yKFÃ MSKR
Total -
Advance Payment Before VAT
yQD¸Ã KFà BR
1,342,998.70
Amount of Advance taken
1st 186,478.78
Advance repaid
Before VAT
1st 31,079.80
Retention 2nd
3rd -
4th -
5th
Total retention Retained 31,079.80
yS‰ t̉+/Contractor/
trUGÈ*L
Certified
Name: Wubegzier Y.
Signiture: -----------------
trUGÈ*L
Certified
Name ----------------------
Signiture ------------------
Date -----------------------
CERTIFICATE OF PAYMENT No. 1
yKFÃ MSKR wrqT q$_R 1
êÂW WL
Main Contract
ààààààà ààààà
e/
Supplementary Contract
yለw_ S‰ T:²øC
er berou
Variation orders
t. ዕ.ታክስ
on Enterprise
Vat 15 %
ጠቅላላ ድምር
Works Enterprise
Total Sum
nW yts„ S‰ãC mlk!à snD msrT XSk²Ê DrS S‰ t̉Œ ys‰W S‰¼ÃqrbW :” êU
As per the attached statement the value of work executed and/or materials supplied to date is
tqÂ>
DEDUCTIONS
1. xSqDä yidq
Previous Approved
2. mÃÏ
Retention (5%)
3. mqÅ
Penalty
4. yQD¸Ã KFÃ
Advance payment (20%)
5. l@§
Others (10% for material supply)
DMR
Total
After VAT .-Q§§ DMR
Net sum before VAT
1,544,448.51
(V.A.T 15%) due to Net Sum
214,450.59 (V.A.T 15%) due to Current Retention
lt̉Œ y¸kfL gNzB
Net sum due to the Contractor
After VAT (Four Hundred Sixty Nine Thousand Three Hundred Four
35,741.77 Two Cents )
-
-
-
-
35,741.77
‰+/Contractor/
iDÌL
Approved
Name:-Wubegzier Y.
Signiture: ---------------
iDÌL
Approved
Name--------------------
Signiture----------------
Date---------------------
Amount (Birr)
L
4,476,662.34
tract
ààà
entary Contract
‰ T:²øC
orders
671,499.35
ምር
5,148,161.69
m
AMOUNT (BIRR)
Œ ys‰W S‰¼ÃqrbW :” êU
621,595.93
/or materials supplied to date is
ygNzb# LK¼BR¼
AMOUNT (BIRR)
31,079.80
186,478.78
217,558.57
.-Q§§ DMR
404,037.35
Net sum before VAT
(V.A.T 15%) due to Net Sum 60,605.60
15%) due to Current Retention 4,661.97
lt̉Œ y¸kfL gNzB
469,304.92
Net sum due to the Contractor
1.1 Site clearing to a depth of 250mm m2 71.34 25.00 1,783.50 #REF! #REF! - #REF!
Bulk excavation to a depth not
1.2 exceeding 500mm m3 10.58 65.00 687.70 - -
Excavation in footing foundation
1.3 to a depth 150cm m3 21.16 80.00 1,692.80 21.16 - - 21.16
1.4 Ditto but to a depth of 300mm m3 26.16 90.00 2,354.40 #REF! #REF! - #REF!
1.5 Ditto but in soft rock m3 25.00 - - - -
1.6 Ditto but in hard rock m3 150.00 - - - -
1.7 Cart away excavated material m3 64.74 30.00 1,942.20 #REF! #REF! - #REF!
Supply approved selected
material and compact in 20cm
layers as instructed by the
1.8 Engineer m3 37.12 40.00 1,484.80 41.00 1,640.00 - 41.00
1.9 Hard core filling m2 8.00 125.00 1,000.00 8.00 1,000.00 - 8.00
Sub total 10,945.40 #REF! - -
For the Contructor For the Consultant
Name ________________________________ Name ______________________
Position ______________________________ Position ____________________
Signiture _____________________________ Signiture ___________________
Date _________________________________ Date _______________________
Project Name:- Hamusit Rural Town Water Supply Pproject Consultant :- Amhara Design and Supervision Works Enterpri
Client: Amhara Water Resource Development Bureau Contructor: Yonas Girma Car Rent and Water Constraction
Bill No. 2 Construction of 60m3 elevated Reservior Payment No. (04) final payment
Contract Previously Approved Currently Approved To date Qauntity
Item Amount Quantity Amount (birr) Quantity Amount(birr) Requested
No. Description of work unit Quantity Rate
2 Concrete work
Provide and place in-situ concrete Page 11 file:///conversion/tmp/scratch/448063329.xlsx
2.1 to specifications - -
Grade C-15, 5 cm thick blinding
2.1.1 concrete m2 11.56 2690.00 31,096.40 11.56 31,096.40 11.56
2.2 Grade C-25 reinforced concrete - - -
2.2.1 RCC for footing (C-25) m3 4.62 3050.00 14,091.00 4.62 14,091.00 4.62
2.3.2 RCC for for columen (C-25) m3 3.24 3050.00 9,882.00 #REF! #REF! #REF! #REF! #REF!
2.4.3 RCC for breacing beam (C-25) m3 2.99 3050.00 9,119.50 2.99 9,119.50 2.99
2.5.4 RCC for top tie beam (C-25) m3 2.80 3050.00 8,540.00 2.80 8,540.00 2.80
2.6.5 RCC for slab (C-25) m3 4.50 3050.00 13,725.00 3.45 10,522.50 1.05 3202.50 4.50
2.6.5.1 RCC for wall m3 14.40 3050.00 43920 #REF! #REF! #REF! #REF! #REF!
2.6.5.2 RCC for top slab m3 5.76 3050.00 17568 #REF! #REF! #REF! #REF! #REF!
Sub total 147,941.90 #REF! #REF!
Project Name:- Hamusit Rural Town Water Supply Pproject Consultant :- Amhara Design and Supervision Works Enterpri
Client: Amhara Water Resource Development Bureau Contructor: Yonas Girma Car Rent and Water Constraction
Bill No. 2 Construction of 60m3 elevated Reservior Payment No. (04) final payment
Contract Previously Approved Currently Approved To date Qauntity
Item
No. Activities Description unit Quantity Rate Amount Quantity Amount (birr) Quantity Amount(birr) Requested
3 FORM WORK
3.1 Formwork for footing m3 10.88 300.00 3,264.00 10.88 3,264.00 10.88
3.2 Formwork for column m3 41.76 300.00 12,528.00 #REF! #REF! #REF!
3.3 Formwork for bracing beam m3 31.68 300.00 9,504.00 31.68 9,504.00 31.68
3.4 Formwork for top tie beam m3 30.26 300.00 9,078.00 29.90 8,970.00 0.36 108.00 30.26
3.5 Formwork for slab m2 26.30 300.00 Page 12 7,890.00 26.30 7,890.00 file:///conversion/tmp/scratch/448063329.xlsx
- 26.30
Formwork for wall m2 300.00 - -
Sub total 42,264.00 #REF! #REF! 108.00
4 REINFORCEMENT - - -
Provide, cut, bend and fix in
position reinforcement steel bars
all according to structural
drawing - - -
4.1 Reinforcement Dai.24mm kg 1,209.89 35.00 42,346.15 1209.89 42,346.15 1,209.89
4.2 Reinforcement Dai.20mm kg 1,286.28 35.00 45,019.80 #REF! #REF! #REF!
4.3 Reinforcement Dai.16mm kg 1,476.67 35.00 51,683.45 1476.67 51,683.45 1,476.67
4.4 Reinforcement Dai.12mm kg 796.23 35.00 27,868.05 796.23 27,868.05 796.23
4.5 Reinforcement Dai.8mm kg 191.73 35.00 6,710.55 #REF! #REF! #REF!
sub total 173,628.00 #REF!
5 Supply and install steel ladder - -
Supply and install steel ladder
with length of 10.4 m and width of
0.5m(11/2 pipe) as shown in the Ls 1.00 1000.00 1,000.00 #REF! #REF! #REF!
drawing and directed by the
5.1 Engineer
sub total 1,000.00 #REF! -
Project Name:- Hamusit Rural Town Water Supply Pproject Consultant :- Amhara Design and Supervision Works Enterprise
Client: Amhara Water Resource Development Bureau Contructor: Yonas Girma Car Rent and Water Constraction
Bill No. 2 Construction of 60m3 elevated Reservior Payment No. (04) final payment
Contract Previously Approved Currently Approved To date Qauntity
Item
No. Activities Description unit Quantity Rate Amount Quantity Amount (birr) Quantity Amount(birr) Requested
Supply &Installation of pipe Page 13 file:///conversion/tmp/scratch/448063329.xlsx
6
and fittings
6.1 3 inch GS pipe for inlet m 10.00 300.00 3,000.00 10.00 3,000.00 10.00
3 inch GS pipe for over flow and
6.2 drainage m 24.00 300.00 7,200.00 #REF! #REF! #REF!
6.3 3 inch GS pipe for outlet m 20.00 300.00 6,000.00 9.60 2,880.00 0.50 150.00 10.10
6.4 Ventilation pipe for 2.5inch m 1.00 250.00 250.00 0.50 125.00 0.50
6.5 Elbow 2.5inch (for vent pipe) pcs 4.00 300.00 1,200.00 #REF! #REF! #REF!
6.6 Vent 2.5inch (for vent pipe) pcs 2.00 150.00 300.00 - -
Insert guard steel net for vent
6.7 pipe head m2 0.25 250.00 62.50 #REF! #REF! #REF!
Elbow 3 inch 90deg. For over flow
6.8 and washout pcs 6.00 200.00 1,200.00 6.00 1,200.00 6.00
6.9 Tee 3 inch pcs 2.00 450.00 900.00 0.00 - - -
6.10 gate valve 3 inch (un-flanged) m 2.00 250.00 500.00 #REF! #REF! - #REF!
6.11 Union 3 inch pcs 2.00 200.00 400.00 2.00 400.00 2.00
6.12 Nipples 3 inch pcs 2.00 250.00 500.00 2.00 500.00 2.00
6.13 Water meter 3 inch pcs 1.00 3000.00 3,000.00 0.00 - -
sub total 24,512.50 #REF! 150.00
Project Name:- Hamusit Rural Town Water Supply Pproject Consultant :- Amhara Design and Supervision Works Enterpri
Client: Amhara Water Resource Development Bureau Contructor: Yonas Girma Car Rent and Water Constraction
Bill No. 2 Construction of 60m3 elevated Reservior Payment No. (04) final payment
Item Contract Previously Approved Currently Approved To date Qauntity
No. Activities Description unit Quantity Rate Amount Quantity Amount (birr) Quantity Amount(birr) Requested
7 Finishing works - - -
Page 14 file:///conversion/tmp/scratch/448063329.xlsx
3cm cement screend for bottom
slab of the reservoir with 1:2
cement sand mix including
7.1 cement sand finish m2 30.74 175.00 5,379.50 27.5 4,812.50 1.62 283.50 29.12
3cm cement screend for top slab
of the reservoir with 1:3 cement
7.2 sand mix. m2 37.60 120.00 4,512.00 - - -
Three coats of plastering of
internal concrete wall of the
reservoir with 1:2 cement sand
7.3 mix. m2 44.40 120.00 5,328.00 39.9 4,788.00 0.38 45.60 40.28
Rendering work for the exposed
7.4 external wall surface. m2 46.00 120.00 5,520.00 44.08 5,289.60 1.92 230.40 46.00
Plastering at the column surface
7.5 and edges m2 118.00 120.00 14160 36.24 4,348.80 1.44 172.80 37.68
Plastering at the bracing surface
m2
7.6 and edges 120.00 0 - #REF! #REF! #REF!
- - -
- - -
1,209.89 42,346.15 42,346.15
#REF! #REF! #REF!
1,476.67 51,683.45 51,683.45
796.23 27,868.05 27,868.05
#REF! #REF! #REF!
#REF! #REF!
- - -
#REF! #REF!
- - -
Item Transfer
#REF! #REF! #REF! from 7.5
Item Transfer
60.11 7,213.20 7,213.20 from 7.5
Transferred
from Bill No.2
#REF! #REF! #REF! of Item No.7.3
Transferred
from Bill No.9
#REF! #REF! #REF! of Item No.9
#REF! #REF!
#REF! #REF!
#REF! #REF!
Project Name:- Enebi water supply Pproject
Client: ANRS
Bill No.3 Distribution system
Contract agreme
Item
Description of work
No. unit Rate Quantity
1 Public Fountain
provide and fill hard core with hard basaltic or equivalent stone,
1.5 well compacted and blinded with crushed stone to a finished m² 186.11 109.52
thickness of 25 cm
2,282.01 2 1,521.34 2
-
21,666.96 4.00 3,611.16
-
3,999.60 12.00 1,999.80
8,446.80 4.00 844.68
1,331,262.94 621,595.93
For the C
Name :- Enda
Position :-Pro
Signiture _____
Date _________
Total excuted
Remark
Amount (birr)
89,800.47
47,027.75
92,788.03
92,160.79
44,792.00
92,581.65
54,963.12
60,868.50
1,521.34
1,195.58
476.90
11,434.60
10,186.21
15,343.35
-
3,611.16
-
1,999.80
844.68
621,595.93
For the Consultant
Name :- Endalekachew T/w.
1 Trench excavation
Depth up to 0.8m*0.6m
1.1 trench excavation in ordinary m³
soil
Contractor
Name :- Wubegzier Y.
Signature_______________________
Date ___________________________
TAKE OFF FOR ENEBI WATER SUPPLY PROJECT
Consultant:- Amhara Design and Su
Contractor :- Amhara Water Works C
Measurement
Sketch
T L W/L D.avg
Qty. Remark
DISTERBUTION NETWORK
Item
Description Unit
No.
1
Depth up to 0.8m*0.6m
1.2 m³
trench excavation in soft rock
total
Contractor
Name :- Wubegzier Y.
Signature_______________________
Date ___________________________
TAKE OFF FOR ENEBI WATER SUPPLY PROJECT
Consultant:- Amhara Design and Supe
Contractor :- Amhara Water Works Con
Measurement
Sketch
T L W/L D.avg
50 0.6 0.8
27 0.6 0.8
70 0.6 0.8
65 0.6 0.8
0.6 m 107 0.6 0.8
total
Consultant Quantity surveyor
Qty. Remark
24.0 DL22-SCHWPJ
13.0 J3 - J4
33.6 DL22-SCH J
31.2 J14 - J16
51.4 DL31 - J16
153.120
Resident engineer
Name ___________________
Signature________________
Date ___________________
TAKE OFF FOR
Project Name:- Enebi water supply project
Specific site:-Enebi Mender
DISTERBUTION NETWORK
Item
Description Unit
No.
1
Depth up to 0.8m*0.6m
trench excavation in hard m³
rock
total
Contractor
Name :- Wubegzier Y.
Signature_______________________
Date ___________________________
TAKE OFF FOR ENEBI WATER SUPPLY PROJECT
Consultant:- Amhara Design and Supe
Contractor :- Amhara Water Works Con
Measurement
Sketch
T L W/L D.avg
44 0.6 0.8
0.8 m 90 0.6 0.8
107 0.6 0.8
0.6 m 50 0.6 0.8
total
Consultant Quantity surveyor
Qty. Remark
21.1 J8 - Dl14
43.2 J7 - DL10
51.4 SCH j - J10
24.0 J7 - DL14
92,781.04
139.680
Resident engineer 182,581.52
Name ___________________
Signature________________
Date ___________________
TAKE
Project Name:- Enebi water supply project
Specific site:-Enebi Mender
DISTERBUTION NETWORK
Item
Description Unit
No.
SUPPLY AND LAY HDPE PE 100
PN 10 PIPES including compression
2 fittings at joints
2.1 OD 40 mm m
total
Contractor
Name :- Wubegzier Y.
Signature_______________________
Date ___________________________
TAKE
Project Name:- Enebi water supply project
Specific site:-Enebi Mender
DISTERBUTION NETWORK
Item
Description Unit
No.
SUPPLY AND LAY HDPE PE 100
PN 10 PIPES including compression
2 fittings at joints
2.2 OD 50 mm m
total
SUPPLY AND LAY HDPE PE
3 100 PN 10 PIPES including butt
weld at joints
3.1 OD 75 mm m
total
Contractor
Name :- Wubegzier Y.
Signature_______________________
Date ___________________________
TAKE
Project Name:- Enebi water supply project
Specific site:-Enebi Mender
DISTERBUTION NETWORK
Item
Description Unit
No.
SUPPLY AND LAY HDPE PE 100
PN 10 PIPES including compression
3 fittings at joints
3.2 OD 90 mm m
5.1 HDPE Compression Tee
5.1.5 OD 50/40/50 pcs
total
Contractor
Name :- Wubegzier Y.
Signature_______________________
Date ___________________________
TAKE OFF FOR ENEBI WATER SUPPLY PROJE
Consultant:- Amhara Design and Supe
Contractor :- Amhara Water Works Con
Measurement
Sketch
T L W/L D.avg
105
168
26
22
197
100
400
total
Consultant Quantity surveyor
Measurement
Sketch
T L W/L D.avg
128
1327
total
220
120
80
27
total
Consultant Quantity surveyor
Name :- Endalekachew T/w. Name __________
Signature_____________________Signature______________
Date ________________________Date _________________
Measurement
Sketch
T L W/L D.avg
350
total
Consultant Quantity surveyor
Name :- Endalekachew T/w. Name __________
Signature_____________________Signature______________
Date ________________________Date _________________
PPLY PROJECT
Design and Supervision Works Enterprise
Water Works Construction Enterprise
Qty. Remark
105 J3 - NWP1
168 J22 - DLL
26 J23 - WP2
22 J26 - KNWP
197 J26 - KDL7
100 DL23 - CHWP
400 J26 - WP4
1018
Resident engineer
Name ___________________
Signature________________
Date ___________________
PPLY PROJECT
Design and Supervision Works Enterprise
Water Works Construction Enterprise
Qty. Remark
PPLY PROJECT
Design and Supervision Works Enterprise
Water Works Construction Enterprise
Qty. Remark
Resident engineer
Name ___________________
Signature________________
Date ___________________
TAKE OFF F
Project Name:- Enebi water supply project
Specific site:-Enebi Mender
DISTERBUTION NETWORK
Item
Description Unit
No.
1
Contractor
Name :- Wubegzier Y.
Signature_______________________
Date ___________________________
TAKE OFF FOR ENEBI WATER SUPPLY PROJECT
Consultant:- Amhara Design and Supe
Contractor :- Amhara Water Works Con
Measurement
Sketch
T L W/L
350 0.6
0.8 m 400 0.6
1505 0.6
0.6 m 1011 0.6
3266 0.01
total
urement
Qty. Remark
D.avg
Name ___________________
_____________Signature________________
DISTERBUTION NETWORK
Item
Description Unit
No.
1 Public Fountain
Bulk excavation for upto a depth
1.2 m³
of 80 cm
total
Provide, fill and compact in
1.4 layers 20cm selected material for m³
foundation
Contractor
Name :- Wubegzier Y.
Signature_______________________
Date ___________________________
TAKE OFF FOR ENEBI WATER SUPPLY PROJECT
Consultant:- Amhara Design and Supe
Contractor :- Amhara Water Works Con
6 3.2 3.2
Qty. Remark
4.61
12.80
17.41
2.05
61.44
Resident engineer
Name ___________________
Signature________________
Date ___________________
TAKE OFF FO
Project Name:- Enebi water supply project
Specific site:-Enebi Mender
DISTERBUTION NETWORK
Item
Description Unit
No.
2 Concrete Work
total
Contractor
Name :- Wubegzier Y.
Signature_______________________
Date ___________________________
TAKE OFF FOR ENEBI WATER SUPPLY PROJECT
Consultant:- Amhara Design and Supe
Contractor :- Amhara Water Works Con
Qty. Remark
4.10
0.12
3.98
6.47
2.69
9.16
Resident engineer
Name ___________________
Signature________________
Date ___________________
TAKE OFF FO
Project Name:- Enebi water supply project
Specific site:-Enebi Mender
DISTERBUTION NETWORK
Item
Description Unit
No.
4.1.1 DN 25 GS mm pcs
4.2 supplying and installing fittings
4.2.1 DN 25 mm GS Tee pcs
DN 25 mm GS Elbow ( 90
4.2.2 pcs
degree)
total
Contractor
Name :- Wubegzier Y.
Signature_______________________
Date ___________________________
TAKE OFF FOR ENEBI WATER SUPPLY PROJECT
Consultant:- Amhara Design and Supe
Contractor :- Amhara Water Works Con
4.0 1
4.0 3.0
4.0
total
Qty. Remark
4.00
12.00
4.00
Resident engineer
Name ___________________
Signature________________
Date ___________________
Client: Amhara Water Resource Development Bureau
Contructor: YONAS GIRMA car rent and water constraction
Project Name:- Hamusit Rural Town Water Supply Pproject (LOT-2)
Summarized exceutive work presentation format
Payment No. 04(4th Payment)
PART I: Civil Works
Bill No.2: CONSTRUCTION OF 60m3 ELEVATED TANKER
Item Contract agrement
No. Description of work unit Qnty Rate Amount
1 EARTH WORK
Transferr
ed from
bill No.2
Item
No.3.5 Formwork for wall m2 300.00 -
sub total 216,892.00
Transferr
d from 30 cm Selected material fill for m3 40 0.00
bill No.2 foundation
item
No.1.8
Item
No. Activities Description unit Quantity Rate Amount
Supply & instalation of
1 Electromechanical work
Spply & install horizental
centrifugale surface pump with all no 1 150,000.00 150,000.00
approperate accessories for proper
functoning of plant & with capacity
of 5.79l/s ,deliver head H=122M
1.1 that has power of 13KW
- -
- - - - -
#REF! #REF! #REF! -
- - - -
- - -
#REF! #REF! #REF! #REF! #REF!
20 1,400.00 20.00 1,400.00 40.00 2,800.00 20.00
0 - #REF! #REF! #REF! #REF! #REF!
10 500.00 #REF! #REF! #REF! #REF! -
1 70.00 #REF! #REF! #REF! #REF! #REF!
2 140.00 #REF! #REF! #REF! #REF! #REF!
1 750.00 #REF! #REF! #REF! #REF! #REF!
412,010.00 #REF! #REF! #REF!
NT
Previously excuted Currently excuted Total excuted exceeds (Birr)
Quantity Amount (birr) Quantity Amount(birr) Quantity Amount(birr) Quantity
0 - 10.00 6,000.00 10.00 6,000.00 -
0.00 - - - - -
- - -
- - - - - -
- - - - - -
1040 31,200.00 #REF! #REF! #REF! #REF! #REF!
85,280.00 #REF! - #REF!
- - - - -
- #REF! #REF! #REF! #REF! #REF!
- - - - - -
- - - - - -
- - - - - -
- - - - - -
650,100.00 #REF! #REF!
- -
- #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF! -
- - - - - -
- #REF! #REF! -
742,580.00 #REF! #REF!
0 - - - -
6,490.00 #REF! - #REF! -
1.2 960 #REF! #REF! #REF! #REF! #REF!
- - #REF! #REF! #REF! #REF! #REF!
Requeste
Quantity Amount (birr) Quantity Amount(birr) Requested Approved d
1 150,000.00 1.00 1.00 ###
0 - - - -
exceeds (Birr)
Quantity Remark
#REF!
#REF!
#REF!
exceeds (Birr)
Amount(birr) Remark
#REF!
#REF!
-
#REF!
exceeds (Birr)
Amount(birr) Remark
400.00
#REF!
250.00
-
#REF!
exceeds (Birr)
Amount(birr) Remark
-
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
exceeds (Birr)
Amount(birr) Remark
390.00
-
#REF!
#REF!
#REF!
exceeds (Birr)
Amount(birr) Remark
#REF!
#REF!
#REF!
exceeds (Birr)
Amount(birr) Remark
…
…
- .
-
#REF!
1,400.00
#REF!
-
#REF!
#REF!
#REF!
#REF!
exceeds (Birr)
Amount(birr) Remark
-
-
-
- .
-
-
#REF!
exceeds (Birr)
Amount(birr) Remark
-
#REF!
-
-
-
-
-
-
-
#REF!
-
#REF!
exceeds (Birr)
Amount(birr) Remark
-
-
-
-
-
-
-
-
#REF!
3,615.00
#REF!
#REF!
-
-
-
-
-
#REF!
#REF!
exceeds (Birr)
Amount(birr) Remark
#REF!
-
#REF!
-
#REF!
-
#REF!
#REF!
#REF!
#REF!
-
#REF!
#REF!
-
-
-
-
#REF!
-
-
-
-
-
#REF!
exceeds (Birr)
Amount(birr) Remark
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
-
#REF!
-
#REF!
#REF!
#REF!
#REF!
#REF!
-
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
12,000.00
12,000.00
#REF!
Remark
Amount(birr) Remark
Transferre
d from bill
No.2 Item
#REF! No.1.8
-
-
#REF!
-
-
-
#REF!
#REF!
500.00
To date Amount(Birr)
Approved Remark
150,000.00
250,000.00
250.00
1,000.00
400.00
500.00
300.00
1,200.00
403,650.00