Fatigue
• 150 MPa amplitude testing
Locked Coil Cables – Fabrication
Cable length
• Cables need to be fabricated at the exact length in factory
• Cables need to be prestressed to reduce the time dependent deformations
• Remaining creep : about 1,5mm / 10m for large Ø
Coils
• Cable need to be coiled on large diameters ( usually 30x cable diameter)
• Turntables required for uncoiling without torsion for long cable
• Cable cleaning to be allowed for after installation
Locked Coil Cables – Installation
Tensioning
• Hydraulic jacks and transfer beams
• Collar retightening after tension
Locked Coil Cables – Domain of Use
Typical strand
galvanization
wax
HDPE sheath
Parallel Strand System (PSS)
Installation of duct
PSS – H1000 - Sydney Airport
Narellan Road
• 12H1000
• Forks both end
• Fixed on the top
• Adjustable on bottom
PSS – H1000 - Narellan Road
Prefabrication
• Standard product
PSS – H1000 - Narellan Road
Installation
PSS – H1000 - Summary
Modularity
• The number of strands is adjusted to the force in the cable
Flexibility
• The number of strands is adjusted to the force in the cable
Durability
• The double nested corrosion protection barrier + outstanding fatigue performance
Many colors
Aesthetic Compact
Larger diameter