Eastern Railway Pink Book 2019 20
Eastern Railway Pink Book 2019 20
Eastern Railway Pink Book 2019 20
1
पव
ू रे लवे
EASTERN RAILWAY
2 Deoghar-Sultanganj incl. Banka to Barhat & Banka to Bithia Road Cap. 519,66,00 624,41,46 5,77,69 10,00
(147 km)
S.Fund 30,00,00 6,10,72 .. ..
3 Tarakeswar-Bishnupur with extension upto Dhaniakhali, Arambagh- Cap. 2487,49,00 814,30,15 41,81,04 1,00,00
Irphala, Irphala-Ghatal (11.2 km), Arambagh-Champadanga (23.3
km) & Bishnupur-Uparsol (31.8 km) and new material modification
for Mynapur-Kamarpukur via Birsha (19 km)
4 Rampurhat-Mandarhill via Dumka (130 km) with new material Cap. 701,63,33 778,36,22 28,22,95 2,00,00
modification for Rampurhat-Murarai (29.48 km) - 3rd line
5 Azimganj-Murshidabad (Jiaganj), incl. railway bridge over river Cap. 94,80,67 122,83,33 3,27,08 1,00,00
Bhagirathi
S.Fund 15,00,00 87,51 .. ..
Deposit 1,00,00 .. .. 1,00,00
6 Bariarpur-Mananpur via Kharagpur, Lachimpur-Barhat (67.78 km) Cap. 250,55,00 19,66,71 14,14 10,00
S.Fund 50,00 81 .. ..
7 Sultanganj-Katuria via Asarganj, Tarapur & Belhar (74.8 km) Cap. 288,85,00 9,30,94 1 10,00
S.Fund 2,00,00 .. .. ..
8 Tarkeshwar-Magra (51.95 km); incl material modification for Cap. 527,84,00 1,49,38 26,98 10,00
Tarkeshwar-Furfura Sharif (21.75 km) - New Line
S.Fund 50,00 .. .. ..
17 Sonarpur-Canning (14.96 km) with new material modification for Cap. 298,02,00 36,05,79 7,70 65,00
Kalikapur-Minakhan via Ghatakpur (38 km) - new line
EBR(P) 100,00,00 .. .. ..
19 Chandpara-Bongaon with extension to Chandabazar and new Cap. 460,67,23 33,77,13 .. 10,00
material modification for Bongaon-Poramaheshtala (20 km) &
Chandabazar-Bagdah (13.86 km) - new lines
EBR(IF) 5,24,28 6,62,19 .. ..
EBR(P) 4,24,88 .. .. ..
20 Pandabeswar-Chinpai (21.41 km) with new material modification Cap. 292,74,00 134,86,95 2 10,00
between Barbani-Churulia (9 km) - new line
EBR(IF) 80,01,00 74,86 83,96 ..
EBR(P) 79,01,00 .. .. ..
21 Chinpai-Sainthia & New Lines - Prantik-Siuri and new material Cap. 589,91,06 86,94,23 3,92 10,00
modification for Chowrigachha - Sainthia via Kandi
C.Fund 516,80,00 .. .. ..
EBR(IF) 288,91,67 10,36,30 5,28,47 ..
EBR(P) 6,46,24 .. .. ..
2.1.3
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
(Figures in thousand of Rupees)
Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay
No. -tion Cost end of Outlay 2018- Proposed for
March 2018 19 2019-20
DOUBLING
22 Tinpahar-Sahibganj (37.81 km) - As phase-I of doubling of Cap. 168,73,00 229,19,81 1,36 ..
Tinpahar-Bhagalpur
EBR(IF) 488,76,06 26,02,31 7,25,54 3,70,00
EBR(P) 485,76,06 .. .. ..
23 Ghutiari Sharif-Canning with extension upto Bangankhali & new Cap. 594,62,00 125,16,96 1,15,86 49,95
material modification for Bangankhali-Basanti (14.3 km) & Basanti-
Jharkhali (23 km) - new line
EBR(IF) 22,42,32 2,02,29 15,01 ..
EBR(P) 21,43,32 .. .. ..
24 Dakshin Barasat-Lakshmikantapur (19.68 km), new line from Cap. 672,85,00 113,54,84 32,97 10,00
Joynagar to Raidighi (20 km) and new material modification for
Joynagar-Durgapur (32 km)
EBR(IF) 1,00,00 15,54,37 2,98,70 1,20,00
25 Magrahat-Diamond Harbour (19.67 km) with material modification Cap. 735,96,00 113,76,11 .. ..
for Sangrampur - Krishanchandpur (25 km), Diamond Harbour
(Gurudasnagar) - Bahrahat (21 km) - new line & Daiamond Harbour
(Gurudasnagar) - Kulpi (17.25 km) - new line
26 Liluah-Dankuni - 3rd line (10.13 km) with extension to Furfura Sharif Cap. 403,91,00 88,38,24 2,93 ..
27 Kalinarayanpur-Shantipur (15.85 km) with new material Cap. 173,56,09 57,62,07 36 60,00
modification for Ranaghat (Aranghata)-Duttapulia (8.17 km) - new
line
EBR(P) 13,58,58 .. .. ..
28 Katwa-Patuli (17.7 km) with new material modification for Cap. 774,74,00 319,19,72 10,02,74 2,00,00
Ahmedpur-Katwa (51.92 km) - gauge conversion
EBR(IF) 110,00,00 264,74,70 34,15,55 ..
EBR(P) 100,00,00 .. .. ..
29 Sondalia-Champapukur (23.64 km) with new material modification Cap. 263,52,00 95,04,65 .. ..
for Bira-Chakla (11.5 km)
EBR(IF) 135,86,00 34,72,73 16,85,00 21,10,00
EBR(P) 134,86,00 .. .. ..
32 Sealdah Division - 2nd passenger line between Mile 5-B and New Cap. 66,06,00 4,05,10 .. ..
Alipore (1.67 km)
EBR(IF) 1,00,00 7,23,32 13,00,00 9,25,00
DOUBLING
34 Dankuni-Chandanpur- 4th line(25.41 km) as 1st phase of Dankuni- Cap. 295,44,00 8,54,91 97,02 ..
Saktigarh 4th line with new material modification for Baruipara-
Furfura - new line
EBR(IF) 4,26,26 87,03,14 113,95,50 65,00,00
38 Dankuni-Bhattanagar via CC line (west) - Doubling with one Cap. 61,25,00 41,60,62 .. ..
additional loop at Bhattanagar
EBR(IF) 1,00,00 52,39,46 12,20,59 33,00,00
40 Princepghat-Majherhat - Doubling of Circular Railway (4.98 km) Cap. 280,60,50 10,81 .. 1,00
47 Pakur, Tilvita & Kotalpukur - Development of freight & passenger DF(3) 7,29,00 1,47,29 .. ..
train handling facilities
RRSK 4,25,35 60,63 50,00 5,00,00
50 Sealdah Division - Running of 12-coach electrical multiple unit DF(3) 2,96,68 3,25,88 .. ..
trains on circular railway
RRSK 1,00,01 1,47,93 8,88 99,99
51 Howrah Division - Through renewal of turnouts on main line & loop DF(3) 18,33,67 9,57,55 .. ..
line (12 stations)
RRSK 8,53,35 3,21,32 1,02,00 3,00,00
54 Belur - Bybass connection for direct movement of electrical multiple DF(3) 17,21,77 6,36,81 .. ..
unit trains from Bardhman / Bandel to Belur Math
RRSK 10,34,96 6,82 18,00 1,00,00
55 New Garia - New rail terminal station between Sealdah & Sonarpur DF(3) 19,71,00 6,48,55 .. ..
57 Dum Dum Jn. - Flyover to improve passage of goods & Cap. 136,46,19 1,06,55 70,05 10,98,03
mail/express trains
EBR 3,50,00 .. .. ..
61 Andal-Sainthia - Broad gauge bypass line with direct connection Cap. 11,19,00 1,86,83 49,04 2,50,00
from quadruple line to branch line (2.565 km)
62 Kalipahari - Rearrangement of up loops to accommodate full-length DF(3) 3,35,17 1,52,24 .. ..
trains
RRSK 1,60,13 9 2 75,00
63 Andal - Conversion of down line No.2 into common loop DF(3) 8,50,00 2,34,21 .. ..
RRSK 5,97,01 .. 2 75,00
64 Howrah - Extension of platform No.10-11 & 12-13 for DF(3) 9,22,14 34,57 .. ..
accommodating longer length train
RRSK 8,37,57 18,28 17,00 2,00,00
67 Eastern Railway - New bypass line & capacity enhancement works Cap. 295,00,00 .. 1 5,00,00
69 Estimated investment through EBR(Partnership) for private freight EBR(P) 100,00,00 .. 100,00,00 50,00,00
terminals
70 Works costing below Rs.2.5 crore each Cap. .. .. .. 2,00,00
DRF .. .. .. 90,00
DF(3) .. .. .. 6,77,19
RRSK .. .. .. 3,00,00
73 Eastern Railway - Repl. of routers (232 Nos) DRF 2,64,75 2,56,01 1 28,25
COMPUTERISATION
B - New Works
76 Lumpsum Provision For New Works Cap. .. .. .. 1,00
DRF .. .. .. 3,63,05
DF(1) .. .. .. 6,00
DF(3) .. .. .. 1,00
81 Asansol Jn - Integrated power supply at 44 interlocked level RRSK 9,64,09 .. 70,00 50,00
crossing gates in block section
82 Sealdah Division - Mini integrated power supply at interlocked level RRSK 14,11,35 .. 15,00 1,00,00
crossing gates
83 Asansol Junction - Remote terminal unit at 50 interlocked level RRSK 11,57,23 .. 35,00 80,00
crossing gates in block section
84 Sealdah Division - Interlocking of 58 nos. of manned LC gates S.Fund 26,61,81 27,22,93 .. ..
(Suburban section)
RRSK 20,48,40 1,48,22 2,33,67 6,00,00
85 Asansol Division - Sliding boom type gates at interlocked level S.Fund 2,70,40 6,73 .. ..
crossings (68 Nos)
RRSK 2,68,40 50,45 20,00 30,00
96 Memari - Road over bridge in lieu of level crossing No.33 S.Fund 93,48 -6,52 .. ..
RRSK 4,16,52 .. 7,00 1,00
EBR(Dep) 4,64,70
97 Nalikul - Road over bridge in lieu of level crossing No.14 S.Fund 1,01,51 1,51 .. ..
RRSK 4,03,49 .. 1,50,00 2,80,00
EBR(Dep) 4,09,88
98 Rishra-Srirampur - Road over bridge in lieu of level crossing No.4 S.Fund 50,25 25 .. ..
99 Baruipara-Kamarkundu - Road over bridge in lieu of level crossing S.Fund 1,00,06 4,00,06 .. ..
No.27
RRSK 3,15,87 75,14 5,00,00 5,00,00
EBR(Dep) 6,35,93
100 Jaugram-Masagram - Road over bridge in lieu of level crossing S.Fund 1,09,73 9,73 .. ..
No.59
RRSK 2,23,70 .. .. 10,00
EBR(Dep) 4,98,43
101 Samudragarh-Nabadwipdham - Road over bridge in lieu of level S.Fund 17,10 17,10 .. ..
crossing No.14
RRSK 3,16,33 1,00 .. 10,00
EBR(Dep) 4,98,43
2.1.9
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
(Figures in thousand of Rupees)
Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay
No. -tion Cost end of Outlay 2018- Proposed for
March 2018 19 2019-20
103 Howrah Division - Limited use subways in lieu of level crossings (20 S.Fund 8,56,28 8,61,65 .. ..
Nos)
RRSK 16,90,27 60,07 15,00 10,00
104 Barddhaman Yard - 4-lane road over bridge in lieu of 2-lane road S.Fund 60,25,00 113,81,83 2,80,00 ..
over bridge No.213
RRSK 10,00 3,50,00 1,00 1,00
EBR(Dep) 96,33,00
105 Howrah - Repl.of Chandmari road over bridge S.Fund 35,05 35,05 .. ..
RRSK 56,29,95 30,99 1,85,00 3,00,00
106 Howrah Division - Limited use subways for manned level crossing S.Fund 2,17,29 1,79,26 .. ..
gates (Nos. 36 & 44)
RRSK 1,54,11 .. 10,00 1,00,00
107 Howrah Division - Repl. of Benaras road over bridge by cable- S.Fund 2,11 2,11 .. ..
stayed bridge
RRSK 32,50,89 75,60 7,55,00 3,00,00
108 Ambika Kalna-Dhatrigram - Road over bridge in lieu of level S.Fund 12,95 12,95 .. ..
crossing No.12
RRSK 36,82,05 42 1 55,00
EBR(Dep) 19,03,00
109 Andal-Sainthia - Road over bridge in lieu of level crossing No.22- S.Fund 2,49 3,85 .. ..
B/T on Seuri west end
RRSK 29,97,51 34,66 4,00,00 5,00,00
EBR(Dep) 15,37,00
110 Bansberia-Bandel - Road over bridge in lieu of level crossing No.1 S.Fund 96 96 .. ..
111 Adisaptagram-Magra - Road over bridge in lieu of level crossing S.Fund 2,94 2,94 .. ..
No.13
RRSK 35,88,06 .. 1,00 1,00
EBR(Dep) 18,45,00
112 Bandel-Adisaptagram - Road over bridge in lieu of level crossing S.Fund 10,56 9,56 .. ..
No.12
RRSK 35,81,44 .. 1,00 1,00
EBR(Dep) 18,55,00
113 Guskara-Pichkurirdhal - Road over bridge in lieu of level crossing S.Fund 1,18 1,18 .. ..
No.4
RRSK 35,78,82 .. 1 55,00
EBR(Dep) 18,46,00
114 Murarai-Nalhati - Road over bridge in lieu of level crossing No.32 RRSK 35,80,00 .. 30,50 55,00
EBR(Dep) 18,47,00
2.1.10
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
(Figures in thousand of Rupees)
Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay
No. -tion Cost end of Outlay 2018- Proposed for
March 2018 19 2019-20
116 Sheoraphuli-Diara - Road over bridge in lieu of level crossing No.4 S.Fund 50,91 91 .. ..
on Grand Trunk Road
RRSK 35,09,09 .. 1 51,00
EBR(Dep) 18,31,00
117 Bahirkhand-Tarakeswar - Road over bridge in lieu of level crossing S.Fund 51,43 1,43 .. ..
No.23-A
RRSK 35,28,57 .. 1 55,00
EBR(Dep) 18,43,00
118 Kumardhubi-Mugma - 2-lane road over bridge in lieu of existing 2- S.Fund 4,03,72 91,45 .. ..
lane road under bridge No.20
RRSK 23,93,28 4,43,55 4,83,55 5,00,00
EBR(Dep) 14,99,00
119 Chandmari, Mahuadanga, Asansol - Road under bridge adjacent to S.Fund 6,46,84 7,83,55 3,00,00 ..
bridge No.529
RRSK 11,35,80 1,76,99 4,71,01 3,00,00
121 Rishra - Limited use subway in lieu of level crossing No.3 S.Fund 1,33,37 33,37 .. ..
RRSK 16,46,31 .. .. 3,50,00
122 Baruipur - Limited use road under bridge in lieu of level crossing S.Fund 1,54 1,53 .. ..
No.21/S/T
RRSK 6,55,46 .. 1 1
EBR(Dep) 6,57,00
123 Madhupur-Joramow - Road over bridge in lieu of road under bridge S.Fund 3,02,30 2,19,55 .. ..
No.618
RRSK 29,06,95 4,41,45 1,41,00 5,00,00
EBR(Dep) 16,04,63
124 Berhampur Court - Road over bridge & limited use subway in lieu of S.Fund 4,58,94 33,94 .. ..
level crossing gate No.131/T
RRSK 33,24,36 4,45,64 3,99,00 5,00,00
EBR(Dep) 17,72,65
125 Jamtara-Bodma - Road over bridge in lieu of level crossing gate S.Fund 3,02,32 35,55 .. ..
No.9-B
RRSK 28,45,04 1,78,59 4,00,00 3,00,00
EBR(Dep) 15,73,68
126 Chittaranjan-Bodma - Road over bridge in lieu of level crossing S.Fund 2,00,97 2,00,10 .. ..
gate No.7-A/T
RRSK 29,46,39 2,39,52 3,00,00 3,00,00
EBR(Dep) 15,73,68
2.1.11
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
(Figures in thousand of Rupees)
Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay
No. -tion Cost end of Outlay 2018- Proposed for
March 2018 19 2019-20
128 Ichhapur-Shyamnagar - Regirdering of road under bridge No.56 S.Fund 38,95 38,94 .. ..
129 Sankarpur-Jasidih - Road over bridge in lieu of level crossing S.Fund 2,07,37 7,37 .. ..
No.27/C
RRSK 19,49,19 90,97 1,00,00 3,00,00
EBR(Dep) 23,56,56
130 Park Circus-Sir Gurudas Banerjee Halt - Regirdering of road under S.Fund 8,67 9,67 .. ..
bridge No.X/25
RRSK 3,60,33 .. 5,00 10,00
132 Berhampur Court - Road over bridge in lieu of level crossing gate S.Fund 35,17 1,12,65 .. ..
No.132/T at Lalgola end
RRSK 25,36,14 .. 8,91,51 3,00,00
EBR(Dep) 10,63,53
133 Jamalpur Yard - Repl. of road over bridge No.215 with approach S.Fund 1,50,78 3,33,58 .. ..
road
RRSK 28,48,39 4,19,24 5,05,00 5,25,00
135 Satsang Nagar-Baidyanath Dham - Road over bridge in lieu of level S.Fund 3,00,00 3,12,25 .. ..
crossing No.4-B/T
RRSK 35,08,00 2,30,13 2,10,00 2,00,00
EBR(Dep) 20,54,00
136 Howrah division- Road over bridge in lieu of existing Road over RRSK 24,95,74 .. 70,00 2,00,00
bridge at Sainthia station
EBR(Dep) 24,95,73
137 Malda Town-Gour Malda- subway in lieu of level crossing No. 60/A S.Fund 10,00 .. 10,00 ..
138 Howrah division- Strengthening of existing girders of Bankim Setu S.Fund 50,00 .. .. ..
(Salkia end)
RRSK 2,99,72 .. 1,00,00 1,49,72
139 Ranaghat-Gede - Elimination of manned level crossing gates by S.Fund 30,00 2,73 .. ..
limited height subways (6 Nos)
RRSK 9,08,23 39,77 1,18,00 1,00,00
140 Pakur-Barharwa Road- Road over bridge in lieu of level crossing S.Fund 50,00 .. .. ..
No. 19/B & 45/C/E at Labda
RRSK 17,20,63 .. 5,00 50,00
EBR(Dep) 17,70,62
2.1.12
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
(Figures in thousand of Rupees)
Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay
No. -tion Cost end of Outlay 2018- Proposed for
March 2018 19 2019-20
142 Simurali - Chakdaha - Road over bridge in lieu of level crossing RRSK 16,86,00 .. 1 51,00
No.50/T
EBR(Dep) 16,87,00
143 Champapukur - Basirhat -Road over bridge inlieu of level crossing RRSK 15,81,00 .. 1 51,00
No. E/39
EBR(Dep) 15,80,00
144 Birnagar - Badkulla - Road over bridge inlieu of level crossing RRSK 16,86,00 .. 1 55,00
No.60B
EBR(Dep) 16,87,00
145 Sahibganj- Road over bridge in lieu of level crossing No. 82-B/T S.Fund 5,45 .. 1 ..
near west cabin
RRSK 12,88,81 .. 1 1,00,00
EBR(Dep) 12,94,26
146 Kasitarh-Vidyasagar - Road over bridge in lieu of level crossing No. S.Fund 5,00 .. 1,00 ..
13/B/E
RRSK 19,96,85 .. 1,00 2,00,00
EBR(Dep) 20,01,85
147 Kasitarh-Vidyasagar- Road over bridge in lieu of level crossing No. RRSK 20,01,85 .. 1,00 1,00,00
14/A/T
EBR(Dep) 20,01,85
148 Barachak-Hirapur Yard line -Road over bridge in lieu of level S.Fund 1,00,00 .. 87,33 ..
crossing No. 1-A/E-3 over old GT Road near Kumarpur
RRSK 13,88,55 1,01,16 1,00,00 2,00,00
EBR(Dep) 14,88,56
149 Bally Ghat-Bally Halt - Repl. of steel girder bridge No. 15 CCR into RRSK 14,31,68 84 5,15,00 3,00,00
road under bridge(RCC box)
150 Howrah Division - Road over bridge in lieu of level crossing RRSK 19,60,00 .. 1,00 9,00
No.9/Spl (near Ambika Kalna)
EBR(Dep) 19,60,00
151 Estimated investment through EBR(Partnership) for works on EBR(P) 130,00,00 .. 130,00,00 65,00,00
Indian Railways on cost share basis incl deposit from State
Government etc
152 Khaltipur-Chamagram - Road over bridge in lieu of level crossing RRSK 19,12,44 .. 1,00 10,00
No.49 (PB#161/2018-19/ER)
EBR(P) 20,62,44 .. .. ..
153 Ukhra-Pandabeshwar - Road over bridge in lieu of level crossing RRSK 19,60,82 .. 1,00 10,00
No.6/B/T (PB#161/2018-19/ER)
EBR(P) 20,39,15 .. .. ..
154 Malda-Gour Malda - Road over bridge in lieu of level crossing RRSK 19,12,16 .. 1,00 10,00
No.64 (PB#161/2018-19/ER)
EBR(P) 20,62,17 .. .. ..
158 Sealdah Division - Through Rail Renewal (Primary) on various DRF 24,47,74 13,75,17 .. ..
sections - 33.5 km
S.Fund 1,30,00 1,89,97 .. ..
RRSK 10,78,98 5,24,77 1 1
159 Kiul - Barharwa - Complete Track Renewal (Primary) on up & down DRF 20,63,49 10,02,22 .. ..
lines on Malda Division -15.73 km
S.Fund 1,00,00 1,35,00 .. ..
RRSK 7,69,89 3,75,60 1,26,59 1,69,48
165 Naihati-Ranaghat jn - CTR(P) - 15.365 Km & TRR(P) - 0.250 Km. RRSK 24,47,98 .. 4,14,68 2,50,00
R. 77,92
166 Andal-Sainthia (DN) - CTR(P) - 3.13 Km. RRSK 5,19,26 .. 1,30,95 71,87
R. 15,87
167 Khana-Gumani - CTR(P) - 24.829 km & TRR(P) - 26.911 Km. RRSK 68,07,14 .. 18,88,91 45,00,00
R. 1,25,92
TRACK RENEWALS
169 Katwa-Bandel (DN BB Loop) - CTR(P) - 6.456 Km and TTR (CS RRSK 11,12,43 .. 1,74,60 6,00,00
CMSC) - 2 sets.
R. 35,06
170 Howrah-Khana & Bandel - Naihati - CTR(P) - 30.704 Km & TRR(P) - RRSK 54,17,69 .. 8,73 45,00,00
3.651 Km.
R. 1,55,72
171 Madhupur-Giridih - CTR(P) - 5.80 Km & Topsi - Barabani Chord - RRSK 33,01,34 .. 4,62,69 2,53,95
CTR(P) -14.10 Km.
R. 1,00,92
173 New Farakka-Barharwa - CTR(P) -10.59 Km & New Farakka - RRSK 23,39,58 .. 4,01,58 5,00,00
Malda - CTR(P) -3.55 Km.
R. 71,71
175 Ballygunj-Budge Budge - CTR(P) - 5.844 Km & Kakurgachi Chord - RRSK 9,71,32 .. 1,17,86 2,50,00
Ballygunj - TRR(P) - 0.498 Km.
R. 29,64
177 Khana-Andal - CTR (P) - 13.45 Km. RRSK 22,31,31 .. 65,48 35,94
R. 68,21
178 Bonidanga Link Cabin-Keul - CTR(P) - 33.45 km RRSK 55,34,58 .. 2,18,25 6,00,00
R. 1,69,64
179 Barasat Jn-Masalandapur - CTR(P) - 16.045 Km & TRR(P) - 7.30 RRSK 32,59,43 .. 4,97,61 7,60,00
Km.
R. 81,37
180 Barasat jn-Masalandapur - CTR(P) -13.69 Km & TRR(P) - 3.04 Km. RRSK 24,62,53 .. 4,14,68 5,80,00
R. 69,43
185 Andal-Sainthia - CTR - 2.38 km & TRR - 2.53 km (P) DRF 5,09,84 3,34,11 .. ..
RRSK 1,75,72 19,26 24,80 13,61
R. 6,38
2.1.15
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
(Figures in thousand of Rupees)
Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay
No. -tion Cost end of Outlay 2018- Proposed for
March 2018 19 2019-20
TRACK RENEWALS
186 Howrah - Khana - CTR - 2.3 km (P) DRF 2,93,87 7,91,31 .. ..
RRSK 10,00 .. 1 1
R. 6,07
188 Kiul - Barharwa - Malda - CTR - 17.8 km & TRR - 4 km (P) DRF 25,52,19 21,72,44 .. ..
RRSK 1,57,82 34,10 74,21 1
R. 47,74
193 Kanchrapara Workshop - CTR(S) - 5 km & TTR - 10 sets DRF 5,17,45 1,72,55 .. ..
RRSK 2,44,90 20,40 99,22 1
R. 12,01
196 Sealdah Division - CTR(S) - 11.25 km (loop/yard lines) DRF 7,97,70 5,05,75 .. ..
S.Fund 1,97,18 2,42,80 .. ..
RRSK 3,16,15 1,64,70 23,13 1
198 Dum Dum-Bongaon & Sealdah-Gede - CTR(P) - 4.70 km DRF 5,99,37 4,08,43 .. ..
RRSK 2,50,98 1,45,95 1 1
TRACK RENEWALS
202 Sealdah-Baruipur - CTR(P) - 2 km DRF 2,56,74 1,74,97 .. ..
RRSK 1,40,85 39,14 8,46 1
205 Andal & Asasol Yards - CTR(S) - 16.30 km DRF 11,55,78 7,87,25 .. ..
RRSK 5,72,25 2,14,69 23,83 13,08
208 Sainthia-Rampurhat - CTR(P) - 26.2 km with TTR - 27 Nos DRF 38,29,64 24,42,83 .. ..
S.Fund 2,00,00 1,88,20 .. ..
RRSK 11,55,35 4,41,31 1,83,33 50,00
R. 98,02
212 Rampurhat - Pakur - CTR(P) - 22.5 km with TTR - 8 Nos DRF 31,24,17 24,24,35 .. ..
S.Fund 2,00,00 2,02,55 .. ..
RRSK 7,99,81 1,43,66 87 1
R. 75,14
214 Rampurhat - Gumani - CTR(P) - 13.4 km with TTR - 17 Nos DRF 20,44,73 13,53,43 .. ..
S.Fund 2,50,00 .. .. ..
RRSK 7,97,07 1,36,00 1,22,03 1
R. 52,21
215 Ballygunge Jn - Mile5b, Dumdum Jn-Bangaon Jn & Sealdah - DRF 7,31,21 5,07,34 .. ..
Barrakpore - CTR(P) - 5.52 km
S.Fund 1,93,73 2,88,60 .. ..
RRSK 3,04,91 2,68,76 25,12 20,00
R. 17,25
2.1.17
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
(Figures in thousand of Rupees)
Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay
No. -tion Cost end of Outlay 2018- Proposed for
March 2018 19 2019-20
TRACK RENEWALS
216 Ballygunge-Sonarpur - CTR(P) - 5 km DRF 6,62,32 5,98,78 .. ..
S.Fund 2,88,44 4,49,50 .. ..
RRSK 2,38,59 1,82,54 69,60 30,00
R. 15,63
226 Nalhati-Pakur & Rampurhat -Pakur- CTR(P) =6.450 Km with TTR - DRF 10,74,21 1,09,14 .. ..
4 Sets.
S.Fund 6,00,00 6,00,00 .. ..
RRSK 8,81,06 8,72,41 1,48,83 18,00
R. 24,67
TRACK RENEWALS
228 Sahibganj-Bhagalpur-CTR(P) =2.0 Km DRF 3,26,42 2,50,72 .. ..
RRSK 10,00 23,50 24,80 1
R. 6,70
230 Nalhati-Pakur- Gumani-CTR(P) -13.20 Km with TTR-11 sets. DRF 22,60,80 16,81,84 .. ..
S.Fund 8,40,44 8,78,09 .. ..
RRSK 16,44,60 16,39,17 3,49,20 70,00
R. 49,88
233 Naihati-Pakur- CTR(P) -8.5 Km with TTR(P)- 7 sets. DRF 14,56,78 9,67,07 .. ..
S.Fund 8,00,00 7,98,50 .. ..
RRSK 10,42,87 10,30,08 2,61,90 26,00
R. 33,83
237 Malda Town - New farakka - CTR(P) - 5.28 km. DRF 4,54,84 24,30 .. ..
S.Fund 4,34,35 2,50,00 .. ..
RRSK 4,44,84 6,42,49 89,92 25,00
R. 23,82
TRACK RENEWALS
240 Sainthia-Pakur (DN) - CTR(P)-14.915 km & TTR (CS CMSC)-11 DRF 18,32,49 3,00,00 .. ..
Sets
S.Fund 9,00,00 9,00,00 .. ..
RRSK 18,22,49 19,48,34 4,07,26 3,17,64
R. 78,63
242 Bandel jn-Katwa - CTR(P) -0.704 Km & TRR(P)-20.475 km. DRF 17,36,26 3,13,46 .. ..
S.Fund 5,00,00 5,00,00 .. ..
RRSK 17,26,26 13,11,69 5,31,83 2,15,37
R. 3,18
244 Sitarampur-Jhajha on DN M/L- CTR (P) - 1.80 Km. DRF 13,94 3,39 .. ..
S.Fund 2,90,00 2,75,83 .. ..
RRSK 3,94 15,88 4 2
R. 8,12
245 Sahibganj Loop (single line) - CTR(P)-18.397 km RRSK 26,80,06 18,76,51 6,94,52 1,50,00
R. 93,30
246 Khana- Andal - CTR (P) - 3.38 km RRSK 4,93,73 1,04,28 99,22 54,45
R. 17,14
247 Khana- Andal - CTR (P) - 5.85 km RRSK 8,54,54 6,49,80 1,98,43 1,08,91
R. 29,67
248 Khana- Andal - CTR (P) - 3 km RRSK 4,38,23 7,15 99,22 54,45
R. 15,21
249 Malda Town-New Farakka - CTR(P) - 3 km RRSK 4,37,04 2,33,41 1,26,59 50,00
R. 15,21
250 Khana- Asansol - CTR (P) - 4.08 km RRSK 5,95,99 1,30,55 99,22 54,45
R. 20,69
251 Asansol- Sitarampur - CTR (P) - 5.08 km RRSK 7,42,06 1,35,46 1,13,65 1,94,64
R. 25,76
253 New Farakka-Sahibganj - CTR(P) - 6.2 km RRSK 9,03,21 2,37,60 3,96,87 2,00,00
R. 31,44
254 Gumani - Pakur - CTR(P) -10.016 km & TTR - 4 sets RRSK 15,30,11 .. 8,29,48 3,89,72
R. 55,72
2.1.20
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
(Figures in thousand of Rupees)
Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay
No. -tion Cost end of Outlay 2018- Proposed for
March 2018 19 2019-20
TRACK RENEWALS
255 Asansol Division - CTR(P) - 5.64 km RRSK 8,23,86 1,16,22 1,98,43 1,08,91
R. 28,60
257 Asansol Division - CTR(S) - 5.396 km RRSK 4,53,15 1,03,77 99,22 54,45
R. 9,77
260 Howrah - Bandel - CTR(P) - 6.5 Km & TTR - 2 sets RRSK 9,83,69 3,28,31 3,93,30 2,80,00
R. 35,28
261 Ranaghat - Pyradanga - CTR(P) - 2.1 km RRSK 2,87,59 2,84,39 1,20,09 1,85,91
R. 10,65
263 Naihati- Ranaghat - CTR(P) - 3.635 km RRSK 4,97,81 1,67,05 2,48,84 2,10,00
R. 18,43
265 Sealdah Division - CTR(P) - 2.80 Km & TSR(P) - 5.85 km RRSK 7,51,37 1,62,18 5,45,69 1,20,00
R. 43,87
266 Nalhati - Khana - CTR(P) - 8.54 km & TTR -16 sets RRSK 15,52,68 11,50,50 2,01,98 50,00
R. 61,86
267 Azimganj junction-New Farakka - TFR - 50 km RRSK 3,79,07 43,00 1,30,95 1,00,00
269 Seoraphuli- Bandel - CTR(P) - 2 km & TTR - 11 sets RRSK 5,00,69 20,69 2,97,64 1,41,95
R. 22,89
270 Bandel-Katwa - CTR(P) - 13 km & TRR(P) - 2.002 km RRSK 20,70,51 2,24,84 16,00,56 2,69,05
R. 65,93
272 Malda-Barharwa - Complete track renewal (14.14 km)(Primary) RRSK 21,32,00 .. 43,65 1,00,00
273 Bhagalpur-Jamalpur - Complete track renewal (7.95 km),Barharwa- RRSK 50,43,00 .. 87,30 1,00,00
Sahibganj - complete track renewal (16.70 km) andJamalpur-Kiul -
complete track renewal (8.80 km) (Primary)
TRACK RENEWALS
275 Khana-Asansol - TRR(P) - 12.00 Km. RRSK 12,48,33 .. 2,09,00 1,00,14
276 Dankuni-Saktigarh - Bardwan - Khana - TRR(P) - 20.228 Km & RRSK 31,10,49 .. 3,92,85 18,00,00
TSR(P) - 12.867 Km.
R. 65,25
278 Bhagalpur-Jamalpur - TRR(P) -10.55 Km. & Jamalpur - Keul - RRSK 25,01,18 .. 5,01,98 4,00,00
TRR(P) -14.60 Km.
279 Sitarampur-Khana - TRR - 10.5 km (P) DRF 33,94,45 26,71,04 .. ..
S.Fund 1,50,00 5,24,34 .. ..
RRSK 7,23,40 9,88 1,98,43 1,08,91
281 Ballyganj-Budge Budge - TRR - 3.15 km (P) & 2.8 km (S) DRF 3,98,29 3,79,09 .. ..
RRSK 78,16 36,81 16,28 20,00
284 Asansol, Sitarampur, Kalubathan & Suri (Yard Lines) - CTR(S) - DRF 12,61,20 6,01,14 .. ..
17.77 km
S.Fund 2,50,00 6,53,49 .. ..
RRSK 6,60,05 14,89 99,22 54,45
R. 23,79
288 Barharwa-Kahlgaon (Passenger Loops) - TRR(S) & TSR(P) - 8 km DRF 7,17,77 5,63,06 .. ..
each
RRSK 1,54,70 .. 1 1
R. 22,44
290 Sealdah Division - TRR(S) - 10.80 km (loop/yard lines) DRF 5,44,23 3,05,63 .. ..
S.Fund 59,01 76,62 .. ..
RRSK 2,45,08 1,91,21 51,72 30,00
2.1.22
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
(Figures in thousand of Rupees)
Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay
No. -tion Cost end of Outlay 2018- Proposed for
March 2018 19 2019-20
TRACK RENEWALS
291 Dum Dum-Bongaon - TRR(P) - 5 km DRF 4,19,48 3,45,09 .. ..
RRSK 1,40,56 34,63 1 1
297 New Farakka - Azimganj Jn. & Sahibganj - Bhagalpur - TRR(S) - 6 DRF 3,21,77 1,61,97 .. ..
km (passenger loops)
S.Fund 1,29 40,00 .. ..
RRSK 93,35 22,18 49,61 50,00
305 Howrah-Belur-TRR(P) - 4.00 Km TTR(P)- 7 sets (CS CMSC). DRF 6,14,37 2,11,78 .. ..
TRACK RENEWALS
306 Bardwan-Khana - TRR(P)-3.89 Km, TRR(S)-0.31 Km. DRF 4,12,65 46,71 .. ..
S.Fund 3,50,00 4,00,00 .. ..
RRSK 2,83,04 26,17 87 86
311 Ballygunj-Budge Budge and Ballygunj-Baruipur - TRR(P)-6.156 Km. DRF 4,47,54 53,19 .. ..
312 Saktigarh -Khana - TRR(P) -11.369 km RRSK 9,74,14 4,33,19 6,56,83 50,03
315 Sealdah Division - TRR(S) - 4.77 km RRSK 2,79,71 1,80,77 74,66 2,50,00
318 Bhagalpur-Jamalpur - CTR(P)-1.5 km & TRR(P) -27.4 km RRSK 25,55,41 8,65,00 8,29,35 5,00,00
R. 7,61
320 Sitarampur-Jhajha (UP ML) - TRR(P) - 4 km RRSK 3,42,74 1,49,55 7,44 4,08
321 Asansol - Sitarampur - TRR(P) - 6.720 km RRSK 5,75,80 98,91 1,98,43 1,08,91
323 Khana-Sitarampur - Through rail renewal (5.26 km) (Primary) RRSK 4,51,00 .. 57,10 31,34
324 Khana-Jhajha - Through rail renewal (26.67 km) (Primary) RRSK 22,85,00 .. 87,30 74,91
325 Dankuni-Saktigarh - Through rail renewal (12.047 km)(Primary) RRSK 10,32,00 .. 7,77,84 1,53,49
TRACK RENEWALS
328 Budge Budge Yard - TSR - 3.52 km (P) &TRR - 4.07 km (S) DRF 4,58,74 4,71,68 .. ..
S.Fund 29,62 48,02 .. ..
RRSK 10,00 24,54 11,48 25,00
R. 8,55
329 Kolkata Yard - TSR (P) & TRR (S) - 5.4 km each DRF 4,80,87 4,11,08 .. ..
RRSK 73,83 34,54 1 1
R. 13,12
330 Andal Yard - TSR(P) with TRR(S) - 9.7 km DRF 8,68,84 7,75,95 .. ..
RRSK 1,15,83 1,16,82 99,22 54,45
R. 25,10
331 Kiul - Barharwa - Malda - TSR(P) with TRR(S) - 6.35 km DRF 5,51,83 4,81,72 .. ..
RRSK 70,10 .. 1 1
R. 17,04
333 Sealdah Yard - TSR(P) with TRR(S) - 5.18 km DRF 4,65,36 4,33,65 .. ..
S.Fund 63,11 83,55 .. ..
RRSK 29,33 36,70 1 1
R. 13,40
334 Kalyani & Naihati Yards - TSR(P) with TRR(S) - 7.12 km DRF 6,39,70 6,59,23 .. ..
S.Fund 49,28 77,51 .. ..
RRSK 10,00 43,58 8,73 1
R. 18,42
Ballast
339 Jhajha-Khana-Pradhankhanta-Sainthia - TBR - 151.97 Km. RRSK 26,12,77 .. 4,19,04 2,29,99
R. 7,70,72
340 Chhota Ambana - Rajla -Through ballast renewal - 79 km DRF 8,88,44 8,13,86 .. ..
RRSK 74,57 39,85 24,80 13,61
R. 84,53
2.1.25
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
(Figures in thousand of Rupees)
Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay
No. -tion Cost end of Outlay 2018- Proposed for
March 2018 19 2019-20
TRACK RENEWALS
341 Howrah Division - TBR - 146.56 km (main line, Sahibganj loop, BB DRF 16,56,43 15,81,32 .. ..
loop & Tarakeshwar branch)
RRSK 3,65,21 14,77 87 1
R. 1,52,82
342 Sealdah Division - Through ballast renewal - 44.2 km DRF 4,99,55 5,17,10 .. ..
RRSK 10,00 25,00 1 1
R. 47,29
343 Asansol Division - Through ballast renewal - 66.3 km DRF 7,89,08 6,98,74 .. ..
RRSK 90,33 49,58 29,77 16,34
R. 70,94
344 Howrah Division - Through ballast renewal - 149 km DRF 17,76,27 14,35,76 .. ..
RRSK 5,88,90 99,92 1 1
R. 1,56,51
345 Sealdah Division - Through ballast renewal - 118.24 km DRF 15,33,77 12,21,75 .. ..
S.Fund 1,50,00 1,18,18 .. ..
RRSK 3,84,48 3,30,29 15,36 1
R. 1,26,52
TRACK RENEWALS
354 Azimganj- New Farraka-TBR -60.00 Km DRF 7,12,99 98,00 .. ..
S.Fund 5,50,00 6,15,16 .. ..
RRSK 6,14,99 1,18,61 14,88 5,00
R. 2,00,97
357 Sealdah Division - TBR -12.60 km RRSK 2,12,21 1,72,38 77,56 80,00
R. 63,90
358 Sealdah Division - TBR - 63.374 km RRSK 10,67,36 2,50,00 9,42,56 5,50,00
R. 3,21,40
359 Asansol Division - TBR - 51.17 km RRSK 8,61,82 98,75 1,98,43 1,08,91
R. 2,59,51
360 Sealdah Division -TBR -106.949 km RRSK 18,01,26 1,50,00 12,54,06 7,00,00
R. 5,42,39
361 Malda Division - TBR - 53.6 km RRSK 9,02,74 43,35 4,46,48 3,00,00
R. 2,71,83
362 Howrah Division - TBR - 78.381 km RRSK 13,20,11 2,40,14 6,61,76 3,22,12
R. 3,97,51
365 Bhagalpur-Kiul - TTR (CS CMSC) - 54 Sets. RRSK 11,12,59 .. 13,10 2,00,00
R. 62,60
R. 1,13,55
367 Kanchrapara Workshop- TTR (FS CS CMSC) -15 Sets RRSK 2,93,72 .. 39,29 80,00
R. 17,39
368 Sealdah Division - TTR (CS) - 126 sets & TTR (CMSC) - 126 sets RRSK 6,27,29 .. 78,57 3,20,00
369 Howrah Division -Renewal of damaged /grooved Crossing FS RRSK 12,92,31 .. 1,57,14 3,00,00
sleeper - 97330 Nos.
370 Bandel - Katwa & Bandel - Barddhaman -TTR (25 sets &39 sets) DRF 9,80,83 5,95,74 .. ..
diamond crossing (12 sets)
RRSK 3,85,08 3,66,00 99,13 1
R. 33,39
2.1.27
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
(Figures in thousand of Rupees)
Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay
No. -tion Cost end of Outlay 2018- Proposed for
March 2018 19 2019-20
TRACK RENEWALS
371 Howrah Yard Complex - TTR (67 sets) DRF 7,97,75 6,13,82 .. ..
RRSK 1,83,92 95,00 1,19,03 1
R. 29,77
373 Howrah, Asansol & Sealdah Divisions - Complete renewal of points DRF 12,90,12 6,58,06 .. ..
& crossings with thick web switches & weldable CMS (16, 16 & 20
sets)
S.Fund 8,50,00 10,22,89 .. ..
RRSK 6,60,36 1,18,02 2,77,93 2,36,54
R. 29,77
374 Howrah, Asansol, Sealdah & Malda Divisions - Complete renewal DRF 40,11,00 10,62,04 .. ..
of points & crossings with thick web switches (74, 40, 40 & 30 sets)
376 Howrah Division - Thick web switches & weldable CMS crossings DRF 4,03,70 1,02,74 .. ..
(17 sets)
S.Fund 1,20,00 99,30 .. ..
RRSK 1,99,86 .. 87 1,00
R. 8,50
377 Tikiapara & Jheel Siding - TTR (60 sets) DRF 8,17,52 7,06,21 .. ..
S.Fund 1,18,48 1,10,00 .. ..
RRSK 1,37,22 20,00 3,69 1
R. 26,66
378 Malda Yard - Thick web switches & weldable CMS crossings (16 DRF 3,79,95 1,52,72 .. ..
sets)
RRSK 64,67 .. 1 1,00,00
R. 8,00
TRACK RENEWALS
382 Howrah Division - TTR (54 sets) DRF 7,80,85 4,47,75 .. ..
S.Fund 1,41,13 1,40,00 .. ..
RRSK 2,93,09 25,00 1 1
R. 25,96
389 Sealdah Division - Switches, crossings, rails & fittings of points & DRF 8,26,09 6,46,38 .. ..
crossings - 50 sets
RRSK 2,11,44 62,17 13,66 1
390 Barddhaman-Khana - Renewal of points & crossings - 23 sets DRF 3,70,15 1,96,14 .. ..
391 Sealdah Division - Renewal of points & crossings - 50 sets DRF 7,83,56 6,35,20 .. ..
RRSK 1,76,81 7,16 1 1
392 Howrah-Khana - Renewal of switches, crossings, rails & fittings - 50 DRF 8,26,00 9,46,03 .. ..
sets
RRSK 10,00 12,66 2,18,25 37,34
393 Asansol Division - Renewal of switches, crossings, rails & fittings - DRF 8,26,09 9,28,09 .. ..
50 sets
RRSK 10,00 2,55 50 27
394 Andal Yard - Renewal of points & crossings - 40 sets DRF 6,26,85 5,21,84 .. ..
RRSK 24,03 1,22,45 1,98 1,09
395 Andal Down Yard - TTR (50 Nos) DRF 8,11,63 1,98,71 .. ..
RRSK 7,09,15 1,95,46 1,98,43 1,08,91
R. 35,72
2.1.29
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
(Figures in thousand of Rupees)
Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay
No. -tion Cost end of Outlay 2018- Proposed for
March 2018 19 2019-20
TRACK RENEWALS
396 Sealdah Division - TTR 180 sets DRF 32,40,22 6,87,94 .. ..
S.Fund 28,93 7,11,78 .. ..
RRSK 19,45,87 15,22,10 5,45,69 5,50,00
R. 1,28,59
403 Sealdah Division: TTR(DS) -4 Sets & TTR(FS CS CMSC) -87 Sets. DRF 18,51,79 21,96 .. ..
404 Howrah Division - TTR - 149 sets & TTR - 107 sets RRSK 59,66,37 3,34,68 8,45,28 40,98,99
R. 3,10,92
405 Asansol Division - TTR - 50 sets RRSK 9,59,82 2,49,85 52,38 28,75
R. 57,96
406 Khana- Pradhankhunta - TTR - 80 sets RRSK 14,69,48 4,25,67 52,38 28,75
R. 92,74
407 Sealdah Division - TTR - CS-110 sets & -110 sets RRSK 4,81,61 1,57,38 2,48,05 1,20,00
408 Sealdah Division -TTR -107 sets & TTR - 1 set RRSK 17,51,54 1,50,00 12,54,06 5,50,00
R. 51,00
409 Howrah Division - TTR -107 sets RRSK 19,63,70 2,55,79 10,17,94 5,41,88
R. 1,24,03
410 Asansol Division - TTR - 5 sets & TTR - 224 sets RRSK 44,16,96 2,49,50 43,65 23,96
R. 2,22,57
2.1.30
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
(Figures in thousand of Rupees)
Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay
No. -tion Cost end of Outlay 2018- Proposed for
March 2018 19 2019-20
TRACK RENEWALS
411 Howrah Division - TTR - 29 sets RRSK 6,58,28 27,48 2,21,86 3,50,03
Others
412 Sealdah Division - Renewal of SEJ - 166 Nos. RRSK 4,00,40 .. 52,38 2,40,00
413 Khana-Pradhankhunta-Jhajha - TFR - 129.61Km & TWR - 312.56 RRSK 52,99,66 .. 8,09,66 4,44,38
Km.
414 Khana-Pradhankhunta-Jhajha-Andal-Sainthia - Renewal of SEJ RRSK 8,66,39 .. 9,55,94 3,24,66
(60 kg) - 337 Sets.
415 Malda Town-Kiul - Renewal of SEJ -104 Nos. RRSK 2,51,98 .. 30,56 1,00,00
416 Sealdah Division - Renewal of Glued Joints (52 Kg) - 637 Nos. RRSK 2,70,34 .. 39,29 90,00
418 Howrah Division - TFR -115.219 Km. RRSK 9,35,48 .. 2,05,16 3,00,00
419 Khana - Gumani - TFTR - 6.4 km (up & down) (Sahibganj loop) DRF 2,62,37 1,76,13 .. ..
420 Baltikuri - Dankuni - Addl berm & blanketing - 6.61 km DRF 3,23,00 1,10,37 .. ..
S.Fund 22,73 .. .. ..
RRSK 2,05,74 30,00 87 1
422 Sahibganj Loop - Widening of cess & provision of sub-bank with DRF 9,75,00 2,18,12 .. ..
boulder drains & filling up of borrow pits - 15.66 km
RRSK 3,79,48 1,97,12 2,97,65 2,82,89
TRACK RENEWALS
430 Malda Division - Strengthening of embankment at vulnerable DRF 8,49,57 45,04 .. ..
locations - 16.17 km
RRSK 4,86,24 12,20 2,05,40 1,00,00
434 Sealdah Division - TFR - 70.393 km RRSK 5,33,68 1,68,89 3,47,26 1,10,00
435 Malda Division - through renewal of SEJ -120 sets RRSK 2,59,44 95,00 99,22 50,00
436 Malda Town-Kiul - TTR -106 sets RRSK 19,68,62 1,12,74 4,72,25 2,00,00
R. 1,49,79
438 Asansol Division - TBTR- 1750 Nos RRSK 3,85,00 98,46 54,57 29,95
439 Asansol Division - RGJ - 1040 Nos RRSK 4,58,01 1,46,25 99,22 54,45
440 Howrah Division - RGJ - 1225 nos RRSK 5,21,00 39,32 3,47,26 1
446 Bhagalpur-Kiul - Protection work (34 bridges) RRSK 6,97,00 .. 1,00 50,00
447 Nawapatra-Mathurapur - Regirdering & ancillary works (Bridge RRSK 30,99,61 .. .. 20,00
No.623)
448 Bandel-Barharwa Loop - Repl of girders (Bridge No.105, 106 & 217) RRSK 5,40,53 .. .. 1,00,00
449 Sahibganj-Bhagalpur - Reinforced concrete cement jacketting (6 RRSK 8,18,00 .. 25,00 50,00
bridges)
450 Sealdah Division - Repl of steel girder bridges to PSC slab bridges RRSK 10,64,71 .. 1 1,00,00
(5 Nos)
2.1.32
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
(Figures in thousand of Rupees)
Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay
No. -tion Cost end of Outlay 2018- Proposed for
March 2018 19 2019-20
BRIDGE WORKS
451 Lahabon-Simultala - Regirdering with ancillary works (Bridge RRSK 12,42,68 .. .. 20,00
No.676)
452 Tulsitanr-Lahabon - Regirdering with ancillary works (Bridge RRSK 4,65,77 .. .. 20,00
No.665)
453 Tulsitanr-Lahabon - Regirdering (Bridge No.661) RRSK 5,70,91 .. .. 20,00
459 Sealdah Division (ML Section) - Repl of girders (bridge No.1) DRF 2,85,31 36,20 .. ..
RRSK 2,16,81 .. 20,00 6,00
SRSF 1,09,35 .. .. ..
460 Asansol Division - Rebuilding of hume pipes / arches on Rajdhani DRF 3,93,65 88,84 .. ..
route (26 Nos)
RRSK 2,93,65 .. 45,00 1,00,00
462 Howrah Division - Rebuilding by pre-stressed concrete box girder DRF 53,83,00 52,33,35 .. ..
with reinforced concrete cement substructure etc (bridge No.172)
463 Howrah Division - Rebuilding / rehabilitation with reinforced DRF 5,42,04 4,86,95 .. ..
concrete cement box (bridge Nos.240, 258 & 261 down and 262 &
263 up / down)
RRSK 78,76 1,14,77 10,00 10,00
465 Bhagalpur-Mandarhill - Repl. of small span steel girder bridges DRF 4,81,63 3,52,94 .. ..
(bridge No.2, 3, 6, 15, 26, 27, 30, 33 & 100)
RRSK 93,69 .. 1 1
466 Malda Division - Reinforced concrete cement jacketing (bridge DRF 4,60,86 3,61,59 .. ..
No.186 & 195), RCC box (bridge No.120, 102, 132 & 140),
rebuilding (bridge No.279 & 304)
RRSK 45,86 4,55 1 1
467 Howrah Division - Rebuilding / rehabilitation of arch bridges with DRF 38,90,15 28,19,97 .. ..
reinforced concrete cement box (15 Nos) & repair to substructure
(2 bridges)
RRSK 11,17,36 9,40,97 4,00,00 50,00
2.1.33
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
(Figures in thousand of Rupees)
Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay
No. -tion Cost end of Outlay 2018- Proposed for
March 2018 19 2019-20
BRIDGE WORKS
468 Mugma-Thaparnagar - Reinforced concrete cement jacketting DRF 12,50,00 10,27,12 .. ..
(bridge No.34)
RRSK 1,49,74 21,78 1,00,00 50,00
469 Gangpur-Barddhaman - Repl. & strengthening of bridge members DRF 2,98,99 2,13,11 .. ..
(bridge No.209/up main & up HBC line)
RRSK 80,51 26,22 .. 1
470 Bhagalpur-Mandar Hill - Repl. of bridges by PSC/FC slabs with DRF 3,74,34 1,73,06 .. ..
RCC jacketting of piers & abutments (bridge No.1, 24, 72-A, 88 &
74)
RRSK 2,29,32 49,25 30,00 70,00
472 Tildanga-Barharwa - Reinforced concrete cement jacketting & repl. DRF 3,18,33 21,30 .. ..
of early steel girders (bridge No.398) and New Farakka-Azimganj
Jn - Protection works (bridge No.368)
RRSK 2,81,33 16,50 30,00 50,00
473 Howrah Division - Strengthening of arches, piers & abutments by DRF 4,39,25 2,83,13 .. ..
reinforced concrete cement jacketting (bridge Nos.19 & 20)
474 Barakar-Kumardhubi - Repl. of deck plates & inspection pathway DRF 4,63,34 4,11,72 .. ..
(bridge No.18/down)
RRSK 52,35 43,48 12,00 1
478 Dum Dum-Bongaon - Repl of girder bridge (No.67/T), Dum Dum- DRF 9,81,14 .. .. ..
Dankuni (No.18/CCR) & Ballyganj-Budge Budge (No.B/8)
479 Howrah - Rehabilitation by jacketing of abutments & piers and PSC DRF 4,38,50 95,56 .. ..
slab in lieu of steel girders (Bridge No.214, 215, 217, 237 & 238)
482 Sitarampur-Jhajha - RCC jacketing (Bridge No.603) RRSK 4,84,87 .. 50,00 1,00,00
483 Katwa-Gangatikuri - Strengthening of substructure & protection of RRSK 6,20,92 .. 75,00 1,00,00
approach bank (Bridge No.167)
2.1.34
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
(Figures in thousand of Rupees)
Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay
No. -tion Cost end of Outlay 2018- Proposed for
March 2018 19 2019-20
BRIDGE WORKS
484 Bongaon-Petrapole - Regirdering (Bridge No.73/T & 83/T) and RRSK 6,79,56 .. 10,00 1,00,00
strengthening (Bridge No.76/T & 84/T & Bridge No.S/1 in Sealdah-
Diamond Harbour)
485 Nalhati-Chatra - Rehabilitation/rebuilding (Bridge No.192) & RRSK 3,92,83 .. 50,00 1,00,00
Kotalpukur-Gumani (Bridge No.253) in Sahibganj loop
486 Bhagalpur-Jamalpur - RCC jacketting & extension of barrel length RRSK 6,41,68 .. 50,00 50,00
(Bridge No.187, 180, 188 & 185)
487 Bhagalpur-Kiul - RCC jacketting (Bridge No.174, 175, 81, 59, 62 & RRSK 4,04,11 .. 50,00 50,00
163) and construction of wing wall (Bridge No.175 & 176)
490 Madankata-Joramow - Regirdering & ancillary works (Bridge RRSK 26,32,97 .. 50,00 3,25,00
No.603)
491 Kahalgaon-Sabour - Addl opening by RCC box (7 locations), RRSK 18,60,74 .. 20,00 1,50,00
Gangania-Ratanpur (7 locations) & Bonidanga-Gumani (1 location)
495 Rajmahal - Repl of semaphore signal by electronics interlocking RRSK 6,13,11 .. 1,00 1,00,00
with multi aspect colour light signalling
496 Belmuri-Shaktigarh - Duel detection by multi section digital axle RRSK 25,97,84 .. 1,00 1,00,00
counter (Phase-I)
497 Ranaghat Crossing Cabin - Repl of panel interlocking with RRSK 6,49,72 .. 1,00 1,00,00
electronic interlocking system
498 Guma - Repl. of panel interlocking with electronic interlocking RRSK 5,77,69 .. 1,00 1,50,00
system
499 Howrah Division - Repl. of lever frames to electronic interlocking (3 RRSK 15,49,73 .. 1,00 1,00,00
yards)
500 Andal Yard - Electronic interlocking of west down receiving cabin RRSK 14,05,63 .. 1,00 1,00,00
501 Andal - Electronic interlocking of East empty yard cabin RRSK 10,69,84 .. 1,00 1,00,00
502 Sealdah - Augmentation of block proving axle counters with dual RRSK 8,30,43 .. 1,02,08 1,00,00
single section digital axle counter & auto resetting facility in Main &
North section
2.1.35
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
(Figures in thousand of Rupees)
Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay
No. -tion Cost end of Outlay 2018- Proposed for
March 2018 19 2019-20
507 Eastern Railway - Continuous track circuiting with automatic block DF(4) 71,00,00 73,53,20 .. ..
signalling (122.66 km) (A & C-routes) (Rajdhani & Shatabdi route)
508 Malda Division - Repl. of lever frames by centralised operation of DRF 15,22,88 19,92,03 .. ..
points & signals (10 stations) (B-route)
DF(4) 6,72,51 7,57,86 .. ..
RRSK 2,00,00 1,65,73 4,00,00 4,00,00
509 Bally-Shaktigarh - Mobile train radio communication system (90 km) DF(3) 5,20,16 1,23,12 .. ..
510 Kolkata Area - Public address system in suburban trains (141 rakes) DF(1) 16,07,00 30,00 .. ..
511 Sealdah-Howrah-Khana & Automatic Section of Sealdah & Howrah DF(4) 179,96,07 10,15,54 .. ..
Divisions - Train protection system (326 rkm)
RRSK 169,07,90 4,97,55 60,00 1
512 Tikiapara & Howrah Goods Shed - Repl of lever frames by panel / DRF 7,79,69 3,25,68 .. ..
electronic interlocking
RRSK 4,60,67 98,69 2,00,00 3,00,00
513 Sealdah Division - Train management system (30 stations) DF(3) 50,37,66 1,89,44 .. ..
RRSK 48,49,03 49,77 1,00 6,00,00
514 Howrah Division - Train management system (30 stations) DF(3) 50,50,92 20,61,57 .. ..
RRSK 29,06,87 4,54,60 2,86,00 1,00,01
515 Howrah & Sealdah Divisions - Train protection & warning system DF(4) 136,36,00 35,89 .. ..
on balance automatic signalling & important EMU routes (327 rkm)
517 Eastern Railway - Anti collision device on all broad gauge A & B- DF(4) 54,70,00 7,41 .. ..
routes (828 rkm) (excluding Sealdah-Howrah-Khana) &
modification to 1100 existing ACDs on Northeast Frontier Railway
RRSK 54,62,58 .. 1 1
521 BBD Bagh - Repl. of panel by new panel interlocking DRF 4,24,72 19,30 .. ..
RRSK 4,14,72 1,34,87 45,00 2,00,00
522 Khana-Sitarampur - Single section digital axle counters in dual DF(4) 10,18,99 3,81,69 .. ..
mode for redundancy in block line sections (52 Nos)
RRSK 9,18,99 3,11,98 2,50,00 1,50,00
527 Sitarampur-Jhajha - Single section digital axle counters in dual RRSK 6,72,53 1,88,19 2,58,90 2,00,00
mode for redundancy of block line sections (38 Nos)
528 Howrah - Multi section digital axle counters with repl of 831/3 AC RRSK 15,58,80 .. 5,20,00 4,00,00
track circuit
529 Chandan Nagar - Repl of panel interlocking into electronic RRSK 5,68,17 .. 50,00 1,50,00
interlocking
530 Howrah Division - Multi/single section digital axle counters at water RRSK 6,76,15 .. 5,00,00 1,50,00
logging prone areas
531 Howrah-Pradhankhanta - Upgradation of mobile train radio RRSK 4,73,33 .. 50,00 1,00,00
communication system
532 Dum Dum Jn-Balihalt - Provision of MSDAC for dual detection of RRSK 9,15,00 .. 1,00 1,00,00
track circuits
533 Works costing below Rs.2.5 crore each RRSK .. .. .. 9,00,00
536 Asansol Division - Renovation of sub-station at different locations DRF 3,52,06 12,12 1,90,00 73,85
(other than Andal)
2.1.37
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
(Figures in thousand of Rupees)
Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay
No. -tion Cost end of Outlay 2018- Proposed for
March 2018 19 2019-20
540 Estimated investment through EBR(Partnership) for works of solar EBR(P) 62,50,00 .. 62,50,00 50,00,00
power
541 Eastern Railway - Improvement in energy efficiency (PB#293/2018- DF(3) 3,97,48 .. 4 2,35,09
19/NWR)
542 Works costing below Rs.2.5 crore each DRF .. .. .. 2,35,98
DF(3) .. .. .. 26,63
RRSK .. .. .. 1,04,92
550 Asansol Division - Repl. of masts at critical implantations (Phase- DRF 4,02,43 .. .. ..
X) (250 Nos)
RRSK 3,92,43 2,38,53 1,20,00 41,11
552 Asansol - Repl. of masts at critical implantations (phase-XI) DRF 4,82,92 91,30 .. ..
RRSK 2,82,92 1,05,62 1,10,00 96,43
553 Sealdah Division - Repl of SCADA system RRSK 4,48,79 .. 6,43,38 2,01,70
554 Howrah Division - Repl & straightening of leaning mast/TTC/Portal RRSK 5,47,77 .. 1,00,00 1,22,00
(Phase-II) and repl of tight implanted mast (Phase-II)
555 Eastern Railway - Replacement of overaged traction distribution RRSK 7,46,43 .. 34,83 1,64,70
assets (PB#522/2018-19/SECR)
556 Eastern Railway - IT infrastructure works for traction distribution RRSK 6,72,18 .. 10 1,22,00
network (PB#1057/2018-19/SR)
557 Works costing below Rs.2.5 crore each RRSK .. .. .. 1,22,43
560 Andal - Upgradation of B-category infrastructural facilities of up DF(3) 9,54,54 .. 5,00 75,00
yard to A-category for freight train examination
561 Ranaghat (EMU Car Shed) - Inspection bay for 15 coach Cap. 39,12,78 .. 1 4,50,00
maintenance facilities
562 Sealdah - Extension of coaching sick line (100 m) with covered DF(3) 20,08,00 .. 1 30,00
shed at Sealdah end
2.1.39
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
(Figures in thousand of Rupees)
Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay
No. -tion Cost end of Outlay 2018- Proposed for
March 2018 19 2019-20
564 Narkeldanga Car Shed - Addl. pit on line No.4 & shed on line No.3 DF(3) 7,28,00 2,58,45 4,24 60,00
& 4 for 12-coach rakes formation
RRSK 2,00,00 96,76 1,33,00 30,00
567 Kanchrapara Workshop - Augmentation of capacity for periodical Cap. 80,85,74 36,63,43 2,42,75 8,00,00
overhauling of 40 motor & 80 trailer coaches per month
568 Tikiapara - Remodelling of coaching yard (Phase-II) DF(3) 45,04,40 8,68,09 66,83 50,00
RRSK 8,00,00 15,81,66 4,82,46 1
EBR(IF) 10,00 .. .. ..
569 Sealdah - Development of coaching maintenance infrastructure DF(3) 74,63,88 15,64,16 1 50,00
570 Kanchrapara - New rail coach manufacturing unit Cap. 760,16,00 29,97,53 1,00,00 30,00
EBR(Dep) 100,00,00
571 Sahibganj - New diesel electrical multiple unit maintenance shed Cap. 21,43,80 17,45,40 6,81,40 2,50,00
572 Narkeldanga - Upgradation of infrastructural facilities for Cap. 5,00,00 1,52,94 29,00 92,22
maintenance of 12-car rakes at electrical multiple unit car shed
(Phase-II)
573 Bandel - Addl maintenance facilities at electrical multiple unit car Cap. 9,99,00 6,96,78 1,60,00 90,00
shed for running of 12-coach rakes (Phase-III)
574 Kolkata Terminal - Extension of coaching sick line DF(3) 5,06,01 1,98,61 1,00,00 76,00
RRSK 1,84,00 34,75 1,00,00 ..
EBR(IF) 10,00 .. .. ..
575 Liluah - Augmentation of periodical / intermediate overhauling of Cap. 5,72,91 94,81 40,00 1,50,00
LHB coaches from 10 to 30 coaches per month
576 Asansol (Electric Loco Shed) - Augmentation of shed to improve DF(3) 17,24,26 1,56,30 95,53 50,00
facilitiy for maintenance of locomotives
EBR(IF) 10,00 66,19 1 ..
577 Kanchrapara - New central periodic overhauling depot for track DF(3) 39,23,69 8,33,42 29,30 2,00,00
machines
RRSK 10,00,00 4,92,74 5,00,00 ..
EBR(IF) 10,00 8,21,71 2,00,00 7,00,00
581 Water treatment and recycling plants at coaching depots Sealdah Cap. 2,60,00 .. 82,46 1,90,00
and Howrah (Pink book item no. 984/2016-17/NR)
582 Howrah Division - Extn of electric loco shed, Bamumgachi towards Cap. 15,43,91 .. 2,00,00 1,50,00
Howrah end for augmentation of capacity upto 130 locos
583 Howrah - High roof shed over uncovered portion of pit of EMU car DF(3) 2,58,05 .. 1,00,00 73,00
shed
584 Andal - Upgradation of freight train maintenance/examination RRSK 11,80,00 .. 1,00 1,00,00
facilities at west down departure yard
585 Bhagalpur - Augmentation of coaching infrastructure facilities for Cap. 27,50,35 .. 9,80 25,00,00
LHB coaches
586 Kanchrapara - Dedicated power supply for workshop at 33 kv DRF 4,36,22 1,17,13 75,00 2,00,00
instead of existing 6.6 kv supply
587 Bamangachi - Extn of pits & shed of trip shed Cap. 5,17,00 .. 22,99 4,00,00
588 Eastern Railway - Upgradation of upto 7 coaching pit lines RRSK 22,00,00 .. 70 3,00,00
(PB#1002/2018-19/NR)
589 Eastern Railway - Upgradation of freight / routine overhauling RRSK 18,95,77 .. 67 2,00,00
depots, train examination facilities, examination yards
(PB#1001/2018-19/NR)
590 Eastern Railway - Upgradation of critical work centers of workshops RRSK 62,36,98 .. 62 10,66,00
(PB#1000/2018-19/NR)
591 Works costing below Rs.2.5 crore each Cap. .. .. .. 12,01
DRF .. .. .. 3,37,44
DF(3) .. .. .. 4,95,62
RRSK .. .. .. 1,13,03
STAFF QUARTERS
A - Works in Progress
593 Andal - Repl.of quarters, type-I - 28, type-II - 50, type-III - 8 & type- DRF 3,84,19 1,98,81 12,22 3,00
IV - 4 units
594 Sealdah Division - Repl. of quarters, type-I - 16, type-II - 42, type-III DRF 5,31,52 5,06,41 .. 1
- 15 & type-IV - 2 units
595 Howrah Division - Repl.of quarters, type-II - 230, type-III - 35 & type- DRF 13,32,28 8,83,09 82,91 15,00
IV - 20 units
596 Howrah Division - Rebuilding of quarters, type-I - 100 units DRF 4,20,42 1,14,28 .. 1
597 Sealdah Division - Repl.of quarters, type-II - 58, type-III - 15 & type- DRF 3,70,43 3,37,56 8,33 1
IV - 2 units in Kaizer Street & Guard Colony
598 Andal - Repl.of quarters, type-II - 100 units in different colonies DRF 6,69,58 6,61,37 10,50 1,00
600 Sealdah - Repl. of quarter, type-I - 152, type-II - 32, type-III - 12 & DRF 11,61,72 6,35,81 25,49 1
type-IV - 4 units by type-II - 184, type-III - 12 & type-IV - 4 units
601 Panagarh, Durgapur, Raniganj, Madhupur & Jasidih - Quarters for Cap. 3,66,15 .. 1,00,00 71,00
railway protection force
602 Howrah Division - Repl of quarters, type-III-24 units at Bazarpara DRF 4,13,39 .. 25,00 37,00
603 Howrah Division - Repl of quarters, type-V-12 units DRF 6,40,00 .. 34,50 37,00
604 Eastern Railway - Replacement of old/dilapidated quarters at DRF 9,00,00 .. 30,00 3,68,96
various locations (PB#704/2018-19/CR)
605 Eastern Railway - Construction of new quarters for staff/officers at Cap. 24,00,00 .. 10,00 14,21,00
various locations (PB#1038/2018-19/NR)
606 Works costing below Rs.2.5 crore each Cap. .. .. .. 3,83,99
DRF .. .. .. 1,21,00
609 Jamalpur - Improvement of Rampur & Daulatpur colonies as model DRF 4,08,69 2,60,06 19,57 1
colonies
610 Jamalpur - Improvement of staff quarters with treatment of leaky DF(2) 2,61,39 2,58,15 .. 1
roofs (East & West colony)
2.1.42
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
(Figures in thousand of Rupees)
Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay
No. -tion Cost end of Outlay 2018- Proposed for
March 2018 19 2019-20
612 Asansol Division - Repl. of jack arch / asbestos roofs, doors, DF(2) 3,00,00 1,38,21 4,00 1,00
windows, water supply distribution pipes (type-I - 100 & type-II - 150
units)
613 Majerhat - Construction of nursing college & hostel DF(2) 24,32,75 23,92,90 42,70 3,00
614 Kanchrapara - Repl.of pipeline at Dangapara colony, renovation of DRF 6,48,48 8,10,65 43,32 1
filter house, provision of boundary wall, renovation of roads etc
615 Liluah Workshop - Underground storm water drainage system to DF(2) 7,35,26 .. 70,00 2,74,00
prevent flooding (Phase-I)
616 Liluah - Rewiring of quarters & modification of power distribution DRF 3,94,73 .. 88,00 69,00
system (Phase-IV)
617 Asansol Division - Rewiring of staff quarters (1000 Nos) DRF 3,63,59 .. 1,78,00 86,00
618 Eastern Railway - Improvement to various staff amenities like water DRF 3,00,00 .. 26,90 1,29,00
supply arrangement / medical facilities in various hospitals / electric
wiring in staff quarters etc (PB#719/18-19/CR)
623 Jasidih - Second entry to station from south side DF(1) 67,58,75 .. .. 10,00
624 Sealdah - Improvement & development of circular railway DF(1) 8,01,70 7,21,62 1 10,00
2.1.43
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
(Figures in thousand of Rupees)
Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay
No. -tion Cost end of Outlay 2018- Proposed for
March 2018 19 2019-20
PASSENGER AMENITIES
625 Eastern Railway - Improvement of model stations (19 Nos) DF(1) 6,57,00 5,37,00 1 10,00
626 Howrah Division - Renovation of low level & rail level platforms (3 DF(1) 5,81,20 5,81,20 .. ..
stations) and raising of platforms (19 stations)
RRSK 45,68 .. .. 1,00
627 Asansol Division - Making / extension & raising of platforms to rail DF(1) 3,78,80 3,78,80 .. 10,00
level (10 stations)
RRSK 10,00 .. 1,00 10,00
630 Malda Division - High level platform, platform shed, foot over DF(1) 9,25,52 9,27,81 1 1
bridge, new station building, water supply & benches (6 stations)
631 Bhagalpur - Extension of platform No.2 & 3 for 24 coaches with DF(1) 5,70,46 5,70,46 1 ..
yard remodelling, provision of addl shed, 3rd foot over bridge etc
632 Eastern Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 2,70,00 2,70,00 .. ..
633 Asansol Division - Extension of platforms to accommodate 16- DF(1) 4,36,41 4,36,41 .. 10,00
coach trains, with foot over bridges (6 stations)
RRSK 63,59 75,02 50 10,00
634 General improvement in passenger amenities at various important DF(1) 50,00,00 38,03,54 .. 5,00
stations (incl. Majerhat)
635 Naihati - Pedestrian subway DF(1) 14,93,00 4,89,20 .. 15,00
637 Howrah Division - Raising of platforms from rail / low level to high DF(1) 9,57,30 9,57,30 .. ..
level and improvement to platform surfaces (21 stations)
638 Howrah - Extension of shed (platform Nos.15, 17, 18, 19, 20, 21, 22 DF(1) 3,18,42 2,97,00 .. 1
& 23)
639 Azimganj - Drinking water facilities DF(1) 4,78,38 6,08,77 69,93 50,00
641 Jasidih - Water supply arrangement from Ajoy river DF(1) 2,51,00 2,42,00 .. 10,00
642 Sealdah Division - Digital public address & emergency sound DF(1) 4,17,00 2,19,35 1 1
system for centralised digital announcement system (18 stations)
643 Sealdah Division - Full shelter to cover 12/24-coach length at DF(1) 93,01,97 39,61,29 .. 50,00
various stations
644 Naihati, Ranaghat, Krishnanagar & Behrampur Court - Foot over DF(1) 7,39,70 7,39,70 1 10,00
bridge (6 m wide)
RRSK 2,83,30 69,22 43,68 10,00
2.1.44
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
(Figures in thousand of Rupees)
Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay
No. -tion Cost end of Outlay 2018- Proposed for
March 2018 19 2019-20
PASSENGER AMENITIES
645 Sealdah Division - Platform shelter (30 stations) DF(1) 77,81,74 40,66,99 .. 1
646 Howrah Division - Platform shelter (40 C-class stations) DF(1) 157,94,22 49,93,57 75,19 50,00
648 Durgapur - Improvement to platform shed roofing, reinforced DF(1) 2,53,62 1,16,52 15,00 10,00
concrete cement overhead tank etc for development as model
station
649 Srirampur - Twin reinforced concrete cement box subway DF(1) 4,87,00 7,28 .. 1
650 Sealdah - True colour display board for passenger information DRF 5,50,00 3,36,95 2,82 1
system by replacing text board
651 Kolkata Terminal - True colour display board for passenger DRF 4,17,29 2,54,69 .. 10,00
information system by replacing text board
652 Sealdah Division - Repl. of dilapidated station buildings (6 stations) DRF 2,90,00 2,52,00 16,29 10,00
653 Baranagar Road, Dakshineswar & Ballyghat - Repl. of standard DRF 5,41,56 4,62,53 99,00 10,00
platform
654 Behrampur Court, Lalgola, Krishnanagar City, Ranaghat & Gede - DF(1) 3,99,72 3,32,60 .. 1
Piped water supply
655 Mathurapur Road, Gocharn, Majhdia & Joynagar Majilpur - 2nd foot DF(1) 10,00 10,00 .. ..
over bridge and Ranaghat - 3rd foot over bridge
RRSK 2,62,65 .. 10 10,00
656 Bardhaman - Extension of shed to cover entire platform area DF(1) 2,65,23 2,03,17 .. 10,00
(platform No.1, 2/3, 4/5 & 6/7)
657 Krishnanagar City-Lalgola & Ranaghat-Shantipur - Platform shed DF(1) 17,68,00 2,30,00 .. 10,00
for Adarsh stations Muragacha, Bethuadahari, Debgram, Pagla
Chandi & Habibpur
658 Howrah Division - Raising of platform from rail & low level to high DF(1) 4,98,85 4,98,85 .. ..
level and extension of length with improvement to platform surface
(13 stations)
RRSK 2,45,15 50,31 24,00 10,00
659 Tikiapara - Water treatment plant (2.5 mgd capacity) incl. pipeline DF(1) 10,43,16 20,37 55,49 50,00
etc for water supply to coaching complex
660 Howrah Division - Piped water supply with deep tubewell (21 DF(1) 4,99,66 2,10,97 .. 1
stations)
661 Asansol Division - Additional DI pipeline from Barakar pump house DF(1) 11,99,00 3,03,47 1,00 10,00
to Asansol filter house
662 Bolpur, Sainthia & Nalhati - Repl.of foot over bridges DRF 1,85,15 1,85,15 .. ..
RRSK 1,97,36 .. 1,00,00 10,00
663 Asansol, Durgapur, Howrah, Bolpur, Rampurhat, Malda & DF(1) 3,99,00 3,99,00 12,03 10,00
Bhagalpur - Escalators (2 each) (14 Nos)
RRSK 10,18,00 4,61,71 4,78,56 10,00
664 Belgharia - 6 m wide pedestrian subway & 3.65 m wide foot over DF(1) 4,58,49 4,58,49 .. ..
bridge
RRSK 1,61,51 2,22,34 1,31,00 50,00
PASSENGER AMENITIES
666 Howrah Division - Train indication boards at all remaining suburban DF(1) 12,79,00 .. .. 10,00
stations
667 Howrah Division - Optic fibre cable connectivity to all flag stations DF(1) 5,77,36 3,34,96 17,65 10,00
(40 station)
668 Sealdah Division - Optic fibre cable connectivity to all flag stations DF(1) 7,24,75 73,93 12,35 10,00
(45 stations)
669 Howrah - Drinking water facilities for Pakur command area DF(1) 31,82,00 2,30,00 6,48 10,00
670 Liluah - Augmentation of 1.4 mgd water treatment plant DF(1) 5,90,00 2,62,72 .. 10,00
671 Howrah Division - Improvement to suburban stations on HBC DF(1) 57,00,00 1 .. 10,00
section, Howrah-Bardhman main line & BB loop
672 Sealdah Division - Improvement of suburban stations on North, DF(1) 79,30,00 1,00,00 1,85,78 50,00
main & South sections
673 Agarpara - 3m wide pedestrian sub-way & foot over bridge DF(1) 3,56,77 3,56,77 1 10,00
RRSK 1,09,23 20,01 1,02,00 50,00
674 Singur - Reinforced concrete cement box subway DF(1) 6,03,89 2,39,33 1,23 10,00
675 Howrah - 6.1 m wide foot over bridge connecting platform No.1 to DF(1) 1,21,00 1,21,00 .. 10,00
14 of old complex with provision of single way escalator
676 Kolkata - New approach road from Belgachia road over bridge via DF(1) 10,59,68 9,03,78 6 10,00
Ultadanga railway colony
677 Dankuni - Improvement of circulating area & widening of approach DF(4) 2,75,00 2,79,11 .. 10,00
road
678 Howrah - Development of station incl. segregation of arrival / DF(1) 166,89,00 2,46 .. 1
departure & other amenities
679 Howrah Division - Improvement of suburban stations (main line, DF(1) 26,99,00 1 .. 1
chord line & BB loop)
680 Howrah - 6.1 m wide foot over bridge connecting old & new DF(1) 30,01 30,01 .. 10,00
complexes (platform No.14 & 17)
RRSK 2,20,99 .. 19,20 10,00
681 Majerhat - Balance work for station building as phase-II and other DF(1) 4,47,10 3,23,02 50,00 10,00
ancillary works
682 Eastern Railway - Escalators at various stations (16 Nos) (8 DF(1) 10,08,00 .. 7,96 10,00
stations)
RRSK 10,08,00 84,28 7,17,23 5,00,00
683 Sealdah Division - Raising of platform (36 stations) DF(1) 11,34,05 11,34,05 1 10,00
RRSK 4,84,95 3,13 1 10,00
684 Tarapith & Tarakeshwar - Joint development of stations in DF(1) 50,00 1,00,00 .. 50,00
association with Ministry of Tourism (PB 781/2012-13/NR)
EBR(P) 5,00,00 .. 5,50,00 5,00,00
685 Eastern Railway - Lifts at A1, A & other pilgrim stations (with high DF(1) 4,20,00 .. 1 10,00
passenger density) (17 Nos) (PB#854/1415/NR)
RRSK 4,20,00 29,16 2,04,21 10,00
686 Bhagalpur - Enroute coach watering facilities DF(1) 5,27,61 3,22,70 29,00 10,00
2.1.46
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
(Figures in thousand of Rupees)
Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay
No. -tion Cost end of Outlay 2018- Proposed for
March 2018 19 2019-20
PASSENGER AMENITIES
687 Malda Town - Provision & upgradation of enroute coach watering DRF 5,32,35 74,71 60,00 10,00
facilities
688 Bandel - Shed on platform No.1/A & 1/B, raising & renovation of DF(1) 3,76,38 .. .. 10,00
platforms
RRSK 3,76,38 1,01,14 93,00 10,00
689 Jasidih - 6.1 m wide foot over bridge at Howrah end DF(1) 4,41,56 .. 10,00 ..
RRSK 4,41,56 1,67,61 1,00 10,00
690 Malda Division - Hand pump (43 stations), piped water supply (30 DF(1) 2,82,91 25,51 64,00 10,00
stations) & deep tubewell with 50000 gallon overhead tank at
Sultanganj
691 Sealdah - Improvement to roofing sheet over platform, extension of DRF 3,99,34 57,49 2,03,41 10,00
shed of platform No.9C to full length
692 Bariarpur, Dharhara & Kajra - Extn. of platform for 24-coach trains DF(1) 5,60,00 .. 1 10,00
693 Malda Division - Platform sheds at different stations DF(1) 3,99,64 .. 38,00 10,00
694 Sealdah Division - Platform shelters to minimize shortfall in DRF 2,89,03 30,00 70,00 10,00
minimum essential amenities
695# Running of proposed passenger train services between Kolkata- DF(1) 10,00,00 .. .. 10,00
Khulna via Bongaon-Petrapole/Benapole
696 Ballyganj - Construction of 3 m wide new foot over bridge RRSK 3,90,00 .. .. 10,00
697 Park Circus & Barasat - Construction of 3 m wide new footover RRSK 7,30,00 .. .. 10,00
bridge
698 Malda Town & Bhagalpur - RDSO type train/coach indication DF(1) 3,22,84 .. 1 10,00
boards & GPS clock at new platform No.6 & 7 and 2, 3 & 6
respectively
699 Eastern Railway - Soft upgrades improvements at stations Cap. 175,00,00 .. 21,77,00 70,04,00
700 Eastern Railway - Provision of foot over bridges and/or high level RRSK 300,00,00 .. 33,77,98 75,00,00
platforms at stations as per requirement
701 Eastern Railway - Provision of washable aprons over Indian DF(1) 10,00,00 .. 11,07 10,00
Railways (PB#1106/2018-19/NR)
702 Eastern Railway - Provision of lifts (234 Nos) at stations @ 2 lifts RRSK 94,53,60 .. 94,33 5,10,00
per station (PB#1105/2018-19/NR)
703 Kolkata - Development of terminal for immigration facilities of DF(1) 12,40,31 .. .. 10,00
international passengers (G 1 storeyed building)
704 Works costing below Rs.2.5 crore each Cap. .. .. .. 3,00,00
DRF .. .. .. 6,49,99
DF(1) .. .. .. 8,99,90
RRSK .. .. .. 6,60,00
PASSENGER AMENITIES
B - New Works
705 Lumpsum Provision For New Works Cap. .. .. .. 4,00
DRF .. .. .. 5,30,00
DF(1) .. .. .. 6,00,00
RRSK .. .. .. 5,65,00
708 Sealdah - Bank protection / treatment with side slopes by rail piling, DF(3) 6,53,69 77,50 .. 1
bullah piling, reinforced concrete cement retaining wall, boulder
pitching etc
709 Kolkata Area - Integrated security system (7 stations) Cap. 21,55,05 4,58,33 5,97,00 6,41,00
710 Eastern Railway - Integrated security system (4 stations) Cap. 10,65,24 1,39,17 3,03,00 6,41,00
711 Gholshapur (Behala) - New indoor sports complex DF(3) 56,45,00 16,22,42 1,23,48 1
712 Howrah - Running room for drivers, guards, motormen, travelling DF(3) 3,26,08 1,34,98 40,85 53,00
ticket examiners etc
713 Howrah - New divisional railway manager's office building DRF 14,20,00 7,18,86 1,80,58 1
714 Asansol Division - Track drain on cutting, dwarf wall at pedestrian DF(4) 2,50,46 73,98 1 1,00
crossing locations
715 Asansol - Development of campus for raising of Railway Protection DF(3) 16,05,82 12,21,23 42,65 1,18,00
Special Force ladies battalion
716 Kolkata - Development of headquarters offices at Fairlie Place DF(3) 6,41,67 1,36,91 49,60 1
719 Sealdah - Improvement of Dr. B.C. Roy institute auditorium DRF 7,28,00 96,77 5,31 17,00
720 Howrah - Development of Rabindra rail museum in front of new DF(3) 12,20,00 3,87,52 .. 30,00
station complex
721 Kanchrapara - Provision of gallary, roofing etc. incl. development of DF(3) 14,83,39 11,87,44 10,00 21,00
playground at railway sports complex
2.1.48
EASTERN RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
(Figures in thousand of Rupees)
Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay
No. -tion Cost end of Outlay 2018- Proposed for
March 2018 19 2019-20
724 Howrah - Repl of tilted retaining wall at riverside of Riviera DF(1) 4,87,93 71,00 .. 47,00
725 Howrah Division - Improvement of drainage system of Howrah car DF(3) 7,87,00 1,01,49 .. 30,00
shed, Jheel siding & Golmohor railway colony
726 Eastern Railway - Boundary wall / fencing to prevent encroachment DF(3) 4,00,00 .. 17,11 1,30,00
on railway land (PB 821/2012-13/NR)
727 Sealdah Division - Railway protection force office cum barracks DF(3) 4,50,00 2,99,98 15,00 2,00
728 Howrah - 75-bedded barrack at Golmohor barrack complex DF(3) 3,57,92 2,02,32 .. 6,00
729 Bhagalpur-Barahat, Barahat-Banka & Barahat-Mandar Hill - DRF 4,94,11 3,34 90,00 1,14,00
Strengthening of bank with ancillary works for raising of sectional
speed from 50 to 100 kmph
730 Howrah - Construction of ladies RPF barrack to accommodate RPF DF(3) 2,99,56 .. .. 30,00
Mahila Bahini
731 Chandanpur-Gurap - Rehabilitation of bad bank to remove DF(4) 4,97,78 .. .. 30,00
permanent speed restrictions on Rajdhani route
732# Provision of video surveillance system at 1,105 stations (D & E- Cap(Nirb) 254,21,00 .. .. 1
category) of Eastern region
733 Eastern Railway - Construction of boundary wall near stations & its RRSK 70,00,00 .. 6,00,00 14,00,00
approaches as measure to safeguard track and establishments
avoiding encroachments (PB#1139/2018-19/NR)
734 Construction of boundary wall along Railway track at vulnerable RRSK 50,00,00 .. 1,00,00 15,00,00
locations (Phase-2) (Suppl.No.16/2018-19/July 2018)
738 Jamalpur (IRIMEE) - Comprehensive plan for upgradation of DRF 6,27,07 4,20,00 .. ..
infrastructure and training facilties
DF(3) 4,48,23 2,71,30 .. 5,00
RRSK 3,84,00 8,88 .. 10,00
739 Jamalpur - Improvement / augmentation of Pilot training school DF(3) 5,71,11 2,85,44 .. 5,00
740 Beliaghata - Advanced track training centre DF(3) 10,00,00 1,54,45 .. 5,00
RRSK 8,65,50 2,26,65 1,22,00 10,00
742 Dankuni - Setting up of skill development instutute DF(3) 3,70,00 1,26,00 .. 5,00
RRSK 1 .. .. 1,00,00
743 Eastern Railway - Augmentation of training facilities RRSK 5,00,00 .. 19,52 80,00
(PB#1154/2018-19/NR)
744 Works costing below Rs.2.5 crore each Cap. .. .. .. 50,00
DF(3) .. .. .. 1,00,00
RRSK .. .. .. 10,00
A - PROGRAMMED DELIVERIES
747 Sealdah- Under-floor wheel lathes (broad gauge) DRF 5,09,86 3,43,29 .. ..
RRSK 1,66,57 .. 1 1
748 System of Online Monitoring of Rolling Stock (OMRS) (2 nos) RRSK 7,70,00 .. 1 1
749 Jamalpur - Diesel generator set (2400 kw) DRF 9,94,50 5,77,46 .. ..
RRSK 7,32,69 .. 30,98 1,00,00
751 CNC Vertical Turret Lathe, Table dia 1200mm for Wheel Cap. 3,43,88 .. 5,00 1,50
752 CNC Bed Type Milling Machine (Travelling Type Column Work Cap. 6,85,13 5,47,77 2,00 2,00
Table-1000x 4500mm Long Travel 4000 MM)
753 Jamalpur Workshop - Non CNC Vertical Turret Lathe For Wheel DRF 2,66,41 1,07,50 .. ..
Machining Table Dia 1400 Mm
RRSK 1,58,91 .. 2,00 2,00
754 Kanchrapara workshop - Traverser - 80T Multi Track DRF 2,70,94 96,90 .. ..
RRSK 2,70,93 .. 23,00 1
755 Jamalpur Workshop : CNC Axle Turning Lathe DRF 2,55,35 1,45,20 1 1,80
756 Liluah Workshop : Traverser - Pit Type(Multi track) Cap. 2,99,85 .. 1,70 30,00
757 Kanchrapara Workshop - Wheel Press(BG & MG) - 500T Cap. 3,13,38 .. 1 1
758 Kanchrapada Workshop- CNC Vertical Turning Lathe Table dia DRF 3,27,57 .. 1 1
1500 mm
759 Kanchrapada Workshop- CNC Surface Wheel Lathe (BG) RRSK 7,38,51 .. 1 1
760 Liluah Workshop- Coil Spring Scragging & Load Deflection Testing RRSK 3,11,27 .. 1 1,42,73
Machine - 25T
761 Hawrah- CNC Underfloor Wheel Lathe with Shed RRSK 7,40,71 .. 1 5,00,00
DRF 1,46,45 .. .. 1
DF(3) 43,94 .. .. 1
RRSK 1,46,45 .. .. 1
763 Eastern Railway - Simulation, equipment and application for crew RRSK 10,93,75 .. .. 1
(PB#1177/2018-19/NR)
764 Works costing below Rs.2.5 crore each Cap. .. .. .. 4,57,93
DRF .. .. .. 5,81,25
DF(2) .. .. .. 2,18,23
DF(3) .. .. .. 3,03,39
RRSK .. .. .. 1,58,89
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
A - PROGRAMMED DELIVERIES
Locomotives
766 Hitachi traction motors HS 15250A (12 Nos) @ Rs.21 lakh each Cap. 2,57,66 3,00,59 .. 1
767 Smaller size rectifier block in electric locos (40 sets) @ Rs. 8.07 DRF 3,85,20 3,28,42 .. ..
lakh
RRSK 40,00 1,97,57 .. 1
768 Kanchrapara (Electric Loco Works) - Repl of hitachi traction motor DRF 3,48,80 2,56,85 .. ..
HS 15250 A on electric locos, 17 Nos @ Rs 20 lakh each
769 Motorized Truck Assembly G-4 for 45 - HP Diesel loco -1 no. Cap. 3,33,90 .. 4,04,55 3,33,89
770 Works costing below Rs.2.5 crore each - Locomotives Cap. .. .. .. 15,79,33
RRSK .. .. .. 20,54,21
772 Provision of VCB for EMU/MEMU in place of 'DJ' Kancharapara DRF 3,13,66 2,66,18 .. ..
workshop
RRSK 28,66 19,26 1,00 1
773 Conventional Motorized Bogie with gear case, bogie frame, bogie Cap. 2,88,64 .. 1,00 2,80,00
bolster and wheel set for EMU/MEMU Motor coaches. (Qty 04 Nos)
@ Rs. 72.16 Lakhs
774 Replacement of Traction Motor complete for BHEL EMU type, DRF 4,79,52 .. .. ..
forKanchrapara workshop @ Rs. 29.97 Lakhs
RRSK 1,79,47 3,71 6,56,00 2,50,00
776 Replacement of traction motor complete for BHEL EMU for RRSK 3,00,04 .. 4,10,00 1,50,00
Kanchrapara -10 Nos.
777 Condenser coil & Evaporate coil for RMPUs used in LHB type EOG RRSK 5,32,81 .. 6,64,95 1
AC coaches(500 nos.) and conventional coaches-250 nos.
778 Works costing below Rs.2.5 crore each - Carriages Cap. .. .. .. 8,07,22
DF(3) .. .. .. 7,66
RRSK .. .. .. 7,70,55
TOTAL-Cranes RRSK .. .. .. 15
TOTAL-PROGRAMMED DELIVERIES Cap. .. .. .. 30,00,45
DF(3) .. .. .. 7,66
RRSK .. .. .. 32,88,95
2.3.2
EASTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
(Figures in thousand of Rupees)
Item Particulars Alloca- Sanctioned Exp. at the Revised Outlay
No. -tion Cost end of Outlay 2018- Proposed for
March 2018 19 2019-20
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
Locomotives
780 Lumpsum Provision For New Works - Locomotives Cap. .. .. .. 11,60
RRSK .. .. .. 1,41,66
TOTAL-Cranes RRSK .. .. .. 40
TOTAL-NEW ACQUISITION Cap. .. .. .. 24,45
RRSK .. .. .. 4,67,06
TOTAL-Rolling Stock Cap. .. .. .. 30,24,90
DF(3) .. .. .. 7,66
RRSK .. .. .. 37,56,01