ENERGY BENCHMARKING
SUMMARY REPORT
Tel.: 613-995-6839
Fax: 613-992-3161
E-mail: cipec-peeic@nrcan-rncan.gc.ca
Web site: oee.nrcan.gc.ca/cipec
or
Cement Association of Canada
502–350 Sparks Street
Ottawa ON K1R 7S8
Tel.: 613-236-9471
Fax: 613-563-4498
E-mail: headquarters@cement.ca
Web site: www.cement.ca
TABLE OF CONTENTS
FOREWORD
1. Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
1.1 About the Canadian Cement Industry. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
4. Technical Practices. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
4.1 Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
6. References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
With support from Natural Resources Canada (NRCan), the Cement Association of Canada
(CAC) commissioned an energy benchmarking study of Canada’s Portland grey cement industry in
2007. The study builds on other sector benchmarking initiatives undertaken by NRCan’s Office of
Energy Efficiency. This report summarizes the outcomes of the CAC study and is based on a more
comprehensive consultant’s report that includes detailed recommendations prepared for the CAC.1
This analysis of energy efficiency performance in the cement sector represents a broad and
comprehensive review of energy management practices, technical practices and overall energy
efficiency performance.
Through this study, the CAC developed benchmarks and sophisticated tools that provide a
comprehensive roadmap for facilities and companies to improve energy management practices and
performance. The benchmarking tools will allow the industry to conduct regular self-assessments
of energy performance in a manner consistent with internationally recognized quality management
principles and best practices.
The study determined that the overall energy efficiency of the cement sector was relatively good,
with a median energy efficiency index (EEI) value of 76, compared with a theoretical best practices
plant with a value of 100. The relatively high level of overall energy efficiency is attributed to
facilities and organizations that are already actively engaged in energy management programs.
However, despite overall high EEI, many facilities have a low electricity EEI, and significant
potential for improved electricity use efficiency exists. Benchmarks for EEI, management best
practices (MBPs) and technical best practices (TBPs) that were developed for individual facilities
identified opportunity areas. Even in facilities with an overall high benchmark, opportunities exist
for more energy efficiency improvements and cost savings.
The benchmarking results show that the most significant potential for increased implementation of
energy MBPs is in project planning and development and in measurement and reporting. The
assessment of both the TBPs and energy use efficiency identifies that the fuel and raw materials
preparation and cement and feedstock process steps have significant potential to yield important
energy efficiency benefits for the sector.
The kiln process consumes approximately 90 percent of the energy used in the cement
manufacturing sector. This includes 99 percent of the thermal energy use and more than a third
of total electricity consumed in the manufacturing process. Even a small improvement in kiln
performance will yield substantial energy and cost savings for the individual facility and the entire
industry.
Cement manufacturing facilities showed significant differences in electric energy efficiency. Electric
energy accounts for a substantial portion of energy cost in the cement manufacturing sector, and
improved electric energy efficiency may result in notable cost savings.
1
Canadian Cement Industry Benchmarking – Final Report, Report prepared for Cement Association of Canada by Marbek Resource Consultants Ltd. in association
with Ecofys and Cement Etc., Inc., 2008.
The study demonstrates that relationships exist between a facility’s implementation of energy MBPs
and TBPs and the energy efficiency of its operations. Operations that implemented the most energy
MBPs also implemented the most TBPs. These facilities consume less energy per unit of production
than their peers.
1 introduction
2
1.1 About the Canadian Cement Industry
The Cement Association of Canada (CAC) comprises eight companies that operate 1 white2 and
15 Portland grey cement manufacturing facilities across Canada. The members of the association
produce 98 percent of the cement manufactured in Canada.
Regionally, cement production is concentrated in central Canada. Ontario (50 percent) and Quebec
(17 percent) have more than 65 percent of the industry’s capacity. The CAC is allied with the United
States-based Portland Cement Association (PCA) and all CAC members are also members of the
PCA.
The cement industry is a key contributor to Canada’s economic and social development. In 2006,
the industry produced more than 14.3 million tonnes (t) of cement with a value of more than
$1.7 billion and provided more than 2000 jobs.3 The industry’s total production is more than
16.7 million t when supplementary cementing materials such as fly ash and slag are included.
The cement manufacturing industry realized an 11 percent increase in energy efficiency per tonne
of cement produced between 1990 and 2006 and a corresponding reduction in greenhouse gas
(GHG) intensity of 6.4 percent.4 However, the industry recognizes that further energy efficiency
improvements are required to
2
The Federal White Cement plant in Woodstock, Ontario, is excluded from the benchmarks due to major differences in raw materials and fuels usage between the
manufacturing of Portland white cement and Portland grey cement, which is produced at the balance of the manufacturing sites in Canada.
3
Cement Association of Canada (2008), Canadian Cement Industry 2008 Sustainability Report
4
Ibid.
Energy benchmarking can play an important role in supporting improved energy practices by
The study involved all 15 Portland grey cement manufacturing facilities operated by CAC member
companies (see Table 1.1).
Company Facility
The study analyzed the industry’s performance in three critical areas that influence overall energy
use:
• management practices
• technical practices
• energy efficiency performance
The assessment of these three areas presents a broad and holistic view of energy practices in the
cement manufacturing sector.
EE TBP
Energy
Managment Practices
Benchmarking
MBP
In addition to this summary report, reports have been produced that document the performance of
each of the 15 facilities against the benchmarks developed as part of the study.
The CAC views this important study as the first step in developing and implementing a
comprehensive action plan to improve energy performance in the sector. Now that benchmarks exist
and current performance has been assessed against those benchmarks, future studies can assess and
report progress in improving energy performance within the Canadian Portland grey cement sector.
The models were developed by reviewing recognized analytical models for energy management
and technical practices broadly, and for cement manufacturing more specifically. These externally
referenced models were developed by international bodies, standard setting organizations
and government agencies that have responsibilities for energy and energy efficiency in the
manufacturing sectors.
Within each model, energy practices were further assessed across each of the key processes and
activities associated with cement manufacturing (see Figure 1-2):
Quarrying Raw Materials Preparation Clinker Production Cement Grinding and Distribution
Limestone and small amounts The extracted materials are The materials are heated The clinker is stored and then finely ground.
of sand and clay are extracted, analyzed, blended with in a kiln reaching a Gypsum is added to control setting time,
usually from a quarry additional mineral components temperature of 1,470˚C. along with supplementary cementing
located near the cement depending on the type of The heat transforms the materials, such as fly ash or slag, to
manufacturing plant. limestone available, and finely materials into a molten obtain a fine powder called cement, with
ground for futher processing. product called clinker, the desired properties of strength and
which is then rapidly cooled. chemical resistance.
More than 70 aspects of energy performance in the cement manufacturing sector were analyzed,
including all energy inputs to the cement manufacturing process: electricity, fuel oil, natural gas,
coal, petroleum coke and other alternative fuels.5
Survey instruments were developed to gather the information to assess performance within each
of the three models. The survey instruments and models were tested at two cement manufacturing
facilities. After revisions, the survey instruments were distributed to all 15 cement manufacturing
facilities. Then supervised data collection, review and analysis proceeded. Performance benchmarks
were developed for each indicator, and each facility’s performance was assessed against the
benchmarks.
The performance benchmarks were set at the 75th percentile, which means that for each
performance indicator, 25 percent of the sector’s facilities met or exceeded the benchmark. This
approach is consistent with the approach taken by Natural Resources Canada’s Office of Energy
Efficiency benchmarking studies and the U.S. Environmental Protection Agency’s ENERGY STAR
for Cement Manufacturing initiative. Draft facility reports were submitted to the facility operators
®
for review and validation. After data error corrections were made, final performance benchmarks
and the final facility and sector-wide reports were prepared.
5
Quarrying activities and/or any of the above activities that take place at locations other than the main cement production site were excluded from the analysis.
Also, analysis of only on-site electricity consumption was considered, rather than the total primary energy consumption associated with off-site electricity
generation.
The kiln process consumes more than 90 percent of the cement manufacturing energy. The
remaining 10 percent is consumed in almost equal amounts by activities related to fuel and raw
materials preparation, grinding of clinker and the blending of materials to prepare the finished
cement product.
Figure 2-1 Total Energy for Cement Manufacturing Sector by Process Step, 2006
The sum of these energy inputs is about 39 percent of the annual operating costs of a cement
manufacturing facility, making energy the largest cost component. It is important to note that
although electricity accounts for only 13 percent of the energy inputs, it is almost 50 percent of the
energy costs of a typical cement plant.6
The cement industry relies heavily on carbon-intensive fossil fuels. Coal (53 percent)7 and
petroleum coke products (29 percent) account for more than 82 percent of energy consumption
(Figure 2-2). Natural gas (used mostly as a start-up fuel), liquid petroleum products and waste
oil products contribute 4 percent of total energy requirements, while tire-derived fuels and other
alternative energy sources contribute about 2 percent.
6
Statistics Canada, Annual Survey of Manufacturers (2004).
7
A comparison of Canadian energy costs on a per-unit basis demonstrated that coal continues to be significantly less expensive than the other forms of energy
used by the cement industry. Natural Resources Canada (2006), Canada’s Energy Outlook: The Reference Case 2006. Ottawa, Ont.
Figure 2-2 Total Energy for Cement Manufacturing Sector by Energy Source, 2006
9
Petroleum
(delayed) coke
21.0%
Coal 53.0%
Electricity 13.0%
Key findings from this high-level overview of energy inputs to the cement manufacturing sector
include the following:
• Due to the significant quantity of energy consumed by the kiln process, energy efficiency
opportunities in the kiln process have, in theory, the greatest potential to translate into real
energy, greenhouse gas (GHG) and cost savings for the industry. Even minor improvements
in the kiln process can potentially deliver significant energy and cost savings over an annual
operating cycle.
• Energy efficiency opportunities in electrically driven systems have the potential to achieve
substantial cost savings for the industry.
• Canada’s contribution of alternative and renewable energy sources to cement manufacturing lags
behind that of other nations in the Organisation for Economic Co-operation and Development.
Many countries in the European Union substitute from 30 percent to 83 percent of the energy
sources for cement manufacturing.8 Increasing the proportion of alternative, renewable and
low-carbon energy sources can contribute significantly to reducing GHG emissions from
cement manufacturing.
8
Cement Association of Canada (2008), Canadian Cement Industry 2008 Sustainability Report. European countries included in this range are Netherlands (83
percent), Switzerland (48 percent), Austria (46 percent), Germany (42 percent), Norway (35 percent), France (34 percent) and Belgium (30 percent).
Vertical roller mill, Mississauga, Ontario reduces Holcim (Canada) Inc. greenhouse gas intensity
3 ENERGY MANAGEMENT PRACTICES
A survey was conducted at every cement manufacturing facility to ascertain the degree to which
the identified best practices are currently employed in the sector. To gain multiple perspectives,
three respondents at each facility were involved in the survey for their facility:
The MBP score was calculated as an average of the three survey results.
9
The energy management models that contributed significantly to the definition of the competencies were developed by Natural Resources Canada’s Office of
Energy Efficiency, United Kingdom’s Carbon Trust, United States’ ENERGY STAR® and Australia’s EPA Victoria and Sustainable Victoria.
Commitment Promotion
Policy
Guidelines and Procedures
Financing Commitment
Planning
Integrating energy management with project approval
Communication Extent
Frequency
Awareness and Participation
The results showed that significant potential exists in the cement sector to improve management
practices in support of improving energy efficiency, especially because only two facilities received a
rating greater than 75 percent for management practices implementation.
The study showed a strong relationship between the implementation of MBPs and the overall energy
efficiency at the cement facilities. The four plants that ranked the highest in overall energy efficiency
14
(see Chapter 5) are among the five plants that rated highest in MBP implementation.
100
90 85
82
80
71
70 65
65 65 62 61 60
MBP implemented (%)
60 57 57
55 53 51 51
50
42
40
30
20
10
0
P15
Benchmark
P1
P3
P4
P5
P6
P7
P8
P9
P10
P11
P14
P2
P12
P13
Plant
The survey of MBPs exhibited a fairly narrow range of implementation scores because 70 percent
of the facilities scored between 50 and 65 percent. MBP scores from plants that belong to the
same organizations also tended to cluster together. This fact suggests that corporate-specific
policies and guidelines generally direct the implementation of practices in cement sector facilities.
Benchmarking studies in other industrial sectors have shown that this situation is not always the
case, and that in some cases, overall MBP scores of plants within the same organization differ
significantly.
For individual MBP categories, the analysis of the survey results showed that the cement sector
emphasizes the financing and communication performance aspects of energy management
(Figure 3-2). Consistent with other Canadian industry studies,10 the analysis showed that the
cement sector has the largest improvement potential in energy management practices areas
related to project development, planning and measurement and reporting.
10
Nova Scotia industry data from Energy Management Potential Analysis and Best Practices Benchmarking in the Nova Scotia Industrial and Manufacturing Sector,
Report by Canadian Manufacturers & Exporters in association with Marbek Resource Consultants Ltd. and Neill & Gunter Limited (Stantec), 2007.
New Brunswick industry data from Energy Performance Benchmarking and Best Practices in the New Brunswick Industrial and Manufacturing Sector, Report by
Canadian Manufacturers & Exporters in association with Marbek Resource Consultants Ltd. and Neill & Gunter Limited (Stantec), 2006.
100
90
80
MBP implemented (%)
70 67
60 59 57 60
53
50 48
44
40 37
30
20
10
0
Overall MBP
Project
development
Planning
Financing
Communication
Organization
Commitment
Measurement
and reporting
4 TECHNICAL PRACTICES
St Marys Cement Bowmanville plant from the West Side Creek Marsh Conservation Area, Ontario
4 TECHNICAL PRACTICES
4 TECHNICAL PRACTICES
18
4.1 INTRODUCTION
The second aspect of energy performance that was analyzed is the implementation of technical
best practices (TBPs) in cement manufacturing facilities. TBPs are production processes, systems,
activities and equipment that can contribute to improvements in plant energy efficiency (e.g. using
adjustable speed drives on kiln and/or roller mill fans).
A survey instrument was developed at each facility to assess the applicability of the identified
practices and the degree of implementation (i.e. full, partial or not implemented).
56 56 54 54 59
60
50 47
50
41 41 41
40 34
30 27
20
10
0
P1
P11
P10
P3
P4
P5
P6
P7
P8
P15
P2
P12
P13
Benchmark
P9
P14
Plant
The results showed that significant potential exists in the cement sector to improve technical
practices in support of improving energy efficiency, especially because only two facilities received a
good rating for technical practices implementation (a rate greater than 75 percent).
The study showed a statistical correlation between the implementation of TBPs and overall energy
efficiency. This means that the energy efficiency of a plant increases when the number of TBPs
implemented at the plant increases. In contrast to the assessment of management practices, the
assessment of technical practices showed a wide spread of implementation scores (70 percent of
the plants have scores between 34 and 63 percent) and an insignificant relationship between TBP
implementation scores among facilities from the same organization.
The benchmarking process demonstrates that the cement sector emphasizes the energy efficiency
practices in the finish grinding process – a process that consumes significant quantities of electrical
energy. The study showed, however, that opportunities exist to improve energy efficiency by
employing additional TBPs in process steps associated with fuel and raw materials preparation and
in cement and feedstock composition and handling. The TBPs include improving the transportation
and blending of cement and addressing the use of additives (see Figure 4-2).
70
59 58
60
54
50
40 36
33
30
20
10
0
Clinker production
All TBP
Finish grinding
Cement and
Process feedstock
The tool calculates such indicators as total energy intensity (gigajoule per tonne [GJ/t of cement);
fuel intensity (GJ/t of cement or clinker); electricity intensity (kilowatt hour per tonne of cement);
and an energy efficiency index.
The Energy Efficiency Index (EEI) allows a meaningful direct comparison between plants with
significant structural differences (e.g. wet kiln and dry kiln processes). A theoretical “best practice”
plant was constructed, normalizing as much as possible for structural differences, and was given an
EEI value of 100.
Energy use and production data at each manufacturing facility were collected and compared with
the theoretical best practices facility. Some facilities performed better than the theoretical best
practices plant and attained an EEI value greater than 100 for some process steps.
Despite this relatively high performance, considerable opportunity exists for improving energy
efficiency because there is a substantial difference between the performance of the lowest performers 23
and the relatively high industry benchmarks within each process step.
When the adjustments for structural differences are ignored, the participating plants have average
total energy intensities of 4.2 GJ/t of cement and 4.5 GJ/t of clinker. The most efficient plant required
only 50 percent as much energy to produce each tonne of clinker as the least efficient plant.
In the cement manufacturing sector, the kiln process uses 90 percent of the energy used and can be
expected to have the largest impact on the plant-level EEI. Although cement plants have a high EEI
benchmark (85) for the kiln process, it is important to prioritize efforts in this area because a small
improvement in the kiln process can potentially result in a large reduction in energy use. The review
of technical best practices (TBPs) showed that significant room for improvement remains in the kiln
process.
The benchmarking analysis indicated that the sector’s raw meal preparation processes have the
lowest EEI benchmark, at 76 percent (see Figure 5-2). This process step was also identified as having
a significant potential for increased TBPs implementation.
100 10.0
90 89
90 86 9.0
82 81 81
77 Benchmark = 75th percentile
80 76 76 71
8.0
70
Energy efficiency index
70 67 7.0
66 64 63
60 6.0
Energy intensity
50 5.0
40 4.0
30 3.0
20 2.0
10 1.0
0 0.0
P1
P2
P3
P4
P5
P6
P7
P8
P9
P11
P10
P12
P13
P14
P15
Plant
76 82
80
60
40
20
EEI
Kiln
Finish
grinding
Raw meal
preparation
Plant
Electric energy is almost 50 percent of energy costs, but only 13 percent of energy use in the cement
manufacturing sector. Improved electricity management is likely to realize significant cost savings
but have a limited impact on the already high overall energy efficiency indices of the plants.
When the adjustments for structural differences are ignored, the analysis showed that the most
efficient plant, in terms of electricity consumption, consumed only a third of the electricity per
tonne of cement produced in comparison with the least efficient plant.
At the process level, the assessment again identified that the sector’s fuel and raw materials
preparation and the cement and feedstock process steps have the greatest opportunities for
improvement.
138 Reported
140 intensity
250
120
Index
200
100 90 Benchmark
(kWh/t cement)
91 85 82 64
80 75 74 73 150
68 66 65
60 57 54 53
100
40 36
50
20
0 0
P1
P4
P11
P2
P3
P5
P6
P7
P10
P12
P13
P14
P15
P8
P9
Plant
Cement bags
6 REFERENCES
6 REFERENCES
28
Cement Association of Canada, Canadian Cement Industry 2008 Sustainability Report. 2008.
Marbek Resource Consultants Ltd., Ecofys, Cement Etc., Inc., Canadian Cement Industry
Benchmarking – Final Report, Cement Association of Canada. 2008.
Marbek Resource Consultants Ltd., Neill and Gunter, Energy Management Potential Analysis and
Best Practices Benchmarking in the Nova Scotia Industrial and Manufacturing Sector, Canadian
Manufacturers & Exporters, 2007.
Marbek Resource Consultants Ltd., Neill and Gunter, Energy Performance Benchmarking & Best
Practices in New Brunswick Industrial and Manufacturing Sector, Canadian Manufacturers &
Exporters, 2006.
Natural Resources Canada, Canada’s Energy Outlook: The Reference Case 2006.
Cement
A APPENDICES
100
90
80 78
80
67 67
70
61 59 57 57 57 64
MBP implemented (%)
60
54 52 52 50 46
50
40
33
30
20
10
0
P1
P11
P10
P3
P4
P5
P6
P7
P8
P15
P2
P12
P13
Benchmark
P9
P14
Plant
100
93
89
90
81
80
67
70
56 61
MBP implemented (%)
60
52 50 48
50
41
40
30 30 26 26 26 26
30
20
10
0
P1
P11
P10
P3
P4
P5
P6
P7
P8
P15
P2
P12
P13
Benchmark
P9
P14
Plant
100
90 86
81
80
69 67
70 64
61 58 58
MBP implemented (%)
60
53
50 47
42 42 42 39 36
40
31
30
20
10
0
P1
P11
P10
P3
P4
P5
P6
P7
P8
P15
P2
P12
P13
Benchmark
P9
P14
Plant
100
90
83
78
80
74
70
MBP implemented (%)
60 56
52 50 48 54
50
40 37 37
33 33 33
30 30 26
30
20
10
0
P1
P11
P10
P3
P4
P5
P6
P7
P8
P15
P2
P12
P13
Benchmark
P9
P14
Plant
100
90 89 89
80 78 78 78 78 78
70 67 67
70
63
MBP implemented (%)
59 59 56 56
60
50
44
40
30
20
10
0
P1
P11
P10
P3
P4
P5
P6
P7
P8
P2
P15
P12
P13
Benchmark
P9
P14
Plant
Benchmark
100
93
89
90
81
80
74 70 70 72
70
61
MBP implemented (%)
60
50
44 44
41 37 37 37 37
40
33
30
20
10
0
P1
P11
P10
P3
P4
P5
P6
P7
P8
P15
P2
P12
P13
Benchmark
P9
P14
Plant
97
100
90 85
76
80
70 65 64 63 68
70
MBP implemented (%)
59 59 57
60 56
52 50 46
50
40
33
30
20
10
0
P1
P11
P10
P3
P4
P5
P6
P7
P8
P15
P2
P12
P13
Benchmark
P9
P14
Plant
100
90
83
80 75
70 67
TBP implemented (%)
60
50
42 42 42 41 36 42
40
30 27
25 25 25
20 17
10 8
–
-0
P1
P11
P3
P4
P5
P6
P7
P8
P15
P2
P12
P13
P10
Benchmark
P9
P14
Plant
100
90
90 85
80 77
68 68 64 64 68
70
59
TBP implemented (%)
60 57
54
50
40 36
32 32 32 29
30
20
10
- 0
P1
P11
P10
P15
P3
P4
P5
P6
P7
P8
P2
P12
P13
Benchmark
P9
P14
Plant
60
50 50
50
40 40
40
30
20
10
0
P1
P11
P10
P3
P4
P5
P6
P7
P8
P15
P2
P12
P13
Benchmark
P9
P14
Plant
100
90
83
80
67 67 67
70
58
TBP implemented (%)
60
50 50 50
40
33 33 33 33 33 33 33 33
30
17
20
10
0
P1
P11
P10
P3
P4
P5
P6
P7
P8
P15
P2
P12
P13
Benchmark
P9
P14
Plant
100
90
80 75
67 67 67 67 67
70
TBP implemented (%)
60 58 58 58
50 50
50
42 42 42 42
40
30
20 17
10
0
P1
P11
P10
P3
P4
P5
P6
P7
P8
P15
P2
P12
P13
Benchmark
P9
P14
Plant
120
104
100
94
87
80 77 76 73 76
Energy efficiency index
68
63
60 59 55 55
49 46 45
40 35
20
0
P1
P11
P10
P3
P4
P5
P6
P7
P8
P15
P2
P12
P13
Benchmark
P9
P14
Plant
EEI = energy efficiency index
100
90 89 86 86 85
90 83 85
80 77
75 74
70 69 69
70
Energy efficiency index
63 61 59
60
50
40
30
20
10
0
P1
P11
P10
P3
P4
P5
P6
P7
P8
P2
P15
P12
P13
Benchmark
P9
P14
Plant
90 89 88 87
80 79 75
67 66
60
40
20 17
0
P1
P11
P10
P3
P4
P5
P6
P7
P8
P15
P2
P12
P13
Benchmark
P9
P14
Plant