Al - Osais Contracting Company Haradh Area Power Reliability Enhancement
Al - Osais Contracting Company Haradh Area Power Reliability Enhancement
Al - Osais Contracting Company Haradh Area Power Reliability Enhancement
• Working at height without • Ensure crews use appropriate procedures and equipment in
appropriate equipment. accordance with their training.
• Ensure that equipment is in accordance with operating
• Using work at height
procedure.
equipment incorrectly e.g. not in
• Use of Individual fall protection – Full body harness and fall arrest
accordance with manufacturer’s
system is a method to reduce the consequences should a fall
instructions, designs or load
occur. The entire system must be capable of withstanding the
capabilities.
Al – Osais Contracting Company
Haradh Area Power Reliability Enhancement
JOB SAFETY ANALYSIS (JSA)
impact forces involved in a fall and must be capable of minimizing
those forces to an acceptable level.
• Falling objects and control • Hazard zones and exclusion zones are established as required.
hazard zone. • Use of visible warning signs and barricade tapes must be applied.
• Use of wire rope to and material basket to prevent fall of
materials used in high elevation.
Al Osais
Emergency Inadequate emergency response • Ensure available of Emergency Response Plan on site.
• Assembly areas shall be identified.
• Emergency Contact Numbers should be posted in site. All staff
should be fully familiar with ambulance points on site and
emergency contact numbers.
• Trained first-aiders and first aid kits will be available according to
SA requirements.
• Ensure all staff understands the action required during
emergency situation.
• All staff should be familiar with emergency contact number.
Al – Osais Contracting Company
Haradh Area Power Reliability Enhancement
JOB SAFETY ANALYSIS (JSA)
Clear and clean the Equipment damage and • Ensure tools and equipment used for the task have been
work area Personnel injury. moved and stored properly Al Osais
(Housekeeping) • Ensure area is clean and safe.
Closing the work If the Work Permit is not • Work permit issuer and receiver should inspect the work
permit properly closed, hazard could area for finding the deficiencies. Al Osais
remain at the job site. • If there are comments from the issuer for rectification then
do it immediately before sign off the work permit.