N. D. Eryou, PHD, Pe: Drawing #
N. D. Eryou, PHD, Pe: Drawing #
JOBSITE:
”
DFE
”
DATE
PRODUCT:
NO.
ENGINEER OF RECORD: N. D. Eryou, PhD, PE
Consulting Engineer
STRUCTURAL ENGINEER:
DRAWING #
KEY PLAN
EXCHANGE PLACE ESCALATOR HEAD HOUSE DATE
SHEET
1 OF 5
CONTRACTOR:
JOBSITE:
DFE
REVISIONS
DATE
PRODUCT:
NO.
ADD VIEWS D/3 & D/4 AS PER
DRAWING N-1
STRUCTURAL ENGINEER:
DRAWING #
DATE
SHEET
2 OF 5
CONTRACTOR:
JOBSITE:
DFE
DESCRIPTION
REVISIONS
DATE
PRODUCT:
NO.
ENGINEER OF RECORD: N. D. Eryou, PhD, PE
Consulting Engineer
STRUCTURAL ENGINEER:
DRAWING #
DATE
SHEET
3 OF 5
CONTRACTOR:
JOBSITE:
IS THIS VIEW DEPLOYED AS THE SILICONE CORD IS
NOT IN THE HEM CORD SLOT. IF SO LABEL
ACCORDINGLY
DFE
LABEL FOAM
DESCRIPTION
REVISIONS
SHOW LOCATION OF
HORIZONTAL LONG BOLTS
& VERTICAL CONCRETE
ANCHOR BOLTS IN DETAIL
DATE
D2 & S3 TO SCALE TO
ENSURE THAT THE
PRODUCT:
BOTTOM OF THE VERTICAL
ANCHOR BOLT NUTS DO
NO.
NOT INTERFERE WITH THE
HORIZONTAL LONG BOLTS
DEFINE ANCHOR
BOLTS
EMBEDMENT
LENGTH & EPOXY
STRUCTURAL ENGINEER:
DRAWING #
DATE
SHEET
4 OF 5
CONTRACTOR:
JOBSITE:
DFE
DESCRIPTION
REVISIONS
DATE
PRODUCT:
NO.
ENGINEER OF RECORD: N. D. Eryou, PhD, PE
Consulting Engineer
STRUCTURAL ENGINEER:
DRAWING #
DATE
SHEET
5 OF 5