of Rates
(Earthwork in Cutting & Embankment, Bridge Work
and P.Way Works)
Engineering Department
2019
Indian Railways Unified Standard Schedule of Rates For Earthwork in
Cutting & Embankment, Bridge Work and P.Way Works - 2019
CONTENTS
1. Earth Work 1.
9. Welding Activities 9.
Chapter-1 Page 1 of 7
IR's Unified Standard Schedule of Rates 2019 Chapter-1 : Earthwork
012030 Extra for mechanical compaction of earth/blanketing material filled in Cum 47.04
embankment with contractor’s rollers of suitable capacity, type and
size to achieve specified density as per specification, testing as per IS
codes including cost of water, T&P, consumable and all labour as a
complete job. The work is to be executed as per Latest edition of
"Guidelines for Earthwork in Railway Projects" issued by RDSO,
Lucknow.
012040 Laying and spreading blanketing materials (Natural or Mechanically Cum 165.03
prepared as per GE-1 or G.E.IRS-2) over new / old embankment /
cutting in layers of 30cm in loose state to make the embankment of
designed profile as per specifications. The rate is inclusive of initial
site clearance, cutting of shrubs, removal of roots of vegetation growth
& heavy grass, surfacing & leveling to give required slope, benching, if
required on existing bank slope, dressing and finishing of bank, all
lead & lift, ascent, descent, crossing of nallahs / other obstructions,
spreading the material and final dressing of slopes and top surface as
per specified camber using contractor’s own machinery, equipment,
T&P, labour etc. as a complete job.
Note - The rate does not include supply / compaction of blanketing
material at site which shall be paid separately.
012050 Finishing blanketing material, already compacted, in accordance with 100Sqm 1176.00
specification - over embankment including sides/cutting
012060 Manufacturing and supplying approved quality blanketing materials Cum 1572.93
(moorum, stone dust, coarse sand granular material etc.) as per
RDSO specifications, properly stacked at site for measurment
MISCELLANEOUS :
013010 Dressing surface (average excavation or filling upto 15 cm) including 10 sqm 161.91
removing vegetation in all kind of soil. Payment against this item is to
be made only if it is not included in earth work item.
013020 Daghbel or lock spit 15cm deep & minimum width at top 20cm. 100 m 265.98
Payment against this item is to be made only if it is not included in
earth work item.
013030 Felling trees of girth (measured at a height of 1m above ground level)
including lead and stacking of material within 100m. Note : 1. When
stumps are grubbed up in addition, the rates shall be doubled for trees
cut and grubbed 2. Payment for grubbing shall only be made where
specially ordered. 3. Grubbing shall be ordered only where it is
essential to remove the stumps, including the roots, as per
specification. 4. Grubbing shall include removal of roots of trees and
saplings to a depth of 60cm below ground level or 30 cm below
formation level or 15 cm below sub grade level, whichever is lower.
Chapter-1 Page 2 of 7
IR's Unified Standard Schedule of Rates 2019 Chapter-1 : Earthwork
013050 Turfing / planting, including all lead & lift and watering as required until
properly rooted with. Note - Initially payment of only 40% will be made.
Balance 60% will be paid only after 3 months of maintenance period, if
the turfing is properly rooted.
013051 Turfing with sods, 10cm thick and 20cm square closely laid 100 Sqm 5097.82
013052 Turfing with planted doob grass 100 Sqm 4971.22
013053 Planting Sarkanda / sarpat or any other suitable species approved by 100 Sqm 5763.36
the engineer
013060 Providing and laying Jute Geo-Textile (JGT) in slopes of Railway
embankment in accordance with RDSO's guidelines for application of
Jute Geotextile in Railway embankments and hill slopes no.
RDSO/2007/GE:G-0008 or its subsequent versions, including
incidental earthwork and fixing arrangements
013061 With GJ - Type 1 Sqm 65.98
013062 With GJ - Type 2 Sqm 73.13
013063 With GJ - Type 3 Sqm 87.08
013070 Cleaning out silt from bed of reservoir/canals including 50m lead and Cum 157.27
lift upto 1.5m
013080 Cleaning side drains in cuttings by the side of track (Kutcha or Pucca)
including disposal of the debris, soil, muck etc. as directed by the
engineer. Note - Rates are for disposal at the end of cutting. Disposal
of debris/soil/muck beyond end of cutting to be paid for under relevant
lead item.
013081 Lead within cutting is up to 50m Cum 265.98
013082 Lead within cutting is over 50m and up to 200m - for every 50m or part Cum 73.45
thereof
013083 Lead within cutting exceeds 200m - for every 100m or part thereof Cum 73.45
013090 Earth work in filling in embankment from Railway land for repairing of Cum 167.67
cess/formation/level crossing, rain cuts etc. to make the surface to the
desired level and slope to the entire satisfaction of Engineer-in-
charge. The rate will include free lead upto 200m, all lifts, descends,
ascends, crossing of track/road/nallah etc. including breaking of clods
etc and compaction by rollers/rammers/temping rods etc.
Note - This item is only to be paid when specially ordered in writing.
013100 Extra rate for quantities of works executed.
Note - The extra percentage rate is applicable in respect of each item,
but limited to quantities of work executed in these difficult conditions.
013101 In or under water and/or liquid mud, including pumping out water as Cum 20%
required.
Note - In or under water means locations/levels where there is
continuous ingress of water.
013102 In or under foul position, including pumping out water as required. Cum 25%
Note - Foul position means filthy and unhygienic conditions where
physical movements are hampered such as soil mixed with sewage or
night-soil.
Chapter-1 Page 3 of 7
IR's Unified Standard Schedule of Rates 2019 Chapter-1 : Earthwork
013140 Supplying, driving and erecting in all types of soils hard wood pile 5m Metre 374.71
to 7m long without joint, 125mm average dia. for protection of bank
slope including two coats of coal tar paint complete, as directed
{Note - Payment will be made as per actual driven length of pile}
013150 Driving rails 90R/52 Kg section below average ground level within the Metre 392.55
slope/toe of embankment including chiseling at the end with
contractor’s own arrangment complete in all respect
{Note - Payment will be made as per actual driven length of rail which
will be supplied free by Railways}
013160 Driving 'Z' section MS sheet piles side by side in all kinds of soil Sqm 3264.98
mechanically or manually as per approved drawing with contractor’s
own arrangment complete in all respect, as directed by engineer in-
charge
{Note - Payment will be made as per actual driven length of pile}
013170 Supplying and fixing bitumen drum sheet by nalling to wooden piles Sqm 655.09
125 mm dia., supplied and driven by contractor complete with
nails/hooks to prevent earth against slippage, as per approved
drawing & as directed
013180 Supplying & providing pre-fabricated vertical drain - Techdrain TD Metre 183.84
3520U or similar, with polypropylene core and wrapped with non-
woven Geotextile with minimum 100mm width & 4mm composite
material thickness and inserting with the help of mechanical / hydraulic
rigs, in the very soft clay for draining out sub-soil water and quick
consolidation of site, excluding the cost of instrumentation, if required
Chapter-1 Page 4 of 7
IR's Unified Standard Schedule of Rates 2019 Chapter-1 : Earthwork
013200 Supplying, laying and fixing reinforced Non-woven composite of 60 Sqm 340.37
kN/m x 60 kN/m tensile strength with minimum width of 5 metre,
indigenously manufactured from needle punched Polypropylene Non-
Woven Geotextile, reinforced with high tenacity polyester yarn on the
prepared formation for seperator cum filteration cum reinforcement
application for rehablitation of existing track and construction of new
track, to have clogfree blanket designed layer for extended life. The
job includes transportation , labour, tools & plants, lead/lift etc., as
directed by Engineer in-charge
013210 Supplying, laying and fixing knitted and PVC coated polyester Biaxial Sqm 236.32
Geogrid having weight of 350 gm/sqm with tensile strength of 30 kN/m
x 30 kN/m for Base reinforcement with a minimum width of 5metres,
indigenously produced for Rail Track Bed stabilisation, below the
ballast layer for higher frictional / shear resistance by interlocking
behaviour
013220 Supplying, laying & fixing needle punched & mechanically bonded Non-
woven Geotextile of minimum 5 metre width, made from high quality
Polypropylene / Polyester Fibres, having apparant opening size of 70
microns and laying for seperator cum filteration cum drainage
application at interface of prepared sub-grade & blanketing layer
including transportation, labour, lead & lift complete as directed by
Engineer in-charge for -
013221 Geo-textile having minimum mass of 300 GSM, ultimate tensile Sqm 248.06
strength of 25 kN/m and puncture resistance of 4 kN
013222 Geo-textile having minimum mass of 200 GSM, ultimate tensile Sqm 191.96
strength of 20 kN/m and puncture resistance of 2 kN
013230 Supplying, laying & fixing needle punched & mechanically bonded Non- Sqm 430.73
woven Geotextile of minimum 5 metre width, made from high quality
Polypropylene / Polyester Fibres, having apparant opening size of 80
microns, minimum mass of 600 GSM, ultimate tensile strength of 40
kN/m and puncture resistance of 6.5 kN and laying for seperator
below ballast and above blanketing layer including transportation,
labour, lead & lift complete as directed by Engineer in-charge
Tunnelling Items :
014010 Providing, fabricating and fixing in position Permanent Structural Steel MT 83324.85
Supports, as directed including cost of all materials, machinery,
labour, cutting, bending, welding, grinding, lighting, ventilation,
drainage and all other ancillary operations etc. complete with initial
lead upto 1km and all lifts
014020 Providing, fabricating and fixing in position Temporary Structural Steel MT 85406.26
Supports, as directed and dismantling the same before concreting
including cost of all materials, machinery, labour, cutting, bending,
welding, grinding, lighting, ventilation, drainage and all other ancillary
operations etc. complete with initial lead upto 1km and all lifts alogwith
depositing released materials in designated store or as directed by
Engineer in-charge
Chapter-1 Page 5 of 7
IR's Unified Standard Schedule of Rates 2019 Chapter-1 : Earthwork
014070 Excavation for ADIT by Tunnelling methods in all types of Rock Cum 2196.16
including cost of all other materials, machinery, labour, scalling
excavated surface, ventilation, lighting, drainage, removing & hauling
excavated muck outside ADIT upto specified dump area and all other
ancillary operations etc. complete with initial lead upto 1km and all lifts
014080 Excavation for vertical / inclined shaft in all types of soft/hard Rock Cum 2760.77
including cost of all other materials, machinery, labour, scalling
excavated surface, ventilation, lighting, drainage, removing & hauling
excavated muck outside shaft upto specified dump area and all other
ancillary operations etc. complete with initial lead upto 1km and all lifts
014090 Excavation for Tunnel by tunnelling methods in Rock not requiring Cum 2327.18
supports including cost of all other materials, machinery, labour,
scalling excavated surface, removing undercuts, ventilation, lighting,
drainage, removing & hauling excavated muck outside tunnel upto
specified dump area and all other ancillary operations etc. complete
with initial lead upto 1km and all lifts
014100 Excavation for Tunnel by tunnelling methods including excavation for Cum 2506.98
supports in all types of soils / rock strata requiring supports (excluding
cost of providing supports) including cost of all other materials,
machinery, labour, scalling excavated surface, ventilation, lighting,
drainage, removing & hauling excavated muck outside tunnel upto
specified dump area and all other ancillary operations etc. complete
with initial lead upto 1km and all lifts
014110 Excavation for Tunnel by Heading and Benching tunnelling methods Cum 2658.44
including excavation for supports in all types of soils / rock strata
requiring supports (excluding cost of providing supports), including
cost of all other materials, machinery, labour, scalling excavated
surface, ventilation, lighting, drainage, removing & hauling excavated
muck outside tunnel upto specified dump area and all other ancillary
operations etc. complete with initial lead upto 1km and all lifts
Chapter-1 Page 6 of 7
IR's Unified Standard Schedule of Rates 2019 Chapter-1 : Earthwork
014150 Providing and laying in-situ vibrated M-10 grade Cement Concrete Cum 2119.97
using 40mm down size approved, clean, hard, graded aggregates
crushed from tunnel excavated muck for filling and levelling over-cuts
in bed due to geological faults etc. including cost of all materials,
machinery, labour, cleaning bed, batching, mixing, conveying and
laying, levelling, compacting, finishing, curing, lighting, ventilation,
drainage etc. complete with initial lead upto 1km and all lifts.
{ Cement Qty. (in qtl.)- 1.75}
014160 Providing and laying in-situ vibrated M-20 grade CC using 40mm Cum 2484.56
down size approved, clean, hard, graded aggregates crushed from
tunnel excavated muck for kerb and bed lining, including cost of all
materials, machinery, labour, formwork, batching, mixing, conveying
upto placing point in agitator cars, placing in position, levelling,
vibrating, finishing, curing, lighting, ventilation, drainage etc. complete
with initial lead upto 1km and all lifts { Cement Qty. (in qtl.)- 1.75}
014170 Drilling 32mm dia. Grout Holes in concrete / rock by percussion Metre 142.31
drilling, using jack hammer or stopper drills, as directed to specified
depth for consolidation / contact grouting including cost of all
materials, machinery, labour, cleaning holes, ventilation, lighting,
drainage and all other ancillary operations etc. complete
014180 Drilling 75mm dia. vertical or inclined Holes in Rock / Concrete in Metre 278.82
tunnel by percussion drilling, using waggon drill or other suitable
drilling equipments, including cost of all materials, machinery, labour,
ventilation, lighting, drainage etc. complete
Chapter-1 Page 7 of 7
IR's Unified Standard Schedule Of Rates - P.Way : 2019 Chapter-2 : Bridge Related Activities
Chapter-2 1 of 14
IR's Unified Standard Schedule Of Rates - P.Way : 2019 Chapter-2 : Bridge Related Activities
Chapter-2 2 of 14
IR's Unified Standard Schedule Of Rates - P.Way : 2019 Chapter-2 : Bridge Related Activities
Chapter-2 3 of 14
IR's Unified Standard Schedule Of Rates - P.Way : 2019 Chapter-2 : Bridge Related Activities
Chapter-2 4 of 14
IR's Unified Standard Schedule Of Rates - P.Way : 2019 Chapter-2 : Bridge Related Activities
Chapter-2 5 of 14
IR's Unified Standard Schedule Of Rates - P.Way : 2019 Chapter-2 : Bridge Related Activities
Chapter-2 6 of 14
IR's Unified Standard Schedule Of Rates - P.Way : 2019 Chapter-2 : Bridge Related Activities
022120 Pulse Echo Test (PET) for integrity testing of Each 2636.61
piles with contractor’s men, materials and
machines. The rate includes cost of
Inspection of site, preparation of pile head and
any other unforeseen cost required for the
test, submission of reports in triplicate as per
satisfaction of the Engineer in Charge at site.
022130 Supplying, spreading and compacting well Cum 1156.46
graded hard stone of 63mm average size
(maximum upto 80mm size) in the bottom of
foundation of box culverts, bridges etc.
including all lead, lift, ascent, descent etc.
complete job as per directions of Engineer In-
charge
WELL FOUNDATION
023010 Earth work in OPEN excavation in foundation Cum 422.73
of bridges, for placing of well curbs of all
shapes and designs in all kinds of soil
including taking out the excavated soil,
levelling, ramming of bottom of excavation
and trimming of sides, returning the soil in
layers, consolidation, disposal of surplus soil
within a lead of 300m, including all lift,
dewatering, shoring and strutting complete as
per technical specification and as directed by
Engineer in charge. (compaction of surplus
soil when led to the bank will be paid as per
relevant item separately)
023011 Extra to item for Earthwork in excavation over Cum 279.68
item no. 023010, if the excavation is carried
out in Rock not requiring blasting
023012 Extra for Earthwork in excavation over item Cum 521.99
023010, if excavation is carried out requiring
controlled blasting or chieselling where
required and permitted by the engineer in
charge
Chapter-2 7 of 14
IR's Unified Standard Schedule Of Rates - P.Way : 2019 Chapter-2 : Bridge Related Activities
Chapter-2 8 of 14
IR's Unified Standard Schedule Of Rates - P.Way : 2019 Chapter-2 : Bridge Related Activities
Chapter-2 9 of 14
IR's Unified Standard Schedule Of Rates - P.Way : 2019 Chapter-2 : Bridge Related Activities
Chapter-2 10 of 14
IR's Unified Standard Schedule Of Rates - P.Way : 2019 Chapter-2 : Bridge Related Activities
Chapter-2 11 of 14
IR's Unified Standard Schedule Of Rates - P.Way : 2019 Chapter-2 : Bridge Related Activities
024032 (b) Extra to Item no. 024031 for additional Each Track 19975.48
surcharge of every one metre or part thereof
024040 Launching of precast RCC Box of any Each Track 359080.63
thickness and height, having linear water- way
upto 3.0 metre for single track, consisting of
precast units of 1.0 to 4.0 metres length in
stages as per approved drawing, depending
upon requirement at site to correct alignment
including shifting of precast RCC Box units
from casting location to bridge site with all
leads before launching, with contractor’s 100
MT capacity road cranes (2 working + 1
spare) and one road trailer of 20 MT carrying
capacity including dismantling, laying and
packing of track after launching of Box and till
allowing the first train to move at non-stop 20
kmph speed. Work shall be carried out with all
contractor's men, materials, crane, tools, lead
& lift etc. including bringing these to site of
work, making approach road to bridge &
crossing of tracks wherever necessary,
complete and as directed by Engineer in-
charge
Chapter-2 12 of 14
IR's Unified Standard Schedule Of Rates - P.Way : 2019 Chapter-2 : Bridge Related Activities
025033 Extra for additional height over item no. sqm/m 84.44
025031 & 025032 wherever required with
adequate bracing, propping etc. over initial
height of 5 metres for every additional height
of 1 metre or part thereof
Chapter-2 13 of 14
IR's Unified Standard Schedule Of Rates - P.Way : 2019 Chapter-2 : Bridge Related Activities
Chapter-2 14 of 14
IR's Unified Standard Schedule of Rates 2019 Chapter-3: Bridge Works- Super Structure:RCC
031011 With Soffit level upto 9m above Bed level Cum 3944.63 4.30 or as
per appd.
Design mix.
031012 With Soffit level From 9m above Bed Level to12m Cum 5192.16 4.30 or as
above Bed Level per appd.
Design mix.
031013 With Soffit level From 12m above Bed Level to 15m Cum 5504.04 4.30 or as
above Bed Level per appd.
Design mix.
031014 Extra over USSOR Item no. 031013 for Soffit level Cum/m 104.33
beyond 15m above Bed Level for every 1m or part
thereof
031015 Extra for increase in span by every 1m or part thereof m/Cum or 141.76 4.30 or as
for spans above 18.3m part thereof per appd.
Design mix.
031016 Deduct for casting of Slab instead of Girders (for any Cum 567.06
heights)
031020 Providing and laying in position machine mixed, Cum 3944.63 4.30 or as
machine vibrated and machine batched Design Mix per appd.
Cement Concrete M-40 grade using 20mm graded Design mix.
crushed stone aggregate and coarse sand of approved
quality for the Precast Prestressed (Post tensioned)
concrete girder/Box (spans upto 30.5m) in contactor’s
casting yard, including finishing, using Admixtures in
approved proportions (as per IS:9103), to modify
workability & other properties without impairing strength
and durability, complete as per specifications and
direction of the Engineer. Payment for Shuttering,
Cement, Admixtures, reinforcement, HTS cables,
anchorage cones, stressing of cables and grouting of
the ducts will be done extra. Launching of girder/slab in
position is not included in this item.
Page 1 of 8
IR's Unified Standard Schedule of Rates 2019 Chapter-3: Bridge Works- Super Structure:RCC
Cement
Item No. Description Of Item Unit Rate (Rs.)
Qty. (qtl.)
031030 Providing and laying in position machine mixed, Cum 4498.95 4.30 or as
machine vibrated and machine batched Design Mix per appd.
Cement Concrete M-40 grade using 20mm graded Design mix.
crushed stone aggregate and coarse sand of approved
quality for the Precast Prestressed (Pre tensioned)
concrete girder (spans upto 9.1m) in contractor’s
casting yard, including finishing, using Admixtures in
approved proportions (as per IS:9103), to modify
workability & other properties without impairing strength
and durability, complete as per specifications and
direction of the Engineer. Payment for Shuttering,
Cement, Admixtures, reinforcement, HTS cables,
sheathing, anchorage cones, stressing of cables and
grouting of the ducts will be done extra. Launching of
girder/slab in position is not included in this item
031031 Deduct from 031030 for casting of Slab instead of Cum 567.06
Girder
031032 Supplying and laying in position M-40 grade precast Cum 4149.61
prestressed cement concrete ballast retainers of size,
as directed by Engineer In-charge
031040 Design, manufacturing, supplying and fixing in position Cu Cm 1.61
elastomeric bearing pads under prestressed concrete
girder, for Pre-cast as well as cast-in-situ girders as per
approved drawing. The rate shall include cost of load
test of one no. bearing from Railway approved firms and
all fixing materials, equipments, machineries, labour,
taxes, loading, unloading, leading, lifting etc.complete.
Rates include getting the drawing approved from
Railway and cost of inspection during manufacturing
from railway approved organization. (Note : 1. The rate
is for finished item complete and paid only after fixing in
position below the girder. 2. The volume shall be given
in the drawing and no deduction shall be made for
inserted steel plates etc.)
Page 2 of 8
IR's Unified Standard Schedule of Rates 2019 Chapter-3: Bridge Works- Super Structure:RCC
Cement
Item No. Description Of Item Unit Rate (Rs.)
Qty. (qtl.)
031060 Load testing of one or more spans of bridge as selected
by the Engineer as per approved load test procedure
following relevant IS/IRC/Railway codes with
contractor’s labour, deflection measuring instruments,
loading materials, recoding and analyzing the load
testing results including all lead & lift, etc. complete as
required. The rates are all inclusive and will be paid
after load test is finished and girder is cleared of the
kentledges/loading material etc. The load shall be 1.25
times the stipulated design load, based on design load
& not span
031071 Deduct for not using CRCA sheathing & other related MT 38289.33
items for pretensioned members from item 031070
031072 Extra for using HDPE sheathing instead of CRCA MT 133.57
sheathing
031080 Making suitable designed staging for casting of PSC Cum 3967.42
girders on over head in cast in-situ method and slewing
them to the exact location to proper level and alignment
complete on to the bed blocks or pedastals with all
contractors materials. Rate includes cost involved for
various arrangements required for staging, slewing,
lifting, lowering with all the contractors materials,
machinary, tools and plants
Page 3 of 8
IR's Unified Standard Schedule of Rates 2019 Chapter-3: Bridge Works- Super Structure:RCC
Cement
Item No. Description Of Item Unit Rate (Rs.)
Qty. (qtl.)
031090 Launching of PSC girders casted by any method MT 1737.13
approved by Engineer or steel girders and placing them
to correct alignment and level over the bed block /
pedastal. The PSC girder shall be precast at casting
bed developed at site. The cost of the casting bed will
be paid extra. The rate includes cost involved for
various arrangements, suitable capacity cranes, men
and machinary, lifting, lowering etc.
031100 Pushing / Insertion of already cast RCC Box through Per Metre per 18571.71
existing embankment below running rail traffic for all Sqm
heights and depths including normal to embankment or
in skew, by mechanical jack pushing technique as per
approved drawing including all types of enabling works
such as excavation of approaches, cutting of banks
upto required level, disposal of surplus earth outside
railway land, alignment of boxes, as per scheme
approved by railway and as directed by the Site
Engineer. It includes provision of cutting edge, cost of
all types of jacks, all lead, lift, ascends, descends,
loading, unloading, handling, rehandling, crossing of
stream, nallah, Railway track, level crossing etc. or any
other obstruction, cost of all seafty works and safety
precautions as a complete job.
(Note : 1. Payment for construction of thrust bed and
RCC box shall be paid sepreately. 2. After completion of
work, released cutting edge will be the property of
contractor.)
Page 4 of 8
IR's Unified Standard Schedule of Rates 2019 Chapter-3: Bridge Works- Super Structure:RCC
Cement
Item No. Description Of Item Unit Rate (Rs.)
Qty. (qtl.)
031113 For Wall Height 6m to 8m Sqm 5767.96
031114 For Wall Height 8m to 10m Sqm 6281.38
031115 For Wall Height 10m to 12m Sqm 7394.45
031116 For Wall Height 12m to 14m Sqm 7958.26
031120 Fabrication of precast concrete structures in the Cum 58270.21 As per appd.
designated plant as per design, using M-50 grade Design mix.
concrete with proper graded aggregate, 53-grade
Ordinary Portland Cement, admixtures conforming to
IS:9103, high yield deformed bars at 10% to 12% by
weight of concrete, lifting hooks for erection; produced
under controlled factory environment {cost includes
inspection and testing by Railway's approved agency}
for Precast Concrete Columns, Beams, Staircase,
Landings, Handrails, Slabs, Foundation Footings etc.
Page 5 of 8
IR's Unified Standard Schedule of Rates 2019 Chapter-3: Bridge Works- Super Structure:RCC
Cement
Item No. Description Of Item Unit Rate (Rs.)
Qty. (qtl.)
031170 Designing, casting and launching of Pre-stressed
Concrete Girders for construction of Road under
Bridges / Railway Bridges with deck slab including
diaphragm with contractor's construction scheme,
approved by Railway including side kerbs and 0.90m
wide box type foot path on one side and ballast retainer
on other side or as required as per site condition with M-
45 / M-50 Grade controlled concrete of approved mix by
weigh batching, using 20mm and down grade hard
granite stone aggregate of approved quality, admixture
etc. including casting PSC Girders, pre-stressing and
grouting in stages, supplying and fixing Elastomeric /
Pot-PTEF / Pot Bearings at both ends complete work as
per approved relavant drawings in accordance with the
relevent Codes and treating deck with M-25 grade
cement concrete wearing coat of 75mm thickness at
centre and 50mm thick at edges, applying hot bitumen
of 80/100 (1.7 kg/sqm) over surface of wearing coat as
per approved drawing all inclusive but excluding cost of
cement, reinforcement etc., which shall be paid
seprately under relevant items.
031171 For girders of spans 18 metres and above with 5.7m Per Metre of 86982.10 4.50 or as
overall width Clear Span per appd.
Design mix.
031172 Add or deduct in rates of USSOR Item no. 031171 for Per Metre 15260.02 4.50 or as
every one metre or part thereof increase or decrease in Width of per appd.
overall width of girder Girder Design mix.
031173 For girders of spans less than 18 metres with 5.7m Per Metre of 78924.31 4.50 or as
overall width Clear Span per appd.
Design mix.
031174 Add or deduct in USSOR Item no. 031173 for every one Per Metre 13846.37 4.50 or as
metre or part thereof increase or decrease of overall Width of per appd.
width of girder Girder Design mix.
031180 Providing Flood Level Gauges on abutments and piers, Sqm 487.63 0.09
made by 20mm thick 1:4 cement plaster for a width of
not less than 300mm, duly engraving markings &
figures in metres, divided into 10 parts commencing
from under-side of girders towards bed, painting
markings & figures with black enamel paint in three
coats on white background including painting HFL Mark
in white by side of gauge with year of occurance with all
Contractor's materials, labour, tools, scafolding and
supports, lead & lifts, curing etc. complete as per
approved drawing and as directed by the Engineer in-
charge
Page 6 of 8
IR's Unified Standard Schedule of Rates 2019 Chapter-3: Bridge Works- Super Structure:RCC
Cement
Item No. Description Of Item Unit Rate (Rs.)
Qty. (qtl.)
031190 Designing, casting, lowering and launching of PSC 'I' /
Box Girders for Road over Bridges with deck slab (cast
in-situ or precast) M-45 to M-50 grade concrete of
approved mix by weigh batching, using 20mm & down
graded hard granite stone aggegate, admixture etc.
including casting PSC girders on piers (or casting on
bed and launching on to bed blocks) without causing
any disruption to normal running traffic as per railway's
approved drawing for making overall width as specified
in GAD and prestressing & grouting in stages as per
relavent Codes and keeping girder in position on
bearings, including supplying & fixing Elastomeric / Pot-
PTFE / Pot Bearings as per Railway's approved
drawings including providing cement concrete wearing
coat 75mm uniform thickness etc. complete all inclusive
but excluding cost of cement, reinforcement etc., which
will be paid as per item in respective schedule as per
specifications and as directed by Engineer in-charge
031191 For girders of spans 25m & above with 12m overall Per Metre of 82693.67 4.50 or as
width and to required construction depth Centre to per appd.
Centre Span Design mix.
031192 Add or deduct in USSOR Item no. 031191 for every one Per Metre 6891.14 4.50 or as
metre or part thereof increase or decrease of overall Width Of Slab per appd.
width of girder Design mix.
031193 For girders of spans less than 25 metres with 12m Per Metre of 72540.24 4.50 or as
overall width and to required construction depth Centre to per appd.
Centre Span Design mix.
031194 Add or deduct in USSOR Item no. 031193 for every Per Metre 6045.02 4.50 or as
one metre or part thereof increase or decrease of Width Of Slab per appd.
overall width of girder Design mix.
031200 Casting of pre or post - tensioned PSC Slab units of Cum 15074.88 4.50 or as
spans as per Railway approved design & drawing, using per appd.
M-45 grade controalled concrete with all contractor's Design mix.
materials, labour, tools/plant & machinery inculding all
lead & lift complete excluding cost of cement &
reinforcement which shall be paid as per item in the
respective schedule and as directed by Engineer in-
charge
031210 Extra over USSOR Item no. 031200 for casting skewed Cum 1507.49 4.50 or as
angle slabs instead of regular shaped slabs per appd.
Design mix.
031220 Providing and fixing in position GI Drainage Spouts of
required length with Grating in RCC slab and filling
bitumen along kerb as shown in drawing with
contractor's pipes, bitumen, tools, equipment, lead, lifts
etc. complete as per specifications and as directed by
Engineer in-charge
031221 50mm dia. Drainage Spouts Metre 470.13
031222 100mm dia. Drainage Spouts Metre 1005.36
Page 7 of 8
IR's Unified Standard Schedule of Rates 2019 Chapter-3: Bridge Works- Super Structure:RCC
Cement
Item No. Description Of Item Unit Rate (Rs.)
Qty. (qtl.)
031230 Reinforced Cement Concrete M-30 / M-35 / M-40 grade Cum 4017.71 4.50 or as
for RCC deck slab on Steel 'I' girder cast-in-situ, using per appd.
controlled concrete by weigh batching / using RMC with Design mix.
contractor's materials, steel shuttering, staging,
scaffolding, supports, labour, tools, plant & machinery,
lead/lifts, curing etc. complete including leaving
necessary reinforcement rods for providing parapet as
per approved drawings and MOST standard drawings &
specifications, as directed by Engineer in-charge but
excluding cost of cement & reinforcement steel {cost of
cement & steel will be paid as per items under
respective schedule items}
Page 8 of 8
IR's Unified Standard Schedule of Rates 2019 Chapter-4 : Bridge Works- Super Structure- Steel
Payment Schedule
(i) Material at site – 40%
(ii) Fabrication at site – 15%
(iii) Erection/Launching – 20%
(iv) Completion incl. painting & finishing – 25%
041011 Plate Girder/Semi Through Girder MT 108688.60
041012 Open web Girder MT 121422.95
041013 Extra for metalising including preparation of surface and applying Sqm 713.89
one coat etch primer to IS:5666
041014 Extra for using steel conforming to Fe 490 of IS:8500 instead of Fe MT 1161.50
410
041015 Deduct for using steel conforming to Fe 410 A of IS:2062 instead of MT 1161.50
Fe 410 B
041020 Assembling and erection of fabricated material including rocker and
roller bearings with crane/derrick at site on sub structure with labour,
equipment, T&P including site riveting/welding with all temporary
arrangements, scaffolding etc. with contractors design and scheme
for longitudinal launching/side slewing (not requiring traffic block)
approved by Railway. Rate includes field rivets / welding, drifts,
service bolts etc. as per drawings
041021 Plate Girder/Semi Through Girder MT 22585.10
041022 Open Web Girder MT 25192.57
Page 1 of 6
IR's Unified Standard Schedule of Rates 2019 Chapter-4 : Bridge Works- Super Structure- Steel
041031 Extra for working under running traffic/traffic block conditions on item MT 20027.02
041030
041040 Fabricating, supplying and fixing of 6mm to 8mm thick steel MT 81307.90
chequered plate conforming to IS:3502 for pathway, trolley refuges,
floor for the bridge including fixing the same over steel channel
sleepers by drilling holes in channel sleepers and trolley refuges
including nuts & bolts, tools & plants, labour as a complete job
041050 Metalising of steel work of girder with grit blasting as per IRS-B1- Sqm 858.02
2001 following by one coat of etch primer (as per IS:5666) one coat
of Zinc Chrome primer (as per IS:104) and two coats of aluminium
paint (as per IS:2339) with all labour, T&P and material as a
complete job
041060 Providing and fixing 65/50 mm nominal dia B class G.I. pipe railing Kg 91.89
used in rows for footpath or anti-crash barrier railing including cost of
M.S. angle and channels in vertical posts, riveting, welding / rivetting,
priming painting two coats, at all heights labour and material as a
complete job
041070 Supplying and fixing anti-slip M.S. Angles/nosing 65mmx 65mmx Kg 92.31
8mm or any other size confirming to IS:2062 fixing 10mm dia, anchor
bar 600mm c/c and fixing with main girder with M.S. flat on top of
step of stair case, making anti-slip grooves 7 nos. arrangement for
keeping and maintaining in position as per approved plan with all
labour and material as a complete job.
041080 Providing/fixing/leaving/grouting various size HTS bolts / holding Kg 126.61
down bolts in concrete column or in other structural steel member
with proper nuts, bolts, washers/plates as a complete job. Note -
Cement used in grouting will be paid separately under relevant item.
041090 Providing, cutting, fabricating, treating, fixing & painting structural MT 91598.94
steel conforming to IS:2062 in access ladders, inspection platforms,
Trolley refugee, railing etc. joints welded to neat finish including one
coat of primer & two coats of synthetic enamel paints
041100 Supplying, fitting and fixing in position true to line and level cast steel MT Bearing 535.36
rocker bearing complete as per IS :7666, IS:9565, IS:1030, IS:919, Capacity
IS:3073 and as per Bridge Code including all accessories as per
drawing and Technical Specifications
041110 Supplying, fitting and fixing in position true to line and level forged MT Bearing 584.04
steel roller bearing conforming complete as per IS:7666, IS:9565, Capacity
IS:1030, IS:919, IS:3073 and as per Bridge Code including all
accessories as per drawing and Technical Specifications
041120 Supplying, fitting and fixing in position true to line and level sliding MT Bearing 1497.38
plate bearing with PTFE Surface sliding on stainless steel as per Capacity
BS:3784, BS 5400, complete including all accessories as per
Drawing and Technical Specifications
Page 2 of 6
IR's Unified Standard Schedule of Rates 2019 Chapter-4 : Bridge Works- Super Structure- Steel
Page 3 of 6
IR's Unified Standard Schedule of Rates 2019 Chapter-4 : Bridge Works- Super Structure- Steel
041200 Surface preparation for cleaning of steel work of bridge triangulated Sqm 58.90
girders with scrappers and/or wire brushes to remove all rust and
loose or perished paint to prepare perfectly clean & dry bare metal
surface free from all dirt/foreign material & ready for initial coat of
paint. Rate includes cost of labour, consumables, brushes, misc.
tools and plants, ladders, scaffoldings, jhoola, hanging scaffolding,
staging etc.
041210 Surface preparation for painting of bridge girders and other steel Sqm 40.85
structures where the finishing coat shows signs of deterioration; but
primer coat of paint is sufficiently in good condition and there are no
signs of rusting etc. Surface shall be cleaned free from oil grease,
scaling and other foreign matters without disturbing the primer coat
{Rate includes cost of labour, consumables, tools & plants,
scaffolding, jhoola, ladder etc.}
041220 Painting cleaned bridge plate girders including all scaffolding,
shuttering and strutting along with provision of Jhoola / hanging
scaffolding where required
041221 With one coat ready mix Zinc Chromate conforming to IS:104 Sqm 65.17
followed by one coat of Zinc Chromate red oxide conforming to
IS:2074
041222 With two cover coats of ready-mixed paint to IS:13607 with Sqm 78.95
colour/shades, as decided by Engineer-incharge
041223 With two coats Aluminium paints in dual containers conforming to Sqm 71.63
IS:2339
041224 With two coats epoxy paint Sqm 98.98
041230 Painting cleaned bridge girders exceeding 30.5m clear span
including all scaffolding, shuttering and strutting along with provision
of Jhoola / hanging scaffolding where required
041231 With one coat ready mix red lead conforming to IS:102 Sqm 45.32
041232 With one coat ready mix Zinc Chromate conforming to IS:104 Sqm 69.96
followed by one coat of Zinc Chromate red oxide conforming to
IS:2074
041233 With two cover coats of ready-mixed paint to IS:13607 with Sqm 83.74
colour/shades, as decided by Engineer-incharge
041234 With two coats Aluminium paints in dual containers conforming to Sqm 76.42
IS:2339
041235 With two coats epoxy paint Sqm 103.77
Page 4 of 6
IR's Unified Standard Schedule of Rates 2019 Chapter-4 : Bridge Works- Super Structure- Steel
041241 DFT (Dry Film Thickness) Coating of 80 micron for Rural & Arid Sqm 2059.80
environment
041242 Extra over Item no. 041241 for DFT (Dry Film Thickness) Coating of Sqm 698.79
120 micron for Medium Industrial & Marine environement
041243 Extra over Item no. 041241 for DFT (Dry Film Thickness) Coating of Sqm 2104.82
200 micron for Severe Industrial & Marine enviroment
041250 Supply, fabrication and erection of bed plate of approved sizes in
exact position over bed block on pier/abutments by giving full and
even bearing, setting them on the layer of free flow non-shrinkable
grouting compound, scrapping or chipping of bed block, if required,
fabrication and fixing of HD bolts of suitable sizes alongwith nuts,
washers etc., drilling holes of required size, grouting of holes by
epoxy mortar after fixing HD bolts. Total work to be done during
traffic block.
041251 Upto 12.2m clear span Kg 338.83
041252 More than 12.2m, but upto 18.3m clear span Kg 423.53
041253 More than 18.3m, but upto 30.5m clear span Kg 564.95
041260 Assembling and erecting pre-fabricated structures, such as columns, MT 6020.08
beams, girders, other members of FOBs and sheds; including
leading all structural elements within 1 Km lead, bolting, riveting or
welding as per approved drawing or as directed by Engineer In-
charge with two coats of aluminium paint conforming to IS: 2339 on
all exposed surface. Rate shall include cost of labour, materials, tools
& plants and only pre-fabricated structural elements shall be given by
Railway. (Work not requiring traffic or power block)
041270 Extra over item no 041260, if the work is to be executed under traffic MT 1224.37
or power block
041280 Cleaning and greasing of free end and fixed end of steel girder
Bridge bearing with Grease Graphite, Kerosene oil and other
materials as per instruction given in Para 222 of Indian Railway
Bridge Manual 1998 with painting of Bearing as per requirement
complete as directed by engineer in-charge
041281 Girder size from 40' to 80' Each 6917.89
041282 Girder size above 80' & upto 150' Each 10251.01
041290 Launching & fixing in exact location of all type of steel MT 1892.55
girders,complete job including lead within five kilometres& lifting to
any hight as per site requirment, provision of approaches,
cleaning/repairs to bed blocks etc.
Page 5 of 6
IR's Unified Standard Schedule of Rates 2019 Chapter-4 : Bridge Works- Super Structure- Steel
Page 6 of 6
IR's Unified Standard Schedule of Rates 2019 Chapter-5: Bridge Works- Misc.
051010 Providing and laying boulders apron on river bed for Cum 1617.20
protection against scour with stone boulders weighing
not less than 35 kg each with voids filled with spalls
complete as per drawing and Technical Specification
051020 Laying of boulder apron laid in wire crates of approved Cum 695.88
size including overlaps at joints, laid with stone boulders,
all loose ends to be tied with 4mm galvanised steel wire.
Payment for boulders & wire crates to be done extra
051030 Supplying Galvanized Wire Net Trungers made from Sqm 332.07
4mm galvanised steel wire @ 32 kg/10sqm having
minimum tensile strength of 300 Mpa conforming to
IS:280 and galvanizing coating conforming to IS:4826,
woven into mesh with double twist, mesh size not
exceeding 100mm x 100mm
051040 Providing and laying of Apron with cement concrete Cum 3133.22 3.2
blocks cast in-situ and made with nominal mix of 1:2:4
with a minimum cement content of 250 kg/cum
{Note : (1) Payment to be made for blocks only; (2)
Cement and shuttering to be paid extra}
051050 Providing and laying Pitching with Stone Boulders, Cum 1835.45
weighing not less than 35kg each with voids filled with
spalls on slopes, laid over prepared filter media including
boulder apron laid dry in front of toe of embankment
complete as per drawing and Technical Specifications
(filter media to be paid separately under the relevant
item)
051060 Providing and laying Pitching with Stone Boulders, Cum 3167.22 1.25
weighing not less than 35kg each with voids filled with
cement sand mortar 1:4 on slopes laid over prepared
filter media including boulder apron laid dry in front of toe
of embankment complete as per drawing and Technical
Specifications (filter media to be paid separately under
the relevant item)
051070 Providing and laying Filter Material as per RDSO Cum 1846.55
Specifications underneath pitching in slopes complete as
per drawing and Technical Specification
051080 Providing & laying of a Permeable Geo-textile Filter
between pitching and embankment slopes on which
pitching is laid to prevent escape of embankment
material through voids of stone pitching/cement concrete
blocks as well as to allow free movement of water
without creating any uplift head on pitching, as per
RDSO Guidelines -
051081 With GJT-Type 1 (for harsh conditions) Sqm 45.92
051082 With GJT-Type 2 (for less severe conditions) Sqm 52.94
051083 With GJT-Type 3 (for moderate conditions) Sqm 67.56
Page 1 of 10
IR's Unified Standard Schedule of Rates 2019 Chapter-5: Bridge Works- Misc.
Cement
Item No. Description Of Item Unit Rate (Rs.)
Qty. (qtl.)
051090 Laying Boulder Apron on river bed for protection against Cum 833.38
scour with stone boulders supplied by Railway with voids
filled with spalls complete as per drawings and Technical
Specifications, with maximum lead upto 150m
051100 Laying Pitching with Stone Boulders supplied by Railway Cum 338.72
with voids filled with spalls on slopes, laid over prepared
filter media including boulder apron laid dry in front of toe
of embankment as per drawings and technical
specifications with maximum lead upto 150m (filter
media to be paid under relevant item)
051110 Insertion or removal of Railway's Steel Cribs (CC Cribs) Each 236.85
of nominal size 0.6m x 0.6m x 1.8m with hard wood
packing for temporary arrangements / scaffolding
including handling from and to stacks at nominated
locations at site with all labour, tools, plant, machinery,
lead upto 250m and all lift etc., complete and as directed
by Engineer in-charge
051120 Stenciling of Girders with yellow background and black / Each 31.19
blue lettering with ready mix paint w.r.t. executed
inspection, greasing and painting/writing date on girder
bridge, as directed by Engineer in-charge
051130 Cleaning Surface of Abutment and Piers upto bed level Sqm 97.38
under water with brush or any other tools to remove all
traces of moss, loose materials, fungus, algae,
vegetational growth etc. Cleaning shall be carried out
with contractor's trained staff, tools & plants, safety
equipments etc. complete job including arranging safe
approach
051140 Inspecting Sub-structure and Foundation in and around Hour 963.46
piers & abutments, using trained and qualified staff,
under-water cameras, monitoring sensors & safety
equipments, recording observed defects, e.g. cracks,
cavities, buldging, leaning spalling and other defects
noticed in the structure on video cassetes & photographs
and submitting detailed inspection report to Engineer in-
charge. Payment shall be made on hourly basis of
videography & photography
Flooring in Bridges
052010 Providing and laying flooring with rubble stone, laid over Cum 2254.97 1.12 for
15cm thick CC 1:2:4 and the voids filled with CC 1:2:4 rubble stone
complete with the joints pointed with 1:2 Cement Sand only
mortar as per drawing and Technical specifications.
Payment for cement to be done separately. Voids in the
rubble stone to be taken as 35% of the gross volume of
the stone layer. (Base concrete to be paid extra)
Page 2 of 10
IR's Unified Standard Schedule of Rates 2019 Chapter-5: Bridge Works- Misc.
Cement
Item No. Description Of Item Unit Rate (Rs.)
Qty. (qtl.)
052020 Providing and laying 300mm thick (average) Dry Stone Cum 1746.41
flooring with boulders of not less than 35kg each in
weight, hand packed with surface levelled off to the
correct section with hammer dressing as necessary on
the ground including filling the gaps with quarry spalls
and ordinary sand complete including cost of supply of
all materials, labour, lead, lift, tools, plants, crossing of
tracks and the like as per drawing and technical
specification as directed by Engineer in charge
052030 Supply and laying of quarry dust including consolidation, Cum 1604.15
supply of all materials, labour, lead, lift, tools, plants,
crossing of tracks as per drawing and technical
specification as directed by the Engineer in charge in
case loose slush is encountered at site of foundation
before casting the foundation or before laying the filtering
media (payment based on stack measurement).
052072 Cement Sand Mortar (1:1) Grout with 20% anti- Kg 356.87 as per actual site
shrinkage compound w.r.t. cement consumption
Page 3 of 10
IR's Unified Standard Schedule of Rates 2019 Chapter-5: Bridge Works- Misc.
Cement
Item No. Description Of Item Unit Rate (Rs.)
Qty. (qtl.)
052090 Applying epoxy mortar over leached, honey combed and Sqm 1094.22
spalled concrete surface and exposed steel
reinforcement complete as per Technical Specification
with average thickness of 10mm including priming coat,
mortar plaster and seal coat of epoxy
052100 Removal of defective concrete, cleaning the surface Sqm 1111.58 0.16
thoroughly, applying the shotcrete mixture mechanically
with compressed air, comprising of cement, sand,
coarse aggregates, water and quick setting compound
as approved, gunite strength not less than 25 Mpa with
average thickness of 40mm in the ratio of 16 kg of
cement to 0.04cum of sand, 50mmX50mmX3mm size
wire mesh with 0.67 kg of epoxy and 0.64 kg of
accelerator compound for guniting per sqm
052150 Providing / fixing / grouting various size HTS holding Kg 170.87 0.01
down bolt in concrete column or in other structural steel
member including drilling holes of required size, bolts
threaded at both ends shall be fixed with proper size
nuts bolts, plates, washers complete including all labour
and material
052160 Providing weep holes by making suitable opening or Metre 367.37 0.02
drilling in existing Brick Masonry / Plain / Reinforced
Concrete abutment, wing wall/return wall with 100 mm
dia. AC pipe, extending through the full width of the
structure complete and repairing the same with cement
mortar 1:2 (1 cement : 2 coarse sand)
052170 Providing and fixing of Drainage Spouts of 100mm Metre 4776.13 0.01
UPVC complete with cement mortar 1:2 (1 cement : 2
coarse sand)
Page 4 of 10
IR's Unified Standard Schedule of Rates 2019 Chapter-5: Bridge Works- Misc.
Cement
Item No. Description Of Item Unit Rate (Rs.)
Qty. (qtl.)
052180 Providing and laying of filter media consisting of granular Cum 2201.50
materials of GW, GP, SW groups as per IS:1498 (latest)
in required profile behind boulder filling of abutments,
wing walls / return walls etc. above bed level with all
labour and material complete job as per drawing and
technical specification of RDSO Guidelines
Page 5 of 10
IR's Unified Standard Schedule of Rates 2019 Chapter-5: Bridge Works- Misc.
Cement
Item No. Description Of Item Unit Rate (Rs.)
Qty. (qtl.)
052230 Painting the HFL and danger level marks, year of HFL Each Mark 215.92
on bridge abutments and piers with ready mixed paint as
per standard in two coats over one coat of primer with all
materials, labour, tools, scaffolding, all lead and lift etc.
including writing complete
052240 Providing cast in situ bridge number plaques as per Each 638.83 0.1
Railway drawing in cement concrete 1:2:4 mix using
20mm hard stone aggregate embedded in 30mm notch
in Bridge parapet coping duly engraving the letter and
figures and an arrow indicating the direction of flow and
finishing the top exposed surface with cement mortar
1:3, painting letters and figures with two coats of black
enamel paint on two coats of white background with all
labour, tools, cement, paint etc. with all leads and lifts
052250 Providing cast in-situ plaques for bridge foundations Each 829.66 0.1
details of size 45cmx45cmx5cm in cement concrete
1:2:4 mix using 20mm hard stone aggregate embedded
in 30mm deep notch over abutment & piers, engraving
the letters & figures with CM 1:3 and finished smooth
including painting letters and figures with 2 coats of black
enamel and plaque with white enamel with all labour,
tools, cement, paint, curing etc. as a complete job
052260 Providing & laying non pressure NP-4 Class RCC pipe
with collars, jointing with 1:2 cement and ordinary sand
mortar including testing of joints, but excluding earthwork
with all labour and material as a complete job. Cement
for mortar will be paid separately.
052261 300mm dia. Metre 1600.52
052262 450mm dia. Metre 1879.01
052263 600mm dia. Metre 2212.52
052264 900mm dia. Metre 2992.67
052265 1000mm dia. Metre 3565.69
052266 1200mm dia. Metre 5503.12
052267 1800mm dia. Metre 8391.09
052270 Supplying, spreading and filling coarse sand (no Cum 2544.84
cohesive materials to be used) of approved quality
including watering and ramming in foundation, plinth,
behind the abutment, wing wall, retaining wall in layers
not exceeding 150mm thick including its compaction as
per direction of Engineer-in-charge. The rate includes all
lead, lift, ascent, descent, crossing of Railway line etc.
complete with contractor’s labour, materials, tools and
plant.
052280 Providing Boulder Backing behind wing wall, return wall, Cum 394.44
retaining wall with hand packed boulders & cobbles with
smaller size boulders toward the back including all lead,
lift, labour & other incidental charges as complete work
in all respect. Payment for boulder/cobbles will be done
extra.
Page 6 of 10
IR's Unified Standard Schedule of Rates 2019 Chapter-5: Bridge Works- Misc.
Cement
Item No. Description Of Item Unit Rate (Rs.)
Qty. (qtl.)
052290 Dewatering of natural or accumulated water from any HP Hour 35.23
location. Payment to be done for Horse power of pump
multiplied by pumping hours.
052300 Supplying & fixing Galvanised Steel Wire Ropenet, made of Sqm 1077.57
9mm dia. steel wire rope having aperture size of 45cm x
60cm with 6m long hangs for top anchoring and 5m wide
alongwith chain-link mesh-netting of 80mm x 80mm mesh
size made from 2.4mm dia galvanised wire, joining of chain-
link mesh & steel wire ropenet and joining of adjacent nets
with galvanised spiral lock springs of steel wire dia 2.2mm;
inner dia. of springs 18mm; total length 50mm ± 0.5mm;
pitch 4mm & open end length 60mm including cutting of
tree/shrub etc. in rope-netting location and also,
excavation / filling-back of trenches in all types of soil after
anchoring ropenet with RCC pre-cast beam of size 15cm x
15cm x 2m of M-15 concrete & 30cm thick M-10 PCC. This
work also includes supply of 200mm x 200mm x 6mm
epoxy coated washer plates with 12.5mm / 18mm dia. hole
at centre and supplying & fixing of anchor bolts/fastners of
10mm dia. including drilling of holes upto a depth of 110mm
in rock; cleaning of holes; fixing of fastners with nut &
epoxy coated washer plates; applying torque 65 to 70
N/mm for fixing of ropenet for intermediate anchoring on
the surface of cutting, bottom anchoring upto 1m depth by
using 16mm dia. HYSD steel bolts, threaded upto 200mm
on top and fixing epoxy coated washer plate, fabrication &
fixing of U-pin on top of cutting for top anchoring and
joining of adjacent nets with spiral spring and fixing at the
ratio of 1 no. per 0.6m in longitudinal direction of net portion
and additional locks for lacing chain link netting with
ropenet with contractor's materials, machinery, tools &
plants, cement, steel, labour, lead, lift, transportation,
ascent, descent, taxes, royalty etc. complete as per
directions of engineer-in-charge.
052310 Supplying & fixing of Erosion Control Geomat (for Sqm 240.64
surfacial erosion control) consisting of 2 layers of
polymeric netting, having aperture size of 20mm x 20mm
and a middle layer of coir as per Specifications. Max.
width of rolls/each composite mat shall be 5m with
overall weight of Geomat as 300(+/- 20) gsm. Work
includes dressing of slopes to proper profile & removing
loose rubbles, muck & leading to the point as directed by
engineer in-charge; supply & spreading of good
earth/soil material on slope/berm portion etc. to proper
profile for laying of Geomat anchoring in top anchor
trench; seaming of adjacent panels of Geomat with
HDPE Twine; fabrication & fixing of U-pin on
slope/berms including top of cutting for anchoring of
Geomat as per approved scheme and providing of grass
sods and placing over Geomat so as to completely cover
it, including watering for 2 weeks with all labour, tools &
materials alongwith lead & lift etc. complete
Page 7 of 10
IR's Unified Standard Schedule of Rates 2019 Chapter-5: Bridge Works- Misc.
Cement
Item No. Description Of Item Unit Rate (Rs.)
Qty. (qtl.)
052320 Supplying & placing of Mechanically Woven Double Cum 2742.67
Twisted Hexagonal Shaped Wire Mesh Gabion Boxes of
required sizes, Mesh Type 10cm x 12cm, Zn and PVC
coated Mesh Wire dia. 2.7/3.7mm (ID/OD), edges of
meshes mechanically edged / selvedged with heavy
coating of galvanization as per EN 10223-3/ASTM A 975
with partitions at every 1m interval and properly packed
with approx. 150mm size boulders including
transportation and placing at indicated places as per
direction of engineer-in-charge including contractor's
tools, plants, labour, royalty charges etc. complete in all
respect and stitching with lacing wire of dia. 2.2/3.2mm
(ID/OD) @ 5% by weight of Gabion boxes, carrying the
material by head lead from nearest approach with all
safety precautions and all leads and lifts.
052341 Piers, substructure, Box bridges and culverts in river bed Sqm 668.63 0.065
Page 8 of 10
IR's Unified Standard Schedule of Rates 2019 Chapter-5: Bridge Works- Misc.
Cement
Item No. Description Of Item Unit Rate (Rs.)
Qty. (qtl.)
052350 Surface protection of Underside of Bridge Decks, Sqm 382.19
Girders, Inside of Box Girders, Railings etc. of Bridges
and Piers and Substructures which are not in River Bed
by cleaning and drying the surface; repairing local
defects, e.g. honeycombs with a paste of cement
admixed with 5% by weight of cement of Polymer
bonding agent, applying (@ 0.30 litre/sqm) a coat (DFT
of 100-150 micron) of a translucent brown coloured
modified phenolic resin based single component high
performance polymeric waterproofing compound (sp. gr.
0.87, rosin content nil and a solid content of minimum
0.47%), applying (@ 0.25 litre/sqm) a top coat of a
modified phenolic resin based single component
waterproofing compound of grey or other shades (sp. gr.
0.85) before the base coat becomes tack-free; permitting
the coatings to cure and dry naturally; the 2-coat system
shall be impermeable under a water head of 20m,
complete as per specification.
052360 Surface protection of Bridge Deck by cleaning and Sqm 619.75 0.065
preparing the surface by acid etching; treating the
surface with a two-layer plaster; first layer of 5mm thick
with cement (OPC or slag), admixed with an
octadecanoic acid based cementitious waterproofing
compound (bulk density not greater than 0.5 gm/cc) in
the weight ratio of 50:3 for cement and waterproofing
compound, further enriched with specially fabricated
deformed galvanized steel fibre @ 150 gm/sqm of
treated surface and second layer of 12mm thick cement-
sand (1:2.5) plaster, enriched with polyester fibre (to be
paid separately) and curing the plastered surface.
Treatment shall be impermeable under a water head of
20m complete as per specifications.
052370 Shotcreting in two layers (each layer of 38mm thickness) Sqm 1596.57 0.9
with cement concrete mortar 1:1:2 (1 cement : 1 coarse
sand : 2 coarse aggregate) mixing epoxy & fixing welded
wire mesh 50mm x 50mm x 3mm in between two layers
including cost and conveyance of all materials, labour
charges, leads, lifts, centering, scaffolding, machine
mixing, laying concrete with shotcrete machine etc.
complete as per specification and as directed by
Engineer in-charge
Page 9 of 10
IR's Unified Standard Schedule of Rates 2019 Chapter-5: Bridge Works- Misc.
Cement
Item No. Description Of Item Unit Rate (Rs.)
Qty. (qtl.)
052380 Fabrication and erection of height gauge / rail type MT 7322.68 0.54
barricades along RUB/ROBs in postion using
50R/90R/52Kg rails supplied by Railways at depot, duly
excavating pits of size 450mm x 450mm x 600mm for
erection of rail posts of required height in correct
alignment including loading, trasnportations, unloading of
rails from Store Depot to site of work, embedding in
1:3:6 concrete using 40mm size hard stone aggregate
including cutting, drilling of holes in rails and connecting
horizontal rails to the vertical posts with bolts and clamps
duly applying two coats of approved quality primer as per
drawing with contractors materials, as directed by
Engineer in-charge
052390 De-launching / removing existing steel girders / PSC MT 1910.44
slabs including ballast retainers, walk ways etc. of
various spans under line block by crane or by any means
and placing the same on bridge approaches or at toe of
embankment without infringement including cutting
holding down bolts with contractor's labour, tools,
cranes, plant & machinery, consumables etc. complete
and as directed by Engineer in-charge
052400 Designing and developing Detailed Reinforcement
Drawings for following items for ROB/RUB/Bridge based
on Railway's approved GADs, duly collecting necessary
data from Railways and R&B authorities, duly designing
members and submission of check plot duly getting
proof-checked by Railway approved institutes, submitting
for Railway's verification and approval, making
corrections duly incorporating suggestions in
drawings/designs, further submission of original in
transparent film paper and soft copy (CD) for Railways
approval etc. with contractor's technical expertise and
instruments, labour, consumables, repeatedly attending
till final approval etc., complete as directed by Engineer
in-charge
052401 (a) Open / Pile / Well Fondation for RCC columns / piers Each Set 21197.38
Page 10 of 10
IR's Unified Standard Schedule of Rates - 2019 Chapter-6 : Rails, Sleepers, Fittings and Renewals
1. Rails :
061010 Pulling & positioning of rails accurately on cess including
supporting rails, providing required gap and squaring at ends
for renewal preparation, as directed by Engineer in-charge
061031 (a) BG Track – For Through Renewal work Track Metre 40.11
061032 (b) MG Track – For Through Renewal work Track Metre 31.60
061033 (c) BG Track – For Casual/Scattered Renewal work Running 28.05
Metre
061034 (d) MG Track – For Casual/Scattered Renewal work Running 23.38
Metre
2. Sleepers :
061040 Removing from track existing Wooden / Metal sleepers with
fittings in running track conditions for TSR (Through Sleeper
Renewal) / ISD (Increasing Sleeper Density) works & stacking
the same neatly at specified places with contractor’s tools &
labour, as directed by Engineer in-charge. (For ISD work only
identified unserviceable sleepers to be covered)
061041 For location of work not involving deep screening Each 95.30
061042 For location of work involving deep screening (deep Each 80.38
screening to be paid separately)
1 of 4
IR's Unified Standard Schedule of Rates - 2019 Chapter-6 : Rails, Sleepers, Fittings and Renewals
061050 Inserting in track Metal / Wooden sleeper lying along the cess
/ formation / slope / toe with all fittings complete for TSR / ISD
work to specified gauge with contractor’s tools including one
packing to make track fit for 20 kmph speed and dressing of
ballast, as directed by Engineer in-charge
061051 For location of work not involving deep screening Each 162.58
061052 For location of work involving deep screening (deep Each 135.48
screening to be paid separately)
061053 Extra to item no. 061051 and 061052 for sleepers lying on Each 20.70
slope / toe of bank beyond initial height of 5 metres
061060 Re-spacing of existing Metal / Wooden sleepers carefully for
Increasing Sleeper Density (ISD) work in track including fixing
all fastenings and initial packing, as directed. (Scope also
includes pre-marking of sleeper spacing as per required
sleeper density)
061061 For location of work not involving deep screening Track Metre 94.47
061062 For location of work involving deep screening (deep Track Metre 69.00
screening to be paid separately)
061070 Removing from track the existing PSC sleepers with fittings in
running track conditions for TSR / ISD works & stacking the
same neatly at specified places with contractor’s tools &
labour, as directed by Engineer in-charge. (For ISD work only
identified unserviceable sleepers to be covered)
061071 For location of work not involving deep screening Each 125.59
061072 For location of work involving deep screening (deep Each 105.65
screening to be paid separately)
061080 Inserting in track the PSC sleepers lying along the cess /
formation / slope / toe with all fittings complete for TSR / ISD
work to specified gauge with contractor’s tools including one
packing to make track fit for 20 kmph speed and dressing of
ballast, as directed by Engineer in-charge
061081 For location of work not involving deep screening Each 210.41
061082 For location of work involving deep screening (deep Each 173.50
screening to be paid separately)
061083 Extra to item no. 061081 and 061082 for sleepers lying on Each 51.75
slope / toe of bank beyond initial height of 5 metres
061090 Re-spacing of existing PSC sleepers carefully for Increasing
Sleeper Density (ISD) work in track including fixing all
fastenings and initial packing, as directed (Scope also
includes pre-marking of sleeper spacing as per required
sleeper density)
061091 For location of work not involving deep screening Track Metre 127.93
061092 For location of work involving deep screening (deep Track Metre 102.34
screening to be paid separately)
061100 Replacement of sleepers in track with sleepers lying on cess
for casual renewal at isolated locations with all fittings
complete to specified gauge & cross level with contractor’s
tools including packing and dressing of ballast, as directed by
Engineer in-charge. Released materials shall be neatly
stacked and handed over.
061101 (a) BG Track (PSC to PSC sleepers) Each 380.56
061102 (b) BG Track (Wooden / Metal to PSC sleepers) Each 314.80
061103 (c) BG Track (Wooden / Metal to Wooden / Metal sleepers) Each 270.96
061104 (d) MG Track (PSC to PSC sleepers) Each 232.25
061105 (e) MG Track (Wooden / Metal to PSC sleepers) Each 203.25
2 of 4
IR's Unified Standard Schedule of Rates - 2019 Chapter-6 : Rails, Sleepers, Fittings and Renewals
061106 (f) MG Track (Wooden / Metal to Wooden / Metal sleepers) Each 186.42
061107 (g) BG Track (Channel to Channel sleepers on Bridges) :
061108 (i) For Non-Track Circuited area Each 394.82
061109 (ii) For Track Circuited area Each 446.57
061110 Replacement of CST-9 plate including carrying serviceable Each 92.47
plate and stacking released plate
3. Fittings / Lubrication Works :
061120 Fixing of fish plate and fish bolt (of 4 fish bolts) on a joint Each 134.14
created in rail of 90R, 52Kg or 60Kg of all UTS, duly
lubricating fish plate/bolts with contractor grease graphite in
running track condition including transportation of fish plate
and fish bolts from nearest station / store / level crossing. (rail
cutting & drilling to be paid separately)
061121 Extra to Item no. 061120 for using fishplate of 6 bolts Each 45.84
061130 Through renewal of Metal / GFN liners in running track Each Sleeper 13.96
condition including removing, cleaning & lubrication of ER
Clip & Insert Eye and re-driving the same with contractor's
grease graphite of approved quality with all lead & lift
061131 Extra to item no. 061130 for lubrication of metal liner and rail Each Sleeper 6.03
foot at liner seat
061140 Through Fitting Renewal (TFR) on PSC track, comprising of Each Sleeper 25.98
renewal of Grooved Rubber Pads, Liners and ERCs
(excluding seized ERCs) without damaging PSC sleepers.
Scope includes cleaning rail seat on sleeper, ERC and eye of
Inserts with wire brushes and applying grease to eye of insert
and central leg of ERC with contractor's grease of Railway’s
specification, cleaning rail flange at liner seats, putting-back
liners in correct position & squaring of sleepers and sealing
liner edges with grease. [Rate includes lead upto 500m)
061150 Lubrication of Elastic Rail Clips on PSC sleepers with Each 2.75
contractor’s grease, conforming to Railway’s specifications,
labour etc. complete as per Para 1411 (5)(b) of IR P.Way
Manual
061160 Recoupment & replacement of missing / wornout fittings of
channel sleeper on Bridge with railway's fittings -
061161 Involving Rubber Pad Each Sleeper 48.17
061162 Not involving Rubber Pad Each Sleeper 24.13
4. Drilling and Cutting Works :
061170 Cutting / cropping of rail of 90R / 52Kg or lighter section – 72
UTS, manually and perfectly vertical with contractor’s labour,
hacksaw blade and tools & plants -
061171 On Cess Each 201.35
061172 In-situ situation Each 293.14
061180 Cutting / cropping of rail of 52Kg – 90 UTS, manually and
perfectly vertical with contractor’s labour, hacksaw blade and
tools & plants -
061181 On Cess Each 241.62
061182 In-situ situation Each 366.42
061190 Cutting / cropping of rail of 60Kg – 90 UTS, manually and
perfectly vertical with contractor’s labour, hacksaw blade and
tools & plants -
061191 On Cess Each 302.02
061192 In-situ situation Each 473.23
3 of 4
IR's Unified Standard Schedule of Rates - 2019 Chapter-6 : Rails, Sleepers, Fittings and Renewals
061193 Extra to item no. 061191 for cutting 110 UTS rail (30% of Each 90.61
relevant item rate)
061194 Extra to item no. 061192 for cutting 110 UTS rail (30% of Each 141.97
relevant item rate)
061200 Drilling of hole in rail of any section and any UTS, manually
with contractor's labours, tools & plants, consumables etc. for -
061230 Stacking of glued joints in single layer for electrical testing, in Each 74.67
such a manner that glued joints - (a) shall not touch ground,
(b) shall not touch one another, (c) shall not touch any rail or
any metallic body, (d) shall not be water-logged from any side
and (e) end post shall not rest on supports of glued joint
4 of 4
IR's Unified Standard Schedule of Rates - 2019 Chapter-7 : Turnouts and Renewal
1. Assembling Works :
071010 Assembling complete MG turnout etc. on staging or on
formation / ballast bed to correct gauge and alignment as per
standard drawing, duly leading all types of special size sleepers,
switches, crossings, fittings, fastenings etc. with maximum lead
of 250m & all lift and testing points with S&T staff for throw of
switch etc. at station yard complete and as directed by Engineer
in-Charge.
071011 (a) 1 in 8½ Turnout Set 22760.80
071012 (b) 1 in 12 Turnout Set 26967.50
071013 (c) 1 in 16 Turnout Set 30239.25
071014 (d) Diamond Crossing Set 34896.75
071015 (e) Derailing Switch Set 4631.05
071020 Assembling complete BG Turnout including symmetrical split on
staging or on formation / ballast bed to correct gauge and
alignment as per standard drawing on all types of rails over PSC
sleepers at specified locations, duly leading special size
sleepers, switches, crossings, fittings, fastenings etc. with
maximum lead of 250m & all lift and testing points with S&T staff
for throw of switch etc. at station yard after levelling surface
complete and as directed by engineer in-charge
071021 (a) 1 in 8½ Turnout Set 41956.60
071022 (b) 1 in 12 Turnout Set 46096.60
071023 (c) 1 in 16 Turnout Set 49201.60
071024 (d) 1 in 20 Turnout Set 56324.70
071025 (e) Diamond crossing Set 58516.60
071026 (f) Derailing switch Set 8711.25
2. Dismantling Works :
071030 Dismantling of existing BG turnouts and trap switches with all
types of rails on other than PSC sleeper layout, removing fish
plates & fastenings, leveling of ballast to correct profile &
stacking all the released materials, sleepers, fastenings, rails,
switches & crossings including segregating & stacking at
specified locations in a neat & countable manner, as directed by
Engineer in-charge :
Under Traffic Block Conditions -
071031 (a) 1 in 8½ Turnout Set 31552.90
071032 (b) 1 in 12 Turnout Set 36285.26
071033 (c) 1 in 16 Turnout Set 40839.26
071034 (d) 1 in 20 Turnout Set 45393.26
071035 (e) Diamond Crossing Set 47670.26
071036 (f) Derailing Switch Set 6509.69
Under Conditions not requiring Traffic Block -
071037 (a) 1 in 8½ Turnout Set 24549.05
071038 (b) 1 in 12 Turnout Set 27816.20
071039 (c) 1 in 16 Turnout Set 30921.20
071040 (d) 1 in 20 Turnout Set 34026.20
071041 (e) Diamond Crossing Set 39554.25
071042 (f) Derailing Switch Set 4884.05
1 of 5
IR's Unified Standard Schedule of Rates - 2019 Chapter-7 : Turnouts and Renewal
071043 Extra over Items 071031 to 071035 and 071037 to 071041 for Set 10948.58
PSC sleeper layout
071044 Extra over Items 071036 and 071042 for PSC sleeper layout Set 2886.79
071050 Removing & stacking all types of rails, crossing & fastenings of
existing turnout excluding switch portion during traffic block, laid
on any type of sleeper with contractor’s labour, tools, plants etc.
for -
071051 (a) 1 in 8½ Turnout Set 11815.10
071052 (b) 1 in 12 Turnout Set 15230.60
071053 (c) 1 in 16 Turnout Set 18646.10
071054 (d) 1 in 20 Turnout Set 20923.10
071060 Removing existing Wooden / ST sleepers of Turnouts excluding
switch portion, collecting all released sleepers, fittings etc. at
indicated place with contractor’s labour, tools & equipments etc.
complete. Work shall be carried out in stages under traffic
including supporting and maintaining track as directed by
Engineer in-charge for safe passage of trains at 20 kmph speed
for -
071061 (a) 1 in 8½ Turnout Set 16597.95
071062 (b) 1 in 12 Turnout Set 20737.95
071063 (c) 1 in 16 Turnout Set 26027.38
071064 (d) 1 in 20 Turnout Set 30568.15
071065 (e) Diamond Crossing Set 33906.60
071066 Extra over Items 071061 to 071065 for PSC sleeper layout Set 9136.18
071070 Dismantling, removing & dressing the area of existing switch
portion on Wooden / ST sleepers including removing rails,
sleepers, fastenings etc. during traffic block with all contractor’s
tools, plants, equipments etc. complete and as directed for -
2 of 5
IR's Unified Standard Schedule of Rates - 2019 Chapter-7 : Turnouts and Renewal
3 of 5
IR's Unified Standard Schedule of Rates - 2019 Chapter-7 : Turnouts and Renewal
071130 Insertion and linking with track, the already assembled BG PSC
turnout by slewing with the help of manual labour or by cranes
including crossing of one track in traffic block without any
damage to track components including preparing ballast bed
and providing one round of kutcha packing of ballast under
bottom of sleepers to make track fit for 20 kmph speed to
required alignment and longitudinal level, as directed by
engineer in-charge for -
071131 (a) 1 in 8½ Turnout Set 32434.60
071132 (b) 1 in 12 Turnout Set 36988.60
071133 (c) 1 in 16 Turnout Set 41046.72
071134 (d) 1 in 20 Turnout Set 44643.12
071135 (e) Diamond Crossing Set 51293.72
071136 (f) Derailing Switch Set 6608.04
071140 Under Traffic block period - Laying / Insertion of already
assembled MG Turnout on staging, available alongside of track
manually including approach sleepers & connecting newly laid
points & crossing with approach track by making necessary
cutting & providing closures / cut rails as required and
subsequently renewing approach rails with suitable length of cut
rails, as required and fixing joints with fish plates, bolts, nuts
etc., providing kutcha packing, levelling, aligning, gauging,
ensuring proper housing of switch etc. to allow traffic with all
leads, lifts etc. complete and as directed by engineer in-charge
4 of 5
IR's Unified Standard Schedule of Rates - 2019 Chapter-7 : Turnouts and Renewal
5 of 5
IR's Unified Standard Schedule Of Rates - 2019 Chapter-8: Manual/ Mechanised screening Ballast Related Activities
081017 Extra to item no. 081013 for deep screening of Turnout Track Metre 170.66
(60% of relevant item rate)
081018 Extra to item no. 081014 for deep screening of Turnout Track Metre 186.72
(60% of relevant item rate)
For MG Track :
081019 (a) Depth of 150 mm below bottom of sleeper Track Metre 164.80
081020 (b) Depth of 200 mm below bottom of sleeper Track Metre 181.28
081021 Extra to item no. 081019 for deep screening of Turnout Track Metre 98.88
(60% of relevant item rate)
081022 Extra to item no. 081020 for deep screening of Turnout Track Metre 108.77
(60% of relevant item rate)
1 of 5
IR's Unified Standard Schedule Of Rates - 2019 Chapter-8: Manual/ Mechanised screening Ballast Related Activities
2 of 5
IR's Unified Standard Schedule Of Rates - 2019 Chapter-8: Manual/ Mechanised screening Ballast Related Activities
081051 (a) For lead upto 50m and lift up to 5m Cum 90.41
081052 (b) Extra to item no. 081051 for each additional lead of Cum / 50m 27.00
50m or part thereof when total lead exceeds 50m, but Lead
upto 250m
081053 (c) Extra to item no. 081051 for each additional lift of Cum / 2m 22.42
2m or part thereof when total lift exceeds 5m Lift
3 of 5
IR's Unified Standard Schedule Of Rates - 2019 Chapter-8: Manual/ Mechanised screening Ballast Related Activities
081090 Regrading of existing MG track by lowering upto the Track Metre 96.31
required depth in stages not exceeding 75mm or part
thereof under traffic condition and providing permissible
slopes as per IRPWM for the formation, including one
round of through packing with beaters & rammers to
attain safe approved gradient & gauge to allow train at
30 kmph speed
081100 Boxing of ballast as per profile mentioned in IR's LWR Track Metre 22.41
Manual including cess dressing on both sides of track
081130 Leading and loading Railway's Ballast collected at yard / Cum 110.91
depot / mid-section into Railway's covered wagon, using
any approved method with all ascents, descents, taxes
etc. with lead of 250m & all lifts complete, as per
specifications and as directed by Engineer in-charge
081140 Leading and loading Railway's Sand collected at yard / Cum 110.50
depot / mid-section into Railway's covered wagon, using
any approved method with all ascents, descents, taxes
etc. with lead of 250m & all lifts complete, as per
specifications and as directed by Engineer in-charge
4 of 5
IR's Unified Standard Schedule Of Rates - 2019 Chapter-8: Manual/ Mechanised screening Ballast Related Activities
081160 Unloading of Ballast from Railway's wagons other than Cum 98.12
Hopper wagons by opening the doors of boxes and
pulling & pushing down ballast with rake irons /
phowrahs and distributing unloaded ballast uniformly
over the track {it also includes taking out jammed
ballast}
081170 Unloading of sand / query dust from Railway's wagons Cum 87.46
other than Hopper wagons by opening the doors of
boxes and pulling & pushing down sand with rake irons /
phowrahs and distributing unloaded sand uniformly over
the track {it also includes taking out jammed sand}
081180 Spreading of unloaded sand / query dust from the Cum 82.20
Railway's wagons on top of cess uniformly in between
sleepers, i.e. in crib portion & on shoulders and clearing
sand on foot of rails manually under traffic condition
complete and as directed by Engineer in-charge
5 of 5
IR's Unified Standard Schedule of Rates - 2019 Chapter-9 : Welding Activities
1 of 3
IR's Unified Standard Schedule of Rates - 2019 Chapter-9 : Welding Activities
2 of 3
IR's Unified Standard Schedule of Rates - 2019 Chapter-9 : Welding Activities
3 of 3
IR's Unified Standard Schedule of Rates -2019 Chapter-10 : Reconditioning of Points Crossings
1. Built-Up Crossing :
101010 In-situ re-conditioning of worn out 1:8½ built-up / fabricated
crossing on all types of rail sections under traffic by RDSO
approved agency, as prescribed in ‘IR's Reconditioning of
Points & Crossings Manual’ with RDSO approved electrodes
and suppliers, finishing & grinding within permissible tolerance
limit, as directed by engineer in-charge.
{Note : One obtuse crossing shall be considered equivalent to
two nos. of 1:8½ crossing for payment} :
101011 (a) Using H3 electrodes Each 3221.15
101012 (b) Using H3A electrodes Each 3911.15
101013 (c) Using H3B electrodes Each 4601.15
101014 (d) Using H3C electrodes Each 5291.15
101020 In-situ reconditioning of worn out 1:12 or flatter built-up /
fabricated crossing on all types of rail sections under traffic
condition by RDSO approved agency, as prescribed in ‘IR's
Reconditioning of Points & Crossings Manual’ with RDSO
approved electrodes and suppliers, finishing & grinding within
permissible tolerance limit, as directed by engineer in-charge :
1 of 3
IR's Unified Standard Schedule of Rates -2019 Chapter-10 : Reconditioning of Points Crossings
101050 Reconditioning of worn-out all types of CMS (Cast Manganese Each 26475.30
Steel) crossings on all types of rail sections 'in-situ' under traffic
conditions using RDSO approved Translanatic Robotic Welding
technology alongwith approved agency, finishing & grinding
within permissible tolerance limit, as directed by engineer in-
charge.
{Note : (1) One obtuse crossing shall be considered equivalent
to two nos. of crossing for payment. (2) Reconditioned crossing
shall give a service life of minimum 80 GMT. In case of pre-
mature reconditioning, it shall be done by the contractor free of
cost} :
3. Switches / Tongue Rails :
101060 In-situ reconditioning of worn out 1:8½ tongue rail (only one
tongue rail alongwith connected stock rail) of all rail sections
under traffic, as prescribed in ‘IR's Reconditioning of Points &
Crossings Manual’ with RDSO approved electrodes and
suppliers, finishing & grinding within permissible tolerance limit,
as directed by engineer in-charge
101061 (a) Using H3 electrodes Each 1035.29
101062 (b) Using H3A electrodes Each 1345.79
101063 (c) Using H3B electrodes Each 1656.29
101064 (d) Using H3C electrodes Each 1966.79
101070 In-situ reconditioning of worn out 1:12 or flatter tongue rail (only
one tongue rail alongwith connected stock rail) of all rail sections
under traffic, as prescribed in ‘IR's Reconditioning of Points &
Crossings Manual’ with RDSO approved electrodes and
suppliers, finishing & grinding within permissible tolerance limit,
as directed by engineer in-charge :
101071 (a) Using H3 electrodes Each 1315.98
101072 (b) Using H3A electrodes Each 1695.48
101073 (c) Using H3B electrodes Each 2074.98
101074 (d) Using H3C electrodes Each 2454.48
101080 Reconditioning of worn out 1:8½ tongue rail (only one tongue
rail alongwith connected stock rail) of all rail sections on Cess
or Depot, as prescribed in ‘IR's Reconditioning of Points &
Crossings Manual’ with RDSO approved electrodes and
suppliers, finishing & grinding within permissible tolerance limit,
as directed by engineer in-charge :
101081 (a) Using H3 electrodes Each 884.71
101082 (b) Using H3A electrodes Each 1160.71
101083 (c) Using H3B electrodes Each 1436.71
101084 (d) Using H3C electrodes Each 1712.71
101090 Reconditioning of worn out 1:12 or flatter tongue rail (only one
tongue rail alongwith connected stock rail) of all rail sections on
Cess or Depot, as prescribed in ‘IR's Reconditioning of Points &
Crossings Manual’ with RDSO approved electrodes and
suppliers, finishing & grinding within permissible tolerance limit,
as directed by engineer in-charge :
101091 (a) Using H3 electrodes Each 1002.88
101092 (b) Using H3A electrodes Each 1313.38
101093 (c) Using H3B electrodes Each 1623.88
101094 (d) Using H3C electrodes Each 1934.38
4. SEJ (Switch Expansion Joint), Weld And Rail :
2 of 3
IR's Unified Standard Schedule of Rates -2019 Chapter-10 : Reconditioning of Points Crossings
101100 Re-conditioning of worn out all types of SEJs of all rail sections
to the standard profile as per RDSO drawing and prescribed in
‘IR's Reconditioning of Points & Crossings Manual’ including
grinding etc. complete.
{Note : Two stock rails + Two tongue rails will constitute one set
of SEJ} :
101101 (a) On Cess condition Set 4687.69
101102 (b) In-situ under traffic condition Set 5474.50
101110 Re-conditioning of cupped welded joints 'in-situ' under traffic Each 282.33
conditions as per RDSO’s guidelines for ‘IR's Reconditioning Of
Scabs, Wheel Burns Of Rail And Cupped AT Welded Joint’
101120 Re-conditioning of Wheel Burns / Scabs on rail under in-situ and Sq cm 8.47
traffic conditions as per RDSO’s guidelines for ‘Reconditioning
Of Scabs, Wheel Burns Of Rail And Cupped AT Welded Joint’
3 of 3
IR's Unified Standard Schedule of Rates - 2019 Chapter-11 : Formation Rehabilitation
1. Earth-Work :
111010 Removing existing ballast neatly from shoulder, crib and below Track Metre 359.66
sleepers so as to completely expose formation top for formation
treatment / repairs and running out the same after completion of
formation treatment work including dressing as per IRPWM
standard profile
111020 Insertion & spreading of blanketing material, conforming to
RDSO’s specifications, uniformly under the existing BG track in
layers of maximum 75mm thickness at a time upto the proposed
formation level as per approved drawing by duly lifting the
existing track in stages under the running conditions,
consolidating every layer of blanketing material manually or
mechanically in stages from stacks collected on either side of
track and packing the track for safe running of trains at speed of
30 kmph, achieving desired track geometry, as directed by
engineer in-charge under - (Note : Supply of blanketing material
shall be paid separately)
111021 (a) Without Traffic Block condition Cum 1081.19
111022 (b) During Traffic Block condition Cum 1255.34
111030 Excavation and leading of excavated earth / muck / dismantled Cum 993.89
rubbish of CC masonry in foundation from platform in-between
running / adjacent to track and by manual or any other suitable
means or descent/ascend, crossing of single track, obstruction
of track, signal wires, OHE wires, passenger crowds or any
other obstructions etc.
111040 Dressing and levelling the formation top surface in cutting or Sqm 41.55
embankment, removing vegetation / shrubs / any debris, duly
making good the isolated undulations etc. of upto 300mm depth
with Railway’s blanketing material, disposal of surplus soil on
slopes by spreading uniformly, rolling formation top in between
or adjacent to running track with 10MT roller for 5 to 8 passes
including watering while rolling to obtain uniform desired
formation top, as directed by engineer in-charge
2. Soil Testing :
111050 Slope stability calculation for Railways Embankment / Cutting
more than 6 meters height based on soil materials & parameters
as per RDSO's latest standards and specifications, duly
conducting relevant lab test, e.g. cohesion and angle of internal
friction etc. and submitting report for approval duly showing the
cross-section dimensions for embankment / cutting :
1 of 3
IR's Unified Standard Schedule of Rates - 2019 Chapter-11 : Formation Rehabilitation
111060 Excavation in all types of soil for formation treatment below track
under speed restriction of 20 kmph upto specified depth & width
including making up the cess as per standard profile or
spreading earth on bank, if the same is not required for cess
making and leveling the excavated bed to slope of 1 in 40
towards cess. The rate also includes working during traffic block
for excavation, removal and insertion of Railway’s Aluminum
Alloy Girders or Rail Clusters on C.C. crib for making temporary
arrangement alongwith erection and removal of cribs, all
wooden packing required and loading, unloading, shifting
operations including carriage of girders etc. complete and
maintaining the track parameters, as directed by engineer in-
charge
111061 (a) With Railway’s Aluminum Alloy Girders Cum 2832.82
111062 (b) With Rail Clusters, fabricated by contractor with rails Cum 3534.16
supplied by Railways
111070 Spreading blanketing material from stacks by the side of track Cum 1149.14
and filling the same in 15cm thick layer in track, levelling,
watering, ramming with hand rammers upto the formation top
during formation treatment in running traffic condition at speed
restriction of 20 kmph
111071 (a) Extra to item no. 111070 for every 50 metres lead or part Cum / 50 51.75
thereof when the lead exceeds the initial 250 metres metre Lead
111072 (b) Extra to item no. 111070, for every 1 metres height / lift or Cum / 1 86.25
part thereof, when the lift exceeds initial 5 metres metre Lift
111080 Earthwork for repairing to cess by cutting or raising of existing Running 83.61
cess upto 4 metre from centre of track with Railway’s earth Metre
including cutting of earth, leading, benching, filling, dressing
including cutting of grass / shrubs / trees etc.; watering,
compaction by ramming and leveling of earth for required
longitudinal & cross-sectional profile, as directed
111090 Formation treatment with Biaxial Geogrid 30 kN/m (Polyester/ Sqm 246.85
Polypropylene) alongwith deep screening of ballast by BCM,
which includes manufacture, testing, supply of Geogrid which
should be made from virgin high density polypropylene of weight
320 gms/sqm with required UTS and aperture sizes of 35mm x
35mm or 45mm x 45mm or 55mm x 55mm square or (30mm to
40mm) x (60mm to 65mm) or (40mm to 50mm) x (60mm to
65mm) rectangular (as approved by engineer in-charge), by
making suitable arrangement to BCM for spreading Geo-grid
beneath sleepers during deep screening with all contractor's
men, material, transportation, crossing of track & cutting of roll
to required length for enabling to lay alongwith BCM and as
directed by Engineer in-charge at site
111100 Earth-work in embankment with contractor's own earth including Cum 250.13
royalty / taxes, excavation / loading into contractor's vehicle
other than black cotton soil for repairing of cess / formation /
level crossing, rain cuts etc. to make surface to the desired level
and slope to entire satisfaction of Engineer in-charge. Rate shall
include sectioning to profile, all lift, descends, ascends, crossing
of track / road / nallah etc. including breaking of clods etc. and
compaction by rollers / rammers / tamping rods etc.
2 of 3
IR's Unified Standard Schedule of Rates - 2019 Chapter-11 : Formation Rehabilitation
111110 Excavation for widening of existing formation in cuttings in hard Cum 408.05
soils which require picks or crow bars for hacking including soils
containing stones or boulders of size under 0.03 cum without
infringing the nearby track, as directed by engineer-in-charge at
site including cutting of earth, loading, leading by contractor’s
vehicles, unloading at site, dumping on spoil bank by head loads
and utilising same excavated earth for widening of existing
formation in embankment as per standards, duly rolling
manually at 2:1 slope and levelling bank to the required profile
including watering and compaction with contractor's labour or
machanically operated rollers with all contractor's labour,
clearing of jungle, benching etc., tools, plants, vehicles etc.
complete with lead upto 1000m and all lifts including crossing of
track, wherever necessary
111120 Extra over item no. 11100 for earth-work for making cess on Cum 25.01
other side of the track (when no approaches available along
track or no road vehicles to work at site) by dumping
contractor's own earth other than black cotton soil, collected
along toe of bank of any height on to other side of track & side
slope of the existing bank by head load, duly crossing of tracks
with all contractor's materials, labour, tools, plant including
loading of earth in baskets, lifting, leading to the non-cess side
of bank including crossing of tracks & dumping etc. and as
directed by the Engineer in-charge
3 of 3
IR's Unified Standard Schedule of Rates -2019 Chapter-12 : Activities at Construction Sites
1. Dismantling Works :
121010 Dismantling of existing MG track, gas cutting of rails into Track Metre 103.71
free rails of length, as directed; removing fish plates &
fastenings, levelling of ballast to correct profile, so as to
form a level bed for laying BG track including segregation
and stacking at specified location in countable manner
121020 Dismantling existing middle rail of 52Kg / 90R track, Track Metre 98.00
serving for MG track in Mixed Gauge track portion and
check rail (on inside of curved track) of 52Kg / 90R / 75R
rails duly removing fish plates and bolts including
removing chairs from sleepers, stacking released rails,
fittings & fastenings, as directed by engineer in-charge
121030 Dismantling & removing existing SEJ (Switch Expansion Set 7686.46
Joint) assembly during line block and its replacement with
plain track as of adjoining section with all fittings and
stacking the released materials, as directed and aligning
rails, providing temporary connection with adequate
welding gap with adjoining rail and ensuring proper track
geometry for 30 kmph speed
121040 Dismantling of existing rail / metal fencing, fixed adjoining MT 1255.42
running lines of track, duly excavating and levelling the
foundation by hand compaction, removing connections
and transporting the released material by suitable means
and stacking the same, as directed by engineer in-charge
121050 Removing, screening and salvaging ballast from track, Cum 390.79
duly digging / scarifying ballast by beaters / wire brushes,
leveling formation after salvaging ballast, separating muck
by screening the salvaged ballast with contractor's 20mm
size sieve, stacking of sieved ballast for measurement on
or outside the formation along track, disposing off muck at
specified locations under non-traffic conditions with all
ascents, descents, as directed by Engineer in-charge
121060 Dismantling existing sand humps in yards including brick
/ stone masonry on either sides of track, removing sand
and earth to the required level including clearing site and
stacking released materials clear of infringement,
complete and as directed for -
121061 (a) Broad Gauge Each 6942.55
121062 (b) Metre Gauge Each 5907.55
2. Barricading Works :
121070 Provision of barricading with contractor's bamboos / balli
vertical post of 75 to 100mm dia. planted at every 2m
interval, projecting at least 1.5m above ground level and
driven firmly (minimum 0.5m) inside ground and including
painting verticals & horizontals with red luminous paints /
strips at alternative bay on barricade. Barricades shall be
completely removed when no longer required by engineer
in-charge. (60% payment shall be made on provision of
barricading at work-site)
121071 (a) With 3 horizontal bamboo / balli members of minimum Running Metre 128.77
50mm dia. spaced equally
121072 (b) Joining with strong nylon rope in one cross and one Running Metre 81.39
horizontal pattern of minimum 5mm dia.
1 of 5
IR's Unified Standard Schedule of Rates -2019 Chapter-12 : Activities at Construction Sites
2 of 5
IR's Unified Standard Schedule of Rates -2019 Chapter-12 : Activities at Construction Sites
3 of 5
IR's Unified Standard Schedule of Rates -2019 Chapter-12 : Activities at Construction Sites
4 of 5
IR's Unified Standard Schedule of Rates -2019 Chapter-12 : Activities at Construction Sites
5 of 5
IR's Unified Standard Schedule of Rates -2019 Chapter-13 : Maintenance Activities
131031 (a) For PSC Sleeper Track (BG) Track Metre 97.74
131032 (b) For other than PSC Sleeper Track (BG) Track Metre 81.01
131033 (c) For PSC Sleeper Track (MG) Track Metre 69.82
131034 (d) For other than PSC Sleeper Track (MG) Track Metre 57.99
131040 Third or subsequent Through Packing of track for all sleeper
density including picking of slacks, as required after second
through packing, subsequent to deep screening work, as
described in Para-238 of Indian Railways Permanent Way
Manual {Notes : (1) Rate is for track laid to 1540 sleepers/km
density; (2) 10% extra to the rate shall be paid in case of 1660
sleepers/km density; (3) Only 80% of the rate shall be paid in
case of 1340 sleepers/km density} -
131041 (a) For PSC Sleeper Track (BG) Track Metre 75.19
131042 (b) For other than PSC Sleeper Track (BG) Track Metre 64.81
131043 (c) For PSC Sleeper Track (MG) Track Metre 57.49
131044 (d) For other than PSC Sleeper Track (MG) Track Metre 48.84
1 of 9
IR's Unified Standard Schedule of Rates -2019 Chapter-13 : Maintenance Activities
2 of 9
IR's Unified Standard Schedule of Rates -2019 Chapter-13 : Maintenance Activities
131104 (ii) For Sleeper Density of 1340 sleepers/Km (M+4) Track Metre 133.63
(c) For PSC sleeper Track (MG) :
131105 (i) For Sleeper Density of 1540 sleepers/Km or more (M+7) Track Metre 149.77
131106 (ii) For Sleeper Density of 1340 sleepers/Km (M+4) or less Track Metre 127.17
(d) For other than PSC sleeper Track (MG) :
131107 (i) For Sleeper Density of (M+7) Track Metre 138.77
131108 (ii) For Sleeper Density of (M+4) or less Track Metre 117.32
131109 Extra over Items 131101 to 131108 for working in yards Track Metre 34.57
131110 Systematic Overhauling (shallow screening) of fish plated /
welded joint track sleepers including 3 approach sleepers on
either sides upto 50mm below bottom of sleepers in crib &
shoulder, replacing rounded ballast, recouping deficient ballast
within 50m lead, replacement of wornout fittings supplied by
Railway, as directed as per Para-227 of Indian Railways
Permanent Way Manual :
131111 (a) For Broad Gauge track Each Joint 1202.67
131112 (b) For Metre Gauge track Each Joint 901.89
131120 Slack picking of joint sleepers and 3 approach sleepers on
either sides with replacement of fittings and giving required lift
to make up general track level, as directed :
131121 (a) For Broad Gauge track Each Joint 431.14
131122 (b) For Metre Gauge track Each Joint 308.75
3. Pulling Back & End Cropping Works :
131130 Pulling back of rails / panels on running track for creep
adjustment or other incidental activities and re-fixing anchors
and all other fittings, including squaring and slack picking of
displaced sleepers, as directed :
131131 (a) For rails of 13 metre length Running Metre 21.09
131132 (b) For rails from 13 metre & upto 40 metre length Running Metre 23.68
131133 (c) For rails more than 40 metre length Running Metre 26.27
3 of 9
IR's Unified Standard Schedule of Rates -2019 Chapter-13 : Maintenance Activities
4 of 9
IR's Unified Standard Schedule of Rates -2019 Chapter-13 : Maintenance Activities
131191 (a) With Railway’s Hydraulic Rail tensor Track Metre 66.21
131192 (b) With Contractor’s Hydraulic Rail tensor Track Metre 68.31
131193 (c) Without Rail tensor Track Metre 60.00
131200 Extra for carrying out Through Fitting Renewal (TFR of ERC, Track Metre 12.58
GRSP, Liners) alongwith de-stressing
131210 Extra for works of RR / SR / FR / Destressing for Track Metre 84.93
Major/Important bridge, having total opening more than 40
metres
6. Renewal and Miscellaneous Works :
131220 Fixing Joggled Fish Plates with bolt / clamp (supplied by
Railway) in running track conditions at welds on rail, as directed
by engineer in-charge (drilling of holes in rail will be paid
separately) :
131221 With 2 bolts Set 103.20
131222 With 4 bolts Set 137.60
131223 With Clamps Set 150.54
131230 End cutting & grinding of Railway's Metal / GFN liner and
providing the same at joints with contractor's tools & plants,
labour, consumable etc. complete as directed :
131231 (a) GFN Liners Each 12.25
131232 (b) Metal Liners Each 25.43
131240 Providing wooden blocks at rail joints duly transporting Each Joint 125.03
Railway’s released wooden sleepers, cutting into blocks,
providing bearing plate with rail screw / dog spikes and doing
packing, if required, as directed under traffic conditions
131250 Removing the existing wooden blocks under each joint, duly Each Joint 53.99
removing fittings, transporting and handing over the wooden
blocks & fittings
131260 Maintenance of track on main line & loops, Points & crossings Per Day 12650.00
etc. including special attention to section for carrying out
various maintenance works listed in Indian Railways P.Way
Manual / Bridge Manual / LWR Manual for safe running of
goods and passenger trains with contractor's tools / labours etc.
complete, as directed by Engineer in-charge.
{Note : (1) Contractor shall arrange one gang at any point of
time comprising of minimum 20 labours with sufficient
experience in P.Way working and one P.Way Supervisor. (2) In
case, contractor provides less no. of Labour / Supervisor,
payment will be deducted @ 10% of the accepted rate per
person}
5 of 9
IR's Unified Standard Schedule of Rates -2019 Chapter-13 : Maintenance Activities
6 of 9
IR's Unified Standard Schedule of Rates -2019 Chapter-13 : Maintenance Activities
7 of 9
IR's Unified Standard Schedule of Rates -2019 Chapter-13 : Maintenance Activities
131510 Anti-corrosive painting of rail outside track on rail bottom, web, Running Metre 124.97
foot and fishing plane as per requirement with two coats of
bituminous emulsion without mica (IP No. 56192 and RDSO
Specification No. IRS-P-30-1996) of reputed make including
surface preparation, i.e. cleaning with wire brush / sand paper
as a complete job as per Para 250 of Indian Railways
Permanent Way Manual
131520 Anti-corrosive painting of rail on running track on web, foot etc. Running Metre 107.59
including liner contact area (excluding bottom of foot) and
fishing plane as per requirement with two coats of bituminous
emulsion without mica (IP No. 56192 and RDSO Specification
No. IRS-P-30-1996) of reputed make including surface
preparation, i.e. cleaning with wire brush / sand paper as a
complete job as per Para 250 of Indian Railways Permanent
Way Manual
131530 Anti-corrosive painting of welds on track or on cess for all rail Each 13.97
sections with high build epoxy paint of reputed manufacturer,
conforming to RDSO's Specification no. M&C/PCN/123/2012
on welded area upto 10cm on either side including on the
underside of rail foot as per Railway's AT Weld Manual
including lettering / numbering, as directed
131540 Marking, inscribing, painting, writing, bordering etc. on new / old
iron surface at various locations of Points & Crossings with
details of turn-in / turn-out reference station mark on rail web for
one set, duly preparing surface with contractor's wire brush and
applying two coats of yellow synthetic enamel paint of approved
quality as background and stenciling the details to suitable size,
as described for every curve reference station mark / switch /
crossing details with black enamel paint of approved quality
complete, as directed :
131541 (a) 1 in 16 Turnout Set 1556.24
131542 (b) 1 in 12 Turnout Set 1038.83
131543 (c) 1 in 8½ Turnout Set 655.50
131544 (d) Derailing Switch Set 327.75
131550 Painting of P.Way Reference Post, Structures etc. with enamel
paint of approved make with different colurs & letters, as
directed by Engineer in-charge :
131551 (a) Kilometre & Gradient post Each 66.93
131552 (b) Hectometre Post Each 74.98
131553 (c) LWR / SEJ Board Each 113.97
131554 (d) Level Crossing Boards including Road Sign Boards Each 128.92
131555 (e) Level Crossing Post Each 130.02
131556 (f) Curve Post Each 74.71
8 of 9
IR's Unified Standard Schedule of Rates -2019 Chapter-13 : Maintenance Activities
9 of 9
IR's Unified Standard Schedule of Rates - 2019 Chapter-14 : Testing of Rails Other Components
1 of 2
IR's Unified Standard Schedule of Rates - 2019 Chapter-14 : Testing of Rails Other Components
141040 Carrying out USFD testing of Flash Butt (FB) & Gas Pressure
(GP) welds on all types of rails using 2 single crystal 45º (2
MHz) for head testing and one single crystal 70º (2 MHz)
probe for web & flange testing by NBC (Need Based
Concept) method under traffic conditions as per provisions of
IR’s "Manual & Specifications for Ultrasonic Testing of Rails
and Welds" & related instructions, duly marking the defects,
submission of daily reports and storing back-up data as
specified & directed. The rates are inclusive of contractor’s
men, materials & machines complete unless otherwise
specified and directed :
(1) With Contractor’s USFD machine :
141041 (a) Track having upto 3 rail panels Each 92.35
141042 (b) Track having more than 3 rail panels Each 80.80
(2) With Railway's USFD machine including related T&P and
probes :
141043 (a) Track having upto 3 rail panels Each 85.77
141044 (b) Track having more than 3 rail panels Each 75.05
4. USFD Testing of SEJ :
141050 USFD testing of Switch Expansion Joint (SEJ) by NBC (Need
Based Concept) method under traffic conditions as per
provisions of "IR’s Manual & Specifications for Ultrasonic
Testing of Rails and Welds" with latest amendments & related
instructions, duly marking the defects, submission of daily
reports and storing back-up data, as specified in the special
conditions, as applicable to rail testing. The rates are
inclusive of contractor’s men, materials & machines complete
unless otherwise specified and directed :
2 of 2
IR's Unified Standard Schedule of Rates - 2019 Chapter-15 : Heavy Track Machines
1 of 13
IR's Unified Standard Schedule of Rates - 2019 Chapter-15 : Heavy Track Machines
Description
Item. No. Unit Rate (Rs)
151073 Guarding and watching the Track machine / group of Per 8 hr's Shift 516.64
machines, spare parts, oils, grease etc. during day and night
time, at all locations wherever necessary, as instructed by the
machine in-charge
2. Track Relaying Train (TRT) Related Works :
151080 Carrying out preparatory works before operation of Track Track Metre 13.85
Relaying Train (TRT), such as –
(1) Broken corroded sleepers to be removed and fastenings to
be loosened;
(2) Excess ballast to be removed and crib ballast between
consecutive sleepers removed upto bottom of sleepers;
(3) Check rails of level crossings falling in the range of work to
be removed;
(4) In case of CTR, rail panels placed at 1.5m away from
existing track centre;
(5) All existing longer wooden sleepers or interlaced sleepers
of different height to be removed;
(6) Cutting of existing rails to 6m piece closure at work site
from where Track Relaying Train (TRT) will start working on
that day;
(7) Removal of Reverse jaw type CST-9 sleeper (T-443),
joggled fish plates, OHE bonds & other obstructions etc.
151090 Loading of PSC sleepers in layers on BRH (special type
modified BFR for TRT / PQRS working) by using contractor’s
Gantry (Crane) in TRT / PQRS Base Depot, placing
B29dunnage (wooden beddings / wedges) between sleepers
to cover entire layer of sleepers, complete in such a manner
that it may be dispatched in train formation
151091 Mechanised loading with Railway's cranes Each 4.20
151092 Mechanised loading with Contractor's cranes Each 5.59
2 of 13
IR's Unified Standard Schedule of Rates - 2019 Chapter-15 : Heavy Track Machines
Description
Item. No. Unit Rate (Rs)
151112 Doing various miscellaneous works for proper upkeep of crew Per Day 1557.10
rest van / rest room, as directed by the machine in-charge by :
(1) Bringing water from nearby source for cleaning machine;
(2) Cleaning machine with water jet or any suitable means;
(3) Fuelling machine, duly bringing diesel / hydraulic oil from
the stacked drums;
(4) Bringing water to staff rest van or staff rest room, cleaning
rest van / rest room, cooking food for Track Machine staff or
bringing food from outside (cost of food shall be borne by the
staff concerned)
151120 Unloading of released sleepers from BRH (special type Each 6.83
modified BFR for TRT working) in Depot by using contractor’s
Gantry (Crane) and stacking them at nominated locations
within the yard limits with all leads & lift
3. T-28 Machine Related Works :
151130 Replacement of Turnout by dismantling the existing one,
removing and stacking all released materials, removing ballast
and muck by excavating upto required depth, preparation of
formation bed, laying of Turnout assembly by Railway's T-28
machine, linking of track with all fittings, filling up of ballast
duly screened; packing, adjusting, opening & housing of
switch; testing operation of switch assembly and attending
track parameters, so as to make track fit for 20 kmph speed
including disposing off muck to indicated places upto free lead
after the block working etc. complete for -
3 of 13
IR's Unified Standard Schedule of Rates - 2019 Chapter-15 : Heavy Track Machines
Description
Item. No. Unit Rate (Rs)
151152 Carrying out various miscellaneous works for proper upkeep Per Day 1041.90
of crew rest van / rest room, as directed by the machine in-
charge (T-28) for -
(1) Fuelling machine duly bringing diesel / hydraulic oil from
the drums stacked;
(2) Bringing water to staff rest van or staff rest room, cleaning
rest van / rest room, cooking food for Track Machine staff or
bringing food from outside (cost of food shall be borne by the
staff concerned)
4. BCM / FRM Machine Related Works :
4 of 13
IR's Unified Standard Schedule of Rates - 2019 Chapter-15 : Heavy Track Machines
Description
Item. No. Unit Rate (Rs)
151160 Carrying out preparatory works for operation of Ballast Track Metre 11.75
Cleaning Machine (BCM) which includes making trench in
track for inserting cutter bar, supporting track on wooden
block supplied by Railway, removal of ballast alongwith muck
from shoulder which is out of reach of cutter chain and putting
the same in cutting width or between rails. Rate includes all
miscellaneous works, e.g. opening and re-fixing of joggled fish
plates, OHE Bonds, dismantling & removing obstructions etc.
151190 Removal of screened muck discharged by BCM from cuttings, Running Metre 23.31
drains, platform etc. (including muck around OHE mast, signal
post etc.) and disposing it beyond 5m from edge of cutting
which are upto 3m deep or alternatively carting it upto 50m for
disposing it off beyond the length of cutting / platform and
making up cess wherever low using muck
151200 Removal of screened muck discharged by FRM / SBCM from Running Metre 15.54
cuttings, drains, platform etc. (including muck around OHE
mast, signal post etc.) and lifting it beyond 5m from edge of
cutting which are upto 3m deep or alternatively carting it upto
50m for disposing it off beyond length of cutting / platform and
making up cess wherever low, using muck
151201 Extra to item nos. from 151190 to 151200 for disposal of muck Running Metre / 2.07
at a distance beyond 50m for every additional lead of 50 50 metre Lead
metres or part thereof upto 500 metres
151202 Extra to item nos. from 151190 to 151200 for disposal of muck Running Metre / 4.31
for additional lift of 1 metre or part thereof beyond 3 metre lift 1 metre Lift
in case of disposal of muck from track in cutting
151210 Ballast equalisation & ballast profiling after completion of deep Track Metre 27.58
screening work by BCM and/or unloading of ballast by DMT
(Ballast Train), as directed by Site Engineer as per IRPWM
including heaping of ballast in tamping zone keeping rails &
sleeper top free from ballast, spacing and squaring of sleeper,
gauging, cleaning of muck, proper fixing of fastening, attention
during each round of sleeper tamping in relation to pre & post
working
151220 Making cess in deep screened track by using screened muck Track Metre 44.41
discharged by BCM where cess is low or cutting cess to
required depth upto 4m from centre of track, where cess is
high and disposing off extra muck beyond 5m from edge of
cutting which are upto 3m deep or alternatively carting it upto
50m for disposing it off beyond cutting or platforms, so as to
make cess as per standard profile including providing proper
slope
5 of 13
IR's Unified Standard Schedule of Rates - 2019 Chapter-15 : Heavy Track Machines
Description
Item. No. Unit Rate (Rs)
151230 Carrying out packing of sleepers behind BCM including filling Track Metre 66.61
ballast when only lifting is carried out by BCM. Rate includes
attending track parameters with required manual packing, so
as to make track fit for 30 kmph speed
151240 Ballast Cleaning Machine (BCM) :
151241 Assisting the operator and maintenance engineers in their Per Day 6649.30
duties of day-to-day machine maintenance for BCM at stabling
station or at site of working. The activities include :
(1) Setting & disconnecting cutter bar;
(2) Carrying chain links to connect and disconnect chain;
(3) Cutting rail pegs and other obstructions by gas cutting;
(4) All gas cutting, welding works & oiling / greasing for
machine working & maintenance;
(5) Transportation of spares, batteries, trough plates, chain
links etc. from site store/ BFRs at stabling station during
maintenance and at site during block / break down etc.;
(6) Assisting in replacement of spares on machine;
(7) Rendering assistance to machine staff, as directed by
machine in-charge.
{Payment shall be made for the days which have not been pre-
notified as off-days}
151242 Carrying out various miscellaneous works for proper upkeep Per Day 1557.10
of crew rest van / rest room, as directed by machine in-charge
by (BCM) :
(1) Bringing water from nearby source and cleaning machine
with water jet or any suitable means;
(2) Fuelling machine, duly bringing diesel / hydraulic oil from
the stacked drums;
(3) Bringing water to the staff rest van or staff rest room,
cleaning the rest van / rest room, cooking food for Track
Machine staff or bringing food from outside (cost of food shall
be borne by the staff concerned)
151250 Ballast Regulating Machine (BRM) :
151251 Carrying out various miscellaneous works for proper upkeep Per Day 1041.90
of crew rest van / rest room, as directed by machine in-charge
(BRM) by :
(1) Bringing water from nearby source and cleaning machine
with water jet or any suitable means;
(2) Fuelling machine duly bringing diesel / hydraulic oil from
the stacked drums;
(3) Bringing water to staff rest van or staff rest room, cleaning
rest van / rest room, cooking food for Track Machine staff or
bringing food from outside;
(4) Guarding & watching machines, spare parts, oils, grease
etc. during day and night time at all locations, wherever
necessary, as instructed by the machine in-charge;
(5) Cooking food for Track Machine staff or bringing food from
outside (cost of food shall be borne by the staff concerned)
6 of 13
IR's Unified Standard Schedule of Rates - 2019 Chapter-15 : Heavy Track Machines
Description
Item. No. Unit Rate (Rs)
151261 Assisting operator and maintenance engineers in their duties Per Day 5809.80
of day-to-day machine maintenance for SBCM at stabling
station or at site of working. The activities include :
(1) Setting & disconnecting cutter bar;
(2) Carrying chain links to connect and disconnect chain;
(3) Cutting rail pegs and other obstructions by gas cutting;
(4) All gas cutting, welding works & oiling / greasing for
machine working & maintenance;
(5) Transportation of spares, batteries, trough plates, chain
links etc. from site store / BFRs at stabling station during
maintenance and at site during block / break down etc.;
(6) Assisting in replacement of spares on machine;
(7) Rendering assistance to machine staff, as directed by
machine in-charge
{Payment shall be made for the days which have not been pre-
notified as off-days}
151262 Doing various miscellaneous works for proper upkeep of crew Per Day 1557.10
rest van / rest room, as directed by machine in-charge
(SBCM) by :
(1) Bringing water from nearby source and cleaning machine
with water jet or any suitable means;
(2) Fuelling machine duly bringing diesel / hydraulic oil from
stacked drums;
(3) Bringing water to the staff rest van or staff rest room,
cleaning the rest van / rest room, cooking the food for Track
Machine staff or bringing food from outside (cost of food shall
be borne by the staff concerned)
151263 Screening of ballast haunch, left out of FRM / SBCM reach Running Metre 56.03
and utilising screened ballast in track profile alongwith muck
for cess making or throwing away within 50m lead and 3m lift
when not required for cess repairs
151264 Making cess in deep screened track by using screened muck Track Metre 31.08
discharged by FRM where cess is low or cutting cess to
required depth upto 4m from centre of track, where cess is
high and disposing off extra muck beyond 5m from edge of
cutting which are upto 3m depth or alternatively carting it upto
50m for disposing it off beyond cutting or platforms so as to
make the cess as per standard profile including providing
proper slope
151270 CSM, Duomatic and 3X Sleeper Tamping Machines :
151271 Assisting operator and maintenance engineers in their duties Per Day per 4953.63
of day-to-day tamping machine maintenance at stabling machine
station or at site of working. The activities include :
(1) Replacement, collection and transportation of tamping
tools from site to the machine / rest van;
(2) All gas cutting, welding works & oiling / greasing for
machine working & maintenance;
(3) Transportation of tamping tools, spares, batteries etc.
from site store / BFRs at stabling station during maintenance
and at site during block / break down etc.;
(4) Assisting in replacement of spares on machine;
(5) Rendering assistance to machine staff, as directed by
machine in-charge
{Payment shall be made for the days which have not been pre-
notified as off-days}
7 of 13
IR's Unified Standard Schedule of Rates - 2019 Chapter-15 : Heavy Track Machines
Description
Item. No. Unit Rate (Rs)
151272 Doing various miscellaneous works for proper upkeep of crew Per Day per 1041.90
rest van / rest room, as directed by machine in-charge machine
(CSM/Duomatic/3X) by :
(1) Daily cleaning machine with water jet or any suitable
means;
(2) Fuelling machine duly bringing diesel / hydraulic oil from
stacked drums;
(3) Bringing water to staff rest van or staff rest room, cleaning
rest van / rest room, cooking food for Track Machine staff or
bringing food from outside (cost of food shall be borne by the
staff concerned)
5. CSM / DUO / 3X Machine Related Works :
151280 Carrying out pre-tamping, during tamping and post-tamping
work for tamping track with all types of rails, sleepers &
sleeper density by various Track Tamping machines, which
include :
(1) Re-adjustment of ballast, heaping-up of ballast, filling-up of
cavities in tamping zone by picking ballast from stacks /
shoulders / crib of adjoining track upto lead of 50 m to ensure
effective packing;
(2) Clearing of ballast on sleepers to make them visible to
operator,
(3) Clearing of ballast over rail foot to facilitate holding of rail
by rollers of TTM;
(4) Digging, screening and replenishment of ballast at mud
pumping / rounded ballast in sleeper crib location;
(5) Tightening of loose fittings immediately before & after
tamping;
(6) Replacement of broken / missing fittings supplied by
Railway;
(7) Correcting displaced sleepers to position alongwith
squaring;
(8) Re-setting of worked-out / fallen fittings;
(9) Removing and re-fixing joggled fish plates & wooden
blocks, wherever necessary;
(10) Manual consolidation of ballast in crib / shoulders;
(11) Neat boxing/dressing of ballast to standard profile -
151281 (a) For day time block working Track Metre 29.27
151282 (b) For night time block working Track Metre 35.28
151290 Pre, during & post tamping operations, as mentioned in Item
no. 151300 at level crossing portion alongwith opening the
road, removing and re-fixing of check rails & fittings, painting
of running rail & check rail, completing road surface to
motorable smooth condition after packing is over, as directed
for -
151291 (a) Level crossing with CC block surface Each LC 19535.40
151292 (b) Level crossing with asphalted surface Each LC 21812.40
151293 (c) Level crossing with moorum / earth surface Each LC 18396.90
151300 Dynamic Track Stabiliser (DGS)
8 of 13
IR's Unified Standard Schedule of Rates - 2019 Chapter-15 : Heavy Track Machines
Description
Item. No. Unit Rate (Rs)
151301 Carrying out various miscellaneous works for proper upkeep Per Day 1041.90
of crew rest van / rest room, as directed by machine in-charge
(DGS) by :
(1) Daily cleaning machine with water jet or any suitable
means;
(2) Fuelling machine duly bringing diesel / hydraulic oil from
stacked drums;
(3) Bringing water to staff rest van or staff rest room, cleaning
rest van / rest room, cooking food for Track Machine staff or
bringing food from outside (cost of food shall be borne by staff
concerned)
6. Unimat Machine Related Works :
151310 Carrying out pre-tamping, during tamping and post-tamping
works for tamping track with all types of rails, sleepers &
sleeper density by various Track Tamping machines, which
include :
(1) Re-adjustment of ballast, heaping-up of ballast, filling-up of
cavities in tamping zone by picking ballast from stacks /
shoulders / crib of adjoining track upto lead of 50 m to ensure
effective packing;
(2) Clearing of ballast on sleepers to make them visible to
operator;
(3) Clearing of ballast over rail foot to facilitate holding of rail
by rollers of TTM;
(4) Digging, screening and replenishment of ballast at mud
pumping / rounded ballast in sleeper crib location;
(5) Tightening of loose fittings including check rails
immediately before & after tamping;
(6) Replacement of broken / missing fittings supplied by
Railway;
(7) Correcting displaced sleepers to position alongwith
squaring;
(8) Re-setting worked-out / fallen fittings;
(9) Removing and re-fixing joggled fish plates & wooden
blocks, OHE bonds & other obstructions, wherever
necessary;
(10) Removing and re-fixing stretcher bar, as directed;
(11) Adjustment in opening and housing of switch for testing
operation of points for -
151311 (a) 1 in 8½ Turnouts Each Set 12447.60
151312 (b) 1 in 12 Turnouts Each Set 14218.60
151313 (c) 1 in 16 Turnouts Each Set 19029.40
151314 (d) 1 in 20 Turnouts Each Set 21306.40
151315 (e) Derailing Switch Each Set 8945.45
151316 (f) Extra to Item no. 151311 for night block working (15% of Each Set 1867.14
relevant item rate)
151317 (g) Extra to Item no. 151312 for night block working (15% of Each Set 2132.79
relevant item rate)
151318 (h) Extra to Item no. 151313 for night block working (15% of Each Set 2854.41
relevant item rate)
151319 (i) Extra to Item no. 151314 for night block working (15% of Each Set 3195.96
relevant item rate)
151320 (j) Extra to Item no. 151315 for night block working (15% of Each Set 1341.82
relevant item rate)
151330 UNIMAT (Points & Crossing Tamping Machine) :
9 of 13
IR's Unified Standard Schedule of Rates - 2019 Chapter-15 : Heavy Track Machines
Description
Item. No. Unit Rate (Rs)
151331 Assisting the operator and maintenance engineers in their Per Day per 4612.65
duties of day-to-day Tamping Machine maintenance at machine
stabling station or at site of working. The activities include :
(1) Replacement, collection and transportation of tamping
tools from site to machine / rest van;
(2) All gas cutting, welding works & oiling / greasing for
machine working & maintenance;
(3) Transportation of tamping tools, spares, batteries etc.
from site store / BFRs at stabling station during maintenance
and at site during block / break down etc.;
(4) Assisting in replacement of spares on machine;
(5) Rendering assistance to machine staff, as directed by
machine in-charge;
{Payment shall be made for the days which have not been pre-
notified as off-days}
151332 Carrying out various miscellaneous works for proper upkeep Per Day per 1041.90
of crew rest van / rest room, as directed by machine in-charge machine
(Unimat) by :
(1) ) Daily cleaning machine with water jet or any suitable
means;
(2) Fuelling machine duly bringing diesel / hydraulic oil from
stacked drums;
(3) Bringing water to staff rest van or staff rest room, cleaning
rest van / rest room, cooking food for Track Machine staff or
bringing food from outside (cost of food shall be borne by staff
concerned)
7. Miscellaneous
151340 Laying of auxiliary track with all types of rails, already available Track Metre 58.08
on cess, fixing rails on wooden blocks / CST-9 pots at 2m
interval, true to square, to required alignment & level, fixing
with spikes / screws / keys, linking rails with fish plates, bolts &
nuts to a gauge of 3400mm (with reference to centre line of
existing BG track), levelling both the rails to same plane as
that of BG track over stone ballast by way of removing ballast
from shoulders of existing track, providing one proper packing.
Subsequently, dismantling auxiliary track after completion of
PQRS work at site by way of removing wooden blocks / CST-9
pots and carrying same to next stretch / location, if required,
where auxiliary track has to be laid and spreading the same at
required locations and leaving rails there itself for carrying out
TRR work later.
151350 Through rail renewal of BG track on PSC sleepers of any
density with all types of rails / rail panels lying in auxiliary track
or on cess or involving removal of fastenings, carting and
stacking released materials. It also includes fastening rails
taken from auxiliary track to sleepers to correct gauge with
fish plates, bolts & nuts to a neat gauge of 1673 mm including
handling of rails by way of dragging, pairing etc. and leading
released service rails to load into BFR / Lorry or to shift to next
location including crossing of track with lead & lift, as directed -
151351 (a) For rails upto 13m length Track Metre 88.23
151352 (b) For rails of more than 13m and upto 40m length Track Metre 82.70
151353 (c) For rails above 40m length Track Metre 83.35
10 of 13
IR's Unified Standard Schedule of Rates - 2019 Chapter-15 : Heavy Track Machines
Description
Item. No. Unit Rate (Rs)
151360 Through Rail renewal with free service rails of all types by Track Metre 88.23
removing existing running rails, already cut into free rails / rail
panels for making auxiliary track, including attending
alignment, cross level, gauging, packing; wherever required
including crossing of track, as directed
151370 Reconditioning of worn out tamping tools of track machines Each 666.76
like CSM, Duomatic, Unimat, Tamping Express etc. by
approved welding electrode with contractor’s welding plant,
power, welder, labour etc. so as to bring the worn out tamping
tools to its original shape & size and to achieve minimum 5 km
of tamping with wear upto 20% of the original size of tool
151380 Reconditioning of worn out tamping tools of track machines; Each 1385.18
like CSM, Duomatic, Unimat, Tamping Express etc. using
special hard drawn / flux covered self shielded RDSO
approved electrodes for enhanced life cycle with contractor’s
welding plant, power, welder, labour etc. so as to bring the
worn out tamping tools to its original shape & size and to
achieve minimum 50 km of tamping with wear upto 20% of
original size of tool.
151390 Supply of Hydraulic Hose pipes of different diameter,
approved by SAE (Society of Automotive Engineers) or DIN
(Deutsches Institute for Norms) of different diameter, and also
as approved by Railway Engineer, suitable for fixing in Heavy
Track Machines
151391 (a) No. 4-SAE 100R2 with max. WP400 bar and minimum Metre 86.25
bursting pressure 1600 bar of running length
151392 (b) No. 6-SAE 100R2 with max. WP330 bar and minimum Metre 103.50
bursting pressure 1320 bar of running length
151393 (c) No. 8-SAE 100R2 with max. WP276 bar and minimum Metre 115.00
bursting pressure 1103 bar of running length
151394 (d) No. 10-SAE 100R2 with max. WP 250 bar and minimum Metre 156.40
bursting pressure 1000 bar of running length
151395 (e) No. 10-SAE 100R5 with max. WP 121 bar and minimum Metre 179.40
bursting pressure 483 bar of running length
151396 (f) No. 12-SAE 100R2 with max. WP215 bar and minimum Metre 195.50
bursting pressure 860 bar of running length
151397 (g) No. 12-SAE 100R9 with max. WP 250 bar and minimum Metre 230.00
bursting pressure 1034 bar of running length
151398 (h) No. 16-SAE 100R2 with max. WP165 BAR and minimum Metre 1069.50
bursting pressure 660BAR of running length
151399 (i) No. 20-SAE 100R2 with max. WP125 BAR and minimum Metre 1109.75
bursting pressure 500BAR of running length
151400 (j) No. 24-SAE 100R5 with max. WP35 BAR and minimum Metre 460.00
bursting pressure 140BAR of running length
151410 Supply of Chain Bolt, Plasser Part No. 61.04.212 (RDSO Each 59.80
specification No. TM/HM/6 /111 and RDSO Drawing No.
TM/9302 (Revised)
151420 Supply of T Head Bolt with Double Nuts & Spring Washer, Each 10.35
Plasser Part No. 61.04.218 for BCM
151430 Supply of CSK Bolts with double nuts of different sizes with
one spring washer of make TVS / UNBROKE for Track
Machines -
151431 (a) Part No. M 12mm x 60mm or 12mm x 65mm Each 24.73
151432 (b) Part No. M 16mm x 60 mm Each 47.15
151433 (c) Part No. M 16mm x 90mm Each 66.13
151434 (d) Part No. M 20mm x 60mm Each 140.30
11 of 13
IR's Unified Standard Schedule of Rates - 2019 Chapter-15 : Heavy Track Machines
Description
Item. No. Unit Rate (Rs)
12 of 13
IR's Unified Standard Schedule of Rates - 2019 Chapter-15 : Heavy Track Machines
Description
Item. No. Unit Rate (Rs)
13 of 13
IR's Unified Standard Schedule of Rates - 2019 Chapter-16 : Small Track Machines
1 of 5
IR's Unified Standard Schedule of Rates - 2019 Chapter-16 : Small Track Machines
2 of 5
IR's Unified Standard Schedule of Rates - 2019 Chapter-16 : Small Track Machines
161140 Breaking of brick work, asphalt and rocks by Concrete Cum 1331.32
Sleeper Breaker with contractor's tools & plantS, equipments,
consumable etc. with all lead & lift complete, as directed by
Engineer in-charge. Concrete Sleeper Breaker shall be as
per RDSO's Specification No. TM/SM/30, dated 26.10.1995
3 of 5
IR's Unified Standard Schedule of Rates - 2019 Chapter-16 : Small Track Machines
3. Fittings :
161160 Measuring of Toe Load of ERC during service in field by Toe Each 3.03
Load Measuring Device (Mechanical) with contractor's tools &
plants, equipment, consumable with all lead & lift etc.
complete, as directed by Engineer in-charge. Toe Load
Measuring Device (Mechanical) will be as per RDSO's
Specification No. TM/SM/14 (Rev. 01 of 2005 with all
updation)
161170 Measuring of Toe Load of ERC during service in field by Each 3.38
Electronic Toe Load Measuring Device with contractor's tools
& plants, equipment, consumable with all lead & lift etc.
complete, as directed by Engineer in-charge. Electronic Toe
Load Measuring Device will be as per RDSO's Specification
No.TM/SM/ETLMD/218 (Rev. 01 of 2003 with all updation)
161180 Carrying the rails / rail panels, concrete sleepers (using the
attachments) at site of work for 300 metres lead by Insulated
rail dolly with contractors tools and plant, equipment,
consumable with all lead and lift etc. complete as directed by
Engineer-in-charge as per Specifications :
{(i) Tubular frame : made of mild steel heavy duty pipe. (ii)
Chain : alloy steel chain conforming to IS : 10131/82 grade l
or (3) of 12 mm size of rail handling (iii) Attachment for
concrete sleeper : the chain sling conforms to IS : 2760/80,
having lifting link & grippers assembly:
161181 (a) Sleeper Each 39.43
161182 (b) Rail Each 402.62
4. Miscellaneous :
4 of 5
IR's Unified Standard Schedule of Rates - 2019 Chapter-16 : Small Track Machines
5 of 5
IR's Unified Standard Schedule of Rates - 2019 Chapter-17 : Handling 0f Materials
171041 Extra to Item no. 171040 for lead beyond 250 metre and up to MT 221.79
1 Km
171042 Extra to Items no. 171040 & 171041 for lead beyond 1 Km for MT / KM 44.36
every subsequent Km or part thereof and upto 10 Km
171043 Extra to Item no. 171040 with contractor's Rail Dolly MT 42.71
171050 Loading, unloading and hauling of 52Kg / 60Kg rail more than MT 634.86
13 metre and upto 40 metre length by Railway's rail dolly to
the nominated location under traffic in case road carriage is
not possible with lead upto 250 metre and lift upto 5 metre
during block period
171051 Extra to Item no. 171050 for lead beyond 250 metre and up to MT / KM 272.37
1 Km
171052 Extra to Items no. 171050 & 171051 for lead beyond 1 Km for MT / KM 54.47
every subsequent Km or part thereof and upto 10 Km
171053 Extra to Item no. 171050 with contractor's Rail Dolly MT 76.26
171060 Loading, unloading and hauling of 52Kg / 60Kg rail upto 13 MT 574.54
metre length by Railway's Dip Lorry to the nominated
location under traffic in case road carriage is not possible with
lead upto 250 metre and all lift upto 5 metre during block
period
171061 Extra to Item no. 171060 for lead beyond 250 metre and up to MT / KM 188.18
1 Km
171062 Extra to Items no. 171060 & 171061 for lead beyond 1 Km for MT / KM 37.64
every subsequent Km or part thereof and upto 10 Km
171063 Extra to Item no. 171060 with contractor's Dip Lorry MT 21.95
1 of 7
IR's Unified Standard Schedule of Rates - 2019 Chapter-17 : Handling 0f Materials
2 of 7
IR's Unified Standard Schedule of Rates - 2019 Chapter-17 : Handling 0f Materials
3 of 7
IR's Unified Standard Schedule of Rates - 2019 Chapter-17 : Handling 0f Materials
171194 (d) Extra to Items no. 171191, 171192 & 171193 for MT / 5 KM 7.73
additional lead beyond 400 Km for every 5 Km or part thereof
upto 1000 Kms
171200 Leading all types of PSC sleepers of upto 2.7 metre length by
road vehicles with contractor's vehicle, crane, crew,
consumables, labour, tools & plants etc. excluding loading /
unloading, to destination with all contractor's labour,
tools/plants -
171201 (a) Lead upto 10 Km MT 157.75
171202 (b) Extra to Item no. 171201 for additional lead over 10 Km MT / 5 KM 19.04
for every 5 Km lead or part thereof upto 100 Kms
171203 (c) Extra to Items no. 171201 & 171202 for additional lead MT / 5 KM 10.26
beyond 100 Km for every 5 Km or part thereof upto 400 Kms
171204 (d) Extra to Items no. 171201, 171202 & 171203 for MT / 5 KM 6.82
additional lead beyond 400 Km for every 5 Km or part thereof
upto 1000 Kms
171210 Leading all types of PSC sleepers beyond 2.7 metre length
by road vehicles with contractor's vehicle, crane, crew,
consumables, labour, tools & plants etc. excluding loading /
unloading, to destination with all contractor's labour,
tools/plants -
171211 (a) Lead upto 10 Km MT 167.61
171212 (b) Extra to Item no. 171211 for additional lead over 10 Km MT / 5 KM 20.23
for every 5 Km lead or part thereof upto 100 Kms
171213 (c) Extra to Items no. 171211 & 171212 for additional lead MT / 5 KM 10.90
beyond 100 Km for every 5 Km or part thereof upto 400 Kms
171214 (d) Extra to Items no. 171211, 171212 &171213 for additional MT / 5 KM 7.25
lead beyond 400 Km for every 5 Km or part thereof upto 1000
Kms
171220 Unloading of Wooden / Steel / CI sleepers in Depot / Station /
Mid-section between stations in neat manner for Railway
usage from departmental material train (DMT) or contractor's
/ Railway's Truck/Trailer with crane or any other means
including crossing of one track and lead upto 250 metre & lift
upto 5 metre -
171221 (a) During period of traffic block MT 168.47
171222 (b) In yards not involving traffic block or on lines, not opened MT 91.60
to traffic
171223 (c) From Truck / Trailer MT 79.28
4 of 7
IR's Unified Standard Schedule of Rates - 2019 Chapter-17 : Handling 0f Materials
5 of 7
IR's Unified Standard Schedule of Rates - 2019 Chapter-17 : Handling 0f Materials
6 of 7
IR's Unified Standard Schedule of Rates - 2019 Chapter-17 : Handling 0f Materials
171370 Leading out temporary girder with Railway's dip lorry under
traffic block period including loading, leading and unloading
the same by contractor's men & materials, erection of
temporary staging aside track at loading and unloading points
clear of running trains. (All labour & materials to be arranged
by contractor and Dip Lorry, steel cribs & wooden sleepers to
be supplied by Railway free of cost) -
171371 (a) For lead upto 250 metre, Lift of 5 metre and crossing of MT 704.64
one running track
171372 (b) Extra to Item no. 171371 for additional lead of every 1 Km MT / KM Lead 207.00
or part thereof beyond 250 metre, as directed
171380 (c) Extra to Item no. 171371 for crossing of each additional MT / Track 258.59
running track beyond one track, as directed Crossing
171390 (d) Extra to Item no. 171371 for additional lift beyond 5 metre MT / 1 metre Lift 184.82
for each 1 metre lift or part thereof, as directed
7 of 7
IR's Unified Standard Schedule Of Rates -2019 Chapter-18 : Level Crossings
1 of 6
IR's Unified Standard Schedule Of Rates -2019 Chapter-18 : Level Crossings
181081 (a) Level crossings with asphalted road surface Sqm 701.54
181082 (b) Level crossings with concrete blocks road surface Sqm 673.07
181083 (c) Level crossings with any other type of road surface Sqm 616.15
Metre Gauge :
181084 (a) Level crossings with asphalted road surface Sqm 585.16
181085 (b) Level crossings with concrete blocks road surface Sqm 542.46
181086 (c) Level crossings with any other type of road surface Sqm 514.00
181090 Annual maintenance of various assets at level crossing, Each 22393.95
e.g. lifting barrier assembly, boom locking arrangement
with ground lever frame, winch etc., as directed by
engineer in-charge. Scope of work includes –
(1) Adjustment of adjusters;
(2) Cleaning & oiling greasing of dust/rust of pulleys and
levers;
(3) Claening of check rail clearance and rope channels;
(4) Repairing of pot holes of road surface
3. Check Rail Related Works :
181100 Drilling of parabolic shaped holes to the web of check Each 123.01
rail as per drawings & specifications and as directed by
engineer in- charge
181110 Fabrication (including cutting & bending) and fixing of Running Metre 822.00
check rails of all sections as per Railway’s approved
drawings & specifications for level crossings / trolley
paths, duly cutting rail flanges, wherever required to
correct alignment and level with Railway’s rail, fittings &
fastenings, drilling of holes in check rails with all fittings,
e.g. rail screws / grip expansion bolts, brackets, packing
pieces, bolts, washers etc. and as directed by the
181120 Fabricating (cutting and machining) check rails of all
sections as per drawing and directions of engineer in-
charge with all contractor’s labour, tools and materials
complete. Rails shall be supplied by Railways
181121 (a) For rails of 90 UTS and above Running Metre 957.72
181122 (b) For rails of 72 UTS Running Metre 872.55
181130 Cutting foot of rail by gas or any other approved method Running Metre 158.03
for check rails with contractor’s tools & plants of Gas Cut
181140 Manufacture & supply of stoppers & other accessories, Each 356.42
such as grip expansion bolts, brackets, packing pieces,
bolts etc. as per standard drawing for fixing check rail at
level crossing
181150 Fixing check rails on level crossings with MS brackets, Each Level 4026.73
MS packing plates, bolts & nuts, spring washers etc. as Crossing
per approved drawing & specifications, as directed.
Rails, MS brackets, packing plates, bolts & nuts, spring
washers will be supplied by Railways
4. Painting Works :
181160 Painting of running rails and check rails with approved Running Metre 26.49
bituminous paint (RDSO's Specification no.
M&C/PCN/120-2011), duly cleaning running rail and
181170 Providing 1:6 sand bituminous mix (Hot mix) on pre-cast Sqm 888.03
slab joints duly levelling edges of slab and packing /
grouting as required on level crossing portion with all
labour and material by contractor.
181180 Painting speed breakers with paint of approved quality
& colour over the Bituminous surface near approaches
to level crossing, as directed -
181181 (a) With Normal paint (two coats) Sqm 121.73
2 of 6
IR's Unified Standard Schedule Of Rates -2019 Chapter-18 : Level Crossings
181182 (b) With Hot melt thermoplastic road marking paint Sqm 147.10
5. Fencing And Gate Boom Related Works :
181190 Dismantling existing rail hurdle fencing including Running Metre 74.78
removal of base concrete and stacking released
materials in a neat and countable manner clear of
infringements from the track, removing debris clear of
site alongwith disposing debris, as directed by engineer
in-charge within free lead of 250 metre & lift upto 5
metre complete with all labour, tools & plants by
181200 Providing rail hurdle fencing on all four sides of level Running Metre 130.31
crossing approaches / platforms for a length of 15 m
(approx.) on each side with vertical rails fixed duly
embedded in Cement Concrete foundation at 3 metre
interval and two horizontal rails {overall height of
fencing being at 1.0 metre (approx.) above ground
level}. Item includes cutting rails and drilling holes as
required, assembling necessary accessories to required
length, painting fencing with two coats over one coat of
primer with paint of approved quality & colour with all
leads & lifts etc. complete and as directed.
{Note : (1) All labour, materials and tools & plants to be
arranged by contractor; (2) Rails of required section and
overall length will be supplied by Railway within free
lead of 250 metre. (3) Excavation and concrete work for
foundation will be paid separately}
181210 Dismantling existing Rail Post including demolishing Each Post 129.76
base concrete and stacking released materials within
free lead of 250 metre at location including clearing of
debris, as directed by engineer in-charge
181220 Fixing Rail Posts at locations shown in relevant Drawing Each Post 485.30
including earthwork / excavation for foundation, fixing
rail posts in cement concrete of 30cm x 30cm x 30cm
size and painting posts with two coats with paint of
approved quality & colour, clearing area and preparing
surface area of posts within 250m lead and lift of 5
metre complete, as directed {Note : (1) All labour,
materials and tools & plants to be arranged by
contractor; (2) Rails of required section and overall
length will be supplied by Railway within free lead of 250
metre. (3) Excavation and concrete work for foundation
181230 Providing Rail Height Gauge at approaches of level
crossings as per approved drawings in cement concrete
foundation using Railway's rails of all sections including
cutting, bending, drilling holes, erecting in position with
clamps, bolts & nuts including painting with one coat of
enamel paint of specified colour over one coat of
primer.
{Note : excavation and concrete work will be paid
181231 (a) Less than 5 metre width of level crossing Each 6580.30
181232 (b) Above 5 metre width of level crossing Each 8029.30
3 of 6
IR's Unified Standard Schedule Of Rates -2019 Chapter-18 : Level Crossings
4 of 6
IR's Unified Standard Schedule Of Rates -2019 Chapter-18 : Level Crossings
181291 80mm thick blocks of M-35 grade for medium traffic Sqm 782.07
181292 120mm thick blocks of M-40 grade for heavy traffic Sqm 1179.90
181300 Fixing of Railway’s precast concrete slabs of different Sqm 114.86
sizes in position for level crossings / trolley path and
filling gap between check rail / running rail, slabs,
approaches etc. with asphalt complete and as directed
181310 Paving of level crossing road surface with Railway's Sqm 171.23
precast RCC slab / blocks as per standards / approved
drawings for light and heavy vehicles, supplied on bed
of sand, moorum or gravel, duly compacted and joints
filled with mixture of sand & tar/bitumen in proportion of
181320 Removal of RCC slab in existing level crossing portion Sqm 38.93
and in between tracks alongwith stacking them in
countable manner, as directed.
181330 Provision of speed breaker on approaches of level Running Metre 293.71
crossings with pre-cast concrete blocks (M-25) of
parabolic shape for entire road width with 125 mm
central rise, 2m wide in the middle including painting
two coats with paint of approved quality and colour
181340 Provision of one Asphalt Speed Breaker Rumble Strip Running Metre 488.25
on each side of the approaches of manned level
crossings as per approved drawing including painting
two coats with paint of approved quality and colour
181350 Manufacture & supply of tested GI wire rope of 6mm Kg 200.10
dia. and 6 ply to suit lifting barrier gates at nearby
P.Way Stores / Depot / Level Crossing gate, as directed
181360 Supplying and fixing of Boom Supports (stay wires) for Each 1141.09
lifting barrier (approx. 8mm dia.) with suitable adjuster
and other specials, as directed
181370 Manufacture and supply of vertical / horizontal Turnout Each 1000.50
Wheels and Shafts, mounted over base plate weighing
not be less than 6 Kg with supporting vertical base,
made of MS angle 75mm x 75mm x 10mm as per
Railway's approved drawings and specifications
181380 Manufacturing and supplying to site of work including Each 357.54
installation pulley with pulley stakes complete, wire rope
6 x 6 x 19 with accessories as per Railway’s approved
drawings for operation of lifting barriers complete, as
181390 Fabrication, supply and fixing of Fringes to the lifting Running Metre 564.83
barriers of various length at level crossing as per
approved drawing; made of MS flat of size 30mm x
6mm in 2 rows, 40mm x 6mm in 1 row horizontally and
MS flat of size 30mm x 6mm vertically at 500mm centre
to centre, painting iron works with two coats of synthetic
enamel paint of approved quality & colour over one coat
of red lead primer of approved quality, as directed
5 of 6
IR's Unified Standard Schedule Of Rates -2019 Chapter-18 : Level Crossings
181400 Supplying and driving into ground 'C' class G.I. pipes of Each LC 610.08
20mm dia. x 150mm length for planting red flags and
lamp at 5 metre from centre of road at level crossings
with all leads & lifts {cost of G.I. pipes to be paid
181410 Manufacturing & supplying to site of work and installing Each 1518.52
Turnout wheel - Horizontal Rope Wheel - double wire (2-
way) including guides with all contractor's materials,
fabrication, labour, T&P, consumables, all leads & lifts
etc. complete as per approved drawing and as directed
by Engineer in-charge
181420 Supplying galvanized Steel Wire Rope for DW Kg 201.25
signalling 6 x 19 ply as per IRS No. S.11 amended upto
date for lifting barrier at level crossing gates, as directed
by Engineer in-charge
181430 Provision of Emergency Chain Posts for level crossings Each Post 591.42
as per Annexure 9/2 of Para 905 of IRPWM, duly cutting
rail to suitable length & drilling holes, providing hooks &
links / rings with necessary locking arrangements to fix
emergency chain, duly excavating pit and fixing rail
posts in vertical position, concreting base with cement,
base painting two coats with paint of approved quality &
colour over one coat of primer complete, as directed.
{Note : (1) Rails & chain will be supplied by Railways,
(2) Excavation and concrete work will be paid
181440 Fabrication, supplying and fixing Stop Boards of 600mm Each 1570.04
dia. to lifting barriers approved drawing, made of 3mm
thick plate, using MS clamps, providing 6 nos. of 50mm
dia. red reflector on stop board, painting iron works with
two coats of synthetic enamel paint over one coat of red
lead primer of approved quality & colour and writing
STOP mark over the board
181450 Manufacturing, supplying and fixing Wicked Gate of size MT 59159.07
1025mm x 1025mm x 1000mm at manned level
crossings, as per approved drawing including painting
with 2 coats of specified enamel colour paint over 1 coat
of primer including earthwork in excavation etc.
complete, as per specifications and as directed
181460 Providing rail reference posts by cutting rails of length Each 576.82
for 60cm above & 30cm below ground level, excavation
for foundation, fixing post in foundation in cement
concrete base of size 0.3m x 0.3m x 0.6m in 1:3:6 mix,
painting two coats with paint of approved quality &
colour and marking, as directed
{Note : (1) Rails will be supplied free by Railways in
available length at nearest stores depot; (2) Excavation
and concrete work will be paid separately}
181470 Fixing of wooden blocks of approximate size of 150mm
x 300mm x 1000mm on end of check rails at level
crossings with contractor's labour, tools & plants and as
181471 (a) With Railway’s wooden block by cutting Railway’s Each 209.85
wooden sleepers (supplied free by Railways) into blocks
by sawing to size
181472 (b) With Contractor’s hard wood block Each 1040.64
6 of 6
IR's Unified Standard Schedule of Rates -2019 Chapter-19 : Bridge Related Activities
1 of 5
IR's Unified Standard Schedule of Rates -2019 Chapter-19 : Bridge Related Activities
2 of 5
IR's Unified Standard Schedule of Rates -2019 Chapter-19 : Bridge Related Activities
3 of 5
IR's Unified Standard Schedule of Rates -2019 Chapter-19 : Bridge Related Activities
4 of 5
IR's Unified Standard Schedule of Rates -2019 Chapter-19 : Bridge Related Activities
5 of 5
IR's Unified Standard Schedule of Rates -2019 Chapter-20 : Supply of P.Way Items
1 of 11
IR's Unified Standard Schedule of Rates -2019 Chapter-20 : Supply of P.Way Items
201140 Manufacture & supply of Elastomeric Pads 25mm / 30mm thick Set 349.60
as per RDSO drawing No. B/1636/I/R2 to suit Insulated steel
channel sleepers with all contractor's material, lead, lift, labour,
tools, plant and transportation etc. complete as per approved
drawings and as instructed by Engineer in-charge {One set of
sleeper constitute two Nos.}
3. ERCs, Liners, Fish Plate, Joggled Fish Plate :
201200 Manufacture and supply of Elastic Rail Clip-J, conforming to Each 54.05
IRS specification No.T-31-92 with latest corrigendum as per
Drg. No.T-4158 of RDSO with latest alteration
201210 Manufacture & supply of Glass Filled Nylon (GFN-66) Liners
as per RDSO Drg. from RDSO approved sources, as directed
by Engineer in-charge :
201211 (a) Liners to Drg. No.RDSO/T-3702 Each 9.20
201212 (b) Liners to Drg. No.RDSO/T-3706 Each 8.80
201213 (c) Liners to Drg. No.RDSO/T-3707 & 3708 Each Set 26.45
201220 Manufacture & Supply of Metal Liners as per RDSO Drg. from
RDSO approved sources, as directed by Engineer in-charge :
201232 (b) Fish Plate 60 Kg (610mm long) to RDSO Drg. No. T-2434 Set 2272.40
201233 (c) Fish Plate 52 Kg (1000mm long) to RDSO Drg. No. T-5915 Set 3059.00
201234 (d) Fish Plate Combination 60Kg/52Kg RDSO T- 696 To T-699 Set 7072.50
201235 (e) Fish Plate Combination 52Kg/90R RDSO T- 1900 To T- Set 4600.00
1901
201240 Manufacturing and supplying Joggled Fish Plates of different
sizes as per IRS /T-1 specification from RDSO's approved
sources etc. with all contractor's material, labour, tools, plants,
all lead & lift etc. and as directed by the Engineer in-charge
2 of 11
IR's Unified Standard Schedule of Rates -2019 Chapter-20 : Supply of P.Way Items
3 of 11
IR's Unified Standard Schedule of Rates -2019 Chapter-20 : Supply of P.Way Items
4 of 11
IR's Unified Standard Schedule of Rates -2019 Chapter-20 : Supply of P.Way Items
5 of 11
IR's Unified Standard Schedule of Rates -2019 Chapter-20 : Supply of P.Way Items
201720 Supply of B.G. Push Trolley complete with umbrella and Each 43125.00
bench, procured from RDSO approved source at SSE/P.Way's
Store. Trolley shall be as per latest technical specification and
drawing issued by RDSO
6 of 11
IR's Unified Standard Schedule of Rates -2019 Chapter-20 : Supply of P.Way Items
201741 Supply of complete Wheel Assembly for BG Rail Dolly as per Each 1725.00
approved drawing
201742 Supply of Axle of Wheel for BG Rail Dolly Each 230.00
201743 Supply of Wheel Drum for BG Rail Dolly Each 575.00
201750 Manufacturing and supplying Light Weight (weighing upto 20 Each 5520.00
kg) Rail cum Road Trolley for carrying materials weighing upto
100 Kg. Trolley shall be procured from RDSO approved
sources and equipment shall be as per RDSO specification no.
TM/SM/16, dated 31.03.1992
201760 Manufacturing and supplying Gang tool box made either by Kg 78.87
riveting or welding of 16 SWG Mild Steel sheet and M.S. anlge
iron frame complete as per size and shape approved by
Engineer In-charge. The box shall be painted with two coats of
synthetic enamel paint applied over red oxide primer, as
approved & directed
201770 Train Speed Recorder, as per RDSO's Specification no. Each 124775.00
TM/SM/TSR/221, dated 16.04.2004
7. Welding Equipments :
201800 Manufacture & supply of Steel Mould Shoes for SKV welding
as per IR's AT Weld Manual :
201801 (a) 52Kg - 2 piece Mould Shoe Set 2760.00
201802 (b) 52Kg - 3 piece Mould Shoe Set 3082.00
201803 (c) 60Kg - 2 piece Mould Shoe Set 2990.00
201804 (d) 60Kg - 3 piece Mould Shoe Set 3082.00
201810 Manufacture & supply of rail file approximate size 15" long for Each 517.50
filing SKV welds from Railway approved firm
201820 Manufacture & supply of Welding Equipments, as directed by
Engineer in-charge :
201821 (a) Welding Cable Copper (50mm2 ) Metre 126.50
201822 (b) Pressure Regulator for Oxygen Multi-stage cylinder Each 1667.50
201823 (c) Pressure Regulator for Acetylene gas cylinder Each 1667.50
201824 (d) 500amp Arc Welding Electrode Holder Each 97.75
201825 (e) Gas Cutting Torch Blow Pipe Each 1092.50
201826 (f) Hand Gloves Leather (Left Hand & Right Hand) Set 36.80
201827 (g) Hose Rubber for Oxygen 6mm dia. Metre 32.20
201828 (h) Hose Rubber for Dissolved Acetylene (D.A.) 6mm dia. Metre 32.20
201829 (i) Welding Screen (approximate size 4" x 3") Each 172.50
201830 Manufacture & supply of Gas Cylinders (returnable cylinders)
with gas for repairing of check rails at level crossings and
guard rails on bridges alongwith other works, as required :
201831 (a) Oxygen Gas Cylinders (Pressure 1800 lbs to 2000 lbs) Each 9200.00
201832 (b) Dissolved Acetylene (D.A.) Gas Cylinders with pressure of Each 5520.00
15 Kg to 20 Kg
201840 Manufacture & supply of wire brush 25mm long, as directed by Each 17.25
Engineer in-charge
201850 Supply of Used Lubricating Oil of approved quality Litre 11.50
8. USFD Related Items :
7 of 11
IR's Unified Standard Schedule of Rates -2019 Chapter-20 : Supply of P.Way Items
201931 (a) 0 degree 4 MHz Double Crystal PZT Probe - 18mm dia. for Each 3565.00
rail testing
201932 (b) 0 degree 2 MHz double Crystal PZT Probe - 18mm dia. for Each 2209.15
AT weld testing with BNC connector
201933 (c) 70 degree 2 MHz (F+B) Single Crystal PZT Center Probe - Each 3754.75
20mm x 20mm square for rail testing
201934 (d) 70 degree 2 MHz (F+B) Single Crystal PZT GFC Probe - Each 3680.00
20mm x 20mm square for rail testing
201935 (e) 70 degree 2 MHz Single Crystal PZT Hand Probe - 20mm x Each 2789.90
20mm square for AT weld testing with BNC connector
201936 (f) 45 degree 2 MHz Single Crystal PZT Hand Probe - 20mm x Each 2789.90
20mm square for AT weld testing with BNC connector
201937 (g) 14.8 Volts / 7 Ampere Hour, Lithium Rechargeable Each 14375.00
Maintenance-free Battery Pack
201938 (h) Battery Charger cum Main Power Pack with charge status Each 16675.00
indicator and power chord, Input 110-260 V AC, 50-60 Hz
201939 (i) BNC Double End Connector with a co-axial cable of length 3 Each 431.25
metre
201940 Manufacture & supply of 70 degree 2 MHz Single Crystal PZT Each 7475.00
Probe in pair of 20mm x 20mm square side looking probe
(SLP) with BNC connector
201950 Manufacture & supply of 70 degree 2 MHz (F+B) single crystal Each 3795.00
PZT Non-gauge Face Side Probe - 20mm x 20mm square for
rail testing
201960 Manufacture & supply of Tandem Test Rig with two 45 degree Each 12075.00
Probes for AT weld testing
201970 Manufacture & supply of spares for Digital SRT USFD Machine
:
201971 (a) Complete Trolley Carriage Assembly Each 22425.00
201972 (b) Complete Trolley Sub-assembly of Central Probe Housing Each 10350.00
201973 (c) Complete Trolley Sub-Assembly of Gauge Face Probe Each 2875.00
Housing
201974 (d) Complete Trolley Wheel Assembly Each 5750.00
201980 Manufacture & supply of spares for Digital DRT USFD
Machine :
201981 (a) Complete Trolley Carriage Assembly Each 26450.00
201982 (b) Complete Trolley Sub-assembly of Central Probe Housing Each 9775.00
8 of 11
IR's Unified Standard Schedule of Rates -2019 Chapter-20 : Supply of P.Way Items
202000 Manufacture & supply of Standard Rail Test Piece with artificial Each 57500.00
defects, made by EDM (Electric Discharge Machine) System
alongwith wooden stand for sensitivity setting of DRT as per
IR's Manual of Ultrasonic Testing of Rails and Welds, revised
2006 with latest Correction Slips (New 60 Kg/52Kg rail piece of
½ meter length shall be supplied by Railway)
202010 Manufacture & supply of Standard AT Weld Test Piece with Each 17250.00
artificial defects, made by EDM (Electric Discharge Machine)
System for sensitivity setting of AT Weld Tester as per IR's
Manual of Ultrasonic Testing of Rails and Welds, revised 2006
with latest Correction Slips (New 60 Kg/52Kg weld piece of
sufficient length shall be supplied by Railway)
9. Miscellaneous Items :
202100 Manufacture & supply of Anti-corrosive Bituminous Paint Litre 92.00
(Black) ready mix paint conforming to IS:9862-1981
202110 Manufacture & supply of Enamel Paint all shades as per Litre 161.00
RDSO Specification No. M&C/PCN/120-2011
202120 Manufacture & supply of Aluminum Paint as per RDSO Litre 149.50
Specification No. M&C/PCN/120-2011
202130 Manufacture & supply of Red-oxide ready-mix Paint to IS : Litre 92.00
2074 of reputed make
202140 Manufacture & supply of Grease Graphite Grade 'O' of IS:408- Kg 230.00
1981
202150 Manufacture & supply of painting brush of difference size :
202151 (a) 25 mm width Each 46.00
202152 (b) 50 mm width Each 57.50
202153 (c) 75 mm width Each 69.00
202154 (d) 100 mm width Each 86.25
202160 Manufacture & supply of Mild Steel Core Wire Rope required
for unloading Rail panels :
202161 (a) Wire Rope with both ends eye & crimping – 20mm dia. Metre 230.00
202162 (b) Wire Rope with both ends eye & crimping - 25mm dia. Metre 316.25
202163 (c) Wire Rope with both ends eye & crimping - 50mm dia. Metre 575.00
202170 Manufacture & supply of Tri Colour Hand Signal Torch / Lamp Each 172.50
190mm x 80mm x 120mm
202180 Manufacture & supply of Keyman's Pitthu (Hatch-back) Bag of Each 2530.00
size 30cm x 40cm x 20cm with weight 0.860 Kg, made of
super quality canvas cloth having four pockets
202190 Manufacture & supply of Safety Jacket with high glow reflective Each 2645.00
EN-471 tapes stitched and laminated on glow / florescent
orange / yellow industrial Cloth / Net {Tech. Spec. - Net 100%
Polyester, Fabric 65%+35% Polyester Cotton & Reflective tape
gloss Beads/Presmatic as per EN-471}
9 of 11
IR's Unified Standard Schedule of Rates -2019 Chapter-20 : Supply of P.Way Items
202221 Built-in 4V/3000mAh Sealed Maintenance Free (SMF) Battery Each 1840.00
having back-up of 3-4 hours in full power mode and 5-6 hours
in low power mode
202222 Built-in 3.7V/2000mAh Lithium Ion Battery having back-up of 6- Each 2300.00
8 hours in full power mode and 10-12 hours in low power
mode
Manufacture & supply of Measuring Tape Non-Metallic
fibre glass type :
202231 (a) 30 metre long Each 327.75
202232 (b) 15 metre long Each 207.00
202233 (c) 5 metre long Each 120.75
202240 Manufacture & supply of A4 size paper for Xerox, Copier, Ream 141.59
Computer, Printer of 80 GSM thickness.
202250 Manufacture & supply of Gang Work-site Remote Control Each 62100.00
Hooter, as per RDSO Specification no. TM/SM/318, dated
21.05.2008
202260 Manufacture & supply of Mechanical Hooter Light Weight Each 30015.00
having range upto 500 metre
202270 Manufacture & supply of Walkie Talkie set as per RDSO Set 16100.00
approved specifications for 10 Km range
202280 Manufacture & supply of Battery for Walkie Talkie Set with 3 Each 1035.00
days back up
202290 Manufacture & supply of Battery Charger for Walkie Talkie Set Each 230.00
10 of 11
IR's Unified Standard Schedule of Rates -2019 Chapter-20 : Supply of P.Way Items
11 of 11
IR's Unified Standard Schedule of Rates - 2019 Chapter-21 : Miscellaneous Items
1 of 3
IR's Unified Standard Schedule of Rates - 2019 Chapter-21 : Miscellaneous Items
211170 Supplying and fixing MS Sadle Plates for worn out seat of
CST-9 sleepers 165mm x 150mm, pressed into channel
shape suitably for fixing at rail seat in track -
211171 (a) 3mm thick plate Each 24.40
211172 (b) 4mm thick plate Each 30.50
211180 Supplying and spraying in specified proportion Weedicide Sq.metre 0.45
Chemical, capable to kill entire weed on track / cess /
embankment with all labour, material, tools & plants etc.
complete job in all respect. Scientific name of the chemical is
Isopropylamine Salt of Glyphosate, in which active ingredient
is Glyphosate (41%), colour is light amber to brownish, very
low in toxicity and has favourable enviremental
characteristics. It will be ensured that no weed growth occurs
upto six months period, otherwise respraying shall be done
by the contractor
2 of 3
IR's Unified Standard Schedule of Rates - 2019 Chapter-21 : Miscellaneous Items
3 of 3