Evening Shift Report 31-08-2019
Evening Shift Report 31-08-2019
Evening Shift Report 31-08-2019
Safety
No Personnel Safety related event reported in Shift. No Safety Critical device is bypassed.
Concern
Urgent Description Notification# Remedies Taken
Attention
Operationa Borewell 1 Tripped Not # 240016736
l Issues
Total
Sec #
Sec # 1 Sec # 2 Sec # 3 ST Plant
Load (MW) 4
Load
2.7 2.7 0 0 0 0
No of Engines Running 0
Remaining Engines On Gas Quota
Engines Under Maintenance Work
Engines on Fault
Tank Level
Tanks Underground Water
245
Levels Tank (cm)
RO Tank (%) 69
Engine #
Engine
Engines on standby
#12
Engine
Engines on standby
#13
Engine
Engines on standby
#16
Engine
Engines on standby
#17
Engine
Engines on standby
#22
Engine
Engines on standby
#23
Engine
Engines on standby
#24
Engine
Engines on standby
#25
Engine
Engines on standby
#26
Engine
1955 Generator breaker closed as gas quota increased
#27
Engine
Engines on standby
#28
Engine
Engines on standby
#31
Engine
Engines on standby
#32
Engine
Engines on standby
#33
Engine
Engines on standby
#34
Engine
Engines on standby
#35
Engine
Engines on standby
#36
Engine
Engines on standby
#37
Engine
Engines on standby
#38
Engine
Engines on standby
#41
Engine
Engines on standby
#42
K-Electric Limited
100 MW Korangi Town Gas Turbine Power Station
Shift Report
Engine
Engines on standby
#43
Engine
Engines on standby
#44
Engine
Engines on standby
#45
Engine
Engines on standby
#46
Engine
Engines on standby
#47
Engine
Engines on standby
#48
Boilers Events No boilers are in service
Equip
Description Action Taken
ment
Alarms
Nil
Preservation
Nil
Activities
Surrendered
Safety Safety
Safety Reason for
Documents Documents
Sr. No. Equipment Maintenance Work Document Surrendered
Safety Documents Issue Cancellation
Surrendered Document
Date/Time Date/Time
Date
No gas pressure fluctuation was observed, However gas quota was changed multiple times
No water tankers were received
Section 3 was normalized at 1938 hours after wiring was completed in MV panels for CBFP.
Sec 4 GVCB was normalized at 2002 hours after deisolation was complete
Common MCC supply has been energized from GC 1.
FACP alarms rectification has been carried out. Any new alarm has to be reported to electrical team. Moreover, Lube oil
skid deluge system was checked and tested by electrical team.
K-Electric Limited
100 MW Korangi Town Gas Turbine Power Station
Shift Report
Zarak Noveed