08-SOP of ASH SLURRY PUMP
08-SOP of ASH SLURRY PUMP
08-SOP of ASH SLURRY PUMP
TECHNICAL DETAILS:
1. Open fluid coupling oil pump cooling water line valve and ensure pressure showing healthy in field
and SCADA.(pressure >5.5kg/cm2).
2. Start fluid coupling oil pump and ensure oil flow switch, temp switch and DP switch ok.
3. Open BAHP slurry sump agitating valve of selected slurry group.
5. Open the seal water valve for the gland sealing/cooling and ensure seal water pressure switch is
healthy of all 02 pumps. ( 12.5 kg/cm2).
9. Tripping Condition:
1. MCC Disturbance.
2. Ash Slurry sump level below than 1.5 Mtr.
3. Seal water pressure below than 5.5 kg/cm2.
01. 1st stop the stage two pumps from SCADA and ensure stop feedback.
02. Adjust scoop of fluid coupling between 40-60%.
03. Close BAHP water valve of slurry sump agitation and ensure flushing completed.
04. Close suction valve and ensure close feedback of suction valve
05. Stop stage one pump and ensure stop feedback.
06. Close suction valve and ensure close feedback.
07. After stopping the slurry series operator must be ensure that slurry line raw flushing valve (Taping
from raw water line at suction line of each slurry groups) open w.r.t. running slurry group.
08. Ensure that slurry group discharge line flushing completed, then close raw water flushing valve.
09. Close seal water valve of the pump.
10. After ensuring that seal water press. Of the pump is not ok, then close discharge valve and ensure
close feedback of the valve.
11. Stop oil cooler pump and close the cooling water valve.
FIRST ENSURE SLURRY AND ASH WATER SUMP CLEANING AND THEN FILL
THE SUMP.
CHECK THE LINE VACUUM AND SHUT OFF VACUUM OF ALL PASSES.