Project Documents Brief Description KA KA Count: Prepared By: Mohammed Irfan, PMP, MBA, BE
Project Documents Brief Description KA KA Count: Prepared By: Mohammed Irfan, PMP, MBA, BE
Project Documents Brief Description KA KA Count: Prepared By: Mohammed Irfan, PMP, MBA, BE
Note:
1. Project documents includes all those documents which can be used as Input, Output and Updated (frequent) for different process throughout the project.
2. No formal procedure (No Change request) required for updating of Project document
Note: All PMP requires formal change request via Perform Integrated change control process.
In addition to above, Preventive action, Corrective action and Defect repair also requires formal CR for modifications or updates