 TH=330 TH=330 TH=330

1555
M2CA5

HE300A Remove this beam Remove this beam


4025

3975
M2CA5

M2CA5
M2CA5

M2CA5

M2B25
M2CA5
M2CA5

M2CA5

M2CA5

M2CA5

2BB12

2BB12
M2CA5
5100

M2CA5
26

1555
HE300A
4060

HE300A B502-04 HE300A

2700
1000 DEEP BEAM

1000 DEEP BEAM


(TYP)

(TYP)

(TYP)
2500

2500

2500

1555
1000

1000
M2B72 M2B82 300 M2B42
25.1
400

400
5000

850

M2B42
(TYP)

(TYP)

(TYP)
2500

2500

2500
400 THICK LEDGE AT +11.55 TH=150 400 THICK LEDGE AT +11.55
2740
M2B37
MATCH LINE FOR CONTINUATION

B141-05 B141-05
M2B37

M2B37

M2B37

M2B37

M2B37

2BB11

2BB11

2BB11
M2B37
M2B37

M2B37

M2B37

M2B82
M2B37

+12.150 m

5800
M2B37
1200
REFER DWG NO. S-22-02-010

265mm HOLLOW CORE PROJECT TITLE


+ 65mm TOPPING
MARASSI AL BAHRAIN - PLOT 1
25
MARASSI GALLERIA
+12.150 m
C:\Users\retheesh.kumar\Documents\1800342-MAL-PC-ZZ-S-ZZ9-ZZ-01_retheesh.kumar.rvt

+12.150 m +12.150 m
265mm HOLLOW CORE 265mm HOLLOW CORE
+ 65mm TOPPING + 65mm TOPPING
2BB11

2BB11

2BB11

2BB11
2BB11

2BB11

2BB11

2BB11

2BB11

2BB11

2BB11

2BB11

2BB11
265mm HOLLOW CORE 265mm HOLLOW CORE

2BB12*

2BB11

8500
+ 65mm TOPPING + 65mm TOPPING
PROJECT NUMBER STAGE
+12.150 m 1800342-MAL-PC-ZZ 2
265mm HOLLOW CORE PROJECT MANAGER DIVISION HEAD
M2B31 M2B32
+ 65mm TOPPING AS Adel Tawab
24 CHECKED APPROVED
Sim
YS/CA AT
M1 600 2000
NOTCHING IN BEAM
DRAWN JOB CAPTAIN
WIDTH=200mm AND
S-39-ZZ-020 DEPTH=90mm MA YS

M2B24
2BB11

2BB11

2BB11

2BB14

2BB14

2BB14

2BB11

2BB11

2BB11

2BB11

2BB11

2BB11

M2B14
Sim

M2B25
TH=300

8500
M28 DATE SCALE
24.07.2018 1 : 200@A1
S-39-ZZ-024
SHEET TITLE
M2B11* M2B12 M2B11 M2B11* M2B10
LEVEL 02
23
+12.150 m M2B11 MATCH LINE FOR CONTINUATION (RETAIL 1 CARPARK 2) FRAMING PLAN
+12.150 m
+12.150 m
PART 11
?

M2B6*
REFER DWG NO. S-22-02-015
2/27/2019 5:23:44 PM

M2B18 M2B73 TH=300


TH=250 TH=300
?

DRAWING NUMBER REVISION NUMBER

S-22-02-011 2

Page 53
Job No. :- 1907 Rev. No :- -00-

Client :- DIYAR Calc. By :- 10156


Project :- MARASSI AL BAHRAIN Checked By :- 10263
AL SHAFAR STEEL Struct. Description :- GALLERIA MALL Approved By:- 10272
ENGINEERING
Conn. Location :- AS PER KEY PLAN Date :- 02-JUNE-2019

B141-05
HEA800
50

SLOT DETAIL

1000
STIFF. PL. 10mm
TYP. STIFF. PL. 10mm
6 TYP.
6
6 HEA800
6

25
STAINLESS STEEL PL. 3mm >400
WELDED TO BEAM A 75 150 75 A
PL. 300X30MM
Grout-25mm
PTFE SHEET
(By others)
BY SPECIALIST

PL. 300X5MM
200
400

25

400
50
200
50

SLOTS ARE IN BEAM FLG.


SEC (A-A)
AND STAINLESS STEEL PL.

NOTES:

- ANCHORS ARE M24 ASTM F1554 GR55.


- WELD SIZE IS AS PER WELD TABLE U.N.O.
- CONCRETE GRADE IS C40/50
- IT IS THE MAIN CONTRACTOR'S RESPONSIBILITY TO CHECK THE RCC ELEMENTS LOCALLY AND GLOBALLY
BASED ON THE GIVEN JOINT REACTIONS IN SHOP DRAWINGS.
Page 62
Reactions of Connections B141-05

TABLE: Beam Forces


Story Beam Unique Name Load Case/Combo Station P V2 V3 T M2 M3
m kN kN kN kN-m kN-m kN-m
Story1 B497 646 122: 1.2D-1.2T+1.6L+0.5Lr 0 0.0 -611.3 0.0 4.6 0.0 0.0
Story1 B497 646 121: 1.2D+1.2T+1.6L+0.5Lr 0 0.0 -611.3 0.0 4.6 0.0 0.0
Story1 B52 101 121: 1.2D+1.2T+1.6L+0.5Lr 0 0.0 -325.4 14.0 0.0 0.0 0.0
Story1 B52 101 121: 1.2D+1.2T+1.6L+0.5Lr 19.275 -182.1 325.4 0.1 0.0 0.0 0.0
Story1 B52 101 122: 1.2D-1.2T+1.6L+0.5Lr 19.275 179.4 325.4 0.2 0.0 0.0 0.0
Story1 B52 101 122: 1.2D-1.2T+1.6L+0.5Lr 0 0.0 -325.4 -13.7 0.0 0.0 0.0
Story1 B497 646 122: 1.2D-1.2T+1.6L+0.5Lr 18.85 52.6 614.7 0.0 -4.6 0.0 0.0

Page 63
Job No. :- 1907 Rev. No :- -00-

Client :- DIYAR Calc. By :- 10156


Project :- MARASSI AL BAHRAIN Checked By :- 10263
AL SHAFAR STEEL Struct. Description :- GALLERIA MALL Approved By:- 10272
ENGINEERING
Conn. Location :- AS PER KEY PLAN Date :- 02-JUNE-2019

B502-04
B/U1000x300x12x20
50

SLOT DETAIL
STIFF. PL. 12mm 1000
TYP.
8
8 B/U1000x300x12x20

STIFF. PL. 12mm


25
TYP.
8

>400
8
STAINLESS STEEL PL. 3mm A A
WELDED TO BEAM 75 150 75 Grout-25mm
PTFE SHEET (By others)
BY SPECIALIST

PL. 300X5MM
PL. 300X20MM
200
>400

25

400
50
200
50

SLOTS ARE IN BEAM FLG.


SEC (A-A)
AND STAINLESS STEEL PL.

TABLE: Beam Forces


Story Beam Unique Name Load Case/Combo Station P V2 V3 T M2 M3
m kN kN kN kN-m kN-m kN-m
Story1 B500 661 122: 1.2D-1.2T+1.6L+0.5Lr 18.85 48.0 615.5 0.0 0.0 0.0 0.0
Story1 B500 661 121: 1.2D+1.2T+1.6L+0.5Lr 18.85 -48.0 615.5 0.0 0.0 0.0 0.0
Story1 B500 661 121: 1.2D+1.2T+1.6L+0.5Lr 0 0.0 -612.0 0.0 0.0 0.0 0.0

NOTES:

- ANCHORS ARE M20 ASTM F1554 GR55.


- WELD SIZE IS AS PER WELD TABLE U.N.O.
- CONCRETE GRADE IS C40/50.
- IT IS THE MAIN CONTRACTOR'S RESPONSIBILITY TO CHECK THE RCC ELEMENTS LOCALLY AND GLOBALLY