Method Statement of Lowerin in
Method Statement of Lowerin in
Method Statement of Lowerin in
Contract n°:
………………………………….-SPE-00001
03.03.16 P
P AA G
GE
E 22 OOFF113 0
……………………………………………………….._000_Method of statement
Replacement of 11 kilometers of the Brega- ALSHOLA ALMUDIA & Ezar for Engineering &
Misurata 34” Gas Pipeline Technical Services.
This method statement defines the work involved in excavating and maintaining the
trench for the construction of Replacement of 11 kilometers of the Brega- Misurata 34”
This document shall act as a guide to construction personnel on how to carry out the
The following expressions and derivatives thereof, appearing in capital letters in the
CONTRACT, shall have the meaning hereby assigned to them unless otherwise
specified, it being understood that such expressions appearing small letters shall have
their common meaning as the context requires. The same principle shall apply to
Abreviations Description
The following referenced documents shall apply and shall be read in conjunctions
03.03.16 P AGE 3 OF 13
……………………………………………………….._000_Method of statement
Replacement of 11 kilometers of the Brega- ALSHOLA ALMUDIA & Ezar for Engineering &
Misurata 34” Gas Pipeline Technical Services.
PPE Requirements
Excavation Works Procedure
03.03.16 P AGE 4 OF 13
……………………………………………………….._000_Method of statement
Replacement of 11 kilometers of the Brega- ALSHOLA ALMUDIA & Ezar for Engineering &
Misurata 34” Gas Pipeline Technical Services.
Work shall be performed in accordance with the latest revision of the following
precedence.
Lowering in operations shall be carried out in accordance with the Project Health
& Safety Plan and contract requirements. Before starting the operations, a dedicated
Prior to commencing work all Contractors employees shall have attended a joint safety
Site personnel shall adhere to the site HSSE policies at all times with emphasis on
wearing the correct PPE relevant to the type of operation being performed.
Minimum PPE requirements shall consist of Safety Boots, Ear muff, Ear plug, Safety
Glasses, Safety Helmet, Body / Coverall, Gloves, High visibility Jackets, as per PPE
procedure.
public and any operations carried out adjacent to public access shall be closely
During lowering in operations extreme care shall be taken to ensure that excavations
hazards:
- Cave In Hazards
- Falling Hazards
- Vehicular Traffic
Hazards
- Adjacent Structures
Hazards
4.2. Environmental
Site personnel shall ensure that the site is kept clean and tidy at all times .
Spills and leaks of diesel, hydraulic fluid etc shall be cleaned up immediately using
5.0. RESPONSIBILITIES
Ensuring plant and equipment is in suitable safe working order and certificated
as necessary.
for:
Assistance during the operation of lifting and erection of pipe into the ditch
Plan and prepare for the work and produce daily report.
operations.
for:
Ensure that the bottom of the ditch is clear for any material which can involve
Ensure the housekeeping of the area during the operation to avoid any accidents
03.03.16 P AGE 7 OF 13
……………………………………………………….._000_Method of statement
Replacement of 11 kilometers of the Brega- ALSHOLA ALMUDIA & Ezar for Engineering &
Misurata 34” Gas Pipeline Technical Services.
inspections.
toolbox talks.
6.1. Preliminary
As a first to beginning, the ditch must be free from water loose rocks , stones ,
timbers , welding rods , hard colds and any remaining materials which can be cause of
pipe ‘s damage .
Prior to commencement of lowering in activities, all services shall have been located,
temperature shall not exceed 100 °F to avoid stress for the pipe . Contractor send a
request for notification for inspection to company in order to check the bottom of the
ditch .
The operators run equipments and labors do the manual work ( eg moving skids )
The truck drivers drive the truck that haul skids and fuel tank
The pipe is suspended into the ditch by side boom tractors which are crawler tractors
with special hoisting frame attached to one side and equipped with belt slings
The pipe is gradually lowered to the bottom of the ditch, where rocky soil or solid
rock exist, it’s required to put fine bed or soil under the bottom. Fine materials
03.03.16 P AGE 8 OF 13
……………………………………………………….._000_Method of statement
6.3. PERSONAL AND EQUIPMENT:
LIST OF EQUIPMENT
01 Mechanical truck
LIST OF MANPOWER
01 QA/QC supervisor
01 Mechanical supervisor
02 Team leaders
05 equipment operators
04 labours
01 HSE supervisor
7.0. DOCUMENTATION