Portal RATOL & Rates PreMo

CAWANGAN KONTRAK DAN UKUR BAHAN 20.10.2020

Work Item Unit Overall Average (RM)


WORK BELOW LOWEST FLOOR FINISH m3 Location Range (RM) Average (RM) RM 9.58
EXCAVATION AND EARTHWORK
A 3.50 - 15.00 8.95
EXCAVATION
Excavating to reduce level B 4.40 - 10.00 6.84
Maximum depth not exceeding 1.00m C 3.00 - 16.50 8.42
D 5.50 - 15.80 9.11
E 3.00 - 12.00 5.69
F 4.00 - 18.00 8.86
G 11.80 - 11.80 11.80
H 15.00 - 19.00 17.00
WORK BELOW LOWEST FLOOR FINISH m3 Location Range (RM) Average (RM) RM 15.00
EXCAVATION AND EARTHWORK
C 15.00 - 15.00 15.00
EXCAVATION
Excavating basements and the like starting from
formation level
Maximum depth not exceeding 2.00m
WORK BELOW LOWEST FLOOR FINISH m3 Location Range (RM) Average (RM) RM 14.02
EXCAVATION AND EARTHWORK
C 15.00 - 25.07 20.04
EXCAVATION
To receive pad footings E 8.00 - 8.00 8.00
Maximum depth not exceeding 1.00m (In No: )
WORK BELOW LOWEST FLOOR FINISH m3 Location Range (RM) Average (RM) RM 10.09
EXCAVATION AND EARTHWORK
A 3.50 - 18.00 8.61
EXCAVATION
To receive ground beams B 3.20 - 8.00 5.55
Maximum depth not exceeding 1.00m C 3.00 - 25.07 9.14
D 5.00 - 20.00 10.22
E 4.00 - 18.00 9.50
F 4.00 - 18.00 9.01
H 12.00 - 35.00 18.60
WORK BELOW LOWEST FLOOR FINISH m2 Location Range (RM) Average (RM) RM 13.45

1/6
Portal RATOL & Rates PreMo
CAWANGAN KONTRAK DAN UKUR BAHAN 20.10.2020

Work Item Unit Overall Average (RM)


EXCAVATION AND EARTHWORK A 11.90 - 15.00 13.45
FILLING
Hardcore as specified
To make up levels not exceeding 250mm thick;
average 250mm thick
WORK BELOW LOWEST FLOOR FINISH m3 Location Range (RM) Average (RM) RM 206.00
CONCRETE WORK
F 206.00 - 206.00 206.00
Plain In-Situ Concrete Grade 7 as specified; blinding
screed; laid on earth or hardcore
Under pile caps (In No. )
100mm - 150mm Thick
WORK BELOW LOWEST FLOOR FINISH m3 Location Range (RM) Average (RM) RM 265.00
WORK BELOW LOWEST FLOOR FINISH
C 230.00 - 295.00 265.00
CONCRETE WORK
Reinforced In-Situ Concrete Grade 30 as specified
In isolated foundation bases to columns (In No. )
WORK BELOW LOWEST FLOOR FINISH m3 Location Range (RM) Average (RM) RM 312.90
WORK BELOW LOWEST FLOOR FINISH
A 310.00 - 320.00 315.00
CONCRETE WORK
Reinforced In-Situ Concrete Grade 30 as specified B 229.10 - 350.00 299.70
In column stumps C 230.00 - 398.72 322.29
E 325.00 - 325.00 325.00
F 230.00 - 330.00 302.50
WORK BELOW LOWEST FLOOR FINISH m3 Location Range (RM) Average (RM) RM 306.74
WORK BELOW LOWEST FLOOR FINISH
A 300.00 - 360.00 323.89
CONCRETE WORK
Reinforced In-Situ Concrete Grade 30 as specified B 229.10 - 350.00 307.28
In ground beams C 230.00 - 398.72 294.74
D 236.80 - 330.00 295.60
E 280.00 - 325.00 302.50
F 278.00 - 330.00 316.44
WORK BELOW LOWEST FLOOR FINISH Kg Location Range (RM) Average (RM) RM 3.10
CONCRETE WORK

2/6
Portal RATOL & Rates PreMo
CAWANGAN KONTRAK DAN UKUR BAHAN 20.10.2020

Work Item Unit Overall Average (RM)


Reinforcement bars; hot rolled plain round mild steel C 3.10 - 3.10 3.10
In isolated foundations
10mm Diameter; Links, stirrups, binders and the like
WORK BELOW LOWEST FLOOR FINISH Kg Location Range (RM) Average (RM) RM 3.50
CONCRETE WORK
A 2.60 - 3.60 3.18
Reinforcement bars; hot rolled plain round mild steel
In ground beams B 2.84 - 4.50 3.44
10mm Diameter; straight and bent C 2.60 - 4.30 3.29
D 2.80 - 4.50 3.38
E 2.70 - 5.60 3.22
F 3.30 - 4.50 3.68
G 3.40 - 3.40 3.40
H 4.30 - 4.50 4.40
WORK BELOW LOWEST FLOOR FINISH Kg Location Range (RM) Average (RM) RM 2.95
CONCRETE WORK
A 2.80 - 2.80 2.80
Reinforcement bars; hot rolled plain round mild steel
In column stumps E 3.10 - 3.10 3.10
8mm Diameter; straight and bent
WORK BELOW LOWEST FLOOR FINISH m2 Location Range (RM) Average (RM) RM 18.00
CONCRETE WORK
F 18.00 - 18.00 18.00
Reinforcement; fabric; hard drawn plain round steel,
welded as described
In floor slab
Type BRC Ref. No. A98 weighing 1.54 Kg/m2, lapped
225mm both sides
WORK BELOW LOWEST FLOOR FINISH m Location Range (RM) Average (RM) RM 18.43
CONCRETE WORK
D 15.00 - 28.00 21.59
Class F1 formwork as specified to foundation and beds
To edges and faces of pile caps E 13.00 - 20.00 16.00
250mm - 500mm High G 17.70 - 17.70 17.70
WORK BELOW LOWEST FLOOR FINISH m Location Range (RM) Average (RM) RM 13.84
CONCRETE WORK
Class F1 formwork as specified to foundation and beds

3/6
Portal RATOL & Rates PreMo
CAWANGAN KONTRAK DAN UKUR BAHAN 20.10.2020

Work Item Unit Overall Average (RM)


To ground beams A 6.00 - 20.00 15.19
250mm - 500mm High
B 5.00 - 20.10 12.43
C 7.00 - 20.00 14.64
D 4.00 - 28.00 14.51
E 6.60 - 20.00 11.81
F 0.00 - 25.00 14.47
WORK BELOW LOWEST FLOOR FINISH m2 Location Range (RM) Average (RM) RM 33.33
CONCRETE WORK
A 20.70 - 40.00 32.09
Class F1 formwork as specified to foundation and beds
To Column Stumps B 20.05 - 75.00 32.18
To sides of column stumps C 18.00 - 48.00 32.49
D 20.00 - 43.90 31.05
E 26.00 - 40.00 32.09
F 27.90 - 45.00 35.11
H 35.00 - 40.00 38.33
WORK BELOW LOWEST FLOOR FINISH m2 Location Range (RM) Average (RM) RM 4.66
WATERPROOFING AND ASPHALT WORK
A 2.50 - 5.30 3.40
DAMP PROOFING AND TANKING
Damp Proof Membrane as specified B 1.50 - 3.90 2.68
Over 300mm wide; flat; subsequently covered C 1.20 - 28.50 5.88
D 1.70 - 15.00 4.70
E 2.00 - 10.00 4.67
F 3.00 - 30.00 8.29
H 3.00 - 3.00 3.00
WORK BELOW LOWEST FLOOR FINISH m2 Location Range (RM) Average (RM) RM 4.08
EXCAVATION AND EARTHWORK
D 3.10 - 7.40 4.08
FILLING
Approved sand blinding spread and levelled on
hardcore (measured separately)
50mm Thick to receive ground beam

4/6
Portal RATOL & Rates PreMo
CAWANGAN KONTRAK DAN UKUR BAHAN 20.10.2020

Work Item Unit Overall Average (RM)


WORK BELOW LOWEST FLOOR FINISH m2 Location Range (RM) Average (RM) RM 1.95
EXCAVATION AND EARTHWORK
C 1.95 - 1.95 1.95
FILLING
Approved sand blinding spread and levelled on
hardcore (measured separately)
25mm Thick to receive concrete bed

5/6
Portal RATOL & Rates PreMo
CAWANGAN KONTRAK DAN UKUR BAHAN 20.10.2020

Nota Catatan
Sekiranya anda mempunyai sebarang pertanyaan, sila hubungi:
Ketua Penolong Pengarah Kanan
Bahagian Perolehan dan Khidmat Kos
Cawangan Kontrak dan Ukur Bahan
Ibu Pejabat JKR Malaysia
Tingkat 19, Menara Tun Ismail Mohamed Ali
No 25, Jalan Raja Laut
50582 Kuala Lumpur

u.p: En Husnan Husin


Tel: 03-26161111
Email: husnan@jkr.gov.my