Section at X-X: Elevation of Pier in Long. Direction (F-F) Details of Pier in Transverse Direction (E-E)
Section at X-X: Elevation of Pier in Long. Direction (F-F) Details of Pier in Transverse Direction (E-E)
Section at X-X: Elevation of Pier in Long. Direction (F-F) Details of Pier in Transverse Direction (E-E)
1000
100 100
50d 9800
9800
1000
50d
Total Per Pier Foundation
7800
P7B 600
P7C 6000
600
6300
500
P8A 8170
500
P8B 7850
1800
400 400
Varies Varies
0-2840 7900-2500 0-2840
400 400
1340 2500 1340
400 400
Varies Varies
0-1340 4400-2500 0-1340
10000 4350
10000 6 Legs
Avg H= 900 - 1900
DETAILS OF PIER IN TRANSVERSE DIRECTION(E-E) ELEVATION OF PIER IN LONG. DIRECTION(F-F) 4350
6 Legs
H=1900
7900
4350
200 7900
4400
200
2950
1120
1930
1 S1 1080 12 4.88 10 0.889 43.38
2600 OF REINFORCEMENT ARE PROVIDED 750
80 80
2. P7A REINFORCEMENT ARE PROVIDED 2 S2
0-700 700
10 3.06 9 0.617 16.99
10 3.76 11 0.617 25.52
IN OUTER SURFACE 1100 1100
3 PB1 650 1100 650 12 3.0 16 0.889 42.67
3. P7B AND P7C ARE PROVIDED IN 300 300
8000 205.56
Total
SECTION AT X-X PIER CAP TOP PLAN
Final Report on Detailed Consultants: Scale
Government of Nepal SUBMISSION APPROVAL SHEET TITLE: Dwg. No:
Ministry of Physical Infrastructure and Transport Feasibility Study,Detailed Engineering Engineering Survey and Fuji International Design Associates (FIDA) JV CIDEF Department of Roads
Survey,Soil Investigation & Design of Hydrological Study, Soil DESIGNED BY:
Department of Roads New Baneshwor, Kathmandu CKB/PR/02
Bridge Branch
Chumling Khola Bridge Investigation and Design Tel:- 01-4781863 CHECKED BY: PIER DETAIL
Makawanpur Contract No:- Fax:- +977-1-4781863 Date: JULY 2016
Babarmahal, Kathmandu BP-159-DSD-20-071/72 Email:- fidanepal@yahoo.com APPROVED BY: Sheet No : 08