Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Site Diary (MEP) : ORANGEBEAM Construction SDN BHD

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

Doc.Ref.

: OBC/142/PQHSEP/MEP/F001
ORANGEBEAM Construction Sdn Bhd
Effective: 01.04.2019 Page 1 of 1

Site Diary (MEP)


PROJECT : PARAMOUNT ATWATER PJ DATE : 24/07/2020

PROJECT REF : OBC/142/ACMV-C DAY : FRIDAY

SUBCON / NSC : YIK LOONG AIR COND SDN BHD Attachment : YES / NO

TRADE : ACMV ( If YES, no of page:_______)

ACTIVITIES MANPOWER

ITEM LOCATION
(Block, Level & DESCRIPTION SERVICES SK. UNS.
Gridlines)

1 GF TNB PPU SITE MONITORING 1

SITE EVALUATION

MECHANICAL VENTILATION 2
- INSTALL MFD, GRILLE FOR EXHAUST AIR DUCT

REMARKS Total 1 2

TIME PLANT / MACHINERY / TIME


NO PLANT / MACHINERY / EQUIPMENT QTY NO QTY
EQUIPMENT
FROM TO FROM TO

WEATHER CONDITION RAIN : From ________ to _________ From ________ to _________


From ________ to _________ From ________ to _________

Prepared by (SUBCON / NSC): Checked by (OBC): Acknowledged by (CLIENT):

AZIM
(Site Supervisor / Manager) (M&E Manager) (Client Representative)
Name : AFIFI Name : ABDUL AZIM Name : TOO CHEE WEI
Date : 24/07/2020 Date : 24/07/2020 Date : 24/07/2020
Project QHSE Plan

You might also like