PROJECT: East Gate 3/13/2019

NURGES VILLA TYPE A
BOQ 
Item Unit Cost Total Cost
Div. Description of Material Unit Quantity Remarks
No. S.R S.R
16 Electrical
General:

all works shall comply with Saudi Building Code,


specification, drawing and engineer instructions.

1 Distribution and Power Panel boards:

Supply, install and connect the following distribution and


power panel boards including metallic enclosure (type tested
for MDB and form 2b as per IEC for DBs), circuit breakers
to withstand short circuit current, protective devices,
indicating devices(R,S,T,N,E ) and all necessary accessories
to complete the work as per drawings ,specifications and
engineer instructions.

Supply, install, connect, test and commission (MDB) as per


1-1 1 No.
shown in drawings.

Supply, install, connect, test and commission (DB-G) as per


1-2 1 No.
shown in drawings.

Supply, install, connect, test and commission (DB-F) as per 1


1-3 No.
shown in drawings.

supply and install wooden enclosure recessed in outside


1-4 fence wall for Meter as per specification and SEC 1 No.
requirements

2 LV cables :

‫عام‬ Supply, install, connect test and commission the following


multicore feeders cable CU/XLPE/PVC including cable tray
, conduits ,connectors, supports, clamps, etc. and all
necessary accessories to complete the work as per drawings
,specifications and engineer instructions.

2-1 4x 35mm2 + 16mm2E 8 m

2-2 4x 16mm2 +16mm2E 50 m

Electrical BOQ
Page 1 Electrical Work
PROJECT: East Gate 3/13/2019
NURGES VILLA TYPE A
BOQ 
Item Unit Cost Total Cost
Div. Description of Material Unit Quantity Remarks
No. S.R S.R
16
3 Lighting Fixtures:
3-1 Supply, install, and test decorative Surface mounted/Pendant 11
F2 lighting fixtures LED type 100W, 230V, 60Hz including
No.
Led Electronic Driver and all necessary accessories to
complete the work as per drawings ,specifications and
3-2 Supply, install, and test decorative Surface mounted/Pendant 2
F3 IP44 W/P lighting fixtures LED type 50W, 230V, 60Hz
including Led Electronic Driver and all necessary No.
accessories to complete the work as per drawings
,specifications and engineer instructions.
3-3 Supply, install, and test Surface mounted/Pendant IP44 W/P 7
F4 lighting fixtures for bathroom LED type 14W, 230V, 60Hz
including Led Electronic Driver and all necessary No.
accessories to complete the work as per drawings
,specifications and engineer instructions.
3-4 Supply, install, and test outdoor wall surface mounted IP65 15
F5 lighting fixtures LED type 26W, 230V, 60Hz including Led
No.
Electronic Driver and all necessary accessories to complete
the work as per drawings ,specifications and engineer
3-5 Supply and install lighting point including conduit, wires 35
and all necessary accessories to complete the work as per No.
drawings ,specifications and engineer instructions.
3-6 Supply and install lighting point for chandler including 7
conduit, wires and all necessary accessories to complete the No.
work as per drawings ,specifications and engineer

3-7 Supply and install lighting point for mirror including 6 No.
conduit, wires and all necessary accessories to complete the
work as per drawings ,specifications and engineer
4 Lighting switches:
‫عام‬ Supply, install, connect test and commission Lighting
switches 230V 50Hz and all necessary accessories to
complete the work as per drawings ,specifications and
engineer instructions.

4-1 1 Gang 1Way lighting Switch 4 No.

4-2 2Gang 1Way lighting Switch 11 No.

4-3 3Gang 1Way lighting Switch 5 No.

4-4 1 Gang 2Way lighting Switch 6 No.

Electrical BOQ
Page 2 Electrical Work
PROJECT: East Gate 3/13/2019
NURGES VILLA TYPE A
BOQ 
Item Unit Cost Total Cost
Div. Description of Material Unit Quantity Remarks
No. S.R S.R
16
5 Wiring Devices:

Supply, install, connect and test the following devices and


equipment including device boxes cover plates, conduits and
wiring between devices and to panelboards, contactors or to
switch panel as applicable.

5-1 Single power outlet 13A 23 No.

5-2 Switched Single power outlet 13A 2 No.

5-3 Double power outlet 13A 6 No.

5-4 Double pole power outlet 45A with indicator lamp for cooker 1 No.

5-5 Electric water heater Flex outlet 20A with indicator lamp 7 No.
for electrical water heater.

5-6 double pole switch 45A with indicator lamp 9 No.

5-7 Single phase weather proof 13A 3 No.

5-8 Power point for fans 6 No.

5-9 Power point for carage door 1 No.

5-10 power point 58 No.

6 First Fix :

6-1 supply and install 38mm conduits from the DB-FF to roof 1 No.
floor to feed the provisional electrical services in roof floor
and all necessary accessories to complete the work as per
drawings ,specifications and engineer instructions.

6-2 supply and install 50mm conduits from the MDB to 1 No.
provisional Guard room with connection box 100x100mm
on the inside fence wall and all necessary accessories to
complete the work as per drawings ,specifications and
6-3 supply and install 25mm conduits from the indoor AC unit to 9 No.
outdoor AC unit and all necessary accessories to complete
the work as per drawings ,specifications and engineer

Electrical BOQ
Page 3 Electrical Work
PROJECT: East Gate 3/13/2019
NURGES VILLA TYPE A
BOQ 
Item Unit Cost Total Cost
Div. Description of Material Unit Quantity Remarks
No. S.R S.R
16
7 Earthing Network System:
7-1 Supply, install, connect and test a complete earthing system 1 L.S
with a minimum resistance of 5 ohm including conductors,
ground rods, earth pits, steel bars, connection to machines
and equipment's, etc. and all necessary accessories as shown
on drawings and as specified.
8 Telephone and Data Systems:
8-1 Supply install telecommunication BOX (IDF) with a conduit 1 No.
connected to external fence of the Villa.
8-2 Supply, install and connect wall mounted data outlet RJ11 5 No.
connector, Cat5 including device boxes, cover plates,
conduits and Cat5 wiring to corresponding IDF and all
necessary accessories as shown on drawings and as
specified.
8-2 Supply, install and connect wall mounted data outlet RJ45 2 No.
connector, Cat6 including device boxes, cover plates,
conduits and Cat6 wiring to corresponding IDF and all
necessary accessories as shown on drawings and as specified.

9 TV SYSTEM :

9-1 Supply install 2 connection box for TV system including 1 LS


first fix dish and all necessary accessories as shown on
drawings and as specified.

9-2 Supply, install, connect and test TV outlets (RG-6) including 5 No.
conduits, cable and boxes up to the connection box

10 Intercom system:

10-1 supply, install, connect and test intercom system including 1 No.
conduits boxes wires,indoor unit, outdoor unit, electrical
door lock on main gate and all necessary accessories as
shown on drawings and as specified.

11 Solar system :

11-1 supply install 50mm conduit form MDB to inverter and form 1 No.
Inverter to solar panels all necessary accessories as shown on
drawings and as specified.

Total amout ( 16 )