Alfanar Co.: Site Test Report Ng-Sa Name of Substation: Dammam Housing 115/13.8KV Substation # 1
Alfanar Co.: Site Test Report Ng-Sa Name of Substation: Dammam Housing 115/13.8KV Substation # 1
Alfanar Co.: Site Test Report Ng-Sa Name of Substation: Dammam Housing 115/13.8KV Substation # 1
Customer:
Contractor’s name:
NG-SA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
4400006262
ACSE (REC670) TESTING
Page 1 of 16
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:
Type: VT Ratio:
ELECTRICAL TEST
I – DEFINITIONS
DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
NG-SA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
4400006262
ACSE (REC670) TESTING
Page 2 of 16
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:
DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
NG-SA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
4400006262
ACSE (REC670) TESTING
Page 3 of 16
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:
9. PARALLEL OPERATION:
If S120 & S320 closed with two of the GT Transformers in service with the
third one is standby.
If S120 or S320 open or both open and three transformers are in service.
II – TIMERS SETTINGS:
DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
NG-SA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
4400006262
ACSE (REC670) TESTING
Page 4 of 16
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:
DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
NG-SA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
4400006262
ACSE (REC670) TESTING
Page 6 of 16
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:
.Differential, HV ref, LV ref, TR fire, WDG( S1105 trip and S120 & S320 autoclose &
Tem. Stage – 2, Bucholz, OLTC, CBF, HV
)BB, PRD
S1105 trip & S120 remain open and S320
13.8kV stuck breaker protection operation
autoclose
CONTROL PANEL INDICATION:
1. INITIAL STAGE : GT1 STANDBY OFF, GT2 STANDBY OFF, GT3 STANDBY OFF
2. DURING SEQUENCE : ACSE IN PROGRESS
3. COMPLETION OF SEQUENCE : ACSE FAILED (ON or OFF)
GT1 in service
GT2 in service
GT3 on standby
Protection Actions
GT2 Transformer protection operation trip (Except for WDG. Temp. STAGE 2) 105
.Differential, HV ref, LV ref, TR fire, WDG( S1205 trip and S320 autoclose &
Tem. Stage – 2, Bucholz, OLTC, CBF, HV
)BB, PRD
S1205 & S120 trip and S320 remain open
13.8kV stuck breaker protection operation
and no autoclose
CONTROL PANEL INDICATION:
1. INITIAL STAGE : GT1 STANDBY OFF, GT2 STANDBY OFF, GT3 STANDBY OFF
2. DURING SEQUENCE : ACSE IN PROGRESS (IN GT PROTECTION ONLY)
3. COMPLETION OF SEQUENCE : ACSE FAILED (ON or OFF)
Sequence 12: “Fault Section – B, bus section A/B S120 & bus section B/C S320 open ”
Independent operation (S120 open & S320 open)
GT1 in service
GT2 in service
GT3 in service
Protection Actions
GT2 Transformer protection operation trip (Except for WDG. Temp. STAGE 2) 105
.Differential, HV ref, LV ref, TR fire, WDG( S1205 trip and S120 & S320 autoclose &
Tem. Stage – 2, Bucholz, OLTC, CBF, HV
)BB, PRD
S1205 trip and S120 & S320 remain open
13.8kV stuck breaker protection operation
and no autoclose
CONTROL PANEL INDICATION:
1. INITIAL STAGE : GT1 STANDBY OFF, GT2 STANDBY OFF, GT3 STANDBY OFF
2. DURING SEQUENCE : ACSE IN PROGRESS (IN GT PROTECTION ONLY)
3. COMPLETION OF SEQUENCE : ACSE FAILED (ON or OFF)
Sequence 13: “Fault Section – C, GT2 on standby”
Parallel operation (S120 & S320 closed)
GT1 in service
GT3 in service
GT2 on standby
Protection Actions
GT3 Transformer protection operation trip (Except for WDG. Temp. STAGE 2) 405
.Differential, HV ref, LV ref, TR fire, WDG( S3405 trip and S1205 autoclose &
Tem. Stage – 2, Bucholz, OLTC, CBF, HV
DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
NG-SA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
4400006262
ACSE (REC670) TESTING
Page 9 of 16
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:
)BB, PRD
13.8kV stuck breaker protection operation S3405 & S320 trip and S1205 autoclose
1. INITIAL STAGE : GT1 STANDBY OFF, GT2 STANDBY OFF, GT3 STANDBY OFF
2. DURING SEQUENCE : ACSE IN PROGRESS (IN GT PROTECTION ONLY)
3. COMPLETION OF SEQUENCE : ACSE FAILED (ON or OFF)
Sequence 18: “Fault Section – C, bus section A/B S120 & bus section B/C S320 open”
Independent operation (S120 open & S320 closed)
GT1 in service
DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
NG-SA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
4400006262
ACSE (REC670) TESTING
Page 11 of 16
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:
GT2 in service
GT3 in service
Protection Actions
GT3 Transformer protection operation trip (Except for WDG. Temp. STAGE 2) 405
.Differential, HV ref, LV ref, TR fire, WDG( S3405 trip and S120 & S320 autoclose &
Tem. Stage – 2, Bucholz, OLTC, CBF, HV
)BB, PRD
S3405 trip & S320 remain open and S120
13.8kV stuck breaker protection operation
autoclose
CONTROL PANEL INDICATION:
1. INITIAL STAGE : GT1 STANDBY OFF, GT2 STANDBY OFF, GT3 STANDBY OFF
2. DURING SEQUENCE : ACSE IN PROGRESS
3. COMPLETION OF SEQUENCE : ACSE FAILED (ON or OFF)
Sequence 19: “INTERLOCK between the five 13.8kV C.Bs”
TOP TOP
S1105 S1205 S3405 S120 S320
.P.B IND
S1205 O/MC C/AT C C C OK
S3405 C O/MC C/AT C C OK
S120 C C O/MC C/AT C OK
S320 C C C O/MC C/AT OK
S1105 C/AT C C C O/MC OK
DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
NG-SA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
4400006262
ACSE (REC670) TESTING
Page 12 of 16
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:
C → “CLOSE” STATUS
(B) IF 13.8KV BOTH SIDES OF BUS SECTION (BUS SECTION BKR) IS NOT LIVE.
DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
NG-SA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
4400006262
ACSE (REC670) TESTING
Page 13 of 16
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:
ON CPU INTERNAL FAULT THE ACSE WILL BE IN STOP MODE, THE WATCHDOG
RELAY WILL BE DE-ENERGIZED AND THE ALARM WILL BE ACTIVE, THE ONLY
WAY TO TEST IT IS TO PUT THE CPU ON STOP MODE USING LAPTOP.
ONCE THE ACSE IS INITIATED A TIMEOUT RELAY WILL START, IF THE SEQUENCE
DON’T FINISH WITHIN A DEFINED TIME, THE SEQUENCE FAILURE ALARM WILL BE
ACTIVE.
ADDITIONAL TEST:
DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
NG-SA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
4400006262
ACSE (REC670) TESTING
Page 14 of 16
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:
DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________
DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________