Team Charter
Team Charter
Team Charter
PROJECT PROJECT
TITLE TEACHNNOVATION CODE
SCHOOL HEAD ROWENA T. QUIAMBAO
FACILITATOR ARNEL A. USMAN/ EMILIA B. NUCUM
TEAM NAME ROLE
COMPOSITION
NANCY C. TAYAG Team Leader
TERESITA S. CARLOS Scribe
RORY G. SARMIENTO Communications
GEMMA P. NAGUIT Documentation
RODOLFO A. YUTUC II Process Observer
KEY
CUSTOMER FOURTH YEAR STUDENTS
KEY PROCESS
TEACHING STRATEGY DEVELOPMENT PROCESS
OBJECTIVES Specific, measurable, attainable, results-oriented, and time-bound (SMART), achievable within project timeframe.
Development of Learner Centered Learning (LCL) integrated teaching strategies
in Math IV that will result in a two (2) point increase in the Mean Proficiency
Score (MPS) in the School Achievement Test (SAT) in Math for the third grading
period in order to meet the eight (8) point increase for the SY 2013-2014 as
indicated in the SIP.
PROJECT Activity OUTPUT TARGET 1 2 3 4 5 6 7 8 9 1 1 1
SCHEDULE DATE 0 1 2
Assess 1. Get organized Project plan Sept.16
Data
Collection
Plan
2. Talk with FGD(Teachers/ Sept. 18
Customers Students) Sept. 19
3. Walk the SIPOC Sept. 20
Process
4. Identify Problem Sept. 27
Improvement Statement
Areas
Analyze 5. Do Root Cause Why –Why Sept. 27
Analysis Diagram
6. Develop To-Be Process Oct.14
Solutions Flow
Chart/Map
7. Finalize Project Oct. 16
Improvement Template ( A3)
Plans
Act 8. Pilot Solution Training Oct. 21
/Orientation
Materials