Alfanar Co.: Site Test Report Sec-Eoa Name of Substation: Dammam Housing 115/13.8KV Substation # 1

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 7

SITE TEST REPORT Date :

Customer:
Contractor’s name:
SEC-EOA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
4400006262
DESCRIPTION : UNDER/ OVER VOLTAGE ( REQ560 )
Page 1 of 7
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:

1. GENERAL DATA AND INFORMATION

Make : Serial No. :

Type/Model No.: Rated Voltage :

Line/Bay : Aux. Voltage :

Panel No. : PTR Used :

ELECTRICAL TEST

3.1 OPERATING DC SUPPLY CURRENT:

DC VOLTAGE DC CURRENT DURING FAULT

LIMIT: (According to the Catalogue page no )

3.2 Voltage Measurement Accuracy Test:

Voltage Injected Voltage Measured Voltage % Error


Phase Terminal
Primary Secondary Primary Secondary
R

B
LIMIT: (According to the Catalogue page no )

DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
SEC-EOA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
4400006262
DESCRIPTION : UNDER/ OVER VOLTAGE ( REQ560 )
Page 2 of 7
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:

3.3 Functional testing

3.3.1 UNDER VOLTAGE TEST:


i) PICK-UP / DROP-OFF TEST:

S e tting Pic k up Dro p-o ff


(V) (V) (V)

LIMIT: (According to the Catalogue page no )

ii) TRIP TIME CHARACTERISTIC TEST:

a) INVERSE TIME CHARACTERISTIC:

OPER. TIME AT OPER. TIME AT


TMS S ETTING
CAL. ACT. (s) CAL. ACT. (s)

LIMIT: (According to the Catalogue page no )

DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
SEC-EOA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
4400006262
DESCRIPTION : UNDER/ OVER VOLTAGE ( REQ560 )
Page 3 of 7
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:

b) DEFINITE TIME CHARACTERISTICS:

OPERATING TIME (s)


SET TIME (s)
AT

LIMIT: (According to the Catalogue page no )

3.3.2 OVER VOLTAGE TEST:


i) PICK-UP / DROP-OFF TEST:

S e tting Pic k up Dro p-o ff


(V) (V) (V)

LIMIT: (According to the Catalogue page no )

ii) TRIP TIME CHARACTERISTIC TEST:


a) INVERSE TIME CHARACTERISTIC:

OPER. TIME AT OPER. TIME AT


TMS S ETTING
CAL. ACT. (s) CAL. ACT. (s)

LIMIT: (According to the Catalogue page no )

DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
SEC-EOA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
4400006262
DESCRIPTION : UNDER/ OVER VOLTAGE ( REQ560 )
Page 4 of 7
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:

b) DEIFINITE TIME CHARACTERISTICS:

OPERATING TIME (s)


SET TIME (s)
AT

LIMIT: (According to the Catalogue page no )

4. LED Checks:

LED no. Configured for Operation checked

4.1 Input/Relay output checks:

Inputs

Input 1
Input 2
Input 3
Input 4
Input 5

Output relays

Output 1
Output 2
Output 3

DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
SEC-EOA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
4400006262
DESCRIPTION : UNDER/ OVER VOLTAGE ( REQ560 )
Page 5 of 7
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:

Output 4
Output 5
Output 6
Output 7
Output 8

5) FINAL SETTING:
5.1 UNDER VOLTAGE TEST:
i) PICK-UP / DROP-OFF TEST:

S e tting Pic k up Dro p-o ff


Re ma rks
(V) (V) (V)

DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
SEC-EOA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
4400006262
DESCRIPTION : UNDER/ OVER VOLTAGE ( REQ560 )
Page 6 of 7
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:

ii) OPERATING TIME TEST:

TRIP TIME CHARACTERISTIC TEST:


a) INVERSE TIME CHARACTERISTIC:

b) DEIFINITE TIME CHARACTERISTICS:

S ET TIME (s) OPERATING TIME AT

5.2 OVER VOLTAGE TEST:


i) PICK-UP / DROP-OFF TEST:

S e tting Pic k up Dro p-o ff


Re ma rks
(V) (V) (V)

ii) OPERATING TIME TEST:

TRIP TIME CHARACTERISTIC TEST:


a) INVERSE TIME CHARACTERISTIC:

b) DEIFINITE TIME CHARACTERISTICS:

S ET TIME (s) OPERATING TIME AT

TEST EQUIPMENT USED:

DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
SEC-EOA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
4400006262
DESCRIPTION : UNDER/ OVER VOLTAGE ( REQ560 )
Page 7 of 7
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:

Equipment Calibration Calibration


Sl. No Description Make
Sl .No Date Due Date

DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________