Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Evening Shift Report 31-08-2019

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4
At a glance
Powered by AI
The power station shift report provides an overview of the plant operations, including engine status, tank levels, auxiliary equipment status, and any work or issues during the shift.

Engine #11 and #27 had their generator breakers closed as the gas quota increased. All other engines were on standby. No maintenance work was reported on any engines.

The status of equipment like cooling modules, pumps, dosing pumps, compressors and plants is detailed on pages 1-2. The EDG, firefighting system pressure is also provided.

K-Electric Limited

100 MW Korangi Town Gas Turbine Power Station


Shift Report

Date 31st Aug, 2019 Time: 15:00/23:00 Report No: SR 1

Operators: Abid, Qasim, Pervaiz, Shahid, Haseeb Jawed,


Anwarullah

Shift Group Shift Shift


Shahrukh Abbas E&I Technicians: Jahanzaib, Rehan
Night B Manager Members

Mechanical Technicians: Ahsan

Safety
No Personnel Safety related event reported in Shift. No Safety Critical device is bypassed.
Concern
Urgent Description Notification# Remedies Taken
Attention
Operationa Borewell 1 Tripped Not # 240016736
l Issues
Total
Sec #
Sec # 1 Sec # 2 Sec # 3 ST Plant
Load (MW) 4
Load
2.7 2.7 0 0 0 0
No of Engines Running 0
Remaining Engines On Gas Quota
Engines Under Maintenance Work

Engines on Fault

Boilers in Operation 00 Boilers Stand By 32

Boilers Hot Bank/Preserved 00 / 00 Boilers Under Maintenance/ Fault Nil / 00

Tank Level
Tanks Underground Water
245
Levels Tank (cm)
RO Tank (%) 69

20M3 Tank (%) 61

Bore Well Tank (%) 59


Equipment’s 1 2 3 Equipment 1 2
Cooling Module RO water Pumps In
Standby In service Standby
Pumps Standby service
Boiler Feed Water In In service TSP HP Chemical In
Standby Standby
Pump service dosing pump service
In
Bore Well Pumps Standby Standby Amine Dosing Pump Standby
service
In
Auxiliaries EDI Plant Running Sulphite Dosing Pump Standby
service
Status
In Auto Auto
Inst. Air Compressor
Service Standby Standby
RO Plant (Modules)
Standby Standby Standby
2/5/6
ACC Plant (Fan 1, 2,
Standby Standby Standby
3)
EDG Diesel
EDG status Standby 80%
Tank Level
EDG Battery
EDG lube oil level OK 24V
Voltage(V)
EDG Battery charger FF diesel p/p 24V
mode battery
ON
voltage
K-Electric Limited
100 MW Korangi Town Gas Turbine Power Station
Shift Report

Date 31st Aug, 2019 Time: 15:00/23:00 Report No: SR 1

Engine #

Engine Generator breaker closed as gas quota increased


1942
#11

Engine
Engines on standby
#12

Engine
Engines on standby
#13

Engine Engines on standby


#14

Engine Engines on standby


#15

Engine
Engines on standby
#16

Engine
Engines on standby
#17

Engine Engines on standby


#18
Engine
Engines on standby
#21

Engine
Engines on standby
#22

Engine
Engines on standby
#23
Engine
Engines on standby
#24
Engine
Engines on standby
#25
Engine
Engines on standby
#26
Engine
1955 Generator breaker closed as gas quota increased
#27
Engine
Engines on standby
#28
Engine
Engines on standby
#31
Engine
Engines on standby
#32
Engine
Engines on standby
#33
Engine
Engines on standby
#34
Engine
Engines on standby
#35
Engine
Engines on standby
#36
Engine
Engines on standby
#37
Engine
Engines on standby
#38
Engine
Engines on standby
#41
Engine
Engines on standby
#42
K-Electric Limited
100 MW Korangi Town Gas Turbine Power Station
Shift Report

Date 31st Aug, 2019 Time: 15:00/23:00 Report No: SR 1

Engine
Engines on standby
#43
Engine
Engines on standby
#44
Engine
Engines on standby
#45
Engine
Engines on standby
#46
Engine
Engines on standby
#47
Engine
Engines on standby
#48
Boilers Events No boilers are in service

ST Steam turbine is stand by on gas quota

ACC Plant Standby

Fire Fighting System 6.9 bar (g)

Plant Items Un-


RO Skid 1
available
No. of Water Tankers
N/A
Decanted

Each Tanker Capacity N/A

Equip
Description Action Taken
ment
Alarms
Nil

Preservation
Nil
Activities
Surrendered
Safety Safety
Safety Reason for
Documents Documents
Sr. No. Equipment Maintenance Work Document Surrendered
Safety Documents Issue Cancellation
Surrendered Document
Date/Time Date/Time
Date

Plant Activities and observations:

 No gas pressure fluctuation was observed, However gas quota was changed multiple times
 No water tankers were received
 Section 3 was normalized at 1938 hours after wiring was completed in MV panels for CBFP.
 Sec 4 GVCB was normalized at 2002 hours after deisolation was complete
 Common MCC supply has been energized from GC 1.
 FACP alarms rectification has been carried out. Any new alarm has to be reported to electrical team. Moreover, Lube oil
skid deluge system was checked and tested by electrical team.
K-Electric Limited
100 MW Korangi Town Gas Turbine Power Station
Shift Report

Date 31st Aug, 2019 Time: 15:00/23:00 Report No: SR 1

Taking Over Shift Manager:

Zarak Noveed

You might also like