The document reports the results of earth resistance measurements taken at various locations at a TPS plant in July 2015. Earth points were measured at substations, areas near cooling towers, compressors, and other plant equipment. The measurements are reported in ohms and most were found to be satisfactory, though a few locations were noted as not okay. In total, earth resistance was measured at 58 locations across the plant throughout July.
The document reports the results of earth resistance measurements taken at various locations at a TPS plant in July 2015. Earth points were measured at substations, areas near cooling towers, compressors, and other plant equipment. The measurements are reported in ohms and most were found to be satisfactory, though a few locations were noted as not okay. In total, earth resistance was measured at 58 locations across the plant throughout July.
The document reports the results of earth resistance measurements taken at various locations at a TPS plant in July 2015. Earth points were measured at substations, areas near cooling towers, compressors, and other plant equipment. The measurements are reported in ohms and most were found to be satisfactory, though a few locations were noted as not okay. In total, earth resistance was measured at 58 locations across the plant throughout July.
The document reports the results of earth resistance measurements taken at various locations at a TPS plant in July 2015. Earth points were measured at substations, areas near cooling towers, compressors, and other plant equipment. The measurements are reported in ohms and most were found to be satisfactory, though a few locations were noted as not okay. In total, earth resistance was measured at 58 locations across the plant throughout July.
Download as DOC, PDF, TXT or read online from Scribd
Download as doc, pdf, or txt
You are on page 1of 2
ELECTRICAL MAINTENANCE
EARTH RESISTANCE MEASUREMENT
ZONE : TPS PLANT MONTH : JULY – 2015 Sr. EP. Value Ok / Location Date Remark No. Designation in Ω N. Ok 1 EP NO: 1 0.31 OK 24.07.15 2 EP NO: 2 0.37 OK 24.07.15 TR – 1, SUBSTATION NO :- 35 3 EP NO: 3 0.45 OK 24.07.15 4 EP NO: 4 0.53 OK 24.07.15 5 EP NO: 5 0.83 OK 24.07.15 6 EP NO: 6 TR – 2 , SUBSTATION NO :- 36 0.53 OK 24.07.15 7 EP NO: 7 0.39 OK 24.07.15 8 EP NO: 8 0.43 OK 24.07.15 9 EP NO: 9 0.47 OK 24.07.15 NR. COOLING TOWER 10 EP NO: 10 0.54 OK 24.07.15 11 EP NO: 11 0.61 OK 24.07.15 12 EP NO: 12 0.71 OK 24.07.15 NR. TPS CONTROL ROOM 13 EP NO: 13 1.15 N.OK 24.07.15 14 EP NO: 14 0.33 OK 24.07.15 NR. COOLING TOWER 15 EP NO: 15 0.39 OK 24.07.15 16 EP NO: 16 0.46 OK 24.07.15 17 EP NO: 17 0.49 OK 24.07.15 18 EP NO: 18 0.52 OK 24.07.15 19 EP NO: 19 0.55 OK 24.07.15 NR. COMPRESSOR HOUSE 20 EP NO: 20 0.67 OK 24.07.15 21 EP NO: 21 0.59 OK 24.07.15 22 EP NO: 22 0.65 OK 24.07.15 23 EP NO: 23 0.53 OK 24.07.15 24 EP NO: 24 0.41 OK 24.07.15 25 EP NO: 25 0.49 OK 24.07.15 IN GARDEN AREA 26 EP NO: 26 0.71 OK 24.07.15 27 EP NO: 27 0.64 OK 24.07.15 28 EP NO: 28 0.57 OK 24.07.15 29 EP NO: 29 IN PLANT AREA 0.63 OK 24.07.15 30 EP NO: 30 0.53 OK 24.07.15 PIT COVERED WITH 31 EP NO: 31 NR. DM WATER AREA - N.OK 24.07.15 RCC
32 EP NO: 32 NR. P-05A ACID UNLOADING PUMP 0.71 OK 24.07.15
33 EP NO: 33 0.85 OK 24.07.15 NR. SEND FILTER – E 34 EP NO: 34 0.25 OK 24.07.15 35 EP NO: 35 NR. SEND FILTER – C 0.39 OK 24.07.15 ELECTRICAL MAINTENANCE EARTH RESISTANCE MEASUREMENT Prepared By: Checked By:
SYSTEM PROTECTION INDIAN OIL CORPORATION LIMITED
ZONE : TPS PLANT MONTH : JULY – 2015 Sr. EP. Value Ok / Location Date Remark No. Designation in Ω N. Ok 36 EP NO: 36 NR. 2117-P-4A 0.81 OK 24.07.15 37 EP NO: 37 NR. 2117-P-04D 0.38 OK 24.07.15 38 EP NO: 38 0.45 OK 28.07.15 39 EP NO: 39 0.51 OK 28.07.15 40 EP NO: 40 TR – 01 0.68 OK 28.07.15 41 EP NO: 41 0.23 OK 28.07.15 42 EP NO: 42 0.37 OK 28.07.15 43 EP NO: 43 0.25 OK 28.07.15 TR – 02 44 EP NO: 44 0.33 OK 28.07.15 45 EP NO: 45 0.39 OK 29.07.15 46 EP NO: 46 0.49 OK 29.07.15 47 EP NO: 47 0.28 OK 29.07.15 48 EP NO: 48 IN PLANT AREA 1.15 N.OK 29.07.15 49 EP NO: 49 0.88 OK 29.07.15 50 EP NO: 50 0.57 OK 29.07.15 51 EP NO: 51 0.45 OK 29.07.15 52 EP NO: 52 0.95 OK 29.07.15 NR.DM PLANT CONTROL ROOM 53 EP NO: 53 0.91 OK 29.07.15 54 EP NO: 54 0.55 OK 30.07.15 55 EP NO: 55 NR. COMPRESSOR HOUSE 0.29 OK 30.07.15 56 EP NO: 56 0.41 OK 30.07.15 57 EP NO: 57 NR. COOLING TOWER 0.59 OK 31.07.15 58 EP NO: 58 NR. TR-2119-T-2764B 0.71 OK 07.08.15
Evaluation of Steel and Tungsten Carbide - Cobalt (WC-8Co) 5.56 × 45 MM Calibre Projectile Penetration Into Silicon Carbide (SiC) : Experiment and Numerical Simulation