Part - A 10 X 2 20 Marks Answer All Questions
Part - A 10 X 2 20 Marks Answer All Questions
Part - A 10 X 2 20 Marks Answer All Questions
1. Mention the key production system characteristics that dictate what type of overall production
approach is most appropriate for any type of product?
2. What are the typical intermediate products for a GT-based shipbuilding approach?
3. Mention the key shops in shipyard layout
4. Draw and mention about friction stir welding
5. Draw and mention various Shipyard Steel Shops
6. What are the typical intermediate products for a GT-based shipbuilding approach?
Unit 2
1. Explain briefly about optical lofting and its requirements
2. What are the steps to carry before prepainting of stockyard steel plate?
3. How shell plate development is carried out by lofts man
4. Brief about different types of shot blasting
5. Explain briefly about compute lofting and its requirements
6. Brief about different types of shot blasting
Unit 3
1. Describe briefly about photo electric and NC controlled devices
2. Describe briefly about plasma cutting
3. What are the steps to carry before pre-painting of stockyard steel plate
4. How steel are stored in shipyard
5. Describe briefly about photo electric and NC controlled devices
6. What are methods of cold forming
Unit 4
1. Describe briefly about welding procedure of ship structure
2. Draw and mention preassembly of double bottom sections
3. Describe briefly about oxygen cutting
4. How photo electric and NC control machines are used in shipyard
5. Write the various uses of robotics in shipyard
6. Draw and mention the use of bilge keel structure
Unit 5
1. What are the methods of quality control in welding process?
2. What are the advantages and disadvantages of preassembly of blocks?
3. Draw and mention side tanks and its bracket
4. Describe briefly about pillar construction in ships
5. Describe briefly about watertight doors
6. Draw and brief about electro slag welding
Part - B 5 X 16 = 80 Marks
Unit 1
1. Describe the principle of flowlines production in shipbuilding mechanism.
2. Explain various layouts of shipyard,area,labour and coastline.
3. Describe the ship production strategies used for Ship building
4. Explain the Relations of shipyard with its various supply industry
Unit 2
Unit 3
Unit 4
1. Describe the prefabrication Sub-assemblies of built up T -bars, web frames and flat sections
2. Describe the preassembly of double bottom sections & side tank units and its welding process
3. Explain about transverse & longitudinal framing with neat sketch.
4. Draw and explain general cargo ship midship section.
Unit 5