Manual Komatsu D475 Full 91015 PDF
Manual Komatsu D475 Full 91015 PDF
Manual Komatsu D475 Full 91015 PDF
PSA-D475A-F/L-FULL 9-10-15
HYDRAULIC LADDER + WALKWAYS
Komatsu D475A
CONTENTS
23 5 Assembly Complete
NOTE
Follow all on-site/Mine lifting and safety procedures when installing
Power Step Landings to Dozer.
PROCEDURE
2. Fit the Rear Spreader Beam across the two assemblies in 'i' above per View X and
Detail W.
4. Fit the Side Platform with all its' auxilary components so as to be supported by the
Rear Spreader Beam at the back and the Isolators at the front, per Views Y & Z
and Details U, V & W.
2. Hold/clamp the Carrier Bars, already assembled with the PROP and Isolators to the
Clamp Beams so the PROP is central with the stowed ladder, per Detail Y. Tack
weld the Carrier Bars to the Clamp Beams.
3. Adjust the outer end of the PROP so it engages the ladder between the two top
treads (top in stowed position) by fitting/moving Isolator Spacers. Adjust the position
of the PROP so the ladder bears against it firmly when fully raised, by changing
which boltholes are used for the isolator pins.
4. Fully weld the Carrier Bars to the Clamp Beams, per Detail T.
DETAIL Z
DETAIL Y
DETAIL X
DETAIL W
VIEW U
VIEW Y
VIEW W
VIEW V
VIEW Z
VIEW X
VIEW W
VIEW X
VIEW V
VIEW Y
VIEW T
VIEW Z
VIEW U
DRIVE ARRANGEMENT
NOTE
Follow all on-site/Mine lifting and safety procedures when installing
Power Step Landings to Dozer.
WARNING
Raising the POWER STEP Landing by external means can create a vacuum in the
hydraulic cylinder and create the opportunity to allow air into the hydraulic system,
defeating the inherent safety features of the POWER STEP.
This must be avoided, to maintain safe operation of the POWER STEP.
In instances where the use of external means to raise the landing must be used,
please follow the following instructions:
Loosen hard plumbed hydraulic lines on cylinder side of lock valve on cylinder.
Raise landing by available means.
Note: Make necessary arrangements to collect displaced oil, and be aware that air enters
the piston side of the cylinder as landing is raised.
Lock in raised position.
Re-tighten hydraulic fittings.
SECURE THE LANDING IN THE RAISED POSITION, MECHANICALLY, CHAIN &
TAGOUT THE POWER STEP
WIRING HARNESS 1
Daily
Visually check ladder and structure for damage, loose components,
handrails, etc.
Check for hydraulic oil leaks from hydraulic cylinders, plumbing and hoses.
500 Hours
Grease the nipples on the rotation shaft and sector gears.
Check hydraulic oil level in power pack and top up as necessary. (Ladder in raised
position).
5000 Hours
Change hydraulic oil in tank of hydraulic power pack (5.0 litres)
It is recommended that the same hydraulic oil be used in the power pack as the
hydraulics of the machine.
Grease 4 grease nipples on rotation shaft and sector gears, all of these are
accessible with the ladder lowered, and accessed from under the ladder.
NOTE.
THE RELIEF PRESSURE OF THE POWERPACK IS TO BE SET TO 2800PSI.
IF THE POWERPACK IS REPLACED,THIS RELIEF PRESSURE WILL NEED TO BE
RESET USING INLINE GAUGES.
FAILURE TO DO SO MAY RESULT IN ACCIDENT OR INJURY.
To Raise Ladder
Ascend the ladder onto the landing of the Dozer.
Ensure the area around the ladder is clear of people and standing to the side, clear
of the area the handrails and ladder raises into, operate the electrical switch to the
raise position (up).
Hold the switch in the up position until the ladder is in the fully raised position.
The ladder is now raised and stored.
OPERATING NOTES
When it is adjusted, lock the adjusting knob by tightening the grub screw located on the
side of the knob.
1 PS-21945 PROP 1
2 PS-23622-01 CARRIER BAR 2
3 PS-23622-02 CLAMP BEAM 3
4 PS-23622-03 ISOLATOR SPACER 6
5 PS-40003 BUFFER 4
6 PS-21930A ISOLATOR ASSEMBLY 4
7 CPS-M12X120 BOLT-M12 x 120 4
8 CPS-M12X90ZP BOLT-M12 x 90 6
9 CPS-M12X60ZP BOLT-M12 x 60 4
10 CPS-M12X40ZP BOLT-M12 x 40 8
11 CPS-M12NZP NUT-M12 14
12 CPS-M12NN NUT-NYLOC-M12 6
13 CPSM12WH WASHER-HARDENED-M12 22
0.030” 0.030”
13 29 26 6 5 25
View B View A
10
11
16
9 9A 24 2 8 8A 7 3 3A 30
7A
14 Hoses shown 27
6
dotted
12
28 18
10
16 31
11
17
19
14 12
32
33
View A 24
15
9
23
21
9A
BEACON
20
WORKLIGHT 3PIN
View B
NOTE.
THE RELIEF PRESSURE OF THE POWERPACK IS TO BE SET TO 1500PSI.
IF THE POWERPACK IS REPLACED,THIS RELIEF PRESSURE WILL NEED TO BE
RESET USING INLINE GAUGES.
FAILURE TO DO SO MAY RESULT IN ACCIDENT OR INJURY
5 6 4 2
7 8
WARNING
LOW OR FAULTY BATTERIES WILL VOID
WARRANTY ON THE POWER PACK AND ALL
ELECTRICAL SWITCHES AND COMPONENTS