Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Section at X-X: Elevation of Pier in Long. Direction (F-F) Details of Pier in Transverse Direction (E-E)

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

BAR BENDING SCHEDULE OF PIER FOUNDATION

Dia. Length Unit Wt.


S.N. Weight (Kg)
4600 Sketch (mm) Nos. (m) (Kg/m)
8000 1000 9800 1000
1000 9800 1000
1000 9800 1000
1000 9800 1000
1900
STIRRUPS

1000
100 100

50d 9800
9800

1000
50d
Total Per Pier Foundation

BAR BENDING SCHEDULE OF PIER STEM


Dia. Length Unit Wt.
S.N. Weight(kg.)
Sketch (mm) Nos. (m) (Kg/m)
x x 9900
P7A 600
4,645.926

7800
P7B 600

P7C 6000
600

6300
500
P8A 8170

500
P8B 7850

Total Per Pier Stem


3700 2600 3700
3700
BAR BENDING SCHEDULE OF PIER CAP
Dia. Length Unit Wt.
S.No. Weight (Kg)
Sketch
(mm) Nos. (m) (Kg/m)
400 7900 400
400 3900 400
400 400
2840 2840
2500

1800
400 400
Varies Varies
0-2840 7900-2500 0-2840
400 400
1340 2500 1340
400 400
Varies Varies
0-1340 4400-2500 0-1340
10000 4350
10000 6 Legs
Avg H= 900 - 1900
DETAILS OF PIER IN TRANSVERSE DIRECTION(E-E) ELEVATION OF PIER IN LONG. DIRECTION(F-F) 4350
6 Legs
H=1900

7900

4350
200 7900

4400
200

Total Per Pier Cap


5000

NOTES: Bar Bending Schedule of Pedestral & Stopper


1. SINCE THERE IS LARGE QUANTITY OF Bar
S.N. Mark Shape
Diameter, Length,
mm m
Nos. Unit Weight,
Wt,kg/m kg
REINFORCEMENT SO TWO LAYERS
4500
2600

2950

1120
1930
1 S1 1080 12 4.88 10 0.889 43.38
2600 OF REINFORCEMENT ARE PROVIDED 750
80 80
2. P7A REINFORCEMENT ARE PROVIDED 2 S2
0-700 700
10 3.06 9 0.617 16.99
10 3.76 11 0.617 25.52
IN OUTER SURFACE 1100 1100
3 PB1 650 1100 650 12 3.0 16 0.889 42.67
3. P7B AND P7C ARE PROVIDED IN 300 300

INNER LAYER ALTERNATIVELY 4 PB2 10 31.2 4 0.617 77.00

8000 205.56
Total
SECTION AT X-X PIER CAP TOP PLAN
Final Report on Detailed Consultants: Scale
Government of Nepal SUBMISSION APPROVAL SHEET TITLE: Dwg. No:
Ministry of Physical Infrastructure and Transport Feasibility Study,Detailed Engineering Engineering Survey and Fuji International Design Associates (FIDA) JV CIDEF Department of Roads
Survey,Soil Investigation & Design of Hydrological Study, Soil DESIGNED BY:
Department of Roads New Baneshwor, Kathmandu CKB/PR/02
Bridge Branch
Chumling Khola Bridge Investigation and Design Tel:- 01-4781863 CHECKED BY: PIER DETAIL
Makawanpur Contract No:- Fax:- +977-1-4781863 Date: JULY 2016
Babarmahal, Kathmandu BP-159-DSD-20-071/72 Email:- fidanepal@yahoo.com APPROVED BY: Sheet No : 08

You might also like