Process Audit Check List PE
Process Audit Check List PE
Special Operations
1 of 1
Initial issue date : Edition :
1-Feb-18 Process Audit Checklist 1
Last amendment:
31 July 2019 Special Operation (Embellishment) Department Document No : V2
Result
No Observation Area 0 1 2 3 Remarks
Development and Technical
Development minimum resources available (Refer guideline)
1. Actual art wort
2. Techniques
3. Color standards
4. Fabric composition
1 5. Fabric dye route
6. Fabric GSM
7. Fabric finishing temperature
8. Brandix fabric risk category
9. Light source (Primary and secondary need to mention)
10. Testing requirement (DTC-3010/LTD37/LTD92 if required/LTD22)
11. Latest placement and graphic gradings
2 Sample room staff awareness on development file minimum resources
Graphic testing details available in Development file
1.Testing requirement (DTC-3010/LTD37/LTD92 if required/LTD22)
3 2. Before and after embellishment panels with fabric color change verification
3. If pressing available strike off should have non presses area
4. Fab shrinkage report for heat operation(For below 130 GSM fabrication)
7 Sample room machinery serviced and calibrated (Scales/Printing machine/Dry machines/ curing
machines/press machine/rulers/tapes)
15 How to check (Visual display & ability to explain the checking method)
1. End line / In line QC
Placement measurements (How to measure - ability to explain how to measure)
16
1. End line / In line QC
Defect identifications (Randomly picked defects will be verify)
17
1. End line / In line QC
18 Operators knowledge on his/her job operation
19 Mockups/ Visual displays are available in front of MO
Trial cut document updated and available (Plant trial cut document)
20
1. Need to keep a copy for reference and circulate for bulk
21 Strike off and Artwork available in bulk production
Technical report available in bulk production
22 1. Bulk finalized technical data sheet.
2. Production method and conditions with process.
Bulk test reports available in bulk production
1. LTD 37
23
2. LTD 92 if required
3. Crocking fasteners test if required
Reference mail documents available
1. Cut related mail communications
24
2. Fabric color related mail communications
3. Special placement related instructions (Brandix or MAST)
Issue note available (Generated by stores and going through production)
25 1. Internal practicing job card or issues note for specified cut number
2. Bundles issued according to issue notes
26 Internal PP has conducted and records available in bulk file
Shade band & Pattern board preserving document availability
1. 6 months past records of shade bands pattern boards
27
2. Specified location for store them
3. Disposal records
Color issuing containers (each containers should be labeled)
28 1. Issue date and Time
2. Shelve lifetime
Positive and Screen disposal process
1. last 6 month records
29
2. Disposal records
3. Dedicated location for storing
Production report in machines are available and test conducted
1. Carbon test report need to conduct in Heat presses once in every shift (every MC & bed)
30
2. Temperature, pressure and timing need to audit every two hours (every MC every bed)
3. Curing parameters in curing machines (Heat, Belt speed etc)
Expired RM quarantine process (Needles in Embroidery)
31
1. Ink/ consumables
44 Dispatch ready goods area available with documents (ECA,FECA, Packing list)
1. Security officer knows minimum document needed to be there
Special Notes:-
0-33 Failed
34-65 Poor
66-97 Good
>98 Excellent
Date
Emb. Plant Start time
Auditor End time