1 2 3 4 5 6 7 8 9 10 11 12

OTHER GENERATION PROJECTS


Luano-Mansa 330kV Line a. Malubila Falls 350kW Hydro Power Potential Site located on the Malubila River in Mpika
Pensulo-Kasama 330kV
District

PHASE I (2013-2014) 700MVA


ZMW TBA
OPs: TBA
Line
382Km
700MVA
b. Mwambwa Falls 1.2MW mini Hydro Power Potential Site located on Mwambwa River in
Mpika District.
A
ZMW 890.4 Million TANZANIA Zambia-Tanzania-Kenya c. Musalango Falls 350kW Hydro Power Potential Site located on the Musalango River in

PHASE II (2015-2016) REA funded Lengwe Rural


OPs: 2014

Lake
TO
SUMBUWANGA Interconnector project
ZMW 492.9Million
OPs: TBA
Mpika District.

OTHER TRANSMISSION PROJECTS


Electrification Project PWETO KAPUTA Tanganyika

Kapisya
NSUMBU KASABA BAY a. Reactive power compensating project 66-330kv grid at a cost to be advised at feasibility

PHASE III (2017-2019)


CHIENGI Lake Mweru NKAMBA BAY
MWERU WANTIPA Geothermal
PUTA NATIONAL
PARK No. 5
Wantipa
Scheme NSUMBU study
Mumbwa-Kalumbila 330kV 2MW
NATIONAL
PARK No. 6
Lake Mweru Nsama ZMW 66.3 Million MPULUNGU MBEYA
b. Replacement of obsolete 330kV circuit breakers at Luano, Kabwe and Pensulo at ZMW
Line OPs: 2015 new scheme MBALA
2x700MWA 1MW Mini Hydro 37.1Million

REA
Power Potential Site
KALUNGWISHI 247MW SCHEME
ZMW 250 Million LUFUBU
Lunzua Scheme
on Nyinaluzi river
REA funded Nyela Rural c. Replacement of obsolete 88kV circuit breakers at Mpongwe East and West, Mukumpu,
14.8MW
OPs: 2014 KASHIKISHI Kundabwika
ZMW 275 Million
TUNDUMA
Electrification Project Kabwe Step-down and Kabwe Town Substation, cost at ZMW 1.06 Million
MPOROKOSO NAKONDE
NCHELENGE OPs: 2014
LUSENGA
PLAIN
Kabwelume d. Replacement of the old 120MVA Transformer at Kitwe and Luano Substation at a cost of B
NATIONAL

TBA
PARK No. 7 Kalebula

To
Makasa
Kayambi Mission
ZWM 116.6 Million
Chilambwe Falls Mbala
MBERESHI KAWAMBWA Station
Zambia-Congo DR KAWAMBWA e. Improvement of system voltage using compesation equipment at major bulk supply points.

Existing 66kV Line


TOWN HPP sites
TEA Tee-off

330kV Regional MWANSABOBWE


LUKULU
FARM BLOCK
interconnector REA funded Laurent Chita
KARONGA

R
To Chambishi East-150 MVAr capacity

E
Kasama
Connection of Lundazi &

RIV
700MVA Rural IPUSUKILO ISOKA
DEMOCRATIC REPUBLIC KASAMA Malole

I
SH
Chishimba Falls
Chama to the National Grid Lumwana -25 MVAr capacity bank
ZMW 339.2Mn

BE
Electrification Project (15MW)

AM
315Km Kansanshi -10 MVAr and 15MVAr capacity
OF CONGO
MWENSE ZMW 243.8 Million
OPs: TBA NYIKA

CH
Mambilima LUWINGU
CHAMBASITU OPs: TBA NATIONAL
124 MW (Site 1) CHINSALI PARK No. 12
132kV At a cost of ZMW 100.7Mn
Kisenga REA funded Mushindano 202 MW (Site 2)
372 MW (Site 5) Shiwang'andu Mini Hydro MUYOMBE
86MVA
Rural Electrification CHIPILI Power Station f. Restoration of the Northern 66kV system and improvement of quality of supply at a cost of
Kasaba 1MW SHIWANG'ANDU MAFINGA ZMW 333.9 Million
KOLWEZI Musonda Falls Namundela Falls 4MW Hydro
Power Potential site (Lower
OPs: 2014
ZMW 7.42Mn
LIKASI Matipa g. Rehabilatation of substation buildings in 66kV Northern system at ZMW 36Mn
11
10MW Shiwangandu)
C
ZMW 174.9 Million Lake
ISANGANO
NATIONAL
RUMPI h. Extension of the SCADA monitoring to other Copperbelt towns at ZMW 31.8Mn by 2014
PARK No. 8 Katibunga 80kW Micro CHAMA
MANSA Bangweulu
IKELENGE
OPs: TBA Chilubi Island Hydro Power Potential
Site on Isase River
i. Upgrade of National Control Centre network Manager at a cost of ZMW 13.25Mn by 2013
Mujila Mini Luano Substation SAMFYA j. Substation Control system for 330kV main Substation at Leopards Hill, Kitwe, Kabwe,
Hydro Scheme

MWINILUNGA
Transformer LUNGA
MZUZU Kafue West and Luano substations at a cost of ZMW 7.95Mn by 2014
Connection of Northwestern LUBUMBASHI
Upgrade k. Improvement of protection and control relays at various substations and on lines at a cost of
Kapamba Falls 12MW
Province ER
IR
IV West Lunga 2x315MVA Mini Hydro Power
E Z MILAMBO NORTH LUANGWA
NATIONAL PARK No.Potential Site ZMW 10.6Mn by end of 2013
to National Grid ZA
M
B at West Lunga River
(3MW)
320/220 KV CHEMBE
MPIKA
Mutinondo - 40MW
2

MZIMBA
KANSANSHI
884km MICHELO OPs: 2013
SOLWEZI LUKULU OTHER DISTRIBUTION PROJECTS

LU
132KV Mombotuta

AP
KASUMBALESA
Luchenene - 30MW Lundazi River

U
Kabompo 490 MW Northern Division Division - Ndola

LA
2MW R Gorge
MALAWI

RI
VE

VE
RI

ER
MILENGE LAVYUSHI MANDA LUNDAZI
ZMW 742 Million (34MW)

R
PO

RIV
MUTANDA NATIONAL
M LUMWANA MOKAMBO PARK No. 9 a. Replacement of 11kV metalclad switchgear
O
REA funded

A
MUFULIRA
OPs: 2014 AB LUANO LUAMBE
b. Establishment of Dola Hill Substation

GW
K KALUMBILA (Mine) KASANKA
NATIONAL
NATIONAL
MWASE
D
PARK NO. 4
PARK No. 10

AN
KANSUSWA
330/132kV CHINGOLA Milenge Rural SOUTH LUANGWA
NATIONAL PARK NO. 1

LU
Copperbelt Division
ANGOLA
KAWAMA
S/S
KALULUSHI Electrification
CHAMBISHI KITWE LUKUSUZI NATIONAL
WEST LUNGA
NATIONAL EAST NDOLA
PENSULO
PARK NO. 3
a. Reinforcement of supply at 66/11kV substation
PARK NO. 14

MAPOSA
Lusiwasi Upper
MFUWE
b. 66kV transmission line from chambashi to mwambashi and scaw
MUFUMBWE 15MW
CHAVUMA CHIPULUKUSU
ZMW 249.1Million
KASUNGU c. Replacement of metalclad switchgear at Parklands substation
BWANA MKUBWA
Maimwene NSELAUKE LUANSHYA
SERENJE
CHITAMBO
OPs: 2015 MWASEPHANGWE
d. Replacement of metalclad switchgear at Parklands substation
MANYIMA 132/66kV
REA funded Maimwene Chikata Fall S/S REA funded St. Margaret
MPONGWE Lusaka West
rural electrification project (3.5MW)
KASEMPA LusiwasI Lower Rural Electrification
ZAMBEZI KABOMPO
MKUSHI
86MW Scheme
ZMW 868.7 Million
CHIPATA Project a. New 33/11kV substation at chalala
132/33kV MKUSHI OPs: 2017 MSORO
b. New 33/11kV substation at St. Bonaventure
S/S KAPIRI CENTRAL c. Reinforcement at 33/11kV Kabulonga
Mumbwa-Lusaka 330kV MUMBEJI MPOSHI MCHINJI d. Upgrade of 33kV/11kV Switchgear at Liverpool 33/11kV Substation
MKUSHI
Line FARM BLOCK e. Establish Roma 11kV Substation
MITETE
f. Reinforcement at 33/11kV substation Makeni, Chelstone, Matero & L85
LILONGWE
AZELE VUBWI
151km KATETE g. 132kV Lusaka Ring Project E
CHADIZA
330KV h. Upgrade of 33kV switchgear at Lusaka West
PETAUKE
700MVA 132/66kV
KABWE Lunsemfwa
SINDA
i. Uprating of 11kV U/G cables
S/S R j. Reinforcement of 11kV U/G cables

R
OPs: 2014 IVE OLD MKUSHI

IVE
TOWN (18MW)
LUWA PLAIN KAFUE NATIONAL PARK NO. 11
UE
R
(LUANO) REA funded k. Reinforcement of 33kV OHL

AR
NATIONAL
F
PARK NO. 15 LUKULU KA MUNKONSHI NYIMBA
Kagolo Rural

GW
KABWE l. Relocate and upgrade Kanyama 33/11kV substation

AN
MANGANGO STEP DOWN
KAOMA MAKULULU Mulungushi
Electrification m. Upgrade Coventry Street Substation

LU
Itezhi-Tezhi -Mumbwa NKENYEMA
shibuyunji (20MW) Mr. Lungu's-Muchimanzi
Proposed Small Hydro n. Lusaka Transmission and Distribution Rehab. Project (LTDRP) US$250m
220kV Line KEEMBE
chisamba Scheme Pensulo-Lusiwasi-Msoro-
SIKONGO MUMBWA
142km LIMULUNGA FIGTREE
RUFUNSA
Improvement of Chipata 330kV Line
Luampa
560MVA KALABO Maimwene
LUSAKA WEST ROMA Kabwe-Kapiri power 285Km ZESCO GRID-33kV to 330kV
2MW MONGU BLUE LAGOON
Water Works CHONGWE
Mpanshya
132/33kV
S/S
transfer capacity 700MVA TETE INCORPORATING TRANSMISSION PROJECTS
ZMW 704.9 Million ZMW 21.2 Million
Matambo s/s
NATIONAL CHITOPE

Nanjucha
NAMPUNDWE
PARK NO. 18

COVENTRY
Chongwe
LEOPARDS LOWER ZAMBEZI
NATIONAL PARK NO. 19
ZMW 879.8 Million Scale

OPs: 2014 Itezhi-Tezhi 120MW HPP AFUE R


IVER Mapepe HILL 330/33kV S/S at
LUANGWA
ZUMBO OPs: 2013 OPs: 2014 ZESCO
Miles 10 0 10 20 30 40 50 60 70 80 90 100 Miles

MOZAMBIQUE
KAFUE KAFUE
Lsk South MFEZ
Kilometres 15 10 5 0 15 30 45 60 75 90 105 120 135 150 165 Kilometres
ZMW 1.261Bn WEST TOWN
CHINGOLA EXISTING P/STATIONS,S/STATIONS & LINES PROPOSED P/STATIONS,S/STATIONS & LINES
NALOLO OPs: 2015 NAMWALA MAALA Cabora Bassa F
PARK NO. 13

Dam 803
LOCHINVAR

Kafue Gorge 330kV 330kV


Mbeza CHINSALI 1373 979
REA funded Nanjucha MAZABUKA Kafue Gorge Lower (990MW) KGL -Lusaka West Zesco funded reinforcement

Za
ZAMBEZI

Rural Electrification LOCHINVAR Chikankata


and KGL-MFEZ of supply at Chisamba
Tedzeni 90 CHIPATA 709 841 546 220kV
132kV
220kV
132kV

mb
MAGOYE CHIRUNDU CHIRUNDU 308 863 1089 694
88kV 88kV
330KV Lines and Figtree substation
RIVER

CHOMA 422 274 707 667 272


SENANGA

ezi
66kV 66kV

REA funded Mbeza SHANGOMBO Nangweshi


MONZE
Kariba North
Extension Siavonga 2x55Km OPs: 2014 KABWE 182 240 92 613 849 454

Kariba North KAFUE 250 68 490 342 775 599 204

Rural Electrification CHISEKESI


(360MW) (720MW) 2x700MVA Zesco funded chongwe KAPIRI MPOSHI 644 894 712 1134 986 1420 377 576 HYDRO PROPOPOSED HYDRO
ZMW 2.22Billion Muntanga POWER STATION POWER STATION
OPs: 2014 ZMW 243.8Million reinforcement project KASAMA 1343 699 537 631 777 629 88 1298 903 Provincial PROPOSED
PEMBA SUBSTATION
Western Power
GWEMBE
KARIBA SOUTH OPs: 2017 OPs: 2013 KATETE 1222 346 523 773 591 1013 865 1298 723 404
Boundary SUBSTATION

40MW Proposed Hydro MUNYUMBWE Main Road PROPOSED


KAWAMBWA 386 851 796 152 402 220 642 494 927 751 52 DIESEL STATION
Sioma Scheme MULOBEZI CHOMA DIESEL STATION
CHIPEPO
Lake
Zesco funded upgrade KITWE 290 661 561 782 138 112 70 325 204 637 737 342
SOLAR MINI GRID
ZIZABONA 330kV Line of Mapepe 88/33kV
LANDLESS CORNER 540 830 1201 965 1322 678 428 610 188 496 1041 1277 882 PROPOSED

Kariba KNBE -Kafue 330kV Line NATIONAL PARKS


700MVA KALOMO
MUZUMA
LIVINGSTONE 803 263 50 434 824 769 125 375 193 615 467 900 724 102 NEW DISTRICT - NOT ELECTRIFIED
132Km Substation LUANSHYA 1086 1227 823 1113 1484 274 1605 961 799 893 1039 891 186 1560 1165
231Km SIOMA
Maamba - Muzuma 330kV
MUCHINGA ESCAPMENT
NATIONAL
SINAZONGWE
330kV OPs: TBA LUNDAZI 754 331 472 68 358 729 493 850 206 44 138 234 136 569 805 410 NEW DISTRICT - ELECTRIFIED BY ZESCO
G
ZMW 1.2 Million PARK NO. 16
ZIMBA
Kafue Town - Muzuma-V/Falls
Line
SESHEKE 231KM 700MVA LUSAKA 745 1500 450 1217 677 401 190 1231 159 539 789 607 1029 881 1314 536 420
NEW DISTRICT - ELECTRIFIED BY REA
LAKES
OPs: 2015 700MVA MAAMBA EMCO
56Km LUWINGU 1066 321 1076 652 283 389 679 1056 814 1172 527 277 459 84 345 890 1126 731
KATIMA MULILO ZMW 1.2vBillion ZMW 325.95Million MAAMBA 882 184 561 1316 267 1033 493 217 168 1054 340 355 605 423 845 697 1130 725 236 INCREASED ACCESS TO ELECTRICITY PROJECTS
(ZAMBIA)
MWANDI OPs: 2015 MCL
2x700MVA OPs: 2014 MANSA 686 196 870 125 880 456 347 196 483 854 816 975 331 81 263 159 148 694 930 535

KATIMA MULILO ZAMBEZI


LIVINGSTONE
LIVINGSTONE
S/S ZMW 164Million MAZABUKA 1142 507 1338 326 1016 1772 774 1789 949 964 366 1510 167 812 1061 879 13011153 1586 544 743

OPs: 2016
ZIMBABWE
RWANDA MBALA 1598 706 1142 902 1326 581 1336 912 525 649 939 1310 1074 1431 787 625 719 865 717 1150 1386 991
KASANE

NAMIBIA
BURUNDI
Vicfalls(Zim) MPIKA 1120 378 764 559 960 370 639 1394 558 1111 571 585 557 1132 211 433 683 501 923 775 1207 166 637
Victoria Falls INDIAN
BOTSWANA Devils Gorge D R CONGO MPOROKOSO 371 1447 228 99 307 1187 197 866 1621 573 1338 799 523 138 1352 160 661 910 730 11501002 1435 537 542
(NAMIBIA) 108MW Batoka Gorge
800MW HPP (800MW) ATLANTIC TANZANIA
MUFULIRA 481 673 966 682 512 175 706 359 385 1140 92 857 317 42 343 878 515 180 429 247 669 521 954 779 61
Vicfalls
Town S/S
ZMW 15.9 Billion Kafue Town - OCEAN OCEAN
MUMBWA 432 1017 686 437 1064 276 608 472 896 151 906 378 623 115 405 776 644 897 253 195 185 435 287 720 852 457
OPs: 2020
Muzuma-V/Falls 330kV

MALA
Kafue ANGOLA
ZAMBIA
MWINILUNGA 906 510 990 1086 785 1192 984 684 1180 868 859 1614 551 1331 791 501 859 1352 1042 653 903 21 1143 995 1428 1252 449

Line

WI
NAKONDE 1461 1061 988 418 375 1595 195 1139 583 1335 402 1014 1786 946 961 589 1507 243 808 1058 876 1298 1150 1583 541 1012 923 559
Lusaka Transmission/ Gorge
348Km

UE
NDOLA 923 559 368 65 547 548 902 747 446 240 642 424 321 1076 32 793 253 58 408 814 759 115 365 183 605 457 890 714 110
Distribution Project Lower

Q
BI
HWANGE 920+600 ZIMBABWE

M
RUFUNSA 483 1176 1021 313 547 1028 802 743 1179 287 723 483 907 162 593 493 634 230 520 891 331 1013 368 207 300 446 298 407 967 572
330kV

ZA
NAMIBIA

O
- 132kV Line (750MW)

M
SESHEKE 824 983 1676 1038 813 10471528 1301 335 1679 537 1221 473 1407 662 1417 993 190 730 1020 1391 1155 1512 868 618 800 378 686 1231 1467 1072
BOTSWANA

US$250Million ZMW 10.6 700MVA SOLWEZI 951 754 283 1184 276 360 234 715 810 604 916 708 409 904 590 583 1338 279 1055 515 255 574 1076 746 377 627 445 867 717 1152 966 174 H
Billion ZMW 530 Million SWAZILAND
ZAMBEZI 515 788 931 716 1618 396 625 694 1175 1243 538 1376 894 869 1090 1058 769 1524 708 1063 837 658 1037 1262 1209 810 813 878 1053 905 1338 1409 688

OPs: 2019 OPs: 2015 SOUTH AFRICA


LESOTHO
SHOWING
ZAMBIA DISTANCE TABLE IN KILOMETRES
OF ZAMBIA

Project Name: Drawing Title: Scale: Sheet/Sheets


ZESCO
Bar_scale
GREAT EAST ROAD
GENERATION, TRANSMISSION AND ZESCO GRID (66-330kV) incorporating Projects
P.O.BOX 33304
DISTRIBUTION PROJECTS Drawing No. Rev.
LUSAKA ZAMBIA
C-13296 a
TEL: 361111