Boiler Calculation
Boiler Calculation
Boiler Calculation
Used Formula
For each room we need 8 kg laundary
laundary is done every 10 hr
required water Qty is 2,5 GPH for each Kg luandary
Luandary hot water calculation
Hotel rooms 88
luandary Qty in (Kg) 704
luandary Qty in (Kg)/10h 70.4
Required hot water GPH 176
Used
TableTables
1 Hot Water Demand in
Fixture Units (60°C Water)
Hotels &
Apartments Club Gymnasium Hospital Industrial Plant OfficeBuildi School YMCA
Dormitories
Basin, private lavatory 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75
Basin, public lavatory — 1 1 1 1 1 1 1 1
Bathtub 1.5 1.5 — 1.5 1.5 — — — —
Dishwasher 1.5 Five fixture units per 250 seating capacity — — — — —
Therapeutic bath — — — 5 — — — — —
Kitchen sink 0.75 1.5 — 3 1.5 3 — 0.75 3
Pantry sink — 2.5 — 2.5 2.5 — — 2.5 2.5
Service sink 1.5 2.5 — 2.5 2.5 2.5 2.5 2.5 2.5
Showera 1.5 1.5 1.5 1.5 1.5 3.5 — 1.5 1.5
Circular wash fountain — 2.5 2.5 2.5 — 4 — 2.5 2.5
Semicircular wash fountain — 1.5 1.5 1.5 — 3 — 1.5 1.5
a*In applications where the principal use is showers, as in gymnasiums or at end of shift in industrial plants, use conversion factor of 1.00 to obtain design water flow rate in gpm.
48.4 *1999 ASHRAE Applications Handbook
fill data you get here and get GPH from chart:-
fixture HWSFU Qty total HWSFU GPM GPH
Basin, private lavatory 1.5 103 154.5 0
sub total
Table 9 Hot Water Demand per Fixture for Various Types of Buildings
(Gallons of water per hour per fixture, calculated at a final temperature of 140°F)
OfficeBuil Private
Apartmen Club Gymnasium Hospital Hotel Industrial School YMCA
ding Residence
t House Plant
8. Pantry sink 5 10 — 10 10 — 10 5 10 10
9. Shower 30 150 225 75 75 225 30 30 225 225
10. Service sink 20 20 — 20 30 20 20 15 20 20
11. Hydrotherapeutic shower 400
12. Hubbard bath 600
13. Leg bath 100
14. Arm bath 35
15. Sitz bath 30
16. Continuous-flow bath 165
17. Circular wash sink 20 20 30 20 30
18. Semicircular wash sink 10 10 15 10 15
19. DEMAND FACTOR 0.30 0.30 0.40 0.25 0.25 0.40 0.30 0.30 0.40 0.40
20. STORAGE CAPACITY FACTORb 1.25 0.9 1 0.6 0.8 1 2 0.7 1 1
a*Dishwasher requirements should be taken from this table or from manufacturers’ data for the model to be used, if this is known.
b*Ratio of storage tank capacity to probable maximum demand/h. Storage capacity may be reduced where an unlimited supply of steam is available from a central street steam system or large boiler plant.
total(GPH) 948
demand factor 0.4
Recovery flow 379.2
∆t(70-80)F 80
Q1(heat)(kw) 73.990243902
Btu/hr 252689.97157
BHP(boiler Hp) 7.5429842261
Storage factor 1
storage(gall) 379.2
storage(litre) 1435.27
no. of califiers
Electrical water Heater storage(GALLON)
storage(litre) 1435.43 387.95
Power(KW) 73.99
Example 1. method using number of persons input number of persons
Examples 6, 7, and 8 demonstrate the use of Equation (6) in conjunction with Tables 10 and 11.
Example 9.
1-Definitions :-
2-Piping Material
3-Return Piping
Caution: This calculation assumes that a 20°F temperaturedrop is acceptable at the last fixture.
4. Select a pump to provide the required flow rate, and obtain from the pump curves the pressure created at this flow.
5. Check that the pressure does not exceed the allowable friction loss per metre of pipe.
6. Determine the required flow in each circulating loop, and sizethe hot water return pipe based on this flow and the allowable
friction loss.
Important note:-
1-Where multiple risers or horizontal loops are used, balancingvalves with means of testing are recommended in the return lines.
2-A swing-type check valve should be placed in each return to prevent entry of cold water or reversal of flow, particularly during periods of
high hot water demand.