MUSE ED Elevator: Installation Manual

Download as pdf or txt
Download as pdf or txt
You are on page 1of 16

Part.

Rail hanging
MUSE ED Elevator Ctrl. No. MUSE ED-IM-01-0

FOD Page 1/16


Overseas Support Team
Installation Manual Date Mar. 2009

Rail hanging

‹ Revision History
Rev. Prepared Checked Approved
Date Revision Contents
No. by by by
30 Mar Harold
0 Release YS Kim DH Kim
2009 Lee
Part. Rail hanging
MUSE ED Elevator Ctrl. No. MUSE ED-IM-01-0

FOD Page 2/16


Overseas Support Team
Installation Manual Date Mar. 2009

Index

1. Rail preparation of scaffold-less method ___________________________________ 3


1.1. Rail installation comparison to scaffold method ______________________________ 3

1.2. Inserting into pit ________________________________________________________ 3

1.3. Working platform in pit __________________________________________________ 4

1.4. Rail height reference_____________________________________________________ 5

2. Rail hanging _________________________________________________________ 6


2.1. Rail hanging for Machine side _____________________________________________ 6

2.2. Rail hanging for CDEH side ______________________________________________ 8

2.3. Bottom rail installation___________________________________________________ 9

2.4. Removal of working platform _____________________________________________ 9

3. Scaffold assembling under scaffold method _________________________________ 9


3.1. Layout of scaffold position ________________________________________________ 9

4. Safety regulation for scaffold method application ___________________________ 10


4.1. Verifying scaffolds & fittings _____________________________________________ 10

4.2. Construction __________________________________________________________ 10

4.3. Preparing platform or safety footstool _____________________________________ 11

4.4. Overhead protection ____________________________________________________ 16


Part. Rail hanging
MUSE ED Elevator Ctrl. No. MUSE ED-IM-01-0

FOD Page 3/16


Overseas Support Team
Installation Manual Date Mar. 2009

1. Rail preparation of scaffold-less method


1.1. Rail installation comparison to scaffold method
Method type Rail assemble Rail cut Top rail end shape
Scaffold method Rail stacked method Top rail
Rail stacked method Top rail
Scaffold-less
method Rail suspended
Bottom rail
method

1.2. Inserting into pit


a. Bring all rails to entrance and clean the oil grease at each end part.
b. Assemble the rail joint at each rail top end. At this time, groove part of rail must be
upward.

Groove part should be


upward direction

Safety
Part. Rail hanging
MUSE ED Elevator Ctrl. No. MUSE ED-IM-01-0

FOD Page 4/16


Overseas Support Team
Installation Manual Date Mar. 2009

1.3. Working platform in pit


a. Install the working platform in pit as below picture.

Fall protection

Working platform Support

1. The load of working platform must not exceed 200kg.


(2 worker, tools and materials)
2. Support must be firmly fixed by anchor bolts. Do not use pin of
Caution
hoistway hall
3. The working platform and fall protection must be fixed firmly.
Part. Rail hanging
MUSE ED Elevator Ctrl. No. MUSE ED-IM-01-0

FOD Page 5/16


Overseas Support Team
Installation Manual Date Mar. 2009

1.4. Rail height reference


a. Rail height (From the top floor sill level)
Speed GRCARH GRCWTH Min.GRB1 Min.GRB2 Min.GRB3
(m/min) (mm) (mm) (mm) (mm) (mm)
60 CH+1186 CH+903 407 690 581
90 CH+1316 CH+1033 537 820 711
105 CH+1459 CH+1176 680 963 854

In case of MIN K, and


free spring condition
Hoistway top ceiling

Top floor sill level

In case car is at bottom floor

Distance Detail
GRCARH Rail height of CDEH side(From the top floor sill level)
GRCWTH Rail height of CWT side (From the top floor sill level)
GRB1 From the car top end to top rail end of CWT side
GRB2 From the car top end to top rail end of CDEH side
GRB3 From the CWT top end to top rail end of CWT side
Part. Rail hanging
MUSE ED Elevator Ctrl. No. MUSE ED-IM-01-0

FOD Page 6/16


Overseas Support Team
Installation Manual Date Mar. 2009

2. Rail hanging
2.1. Rail hanging for Machine side
a. Use a winch and hoist rails one by one as connecting each other.

1. Be careful about falling things while rail is hoisted.


2. The rail can be turned around during hoisting

Caution 3. All of hall entrance must be sheltered.


4. Be careful that hands can be hurt while you connect
rails

Applied tools: Hook pulley, Wire sling,


Shackle, Winch hook
Part. Rail hanging
MUSE ED Elevator Ctrl. No. MUSE ED-IM-01-0

FOD Page 7/16


Overseas Support Team
Installation Manual Date Mar. 2009

b. Guide rail & bracket pitch table


- Top rail height (From the top floor sill level to rail top)
- Top rail bracket height (From top ceiling to bracket)
Speed (m/min) Bracket height[mm] Rail height[mm]

60 CH+923

90 350 CH+1053

105 CH+1196

Note: The rail height must be accord to job site drawing.

c. All of hoisted rails must be hanged to hook

Turn Buckle and chain sling


(FIE00C352) 3sets
Part. Rail hanging
MUSE ED Elevator Ctrl. No. MUSE ED-IM-01-0

FOD Page 8/16


Overseas Support Team
Installation Manual Date Mar. 2009

d. Each rail level must be adjusted within 5mm.


e. Use turn buckle to adjust rail level position

2.2. Rail hanging for CDEH side


a. Guide rail & bracket pitch table
- Top rail height (From the top floor sill level to rail top)
- Top rail bracket height (From top ceiling to bracket)
Speed (m/min) Bracket height[mm] Rail height[mm]

60 CH+1206

90 633 CH+1336

105 CH+1479

Note: The rail height must be accord to job site drawing.


b. The rail hanging method for CDEH side is same as machine side. The rail level
position is different.
c. In case it requires cutting on end of top rail, make it plat by grinding.
Part. Rail hanging
MUSE ED Elevator Ctrl. No. MUSE ED-IM-01-0

FOD Page 9/16


Overseas Support Team
Installation Manual Date Mar. 2009

2.3. Bottom rail installation


a. measure the bottom rail size and cut it out as considering pit depth
b. The rail sheet thickness must be calculated before cutting.
Speed CH=2450 CH=2600
Passengers Buffer type
(m/min) Pit depth(S)
60 Poly urethane 1500 1500
90 17/20/24 1800 1800
Oil
105 2100 2100

2.4. Removal of working platform


a. Remove working platform in reverse sequence of installation.

3. Scaffold assembling under scaffold method


In case the scaffold method is applied to job site, the scaffold position must avoid
rail position.
3.1. Layout of scaffold position
Footstool

Footstool

Scaffold

Entrance
Part. Rail hanging
MUSE ED Elevator Ctrl. No. MUSE ED-IM-01-0

FOD Page 10/16


Overseas Support Team
Installation Manual Date Mar. 2009

4. Safety regulation for scaffold method application


4.1. Verifying scaffolds & fittings
a. All scaffolds & fittings must be recognized by approved grading standard. If such
standards are not available, a qualified engineering authority must approve them.
b. Prior to use, all scaffolds must be constructed according to recommendations of
manufacturer.
c. Responsible person for safety must inspect proper application & defect of scaffolds,
any noted problems must be corrected prior to use.
d. All scaffolds & fittings must be able to support at least 4 times the maximum intended
load

4.2. Construction

a. All post scaffolds must


be erected. (90°)

b. Scaffolds must be fixed


to construction of building
for stability

c. Distance between each


post scaffold must be less
than 2.5m.

d. Construct post scaffold


on steel plate.
Part. Rail hanging
MUSE ED Elevator Ctrl. No. MUSE ED-IM-01-0

FOD Page 11/16


Overseas Support Team
Installation Manual Date Mar. 2009

4.3. Preparing platform or safety footstool


a. Apply working platform or safety footstool close to wall of hoistway as much as it can.
b. In working level, below protections must be provided:
- 100mm-height toeboard.
- Guardrail at 900mm~1100mm height from working level
- Midrail between toeboard and guardrail

Guardrail

Post

900~1100mm

Midrail
Toeboard

Toeboard

100mm
or higher

Footstool
Part. Rail hanging
MUSE ED Elevator Ctrl. No. MUSE ED-IM-01-0

FOD Page 12/16


Overseas Support Team
Installation Manual Date Mar. 2009

c. If guardrail is not available, below alternate means of protection must be provided.


- Safety net
- Full body harness, shock-absorbing lanyard, & lifeline secured above the work
level
- Block all cutouts and opening of hoistway

Distance between each safety net


must be less than 8m.

8m or less

< Safety net >

< Application of safety net >


Part. Rail hanging
MUSE ED Elevator Ctrl. No. MUSE ED-IM-01-0

FOD Page 13/16


Overseas Support Team
Installation Manual Date Mar. 2009

< Full body harness & lanyard >

Lifeline
(2 ton)

< Blocking entrance >


Part. Rail hanging
MUSE ED Elevator Ctrl. No. MUSE ED-IM-01-0

FOD Page 14/16


Overseas Support Team
Installation Manual Date Mar. 2009

d. All planks of platform must be overlapped more than 300mm or must be measured
against moving.

Plank

Plank

Scaffold

< Overlapped plank >

Fix footstool by
using steel wire

Fix footstool by its hook

< Hook type >


Scaffold

< Plank type >


Part. Rail hanging
MUSE ED Elevator Ctrl. No. MUSE ED-IM-01-0

FOD Page 15/16


Overseas Support Team
Installation Manual Date Mar. 2009

e. Planks must extend 150~300mm over their end to support.

Plank (Footstool) Support (Scaffold)

f. Ladder or stairway must be provided to access to working level from landing in case
the height between working level and landing is higher than 1m.
- Ladder or stairway must be secured against moving.
- Safety belt must be applied during assessment.
Part. Rail hanging
MUSE ED Elevator Ctrl. No. MUSE ED-IM-01-0

FOD Page 16/16


Overseas Support Team
Installation Manual Date Mar. 2009

Working platform or footstool

Ladder

4.4. Overhead protection


Block all cutouts and opening of hoistway or install overhead protection above
working level.

Overhead
protection

Working level