Coping Beam Plan P2: Shop Drawing

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

CL COLUMN CL COLUMN

12000

1500 9000 1500


6000
1000 2500 2500 2500 2500 1000

1 5 6 2 SHEAR BLOCK

1090
1200

1200

1200

1200
1600
CL PIER
3200

1020

1020

1020

1020

1020

1020
800

800

800

800
1280 1280 1280 1280
1600

1300 1300 1300 1300 1300


1200

1200

1200

1200

1090
3 7 8 4

RISER
COPING BEAM
℄ PIER 1 ℄ PIER 1
1 COPING BEAM PLAN P2
J-40 SCALE 1:100 1600 1600 1600 450
SHEAR STUDS SHEAR STUDS

℄ ROADWAY
11870
1000 5-16mm THK. 5-16mm THK.
535 2500 7300 535 BEARING STIFFENER BEARING STIFFENER
INNER
RAILING OUTER SHOULDER CLEAR ROADWAY RAILING
SHOULDER

TRANSVERSE BEAM TRANSVERSE BEAM

3000

3000
EL. 99.898 50mm ASPHALT OVERLAY
200mm SLAB
2.5%

200
SHEAR BLOCK SHEAR BLOCK
95.802 1280X800X500 95.802 1280X800X500
150x150x10mm TOP OF COPING BEAM TOP OF COPING BEAM
95.227 1 2 3 4 95.227 1 2 3 4
STEEL GIRDER
3000

TRANSVERSE
BEAM BEARING ASSEMBLY / BEARING ASSEMBLY /
B
SHEAR BLOCK RISER 75MM THK RISER 75MM THK
A

BEARING ASSEMBLY
1280X800X500 95.802 95.802 95.802 95.802 RISER COPING BEAM COPING BEAM

2700
95.227 95.302 95.302 95.302 95.302 95.302

3200

3200
1 3 24
2700
3200

500
COPING BEAM 92.027 5 6 7 8 92.027 5 6 7 8
3000 3000
500

92.027 5 7 6 8 Ø3000 COLUMN P1 Ø3000 COLUMN P1


3200 3200
1375 125 3000 3000 3000 125 1375
A

Ø3000 COLUMN P1

2 COPING BEAM P2 ELEVATION A-A SECTION B-B SECTION


J-40 SCALE 1:100 J-40 SCALE 1:75 J-40 SCALE 1:75

REFERENCE:
SHOP DRAWING
S3-32 (IFC-DED)

PREPARED BY: CONTRACTOR REVISIONS: PROJECT TITLE: DRAWING NO.


PHILKOEI INTERNATIONAL, INC.
STA. CLARA CONSULTANTS - PLANNERS - ENGINEERS NORCONSULT C O R P O R A T I O N
A METRO PACIFIC TOLLWAY COMPANY
NLEX CORPORATION DESIGNED:
REV. DATE DESCRIPTION MANILA NORTH TOLLWAYS PROJECT
INLEX SEGMENT 7 - SUBIC FREEPORT EXPRESSWAY
SCIC_SFEX_DWG
0 4/18/2020 FIRST SUBMISSION _JAD_40
CADD: WIDENING PROJECT (SFEX)
INTERNATIONAL CORPORATION
4F HIGHWAY 54 PLAZA, 986 EDSA Cor, STANDFORD ST. CHECKED BY DESIGN REPRESENTATIVE: REVIEWED BY ICE: CHECKED:
SHEET TITLE: SHEET NO. REV. NO.
WACK-WACK, MANDALUYONG CITY, PHILIPPINES APPROVED:
KERVY S. DATAY J. LEONIDES S. DAVID REY P. PANTINO AGUEDO L . SAHAGUN EMMANUEL C. CABIGAS NEMESIO G. CASTILLO JADJAD BRIDGE COPING BEAM PIER 2 GENERAL
Project Manager Project Manager Design Engineer Project Manager License Engineer Employer's Representative ARRANGEMENT AND REINFORCEMENT DETAIL 1 OF 5 0
12000
3000 6250 3000
TCB1a TCB1a-3 TCB1a TCB1a-3

TCB1 TCB2
12000 TCB2a TCB2a-3 TCB2a TCB2a-3
3000 6250 3000 1375 9254 1375
Ø20 @300 Ø20 @150 Ø20 @300
TCB1a TCB1a-3 TCB1a TCB1a-3 32-Ø36 CB1 CB1-1 32-Ø36

C
SHEAR BLOCK

B
TCB1 TCB2
TCB2a TCB2a-3 TCB2a TCB2a-3 95.802 95.802 95.802 95.802
RISER
95.227 95.302 95.302 95.302 95.302 95.302
1375 9254 1375
Ø20 @300 Ø20 @100 Ø20 @300
32-Ø36 CB1 32-Ø36 CB1-1
2160
SPLICE STAGGER CB2a
OUTLINE OF 3000mm Ø COLUMN
CB2 32-Ø36 CB2a 32-Ø36

2700
CB2 32-Ø36

3200
32-Ø36
2160 CB3
SPLICE STAGGER
2160 7-Ø25 EACH 2160
FACE
SPLICE STAGGER SPLICE STAGGER
TCB4 TIES

500
3200

92.027
1375 125 3000 3000 3000 125 1375
CB5 CB4 CB3a

B
20-Ø28 20-Ø28 1-Ø25 EACH CB5-1
FACE
20-Ø28
CB3a-1 1-Ø25 EACH
FACE

3 COPING BEAM TOP MAIN BARS 5 TRANSVERSE SECTION


J-40 SCALE 1:100 J-40 SCALE 1:100

12000
3000 6250 3000

TCB1a TCB1a-3 TCB1a TCB1a-3

TCB1 TCB2
TCB2a TCB2a-3 TCB2a TCB2a-3

1375 9254 1375


Ø20 @300 Ø20 @100 Ø20 @300

20-Ø28 CB5 20-Ø28 CB4 CB5-1 20-Ø28


OUTLINE OF 3000mm Ø COLUMN

2160
TCB4 TIES

SPLICE STAGGER
3200

4 COPING BEAM BOTTOM MAIN BARS C-C D-D


SECTION SECTION
J-40 SCALE 1:100
J-40 SCALE 1:75 J-40 SCALE 1:75

REFERENCE:
SHOP DRAWING
S3-32 (IFC-DED)

PREPARED BY: CONTRACTOR REVISIONS: PROJECT TITLE: DRAWING NO.


PHILKOEI INTERNATIONAL, INC.
STA. CLARA CONSULTANTS - PLANNERS - ENGINEERS NORCONSULT C O R P O R A T I O N
A METRO PACIFIC TOLLWAY COMPANY
NLEX CORPORATION DESIGNED:
REV. DATE DESCRIPTION MANILA NORTH TOLLWAYS PROJECT
INLEX SEGMENT 7 - SUBIC FREEPORT EXPRESSWAY
SCIC_SFEX_DWG
0 4/18/2020 FIRST SUBMISSION _JAD_40
CADD: WIDENING PROJECT (SFEX)
INTERNATIONAL CORPORATION
4F HIGHWAY 54 PLAZA, 986 EDSA Cor, STANDFORD ST. CHECKED BY DESIGN REPRESENTATIVE: REVIEWED BY ICE: CHECKED:
SHEET TITLE: SHEET NO. REV. NO.
WACK-WACK, MANDALUYONG CITY, PHILIPPINES APPROVED:
KERVY S. DATAY J. LEONIDES S. DAVID REY P. PANTINO AGUEDO L . SAHAGUN EMMANUEL C. CABIGAS NEMESIO G. CASTILLO JADJAD BRIDGE COPING BEAM PIER 2 GENERAL
Project Manager Project Manager Design Engineer Project Manager License Engineer Employer's Representative ARRANGEMENT AND REINFORCEMENT DETAIL 2 OF 5 0
12000
3000 6000 3000
COLUMN OUTLINE

350 1300 1200 1300 1200 1300 1200 1300 1200 1300 350

1090
R2 Ø12@100 R2 Ø12@100 R2 Ø12@100 R2 Ø12@100 R2 Ø12@100

R1 R1 R1 R1 R1

3200

1020
Ø12@100 Ø12@100 Ø12@100 Ø12@100 Ø12@100

1090
SHEAR BLOCK RISER (1300X1020X75)
1280X800X500
1000 2500 2500 2500 2500 1000

COPING BEAM
6 RISER REINFORCEMENT PLAN
J-40 SCALE 1:75

12000

SHEAR BLOCK
1280X800X500 1000 2500 2500 2500 2500 1000

EL. 95.958 EL. 95.958 EL. 95.958 EL. 95.958 RISER (1300X1020X75)
EL. 95.458 EL. 95.533 EL. 95.533 EL. 95.533 EL. 95.533 EL. 95.533
R1 R1 R1 R1 R1

R2 R2 R2 R2 R2
Ø12@100 Ø12@100 Ø12@100 Ø12@100 Ø12@100

2700
3200

COPING BEAM

500
EL. 92.258

1375 125 3000 3000 3000 125 1375

Ø3000 COLUMN P1

7 ELEVATION SHOWING RISER REINFORCEMENT


J-40 SCALE 1:75

REFERENCE:
SHOP DRAWING
S3-32 (IFC-DED)

PREPARED BY: CONTRACTOR REVISIONS: PROJECT TITLE: DRAWING NO.


PHILKOEI INTERNATIONAL, INC.
STA. CLARA CONSULTANTS - PLANNERS - ENGINEERS NORCONSULT C O R P O R A T I O N
A METRO PACIFIC TOLLWAY COMPANY
NLEX CORPORATION DESIGNED:
REV. DATE DESCRIPTION MANILA NORTH TOLLWAYS PROJECT
INLEX SEGMENT 7 - SUBIC FREEPORT EXPRESSWAY
SCIC_SFEX_DWG
0 4/18/2020 FIRST SUBMISSION _JAD_40
CADD: WIDENING PROJECT (SFEX)
INTERNATIONAL CORPORATION
4F HIGHWAY 54 PLAZA, 986 EDSA Cor, STANDFORD ST. CHECKED BY DESIGN REPRESENTATIVE: REVIEWED BY ICE: CHECKED:
SHEET TITLE: SHEET NO. REV. NO.
WACK-WACK, MANDALUYONG CITY, PHILIPPINES APPROVED:
KERVY S. DATAY J. LEONIDES S. DAVID REY P. PANTINO AGUEDO L . SAHAGUN EMMANUEL C. CABIGAS NEMESIO G. CASTILLO JADJAD BRIDGE COPING BEAM PIER 2 GENERAL
Project Manager Project Manager Design Engineer Project Manager License Engineer Employer's Representative ARRANGEMENT AND REINFORCEMENT DETAIL 3 OF 5 0
12000
3000 6000 3000
COLUMN OUTLINE
350 1300 1200 1300 1200 1300 1200 1300 1200 1300 350

1090
Ø25@150 SB2 Ø25@150 SB2 Ø25@150 SB2 Ø25@150 SB2

3200

1020
SB1 SB1 SB1 SB1
Ø25@150 Ø25@150 Ø25@150 Ø25@150

1090
SHEAR BLOCK RISER (1300X1020X75)
1280X800X500
1000 2500 2500 2500 2500 1000
COPING BEAM

8 SHEAR BLOCK REINFORCEMENT PLAN


J-40 SCALE 1:75

12000

SHEAR BLOCK
1280X800X500 1000 2500 2500 2500 2500 1000

EL. 95.958 EL. 95.958 EL. 95.958 EL. 95.958 RISER (1300X1020X75)
EL. 95.458 EL. 95.533 EL. 95.533 EL. 95.533 EL. 95.533 EL. 95.533

SB1 SB1 SB1 SB1

SB2 SB2 SB2 SB2


Ø25@150 Ø25@150 Ø25@150 Ø25@150

2700
3200

COPING BEAM

500
EL. 92.258

1375 125 3000 3000 3000 125 1375

Ø3000 COLUMN P1

9 ELEVATION SHOWING SHEAR BLOCK REINFORCEMENT


J-40 SCALE 1:75

REFERENCE:
SHOP DRAWING
S3-32 (IFC-DED)

PREPARED BY: CONTRACTOR REVISIONS: PROJECT TITLE: DRAWING NO.


PHILKOEI INTERNATIONAL, INC.
STA. CLARA CONSULTANTS - PLANNERS - ENGINEERS NORCONSULT C O R P O R A T I O N
A METRO PACIFIC TOLLWAY COMPANY
NLEX CORPORATION DESIGNED:
REV. DATE DESCRIPTION MANILA NORTH TOLLWAYS PROJECT
INLEX SEGMENT 7 - SUBIC FREEPORT EXPRESSWAY
SCIC_SFEX_DWG
0 4/18/2020 FIRST SUBMISSION _JAD_40
CADD: WIDENING PROJECT (SFEX)
INTERNATIONAL CORPORATION
4F HIGHWAY 54 PLAZA, 986 EDSA Cor, STANDFORD ST. CHECKED BY DESIGN REPRESENTATIVE: REVIEWED BY ICE: CHECKED:
SHEET TITLE: SHEET NO. REV. NO.
WACK-WACK, MANDALUYONG CITY, PHILIPPINES APPROVED:
KERVY S. DATAY J. LEONIDES S. DAVID REY P. PANTINO AGUEDO L . SAHAGUN EMMANUEL C. CABIGAS NEMESIO G. CASTILLO JADJAD BRIDGE COPING BEAM PIER 2 GENERAL
Project Manager Project Manager Design Engineer Project Manager License Engineer Employer's Representative ARRANGEMENT AND REINFORCEMENT DETAIL 4 OF 5 0
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6 TYPE 7 TYPE 8
b
d e b
b f b
a a a e
a c c a c a c
a a c
b b
c b d

NOTE:
(PROPOSED STIRRUPS
CONFIGURATION FOR
TCB1&TCB1A)
1

2 REFERENCE:
SHOP DRAWING
S3-32 (IFC-DED)

PREPARED BY: CONTRACTOR REVISIONS: PROJECT TITLE: DRAWING NO.


PHILKOEI INTERNATIONAL, INC.
STA. CLARA CONSULTANTS - PLANNERS - ENGINEERS NORCONSULT C O R P O R A T I O N
A METRO PACIFIC TOLLWAY COMPANY
NLEX CORPORATION DESIGNED:
REV. DATE DESCRIPTION MANILA NORTH TOLLWAYS PROJECT
INLEX SEGMENT 7 - SUBIC FREEPORT EXPRESSWAY
SCIC_SFEX_DWG
0 4/18/2020 FIRST SUBMISSION _JAD_40
CADD: WIDENING PROJECT (SFEX)
INTERNATIONAL CORPORATION
4F HIGHWAY 54 PLAZA, 986 EDSA Cor, STANDFORD ST. CHECKED BY DESIGN REPRESENTATIVE: REVIEWED BY ICE: CHECKED:
SHEET TITLE: SHEET NO. REV. NO.
WACK-WACK, MANDALUYONG CITY, PHILIPPINES APPROVED:
KERVY S. DATAY J. LEONIDES S. DAVID REY P. PANTINO AGUEDO L . SAHAGUN EMMANUEL C. CABIGAS NEMESIO G. CASTILLO JADJAD BRIDGE COPING BEAM PIER 2 GENERAL
Project Manager Project Manager Design Engineer Project Manager License Engineer Employer's Representative ARRANGEMENT AND REINFORCEMENT DETAIL 5 OF 5 0