ADT REPORT

DEPTH(ft) 10320 DATE 06-Nov-05 TIME REPORT 4 % GAS IN AIR : 1% =50 UNITS
TVD (ft) 10320 6:00
OPERATOR : Pakistan Oilfields Ltd WELL : PINDORI-6 ST-1 B.G % MAX % TRIP % DEPTH ft
OPERATION: POOH with Mill Assembly Contract : SDS RIG-23
ADT ENGG : Mushtaq / Shabbir DAYS FROM SPUD : 416
Lag in(Stks) 1888 AVG ROP 2.54 Mdc Exp: 0.85-1.21
Lag out(Stks) 5317 PROGES 15.0 24 hr Bit Hr 5.9
BIT DATA TYPE SIZE JETS Hrs DEP. OUT DRILLED ROP WOB RPM Rev K
Bit #2/REED EHP51H 8.500 3x18 5.9 10355 18.0 3.05 10-25 75-103 31k

MUD DATA / TYPE : Gel-Lignosulfonate FLOW LINE TEMP. 145º F


WEIGHT 16.8 PH 9.8 SAND Tr REDUCED PUMP RATE: @
VISCOSITY 54 FILTRATE 8.6 Water % 66 SPM P-1 P-2
PV 32 CAKE 2 Oil % 30
YP 20 Ca ppm 200 SOLIDS% 34 40
GELS 0\10 MIN 8/10 CHLORIDE 3000 ECD 17.19 50
PUMP DATA SIZE B/CYCLE CYC/MIN G/MIN PRESS. .
NO. 1 G-D PZ-11 6.0"X11" 0.0933 52 407 2750 Survey @
NO. 2 G-D PZ-12 6.0"X11" 0.0933 52
ANNULUS CS/ H I.D DP/DC O.D. ANN. VOL. LENGTH TOTAL VOL. CRIT.VEL. ANN. VEL. FLOW P. DROP
IN IN BBL/FT FT BBL FT/MIN FT/MIN L/T PSI
9.625"CSG 5"DP 8.681 5.00 0.0489 9542 466.6 255 198 Lam 204.59
9.625"CSG 5" HWDP 8.681 5.00 0.0489 267 13.1 255 198 Lam 5.72
9.625" CSG 6.5" DC 8.681 6.50 0.0321 491 15.8 336 302 Lam 34.10
8 ½" OH 6.5" DC 8.500 6.50 0.0291 20 0.6 352 333 Lam 1.72
0.0000 0.0 #DIV/0! #DIV/0! ) #DIV/0!
0.0000 0.0 #DIV/0! #DIV/0! ) #DIV/0!
0.0000 0.0 #DIV/0! #DIV/0! ) #DIV/0!
3000.0000 10320 496 Total BBLS

DRILL STRING DP/DC I.D LENGTH CAPACITY VOLUME DISPLAC. P. DROP


IN FT BBL/FT BBL BBL/FT PSI PRESSURE DROP PSI
5.00 DP 4.276 9542 0.0178 169.4 0.0065 724 SURFACE EQUIP. 139
5.00 HWDP 3.187 267 0.0099 2.6 0.0144 83 DRILL STRING 1069
6.50 DC 2.870 511 0.0080 4.1 0.0330 263 BIT 46.19
BIT JET % 1.7
ANNULUS 210.3
10320 176.1 Total BBLS JET VEL. F/SEC 55
ESTIMATED FRACTURE PRESS@SHOE. 18.8 ppg EMW AT FT BIT PWR HP 11
ESTIMATED PORE PRESS 16.6 ppg EMW 8908 PSI TD BIT PWR/IN2 0.19
HYDROSTATIC PRESS. 9016 PSI OVERB. 107 PSI IMP FORCE LBS 197
SURGE/SWAB PRESSURE At Bit AT SEC/STD IMP FORCE/IN2 3.5
NOZZLE AREA IN2 2.3571
PUMP HP 654
MUD MOTOR PSI 1180
ACTIVITY AND REMARKS CALC. PRESSURE 2645
Continue increase mud weight to 16.8 ppg and homogenise mud weight in / out. Start cut window in 9 5/8' casing from 10287 ft to 10300 ft.
Drilled 5 ft formation from 10300 ft to 10305 ft. Polish top of window to bottom of window several times without rotation and circulation.
Pumped 25 bbls Hi-Vis pill and circulated out. Flow check ok, pump slug and POOH. Laid down 5' DP from 10305 ft to 9614 ft. Continue
POOH from 9614 ft to to surface, Lay down Mill assembly in progress.

*** Note :- No Mud Loss during last 24 Hrs