Abstract –
Pre Engineered Steel Buildings (PEB) fulfils the requirements of industrial steel structures
along with reduced time and cost as compared to Conventional Steel Buildings (CSB). This
methodology is versatile not only due to its quality predesigning and prefabrication, but also due to its
light weight and economical construction. The present work presents the comparative study and design
of conventional steel frames and Pre Engineered Buildings (PEB).
In this work, an industrial building of length 60 m, with roofing system as conventional
steel truss and pre engineered steel truss of span 20 m, at 6 m along the length and 6 m , 8 m & 6m
bay width at end frames has been considered. Slope of roof truss is taken as 5.71o. The eave height of
these structures has been taken as 10 m. These structures have been analyzed and designed by using
STAAD Pro V8i to compare the PEB and conventional steel truss. Design is based on IS: 800-2007.
Steel with yield stress 250 MPa is considered. Loads considered in analysis are dead load, live load,
wind load and seismic loads along with the various combinations as specified in IS: 800-2007. Dead
load is taken based on IS: 875 (Part 1)-1987. Live load is taken based on IS: 875(Part-2)-1987. Wind
load is taken based on IS: 875 (Part 3)-1987. It is assumed that the structure is located in Visakhapatnam
city. Analysis results observed for base reactions and weight of the steel are compared for these three
structures.
Index Terms—Conventional steel Buildings, Pre Engineered Steel Buildings,Seismic forces, Staad Pro
V8i
1. INTRODUCTION
India is the second fastest growing economy in the world and a lot of it is attributed to its
construction industry which figures just next to agriculture in its economic contribution to the nation.
In its steadfast development, the construction industry has discovered, invented and developed a number
of technologies, systems and products; one of them being the concept of Pre-engineered Buildings
(PEB). As opposed to being on-site fabricated, PEBs are delivered as a complete finished product to
the site from a single supplier with a basic structural steel framework with attached factory finished
cladding and roofing components. The structure is erected on the site by bolting the various building
components together as per specifications. PEBs are developed using potential design software. The
onset of technological advancement enabling 3D modelling and detailing of the proposed structure and
coordination has revolutionized conventional building construction.
PEBs have hit the construction market in a major way owing to the many benefits they possess.
They exemplify the rising global construction, technology and while they oppose the practice of
conventional building construction they simultaneously have taken it to a higher level too. Worldwide,
they are a much used concept with studies revealing that 60% of the non-residential low-rise buildings
in USA are pre-engineered; for India the concept has been gaining momentum and the scope of growth
is guaranteed looking at India's huge infrastructural requirements. Studies already validate that India
has the fastest growing market in the PEB construction segment. The scope of using PEBs ranges from
showrooms, low height commercial complexes, industrial building and workshops, stadia, schools,
bridges, fuel stations to aircraft hangars, exhibition centers, railway stations and metro applications.
While we are still to see PEBs being used in residences in India, one can see their optimal use in
warehouses, industrial sheds sports facilities etc. The Delhi Airport and the metro projects of Delhi,
Bangalore and Mumbai are also examples of PEB applications.
Applications
Pre-Engineered Building concept have wide applications including warehouses, factories, offices,
workshops, gas stations, showrooms, vehicle parking sheds, aircraft hangars, metro stations, schools,
recreational buildings, indoor stadium roofs, outdoor stadium canopies, railway platform shelters,
bridges, auditoriums, etc. PEB structures can also be designed as re-locatable structures.
a) Industrial:
Factories, Workshops, Warehouses, Cold stores, Car parking sheds, Slaughter houses, Bulk product
storage, harbors.
b) Commercial:
Showrooms, Distribution centers, Supermarkets, Fast food restaurants, Offices, Labor camps,
Service stations, Shopping centers.
c) Institutional: Schools, Exhibition halls, Hospitals, Theaters/auditoriums, Sports halls.
d) Recreational:Gymnasiums, swimming pool enclosures, Indoor tennis courts.
e) Aviation& Military: Aircraft hangars, Administration buildings, Residential barracks,Support
facilities.
f) Agriculture: Poultry buildings, Dairy farms, Greenhouses, Grain storage, Animal confinement.
Scope of present study
This study mainly focuses on to compare the structural steel weight of Conventional Steel
Building and Pre-engineered Steel Building using IS 800-2007. These structures are assumed to be
located in Visakhapatnam. These buildings are analyzed and designed by using STAAD Pro V8i
Software. In this study compare the how axial forces and moments are varies from type II structure to
type III structure.
Objectives of study
Objectives identified for the present study have listed as follows.
1. To compare the steel take-off of the conventional steel building and Pre engineered building.
2. To compare the member end forces of Pre engineered building and Conventional steel building.
3. To compare the joint displacements of Pre engineered building and Conventional steel building.
2. METHODOLOGY
In the present study two types of steel buildings designated as Type I and Type II are considered
for the analysis, design and computing structural steel weight.
Type I is Conventional Steel Building of length 60 m and span 20 m. Bay lengths are maintained
at an interval of 6 m along length and 6 m, 8 m and 6m along span only for end frames. The height of
the truss is taken as a minimum pitch that is th of span. So slope of roof is taken as 5.71˚and covered
with GI sheet. The spacing of purlins is maintained as 1.5 m. The eave height of the building has been
taken as 10 m in which 3 m from ground level is used for brick work and remaining 7 m is used for
cladding.
Type II is Pre Engineered Steel Building of length 60 m and span 20 m. Bay lengths are
maintained at an interval of 6 m along length and 6 m , 8 m and 6m along span only for end frames.
The height of the truss is taken as a minimum pitch that is th of span. So slope of roof is taken as
5.71˚and covered with GI sheet. The spacing of purlins is maintained as 1.5 m. The eave height of the
building has been taken as 10 m in which 3 m from ground level is used for brick work and remaining
7 m is used as cladding.
These two structures have been analyzed and designed by using STAAD Pro V8i to compare
the structural steel weight for both PEB and conventional steel building.
Analysis:-
CSB frame of the structure considered in the study is as shown in Figure1
Pre-Engineered Buildings
The typical PEB frame of the structure considered for the present study is shown in Figure 2.
Location Visakhapatnam
Dead load
Dead load on the roof trusses in single storey industrial buildings consists of dead load of
claddings and dead load of purlins, self weight of the trusses in addition to the weight of bracings etc.
Further, additional special dead loads such as truss supported hoist dead loads, special ducting and
ventilator weight etc. As the clear span length (column free span length) increases, the self weight of
the moment resisting gable frame increases drastically. In such cases roof trusses are more economical.
The dead load distributed over the roof is found to be in kN/m excluding the self weight. This
load is applied as uniformly distributed load over the purlins while designing the structure by PEB and
CSB concept.
Live load
The live load on roof trusses consist of the gravitational load due to erection and servicing as
well as dust load etc. and the intensity is taken as per IS:875-1987 (Part-2). Additional special live loads
such as snow loads in very cold climates, crane live loads in trusses supporting monorails may have to
be considered.
The load assumed to be produced by the intended use or occupancy of a building including
the weight of movable partitions , distributed, concentrated loads, load due to impact and vibration, and
dust load but excluding wind, seismic, snow and other loads due to temperature changes, creep,
shrinkage, differential settlement, etc.
According to IS : 875 (Part 2) – 1987, for roof with no access provided, the live load can be
taken as 0.75 kN/m2 with a reduction of 0.02 kN/m2 for every one degree above 10 degrees of roof
slope. Total uniform live load acting on the purlin of the CSB and PEB structures are found to be in
kN/m.
Earthquake Load
Since earthquake load on a building depends on the mass of the building, earthquake loads
usually do not govern the design of light industrial steel buildings. Wind loads usually
govern. However, in the case of industrial buildings with a large mass located at the roof, the
earthquake load may govern the design. These loads are calculated as per IS:1893-2000.
Wind load
Wind load on the roof trusses, unless the roof slope is too high, would be usually uplift force
perpendicular to the roof, due to suction effect of the wind blowing over the roof. Hence the wind load
on roof truss usually acts opposite to the gravity load, and its magnitude can be larger than gravity loads.
The horizontal and vertical bracings used primarily to resist wind and other lateral loads in
trusses. These bracings minimize the differential deflection between the different frames due to lateral
loads in industrial buildings. They also provide lateral support to columns in small and tall buildings,
thus increasing the buckling strength.
Wind load is calculated as per IS: 875 (Part 3) – 1987. The basic wind speed for the location of
the building is found to be 50 m/s from the code. The wind load over the roof can be provided as
uniformly distributed load acting outward over the purlins of PEB, and as uniformly distributed load
acting outward over the CSB purlins. For side walls, the wind load is applied as uniformly distributed
loads acting inward or outward to the walls according to the wind case.
Basic wind Speed (Vb)
Basic wind speed is based on peak gust velocity averaged over a short time interval of about 3
seconds and corresponds to mean heights above ground level in an open terrain (Category 2). Basic
wind speeds have been worked out for a 50 year return period.
Design Wind Speed (Vz)
The basic wind speed (Vb) for any site shall be modified to include the following effects to get
design wind velocity at any height (Vz) for the chosen structure.
a) Risk level
b) Terrain roughness, height and size of structure
c) Local topography
It can be mathematically expressed as follows.
Vz = Vb× k1 × k2 × k3
where
Vz = design wind speed at any height z in m/s
Vb = basic wind speed in m/s
k1 = probability factor (risk coefficient)
k2 = terrain, height and structure size factor and
k3 = topography factor.
Design wind pressure (Pz)
The design wind pressure at any height above mean ground level shell be obtained by the
following relationship between wind pressure and wind velocity.
Pz = 0.6 Vz2
Wind pressures and forces on buildings/structures
General - The wind shall be calculated for:
a) The building as a whole,
b) Individual structural elements as roofs and walls, and
c) Individual cladding units including glazing and their fixings.
Pressure coefficients
The pressure coefficients are always given for a particular surface or part of the surface of a
building. The wind load acting normal to a surface is obtained by multiplying the area of that surface
or its appropriate portion by the pressure coefficient (Cp) and the design wind pressure at the height of
the surface from the ground.
Average values of pressure coefficients are given for critical wind directions in one or more
quadrants. In order to determine the maximum wind load on the building, the total load should be
calculated for each of the critical directions shown from all quadrants. Where considerable variation of
pressure occurs over a surface, it has been subdivided and mean pressure coefficients given for each of
its several parts.
In addition, areas of high local suction (negative pressure concentration) frequently occurring
near the edges of walls and roofs are separately shown. Coefficients for the local effects should only be
used for calculation of forces on these local areas affecting roof sheeting, glass panels, and individual
cladding units including their fixtures. They should not be used for calculating force on entire structural
elements such as roof, walls or structure as a whole.
3. LOAD CALCULATIONS
Span of the truss = 20 m
Length of the building = 60 m
Bay width = 6 m each
Spacing of purlins = 1.5 m
Height of the eaves = 10 m
Height of the building at ridge = 11 m
Dead load: (as per IS 875 (Part-1) – 1987)
Weight of the G.I sheeting = 0.131 kN/m2 (class 1 G.I sheeting, thickness 1.60 mm)
Weight of fixings = 0.025 kN/m2
Weight of services = 0.1 kN/m2
Total weight is = 0.256 kN/m2
Total weight on purlins = 0.256 × 1.507
= 0.3857 kN/m2.
Live load: (as per IS 875 (Part-2) – 1987)
Live load on purlins = 0.750 kN/m2
Therefore live load on purlins at 1.507 spacing = 0.75 × 1.507
=1.130 kN/m2.
Earthquake load: (as per IS: 1893 (Part-1)-2002)
Dead load = 0.256 kN/m2
Live load =0.1875 kN/m2 (25٪ of reduction as per is 1893 (Part-1)-2002)
Total load =0.4435 N/m2
Bay width of the building is 5 m
Therefore earthquake load on rafter
= 0.4435 × 5 = 2.2175 kN/m.
Wind load: (As per IS 875:Part-III)
Location: Visakhapatnam.
Risk coefficient factor (k1) =1
Terrain and height facto (k2) = 0.954
Topography factor (k3) =1
Design wind speed Vz =Vb×k1×k2 × k3
Where Vb = basic wind speed = 50 m/s
Design wind speed Vz =50×1×0.937×1
= 46.85 m/s
Design wind pressure Pz = 0.6 × Vz2
Pz = 0.6 × 46.852
Pz = 1316 N/m2
5. CONCLUSIONS
After analysing, the following are the conclusions of Pre-Engineered steel Building when compared
with Conventional Steel Buildings
1. The total steel take-off for PEB is 16% of the conventional steel building.
2. It is observed than maximum moment will be high for PEB than CSB
3. It is observed than maximum shear force will be high for PEB than CSB
4. For PEB the axial force at haunch is higher than CSB
5. For CSB the axial force at ridge is higher than PEB
6. REFERENCES
[1] Bhavikatti S.S, “Design of steel structures by limit state method as per IS 800-2007”,
I.K.International publishing house Pvt.Ltd., NewDelhi, (2010).
[2] Darshana P.Zoad, “Evaluation of Pre- Engineering Structure Design by IS-800 as against Pre-
Engineering Structure Design by AISC”, International Journal of Engineering Research and
technology (IJERT), Volume-1,
issue 5, July 2012
[3] Duggal S.K, “Limit State Design of steel Structural” Tata McGraw Hill education
[4] Subramanian N, “Design of steel structures”, Oxford higher education, Chennai (2008).
[5] Subramanian. N, “Pre- Engineered buildings selection of framing system, roofing and wall
materials” The Master builder, July,2008, pp 48-62
[6] Zamil steel, “Technical Manual” January 1999.
[7] IS 800, “General construct in steel – code of practice” Bureau of Indian standards, New Delhi,
(2007).
[8] IS 875 (part 1) “Code of practice for design loads (other than earthquake) for building and
structures”, dead loads, New Delhi,1987.
[9] IS 875 (part 2) “Code of practice for design loads (other than earthquake) for building and
structures”, Imposed loads, New Delhi, 1987.
[10] IS 875 (part 3) “Code of practice for design loads (other than earthquake) for building and
structures”, wind loads, New Delhi,1987.
[11] IS 1893-2002 “Code of practice for Seismic loads”
[12] IS 801- 1975 “Code of Practice for Use of Cold-Formed Light Weight Gauge”