SCHEDULE - B
(See Clause 2.1)
DEVELOPMENT OF THE PROJECT HIGHWAY
The Project Highway shall be designed and constructed in conformity with the
Specifications and Standards specified in Annex-I of Schedule-D.
Annex - I
(Schedule-B)
1.1 The Site of the Project Highway comprises section of NH-753(M) and
(principally declared highway) 753H Package II – Dhad to Bhokardan to Sillod
from existing Km 28+000 (Dhad) to Km 67+600 Bhokardan Town junction
Meeting SH 178 at its Chainage of 12/500 on road from Sillod to Jalna. Total
Project Length is 54.50Km. The land, carriageway and structures comprising
the Site are described below. The project highway Two Lane with Paved
Shoulders shall be constructed as per Schedule D.
The Project Highway shall follow the existing alignment unless otherwise
specified by the Authority and shown in the alignment plans specified in Annex
III of Schedule-A. Geometric deficiencies, if any, in the existing horizontal
and vertical profiles shall be corrected as per the prescribed Manual
standards for plain/rolling terrain to the extent land is available. Any
consequent shift of the centerline of this alignment within the existing ROW
shall be incidental to work and shall not be considered as change of scope.
1.2.1 Two Lane with paved shoulder: - Two-Laning with paved shoulders shall
be constructed with rigid pavement. The paved carriageway shall be 10 m
(7m+1.5m+1.5m) wide in open country in accordance with the typical cross
sections drawings as per the Manual (IRC:SP 73-2015) as mentioned in the
Table below.
Sr.No. From To Length Fully paved Typical
(Km) (Km) (Km) shoulders/footpaths cross section
(Ref. to
Manual)
Dhad to Bhokardan
1 28+000 32+300 4.30 Paved Shoulder TCS-2
2 35+100 49+900 15.0 Paved Shoulder TCS-2
3 51+600 66+000 14.4 Paved Shoulder TCS-2
Bhokardan to Sillod
4 0+000 12+500 13.45 Paved Shoulder TCS-2
Design Chainage
Length (m) Type of Cross section
From To
28+000 32+300 4300 TCS-2 T
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km
28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 2
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement
Design Chainage
Length (m) Type of Cross section
From To
32+300 32+400 100 TCS-3 T
32+400 35+000 2600 TCS-1 T
35+000 35+100 100 TCS-3 T
35+100 49+900 15000 TCS-2
49+900 50+000 100 TCS-3
50+000 51+500 1500 TCS-1 T
51+500 51+600 100 TCS-3
51+600 66+000 14400 TCS-2
66+000 66+100 100 TCS-3
66+100 67+600 1500 TCS-1
Sillod to Bhokardan
0+000 0+500 500 TCS-1
0+500 0+600 100 TCS-3
0+600 12+400 11800 TCS-2
12+400 12+500 100 TCS-3
Note:
1) Cross-section at Major/Minor Bridge approaches are to be followed
matching to adjoining cross-sections with suitable transition.
2) Where cross-section changes from two lanes to four lanes a transition
shall be provided as per the Manual (IRC: SP 73-2015)
3) Where Bus Bays constructed as per Schedule C a transition shall be
provided as per the Manual (IRC: SP 73-2015)
The chainages given in above table are indicative and stretches may increase
or decrease depending upon profile designed by contractor as IRC-SP-73-2015,
however, this shall not be treated as change of scope.
1.2.2 Carriageway in built up area: - Two Lane/Four Lane with paved shoulder
shall be constructed in built-up area.
Note:
1. For crossing of utilities at every 200m interval utility ducts are provided
and paver block flooring shall be constructed.
2. Where Bus Bays & Truck Lay Byes constructed as per Schedule C a
transition shall be provided as per the Manual (IRC: SP 73-2015).
3. At built-ups, the available space after paved shoulder up to drain shall be
laid with 100 mm thick, paver block of M-40 grade and shall be used as
parking space.
4. Design and specifications of paved shoulders and granular material shall
confirm to the requirements specified in paragraphs 5.10 and 5.11 of the
Manual. (IRC: SP 73-2015).
5. The chainages given in above table are indicative and stretches may
increase or decrease depending upon profile designed by contractor as
IRC-SP-73-2015, however, this shall not be treated as change of scope.
1.2.3 Two lane with Slip Road: - Two lane with paved shoulder in Grade Separated
Structure approach section with Slip road shall be constructed in accordance
with the typical cross sections drawings in the Manual (IRC:SP 73-2015)
constructed as mentioned in table below:
2.1 General
The design speed shall be the minimum design speed of 100 km per hr for
plain/ rolling terrain. In urban stretch of Bhokardan town portions, design
speed is restricted to 40/80 km per hr. as the development is proposed
within the extent of available land.
Details of curves with less than 100 km/hr speed.
Design Minimum Radius /
Chainage Speed Transition Remark
(Kmph) Length
(Km)
Dhad to Bhokardan
32+894.3 50 150
32+993.8 20 30
33+188 20 200
33+137 20
33+074 20 400
34+077 40 240
39+153.5 30 60
39+428.5 30 60
40+075.3 30 60
40+321.24 30 60
40+544.6 30 400
40+788 30 60
41+223 60 60
50+774.5 20 40
67+157.1 50 150
Sr.
Built-up Location
Length
Fully paved Typical cross
No.
stretch From To (km)
shoulders/fo section (Ref. to
(township) (Km) (Km) otpaths Manual)
NIL
(c) Design and specifications of paved shoulders and granular material shall confirm
to the requirements specified in paragraphs 5.10 and 5.11 of the Manual. (IRC:
SP 73-2015).
Note: Approach Gradient & RE Walls: Approach and exit gradient of road
crossing through underpass shall be maintained. Service/Slip road shall be
provided on all four sides as per availability of land
2.7.1 Lateral and vertical clearances at overpasses shall be as per paragraph 2.12
of the Manual.
2.7.2 Lateral and vertical clearances at overpasses shall be as per paragraph 2.11
of the Manual (IRC: SP 73-2015). Overpass shall be constructed at following
locations:-
Design Name of Proposed Span Total Width of
S. No. Chainage Intersecting arrangement the Structure Remark
Roads (in m) (in m)
NIL
b) Slip roads:-
5.50m wide Slip Road at Grade Separated structure approaches portion shall be
provided on both sides. Slip roads shall be constructed at the following locations and
as per cross sections shown at Schedule D.
Location of Service Right hand side Length (Km) of Remark
Sr. Road (Design (RHS)/Left hand side Service Road
No. Chainage) (LHS)/or Both side
From (km) To (km)
------- NIL -------
Above length of the Service/Slip Road is indicative and minimum specified. The actual
length of the service/slip road shall be determined by the contractor in accordance
with the Manual requirements with approval from the Authority’s Engineer. Any
Increase in the Length specified in the clause of Schedule B shall not constitute a
Change of Scope. Any New location as per site requirement and directed by Authority
Engineer will be considered under a Change of Scope.
Note: Approach Gradient & RE Walls: Approach and exit gradient of road crossing
through underpass shall be provided as per Manual (IRC: SP: 73-2015). Slip
road shall be provided on all four sides as per availability of land.
2.9.2 In the case of grade separated structures, the type of structure and the level
of the Project Highway and the cross roads shall be as follows: [Refer to
paragraphs 2.13 of the Manual and specify the type of vehicular under
pass/ overpass structure and whether the cross road is to be carried at the
existing level, raised or lowered.
Design Chainage
Length (m) Type of Cross section
From To
28+000 32+300 4300 TCS-2 T
32+300 32+400 100 TCS-3 T
32+400 35+000 2600 TCS-1 T
35+000 35+100 100 TCS-3 T
35+100 49+900 15000 TCS-2
49+900 50+000 100 TCS-3
50+000 51+500 1500 TCS-1 T
51+500 51+600 100 TCS-3
51+600 66+000 14400 TCS-2
66+000 66+100 100 TCS-3
66+100 67+600 1500 TCS-1
Sillod to Bhokardan
0+000 0+500 500 TCS-1
0+500 0+600 100 TCS-3
0+600 12+400 11800 TCS-2
12+400 12+500 100 TCS-3
Note 1: The cross section schedule given in above table is indicative and
stretches may increase or decrease depending upon profile designed by
contractor however, this shall not be treated as change of scope
Note 2: Width of paver block, shall be determined, as per availability of land,
by contractor in consultation with the Authority’s Engineer, however, this
shall not be treated as change of scope.
Note 3: The chainages given in above table are indicative and stretches may
increase or decrease depending upon profile designed by contractor as IRC-
SP-73-2015, however, this shall not be treated as change of scope.
All intersections and grade separators shall be as per Section 3 of the Manual
(IRC: SP 73-2015). Existing intersections which are deficient shall be
improved to the prescribed standards. For improvement of intersections and
at grade junction standards and type plan MoRT&H and IRC: SP: 41-1994
shall be followed.
Existing Design
Sr. No. Side Type Category of Cross Road
Chainage Chainage
1 32+400 L Y
2 33+050
3 33+150 R T
4 34+500 L T
5 50+800 L Y
Sillod to Bhokardan
6 12+500 13+845 L T SH-178 (Mahora Road)
20 35+690 R --| R
21 35+730 R --| R
22 36+225 L |-- L
23 36+660 R --| R
24 37+030 R /| R
25 37+670 L |\ L
26 39+230 L |/ L
27 40+100 R&L R&L
28 40+350 L |\ L
29 42+830 L |/ L
30 44+270 R --| R
31 46+130 R&L + R&L
32 48+710 R&L + R&L
33 50+580 L |-- L
34 50+050 R --| R
35 52+780 L |-- L
36 52+920 R --| R
37 54+720 L |-- L
38 54+900 R --| R
39 57+250 R --| R
40 57+680 L |-- L
41 57+930 R --| R
42 58+180 L |-- L
43 58+630 L |-- L
44 61+110 L |-- L
45 62+190 R --| R
46 62+400 L |-- L
47 66+150 R --| R
48 66+580 R --| R
49 66+610 R --| R
50 66+850 L |-- L
51 66+900 R --| R
52 67+050 R --| R
SIllod to Bhokardan
53 1/590 1/590 R T R
54 2/860 2/860 R T R
55 3/096 3/096 R T R
56 4/710 4/710 R T R
57 5/015 5/015 L T L
58 5/200 5/200 R T R
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km
28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 11
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement
59 5/230 5/230 L T L
60 5/240 5/240 R T R
61 5/330 5/330 L T L
62 5/430 5/430 R T R
63 5/440 5/440 L Y L
64 6/120 6/120 R Y R
65 6/150 6/150 L Y L
66 7/380 7/380 R T R
67 7/510 7/510 L Y L
68 7/600 7/600 R Y R
69 7/700 7/700 L Y L
70 8/110 8/110 R Y R
71 8/885 8/885 +
72 9/860 9/860 L Y L
73 9/890 9/890 R Y R
74 11/285 11/285 L T L
75 12/720 12/720 L + Bhokardan Village
76 12/870 12/870 R T Bhokardan Village
77 12/890 12/890 L T Bhokardan Village
78 13/065 13/065 R T Bhokardan Village
79 13/140 13/140 L T Bhokardan Village
80 13/180 13/180 + Bhokardan Village
81 13/280 13/280 Y Bhokardan Village
Note: - It is clarified that if any other deficient junctions with cross BT/CC
roads is identified during development period in addition to those
mentioned above shall be improved as per standard set forth in Schedule
‘D’. Any Increase in the junction specified in the clause of Schedule B shall
not constitute a Change of Scope.
Minimum length
Location Road to be
Sr. Salient of viaduct to be
(Design Ch.) carried under
No. features provided
(Km) the structures
(m)
NIL
Design Design
Sr.No. Chainage Chainage Length (km) Remark
From (Km) To (Km)
8 41+560 41+700 0.140
Note: The chainages given in above table are indicative and stretches may
increase or decrease depending upon profile designed by contractor, the raising
for Reconstruction/ New Construction in approaches of Major/Minor Bridges
shall be carried out by contractor as per Schedule D and in consultation with the
Authority’s Engineer and as per availability of land, however, this shall not be
treated as change of scope.
5. PAVEMENT DESIGN
5.1 Pavement design shall be carried out in accordance with Section 5 of the
Manual (IRC: SP 73-2015), IRC SP: 84- 2014, IRC 58:2015, IRC 81: 1997, IRC
relevant codes and International Standards.
a) Main Carriageway: -
c) Crust below Paver Block: Paver Block flooring 100 mm thick with M40
Grade of Concrete at Built-up portion shall be provided on both sides as per
availability of space for parking. Minimum pavement composition should be
adopted for paver block flooring as below
S. Description Minimum Crust
No. Composition below paver
block
1 Paver Block 100 mm
2 DLC 150 mm
3 WMM 150 mm
4 GSB 150 mm
Total 550 mm
Note: -
In clayey soil areas (black cotton soil) excavate 600mm depth and
replace it with minimum 10% CBR subgrade material. If the soil below
600mm does not satisfy 97% of compaction and MDD of lab results,
then excavate further 500mm and replace entire excavation with buffer
layer.
d) The Crust Composition for Truck Lay Byes shall be as per Main
Carriageway Clause 5.3.2 (a) above.
e) The Crust composition for Minor roads, Bus bay shall be as per section 5 of
IRC SP 73-2015.
f) The Crust composition of Paved shoulder is same as of Main Carriageway.
Note - The chainages given in above table are indicative and stretches may
increase or decrease depending upon profile designed by contractor as IRC-SP-
73-2015, however, this shall not be treated as change of scope.
1. Realignments: -
Note - The Proposed Realignments are within the ROW and details are shown in
the drawings chainages are as per the existing condition and are indicative and
stretches may increase or decrease depending upon profile designed by
contractor as IRC-SP-73-2015, however, this shall not be treated as change of
scope.
2. Bypasses:- 1
Design Chainages
Design Length
Sr. No. From To Remark
(Km)
(Km) (Km)
Existing Dhad
1 32+400 34+500 2.4
byepass
Design Chainages
Design Length
Sr. No. From To Remark
(Km)
(Km) (Km)
NIL
4. Geometric improvements: -
Note - The improvement locations given above are indicative and may vary
depending upon profile designed by contractor as per IRC-SP-73-2015.
However, this shall not be treated as change of scope.
6. ROADSIDE DRAINAGE
Built up concrete Drains are existing in the Habitated area of Bhokardan rest
of the length of the project is provided with open drains only
Drainage system including surface and subsurface drains for the Project
Highway shall be provided as per Section 6 of the Manual (IRC: SP 73-2015)/
IRC: SP: 84-2014. FRP frame with cover drains shall be provided in both side
of Built-Up areas at following locations.
The locations of Drains at roadway shall be as per cross section type given at
Schedule D. In all built up areas FRC frame with cover drains with Footpath
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km
28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 17
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement
7 DESIGN OF STRUCTURES
7.1 General
7.1.1 All bridges, culverts and structures shall be designed and constructed in
accordance with section 7 of the Manual (IRC: SP 73-2015) and shall conform
to the cross-sectional features and other details specified therein. All designs
shall be in conforming with is IRC and International Codes. The deviation
shown in Schedule – D shall be taken in to considerations.
7.1.2 New Major and Minor bridge: Width of the carriageway of new Major bridges
and structures shall be as follows:
The width of carriageway of new Major and Minor bridges shall be 16m as
mentioned below.
a Span arrangement of Major and Minor Bridge shall be designed by
contractor on the basis of detailed surveys & investigations subject to
minimum specified in GAD as per para 7.3.2 of this schedule. Founding
levels shall be decided after detailed Geo-Technical investigation,
Waterway, road top level, soffit etc. shall be decided on the basis of land
survey conforming to various codal provision applicable
7.1.5 The following structures shall be designed to carry utility services specified
in table below:
7.1.6 Cross-section of the new culverts and bridges at deck level for the Project
Highway shall conform to the typical cross-sections given in section 7 of the
Manual (IRC:SP 73-2015)/ IRC:SP:84-2014 and deviations given at Schedule D.
7.2 Culverts
7.2.1 Overall width of all culverts shall be equal to the roadway width of the
approaches. Barrel Length may change as per height of embankment and
shall get approval from Authority Engineer
Note – The span/opening given above are minimum and the proposed dimensions
shall be based on hydraulic calculations and approval from Authority Engineer. Any
change shall not be constitute a change of scope.
28+210
1 1 row x 0.9 m dia. DOUBLE Row RCC Reconstruction
NP 4 Pipe Culvert
28+320
2 1 row x 0.9 m dia. DOUBLE Row RCC Reconstruction
NP 4 Pipe Culvert
28+490
3 1 row x 0.9 m dia. DOUBLE Row RCC Reconstruction
NP 4 Pipe Culvert
29+270
4 2 row x 0.6 m dia. SINGLE Row RCC NP Reconstruction
4 Pipe Culvert
35+210
5 1 row x 1.2 m dia. DOUBLE Row RCC Reconstruction
NP 4 Pipe Culvert
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km
28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 21
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement
35+460
6 1 row x 1.2 m dia. SINGLE Row RCC NP Reconstruction
4 Pipe Culvert
38+470
7 2 row x 1.2 m dia. DOUBLE Row RCC Reconstruction
NP 4 Pipe Culvert
40+060
8 2 row x 1.2 m dia. SINGLE Row RCC NP Reconstruction
4 Pipe Culvert
40+400
9 2 row x 1.2 m dia. DOUBLE Row RCC Reconstruction
NP 4 Pipe Culvert
40+800
10 2 row x 0.8 m dia. DOUBLE Row RCC Reconstruction
NP 4 Pipe Culvert
41+605
11 1 row x 1.1 m dia. DOUBLE Row RCC Reconstruction
NP 4 Pipe Culvert
43+580
12 2 row x 0.9 m dia. THREE Row RCC NP Reconstruction
4 Pipe Culvert
45+150
13 2 row x 1.0 m dia. THREE Row RCC NP Reconstruction
4 Pipe Culvert
47+310
14 1 row x 0.9 m dia. DOUBLE Row RCC Reconstruction
NP 4 Pipe Culvert
48+560
15 2 row x 0.9 m dia. DOUBLE Row RCC Reconstruction
NP 4 Pipe Culvert
49+580
16 2 row x 0.9 m dia. DOUBLE Row RCC Reconstruction
NP 4 Pipe Culvert
50+090
17 2 row x 0.9 m dia. DOUBLE Row RCC Reconstruction
NP 4 Pipe Culvert
50+460
18 2 row x 0.9 m dia. DOUBLE Row RCC Reconstruction
NP 4 Pipe Culvert
51+060
19 2 row x 0.9 m dia. DOUBLE Row RCC Reconstruction
NP 4 Pipe Culvert
51+440
20 2 row x 0.9 m dia. THREE Row RCC NP Reconstruction
4 Pipe Culvert
54+660
21 2 row x 0.9 m dia. DOUBLE Row RCC Reconstruction
NP 4 Pipe Culvert
55+730
22 2 row x 0.9 m dia. DOUBLE Row RCC Reconstruction
NP 4 Pipe Culvert
58+320
23 2 row x 0.9 m dia. SINGLE Row RCC NP Reconstruction
4 Pipe Culvert
61+890
24 2 row x 0.9 m dia. THREE Row RCC NP Reconstruction
4 Pipe Culvert
Sillod to Bhokardan
25 1 row x 0.7 m dia. SINGLE Row RCC NP 0+010 Reconstruction
4 Pipe Culvert
26 1 row x 0.8 m dia. SINGLE Row RCC NP 1+870 Reconstruction
4 Pipe Culvert
27 1 row x 0.9 m dia. SINGLE Row RCC NP 5+532 Reconstruction
4 Pipe Culvert
28 2 row x 0.9 m dia. DOUBLE Row RCC 5+825 Reconstruction
NP 4 Pipe Culvert
29 1 row x 0.9 m dia. SINGLE Row RCC NP 6+132 Reconstruction
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km
28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 22
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement
4 Pipe Culvert
30 1 row x 0.9 m dia. SINGLE Row RCC NP 6+925 Reconstruction
4 Pipe Culvert
31 1 row x 0.9 m dia. SINGLE Row RCC NP 7+357 Reconstruction
4 Pipe Culvert
Barrel Length may change as per height of embankment and shall get approval
from Authority Engineer. Any change in the length specified in this Clause of
Schedule B shall not constitute a Change of Scope.
Details of Proposed
Details of Existing Structure
Existing Design structure
Sr.
Chainage Chainage
No. Span Width of Span Proposed
(Km) (Km) Type of
Arrang- Structure Arrang- Width Remark
Structure
ement (m) ement (m)
--NIL--
Note: - It is clarified that as per site requirement New culverts if required for
drainage arrangement shall be identified & constructed if any during development
shall be constructed as per standard set forth in Schedule ‘D’& as per instruction
of Authority Engineer. The span/opening and numbers given above are minimum
and the proposed dimensions shall be based on hydraulic calculations and
approval from Authority Engineer. Any changes to above dimensions shall not be
constitute a change of scope.
NIL
2 45+780
Single RCC Box Cell CUP of
Size :- 3.0 m x 2.0 m
3 47+170
Single RCC Box Cell CUP of
Size :- 2.0 m x 3.0 m
4 58+650
Single RCC Box Cell of Size :-
3.0 m x 3.0 m
5 59+580
Single RCC Box Cell of Size :-
3.0 m x 3.0 m
6 58+380
Single RCC Box Cell of Size :-
3.0 m x 3.0 m
7 59+500
Single RCC Box Cell CUP of
Size :- 2.0 m x 3.0 m
8 60+300
Single RCC Box Cell of Size :-
3.0 m x 3.0 m
9 61+260
Single RCC Box Cell of Size :-
2.0 m x 3.0 m
Sillod to Bhokardan
13 6+600
Single RCC Box Cell of Size
:- 2.0 m x 3.0 m
14 7+480
Single RCC Box Cell of Size
:- 2.0 m x 3.0 m
15 8+620
Single RCC Box Cell of Size
:- 2.0 m x 3.0 m
16 9+940
Single RCC Box Cell of Size
:- 2.0 m x 3.0 m
17 11+520
Single RCC Box Cell of Size
:- 2.0 m x 3.0 m
Tentative locations are given above; and the same shall be finalised in consultation
with AE at the time of execution.
7.2.6 Floor protection works shall be provided as specified in the relevant IRC Codes
and Specifications.
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km
28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 25
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement
7.3 Bridges
Lowest Minimum
Soffit level length
of between inner
Sr. Design Span Arrangement
Proposed faces of dirt Remarks
No Chainage of Proposed Bridge
bridge (m) wall of
Proposed
bridge (m)
1 29+660 2 Span of 8.0m each 590.55 16.3
2 31+105 1 Span of 6.0m each 584.10 6.3
3 32+010 3 Span of 8.0m each 575.80 24.3
4 34+180 1 Span of 12.0m each 569.10 12.3
5 41+190 2 Span of 6.0m each 560.50 12.3
6 43+300 1 Span of 6.0m each 575.40 6.3
(i) The following narrow Bridges shall be widened including Strengthening &
repairing of Existing Bridge.
Sr. Reduced
Bridge at km Total Length of Total Width
No. Soffit level
(Design Ch.) bridge (m) (m)
(minimum) (m)
NIL
7.3.3 The railings of all existing bridges shall be replaced by crash barriers as per
manual.
S. No. Location at km Remarks
--NIL--
A. BRIDGES
--NIL--
Note: - It is clarified that above repairing & strengthening measures are indicative and
minimum specified. The condition survey of the existing structure shall be
carried out by the contractor as per IRC 35, & Strengthening / repairing shall be
carried out as per the requirement of site and as per instruction of Authority
Engineer, for pier, abutment sub structure & super structure, replacement of
bearings, expansion joints & wearing coat, providing railing on bridge, painting
& protection works etc. If any Increase in the specified above shall not
constitute a Change of Scope.
B. ROB/RUB
(i) ROB: - Nil
Sr.
Location of ROB (km) Remark
No.
- NIL -
8.1 Traffic control devices and road safety works shall be provided in accordance
with Section 9 of the Manual.
8.2 Specifications of the reflective sheeting shall be provided in accordance with
Section 9 of the Manual.
8.3 Details shall be as approved by Authority Engineer.
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km
28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 30
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement
9 ROADSIDE FURNITURE
10.2 Overhead traffic signs: The locations are mentioned in below table and the size
shall be evolved based on design of sign boards given in IRC 67.
Location
S. No (Design Type Remark
Chainage)
1 32+400 Overhead Sign gantry
2 32+400 Cantilever overhead sign
3 33+050 Cantilever overhead sign
4 33+150 Cantilever overhead sign
5 34+500 Cantilever overhead sign
6 35+000 Overhead Sign gantry
7 50+000 Overhead Sign gantry
8 50+800 Cantilever overhead sign
Sillod to Bhokardan
Note: All Traffic Signs for Road Users would be provided as per Manual.
However, the Contractor Shall provide minimum numbers of Cautionary,
Mandatory, Warning and Informatory Traffic Sign Boards as mentioned below:
Above numbers of traffic signs are indicative and minimum specified. The
actual numbers of traffic signs shall be determined by the Contractor in
accordance with the Manual requirements with approval from the
Authority's Engineer. Any increase in the numbers specified in this Clause of
Schedule B shall not constitute a Change of Scope.
10 COMPULSORY AFFORESTATION
The number of trees which are required to be planted by the Contractor as
compensatory afforestation should be as per Forest Conservation Act, ten times
the number of trees cut as compensatory afforestation shall be as finalized by
the Authority’s Engineer. Plantation of trees shall be as per IRC SP-21-2009.
a) TREE PLANTATION
The Contractor shall work out appropriate plan for planting of trees as per
IRC IRC SP-21-2009 on the surplus land of the right-of way with a view to
beautify the highway and making the environment along the highway
pleasing. The existing trees / plants shall be retained to the extent possible.
The Transplantation of trees shall also be proposed wherever feasible.
Wherever trees are cut down due to shortage of land, trees shall be planted
10 times more than the felled/cut trees.
11 HAZARDOUS LOCATIONS
The safety barriers shall be provided at the hazardous locations as per Clause
7.18 of the Manual (IRC: SP 73-2015). W-Beam metal crash barriers shall
however be provided for a minimum length of 0.210 Km at all hazardous
locations. All hazardous locations shall be finalized in consultation with the
Authority Engineer.
13 CHANGE OF SCOPE
I) TCS-2 Two Lane with Paved Shoulder Concrete road over 5.5m wide BT road
II) TCS-2 Two Lane with Paved Shoulder Concrete road over 5.5m wide BT road –
Raised Section
III) TCS-1 - Four Lane with Paved Shoulder Concrete road over 5.50m wide BT road