This specification has been revised as indicated below and described in the revision record on the following
page. Please destroy all previous revisions.
Lead Engineer
Engineering Manager:
Client Approval:
Record of Revisions
Revision Date Description
No.
TABLE OF CONTENTS
1.0 GENERAL
1.1 Summary
A. Scope of Specification
This specification prescribes the design application, drawing presentation and fabrication
details of piping supports, instrument connections and miscellaneous piping details.
B. Related Specifications
C. Terminology
1.2 References
The publications listed below form part of this specification. Each publication shall be the
latest revision and addendum in effect on the date this specification is issued for construction
unless noted otherwise. Except as modified by the requirements specified herein or the details
of the drawings, Work included in this specification shall conform to the applicable provisions
of these publications.
Power and Water Utility Co. for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-P-5009
Project Name Date: 31 Mar 2011
Contract Number Page 5 of 14
Revision 1
A. Approved Marafiq design guidelines and methods are used in compliance with project
requirements.
B. Project piping engineers and piping design supervisors monitor, review and control the
design to ensure that applicable codes, practices and specifications are being followed to
meet project quality goals.
2.0 PRODUCTS
2.1 Materials
B. Welding, weld examination, and weld heat treatment shall be in strict accordance with
Marafiq Welding Specification MQ-SP-P-5029.
C. Carbon steel flats, ASTM-A36, may be substituted for carbon steel plate, ASTM-A36,
without approval. Other substitutions, including thicker wall materials, are not permitted
without written authorization from Marafiq.
D. Galvanized material shall not be used on lines operating above 315 °C (600 °F).
Power and Water Utility Co. for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-P-5009
Project Name Date: 31 Mar 2011
Contract Number Page 6 of 14
Revision 1
2.2 Fabrication
B. Carbon steel components shall be hot dip galvanized in accordance with ASTM-A123,
when furnished separately. Carbon steel components fabricated by a piping shop
fabricator as part of pipe fabrication may be painted in accordance with Marafiq
Mechanical Specification MQ-SP-M-4039 or galvanized.
C. When vendor fabricated, the vendor shall package and tag with respective assembly tag
numbers.
E. U-bolts to be furnished as separate items from individual details unless specifically listed
on bill of material. Marafiq will provide separate take-off quantities for U-bolts.
3.0 EXECUTION
3.1 Responsibility
A. Table 1 lists the level of responsibility between Marafiq Engineering, the Field
Constructor, Shop Spool Fabricator and Vendors with regard to each of the piping
standard details.
Table 1
Level of Responsibility for Piping Standard Details
ID. ITEM PURCH FAB MAT'L INSTAL NOTES
NO. BY BY BY BY
SUPPORTS FOR HOT PIPING
5A ANCHORS E V V F NOTE 1
5ABS ANGLE BASE SUPPORTS E V V F
5BA BASE ANCHORS E V V F NOTE 2
5BS BASE SUPPORTS E V V F
5BSA BASE SUPPORT - E V V F
ADJUSTABLE
5BSL BASE SUPPORT - LINED E V V F
PIPE
5CI CRADLES - ISOLATION E V V F
5CP CONCRETE PADS F F F F
5DA DIRECTIONAL ANCHORS E V V F
5DS DUMMY SUPPORTS E S S S NOTE 4
5FS FIELD SUPPORTS E V V F
5G GUIDES E V V F
5GS GUSSET SUPPORTS E V V F
5HR HANGER RODS E F F F
5IS INSULATION SUPPORT - F V V F NOTE 5
LUG
INSULATION SUPPORT - E V V F
RING
5LPL LOAD PADS E V V F NOTE 5
5PU PICK-UPS E V V F
5RC RISER CLAMPS E V V F
5S SHOES E V V F NOTE 5
5SCL SHOES- CLAMP ON E V V F
5SCLA SHOES CLAMP ON ANCHOR E V V F
5SCLG CLAMP-ON SHOE GUIDE E V V F
5SL SHEAR LUGS - RISER E V V F
CLAMPS
5SPA STIFFENER PLATES F F F F
5SPL SLIDE PLATES F V V F
5ST SUPPORT TRUNNIONS E V S S NOTE 4
5U U-BOLTS E V/P V/P F
Power and Water Utility Co. for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-P-5009
Project Name Date: 31 Mar 2011
Contract Number Page 8 of 14
Revision 1
1. The spool fabrication shop shall provide and attach these to pipe on alloy or heat treated piping.
2. The spool fabrication shop shall provide stubs as indicated on the fabrication detail.
3. The spool fabrication shop shall provide and attach brackets as indicated on the fabrication detail.
4. Fabrication for "Field Fabricated" piping will be by field.
5. The spool fabrication shop shall provide and attach these to pipe on heat treated piping.
6. The insulation subcontractor shall be responsible for installing and banding. The field constructor
shall be responsible for lifting of pipe to facilitate installation.
7. Jack screws are located and installed by shop fabricator on shop fabricated piping.
Power and Water Utility Co. for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-P-5009
Project Name Date: 31 Mar 2011
Contract Number Page 10 of 14
Revision 1
4.0 ATTACHMENTS
Attachment 5A:
Anchors
Attachment 5ABS:
Angle Base Supports
Attachment 5BA:
Base Anchors
Attachment 5BS:
Base Supports
Attachment 5BSA:
Base Support-Adjustable
Attachment 5BSL:
Base Support-Lined Pipe
Attachment 5CI:
Cradles-Isolation
Attachment 5CP:
Concrete Pads
Attachment 5DA:
Directional Anchors
Attachment 5DS:
Dummy Supports
Attachment 5FS:
Field Supports
Attachment 5FST:
Field Support Tees
Power and Water Utility Co. for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-P-5009
Project Name Date: 31 Mar 2011
Contract Number Page 11 of 14
Revision 1
Attachment 5FSX:
Field Supports for Extra Loading
Attachment 5G:
Guides
Attachment 5GS:
Gusset Supports
Attachment 5HD:
Hold Downs
Attachment 5HDS:
Hold Downs-Slotted
Attachment 5HE:
Handwheel Extension
Attachment 5HR:
Hanger Rods
Attachment 5IS:
Insulation Support-Lug and Ring
Attachment 5JS:
Jack Screws
Attachment 5LP:
Load Pads
Attachment 5PU:
Pick-ups
Attachment 5RC:
Riser Clamps
Attachment 5S:
Shoes
Power and Water Utility Co. for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-P-5009
Project Name Date: 31 Mar 2011
Contract Number Page 12 of 14
Revision 1
Attachment 5SCL:
Shoes Clamp On
Attachment 5SCLA:
Shoes Clamp On Anchor
Attachment 5SCLG:
Clamp-On Shoe Guide
Attachment 5SL:
Shear Lugs-Riser Clamps
Attachment 5SPA:
Stiffener Plates
Attachment 5SPC:
Start-up Strainers
Attachment 5SPL:
Slide Plates
Attachment 5ST:
Support Trunnions
Attachment 5STT1:
Runs, Loops, Anchors, &
Insulation Blocks
Attachment 5STT2:
Valves, Flanges & Control Valve
Manifolds
Attachment 5STT3:
Steam Jacketing & Pump Tracing
Attachment 5STT4:
Liquid Level Instruments
Attachment 5STT5:
Steam Tracing Manifolds
Power and Water Utility Co. for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-P-5009
Project Name Date: 31 Mar 2011
Contract Number Page 13 of 14
Revision 1
Attachment 5U:
U-Bolts
Attachment 5UG1:
Underground Water System
Attachment 5UG2:
Drain & Sewer Systems
Attachment 5UHR:
Utility Hose Racks
Attachment 5WL:
Welding Lug
Attachment FE:
Orifice Flange Tap Piping
Attachment LC:
Level Controller Piping
Attachment LG:
Level Glass Piping
Attachment LS:
Level Switch Piping
Attachment PI:
Pressure Connection Piping
Attachment SC:
Sample Connection Piping
Attachment TI:
Temperature Connection Piping
Attachment TR:
Steam Trap Piping
Power and Water Utility Co. for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-P-5009
Project Name Date: 31 Mar 2011
Contract Number Page 14 of 14
Revision 1
Attachment US:
Utility Station Piping
Attachment VD:
Vents and Drains
End of Specification