Site Diary (MEP) : ORANGEBEAM Construction SDN BHD
Site Diary (MEP) : ORANGEBEAM Construction SDN BHD
Site Diary (MEP) : ORANGEBEAM Construction SDN BHD
: OBC/142/PQHSEP/MEP/F001
ORANGEBEAM Construction Sdn Bhd
Effective: 01.04.2019 Page 1 of 1
SUBCON / NSC : YIK LOONG AIR COND SDN BHD Attachment : YES / NO
ACTIVITIES MANPOWER
ITEM LOCATION
(Block, Level & DESCRIPTION SERVICES SK. UNS.
Gridlines)
SITE EVALUATION
MECHANICAL VENTILATION 2
- INSTALL MFD, GRILLE FOR EXHAUST AIR DUCT
REMARKS Total 1 2
AZIM
(Site Supervisor / Manager) (M&E Manager) (Client Representative)
Name : AFIFI Name : ABDUL AZIM Name : TOO CHEE WEI
Date : 24/07/2020 Date : 24/07/2020 Date : 24/07/2020
Project QHSE Plan