Bills of Quantity For Road Works
Bills of Quantity For Road Works
Bills of Quantity For Road Works
A Excavate oversite for road formation average m2 4200 3.54 14, 868.00
depth 350 mm deep, commencing from platform
level, get out, part return, fill in and ram and
deposit and spread in making up level where
directed and remainder, load and cart away from
site.
TOTAL 285,474.00
MIKAS CONSULTANT SDN. BHD
Kerb
1 150mm x 300mm high (extreme size) precast
concrete kerb Grade 20 (1:2:4-20mm aggregate) as
specified cast in 610mm length as required and
including 300mm x 150mm (extreme) high
2 opening at 6000mm centres including 2 Nos.
12mm diameter mild steel rod reinforcement as
3 spacer with and including 610mm x 150mm x
75mm thick precast concrete channel slab and
4 jointed in cement and sand mortar (1:3) and setting
on and including 450mm x 325mm high (extreme) m 24.59 6,813.89
thick concrete Grade 15 (1:3:6-38mm aggregate)
277.1
as specified haunch and bed and including all
necessary excavation.
No. 34.42 860.50
EXTRA FOR 610mm x 330mm high drainage 25
slots through 150mm thick kerb for outlet to
230mm diameter earthenware pipe drain
(measured separately).
TOTAL 7,674.39
MIKAS CONSULTANT
SDN. BHD
TOTAL 2,367.38
MIKAS CONSULTANT
SDN. BHD
Labour Cost
1 Provide workers for maintenance of temporary
warning sign and others equipment related to the 3 200.00 600.00
safety to road user for 24 hours (shift 8 hours)
during construction works.
2 21 3 80.00 5,040.00
Skilled workers
3 21 3 55.00 3,465.00
Unskilled workers
TOTAL 24,855.00
COLLECTION PAGE
285,474.00
Page No. BQ/1 ……………………
7,674.39
Page No. BQ/2 ……………………
2,367.38
Page No. BQ/3 ……………………
24,855.00
Page No. BQ/4 ……………………
TOTAL 320,370.77