16 Electrical General:: Item Unit Cost Total Cost No. S.R S.R Remarks Div. Description of Material Unit Quantity
16 Electrical General:: Item Unit Cost Total Cost No. S.R S.R Remarks Div. Description of Material Unit Quantity
16 Electrical General:: Item Unit Cost Total Cost No. S.R S.R Remarks Div. Description of Material Unit Quantity
NURGES VILLA TYPE A
BOQ
Item Unit Cost Total Cost
Div. Description of Material Unit Quantity Remarks
No. S.R S.R
16 Electrical
General:
2 LV cables :
Electrical BOQ
Page 1 Electrical Work
PROJECT: East Gate 3/13/2019
NURGES VILLA TYPE A
BOQ
Item Unit Cost Total Cost
Div. Description of Material Unit Quantity Remarks
No. S.R S.R
16
3 Lighting Fixtures:
3-1 Supply, install, and test decorative Surface mounted/Pendant 11
F2 lighting fixtures LED type 100W, 230V, 60Hz including
No.
Led Electronic Driver and all necessary accessories to
complete the work as per drawings ,specifications and
3-2 Supply, install, and test decorative Surface mounted/Pendant 2
F3 IP44 W/P lighting fixtures LED type 50W, 230V, 60Hz
including Led Electronic Driver and all necessary No.
accessories to complete the work as per drawings
,specifications and engineer instructions.
3-3 Supply, install, and test Surface mounted/Pendant IP44 W/P 7
F4 lighting fixtures for bathroom LED type 14W, 230V, 60Hz
including Led Electronic Driver and all necessary No.
accessories to complete the work as per drawings
,specifications and engineer instructions.
3-4 Supply, install, and test outdoor wall surface mounted IP65 15
F5 lighting fixtures LED type 26W, 230V, 60Hz including Led
No.
Electronic Driver and all necessary accessories to complete
the work as per drawings ,specifications and engineer
3-5 Supply and install lighting point including conduit, wires 35
and all necessary accessories to complete the work as per No.
drawings ,specifications and engineer instructions.
3-6 Supply and install lighting point for chandler including 7
conduit, wires and all necessary accessories to complete the No.
work as per drawings ,specifications and engineer
3-7 Supply and install lighting point for mirror including 6 No.
conduit, wires and all necessary accessories to complete the
work as per drawings ,specifications and engineer
4 Lighting switches:
عام Supply, install, connect test and commission Lighting
switches 230V 50Hz and all necessary accessories to
complete the work as per drawings ,specifications and
engineer instructions.
Electrical BOQ
Page 2 Electrical Work
PROJECT: East Gate 3/13/2019
NURGES VILLA TYPE A
BOQ
Item Unit Cost Total Cost
Div. Description of Material Unit Quantity Remarks
No. S.R S.R
16
5 Wiring Devices:
5-4 Double pole power outlet 45A with indicator lamp for cooker 1 No.
5-5 Electric water heater Flex outlet 20A with indicator lamp 7 No.
for electrical water heater.
6 First Fix :
6-1 supply and install 38mm conduits from the DB-FF to roof 1 No.
floor to feed the provisional electrical services in roof floor
and all necessary accessories to complete the work as per
drawings ,specifications and engineer instructions.
6-2 supply and install 50mm conduits from the MDB to 1 No.
provisional Guard room with connection box 100x100mm
on the inside fence wall and all necessary accessories to
complete the work as per drawings ,specifications and
6-3 supply and install 25mm conduits from the indoor AC unit to 9 No.
outdoor AC unit and all necessary accessories to complete
the work as per drawings ,specifications and engineer
Electrical BOQ
Page 3 Electrical Work
PROJECT: East Gate 3/13/2019
NURGES VILLA TYPE A
BOQ
Item Unit Cost Total Cost
Div. Description of Material Unit Quantity Remarks
No. S.R S.R
16
7 Earthing Network System:
7-1 Supply, install, connect and test a complete earthing system 1 L.S
with a minimum resistance of 5 ohm including conductors,
ground rods, earth pits, steel bars, connection to machines
and equipment's, etc. and all necessary accessories as shown
on drawings and as specified.
8 Telephone and Data Systems:
8-1 Supply install telecommunication BOX (IDF) with a conduit 1 No.
connected to external fence of the Villa.
8-2 Supply, install and connect wall mounted data outlet RJ11 5 No.
connector, Cat5 including device boxes, cover plates,
conduits and Cat5 wiring to corresponding IDF and all
necessary accessories as shown on drawings and as
specified.
8-2 Supply, install and connect wall mounted data outlet RJ45 2 No.
connector, Cat6 including device boxes, cover plates,
conduits and Cat6 wiring to corresponding IDF and all
necessary accessories as shown on drawings and as specified.
9 TV SYSTEM :
9-2 Supply, install, connect and test TV outlets (RG-6) including 5 No.
conduits, cable and boxes up to the connection box
10 Intercom system:
10-1 supply, install, connect and test intercom system including 1 No.
conduits boxes wires,indoor unit, outdoor unit, electrical
door lock on main gate and all necessary accessories as
shown on drawings and as specified.
11 Solar system :
11-1 supply install 50mm conduit form MDB to inverter and form 1 No.
Inverter to solar panels all necessary accessories as shown on
drawings and as specified.
Total amout ( 16 )
Electrical BOQ
Page 4 Electrical Work