FO MARTADINATA (BOGOR)
Balance Cantilever Bridge Construction using DYWIDAG Form Traveller. The bridge structure
has a main span of 45.5 m and two side spans with lengths of 25.8 m each
(25,8m+45,5m+25,8m) with 65 m Radius crossing the railway Commuter line The hollow box
girder have widths of 12.5 m.
Local Presence
Global Competence
PULAU BALANG CABLE STAY BRIDGE ▪ Deck width: 22.4m, typical deck depth:
2.6 m Pylon height of 112.15m
Free Cantilever Cable Stay Bridge Construction using UNDERSLUNG Form Traveller. The
bridge structure has a main span of 402 m and two side spans with lengths of 201m each. ▪ Segment construction with formtraveller with
(201m+402m+201m) segment length of 9m
Local Presence
Global Competence
Advantage
Principle
LRT Longspan Bridge Kuningan is the longest railway bridge with the
curvature (Museum Rekor– Dunia Indonesia)
• Cast in situ concrete box girder with two column
• Concrete box segment are all 9,15 m wide and varies depth 3,5 m to 8,0 m
• The bridge has three spans (86,5m+148m+86,5m)
• The bridge has Radius 115m
Local Presence
Global Competence
Local Presence
Global Competence
A-Framae
Bottom
Safety Panel
Local Presence
Global Competence
Preparation,
Mobilization Construction Dismantling
Modification, Assembling Erection
to site
& Engineering
Local Presence
Global Competence
Rekomendasi Teknis dan Pengujian Oleh Pihak ke3 Loading Test Project Bersama
Pengujian Oleh Disnakertrans yaitu PT Sucofindo kontraktor, konsultan dan PU
Local Presence
Global Competence
CONSTRUCTION ENGINEERING
Local Presence
Global Competence
precamber calculation
to determine adjustment during each construction
stage so that the bridge reaches its final intended
elevation level
prestressing calculation
to determine the required prestressing for each
construction stage and the requirement for final PT
forces
Local Presence
Global Competence
MODELS in 2D and 3D
Local Presence
Global Competence
Local
Local Presence
Presence
Global
Global Competence
Competence
Geometry control 1%
1
1%
0.200
2 2
0.200
3 5 5 3
4 4
Vertical / Elevation control
Y
Horizontal / Alligment control
Section : 35
Y= 5.500
0.200
0.400
6 6
PRE-CAMBER VALUE
Local Presence
Global Competence
GEOMETRY MONITORING
Local Presence
Global Competence
GEOMETRY MONITORING
Local Presence
Global Competence
GEOMETRY MONITORING
Local Presence
Global Competence
GEOMETRY MONITORING
Local Presence
Global Competence
Geometry control