Saudi Aramco Test Report: Pressure Test Report (Valve Inspection & Field Testing) 24-Jul-18
Saudi Aramco Test Report: Pressure Test Report (Valve Inspection & Field Testing) 24-Jul-18
Saudi Aramco Test Report: Pressure Test Report (Valve Inspection & Field Testing) 24-Jul-18
00 30-Jun-18
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Pressure Test Report (Valve Inspection & Field Testing) SATR-A-2001-V 24-Jul-18
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION TEST SYSTEM No./Test Pack No. PLANT NO.
DRAWING NUMBER (P&ID/ISO) / REV. No. PRESSURE TEST DIAGRAM NATURE OF TEST WORK PERMIT REQD?
SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME LOCATION OF TEST (PLANT NAME & NO.)
SAUDI ARAMCO TIP (SATIP) NUMBER SATIP Activity No. TEST IN ACCORDANCE WITH: a) Procedure No. b) Supporting SAIC No.
Trim Details: Body Seat Surface Material: Closure Member Surface Material:
Valve Seat Type: Resilient Seated / Metal Seated Seat Leakage Permitted (API 598 Table-5):
Service Fluid (Water Quality Cert #): Test Results:
Receiving Inspection Results: Accepted: Rejected* :
*Rejection Details:
Repair Disposition :
Repair Witness: Repair Date:
Repair Accepted (Attached Report /EDR ):
Preservation after Testing: State type
Preservation Check Date/Notes):
Pressure Gages/Recorder Temp Gage/Recorder Relief Valve
Test Instruments
PG- PG- PG- PG- PR- TG- TR- RV #
Serial No/Tag No.
Make
Range
Certificate No.
Date Calibrated
Set Pressure
Re-Cal Due Date
ITEM Description of Test Parameters Actual Pass Fail Remarks
No. (Complete Applicable Data Entry Prior to Test)
Test Medium Type/Quality (Indicate method of treatment if req'd in
A Remarks, i.e., Fluid type, ph, SRB count, O2 Scavenger, etc).
B SystemTemperature at test:
Valve Body: ______________
C Test Pressure: Test Duration:______________
Other ( ): ____________
F Test Pressure: Test Duration:______________
REMARKS:
Contractor / Third-Party Saudi Aramco
Construction Representative PMT Representative
Test is ready for inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Title, Department, Name, Initials and
Company, Initials and Date: Date:
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION TEST SYSTEM No./Test Pack No. PLANT NO.
DRAWING NUMBER (P&ID/ISO) / REV. No. PRESSURE TEST DIAGRAM NATURE OF TEST WORK PERMIT REQD?
SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME LOCATION OF TEST (PLANT NAME & NO.)
SAUDI ARAMCO TIP (SATIP) NUMBER SATIP Activity No. TEST IN ACCORDANCE WITH: a) Procedure No. b) Supporting SAIC No.
24-Jul-18
24-Jul-18