Series NG 200 Site Clearance
Series NG 200 Site Clearance
Series NG 200 Site Clearance
SERIES NG 200
SITE CLEARANCE
Contents
Clause Title Page
NG 201 (02/16) Clearing 2
NG 203 (02/16) Explosives and Blasting 2
NG 204 (02/16) Hazardous Materials 3F
(02/16) Sample Contract Specific
NG
Appendices A1
SITE CLEARANCE
NG 201 (02/16) Clearing
1 (02/16) A schedule of buildings and structures to be demolished, or partially demolished, should be included
in contract specific Appendix 2/1. The locations should be indicated in the contract specific Appendix and
clearly marked on the drawings (with reference numbers for cross identification with the Bill of Quantities
where appropriate). Parts of buildings below ground level (such as foundations) which are to be removed (as an
earthworks operation) should be indicated as such on the drawings.
2 (02/16) Generally, disused soil and surface water pipes over 1 m depth below formation should be left
undisturbed, and need only be sealed as specified. There will, however, be occasions, particularly with the larger
pipes (say 375 mm diameter and over) and when there is evidence of possible collapse, when it may be considered
that steps should be taken to avoid any subsidence. In this case the alternatives include:
(i) Excavation to remove pipe and refill trench with suitable material;
(ii) Grouting with a mixture of cement and pfa in accordance with Clause 506.
Requirements should be stated in contract specific Appendix 2/2, when necessary.
3 (02/16) Where the general site clearance item is to be used in the Bill of Quantities the drawings should include
a plan indicating by shading or hatching the area(s) to be measured as general site clearance. Where sections of
general site clearance are markedly different in character, eg. woodland, these should be separately identified on the
drawings.
4 (02/16) The drawings should clearly indicate any area of grassland or woodland, individual tree or shrub,
required to be preserved, eg. for landscaping purposes or because of Tree Preservation Orders.
5 (02/16) The recovery of existing material should be considered on all types of contracts. Contract specific
Appendix 2/3 should be used to list materials which are to be retained and stored by the Contractor for re-use on
the site, or delivered to a store nominated in the Appendix for future use elsewhere.
Where materials are to be reused or recycled consideration should be given to the requirements of the Construction
Products Regulation (EU) 305/2011 (CPR). If materials are to be processed for a change of use and that further
use is covered by a harmonised standard then the materials would need to be attested and CE marked. Where this
is likely to occur it should be brought to the attention of the Overseeing Organisation and specialist advice sought
with respect to EU product legislation. Such materials should not be vested with the employer unless specifically
agreed with the Overseeing Organisation, as there would be the possibility that the Overseeing Organisation or the
employer would be taking on the obligations of the manufacturer under CPR.
6 (02/16) Contract specific Appendix 2/6 should be used to identify any additional environmental site clearance
requirements including programming constraints or restrictions on working methods. These would include, but not
be limited to, ecological measures including seasonal constraints, the requirements for dealing with injurious and/or
invasive species and the requirements for dealing with archaeological features.
[The column headed ‘Requirements’ is available for including such instructions as:]
Examples are:]
[The column headed ‘Requirements’ is available for including such instructions as:]
(i) Disconnection of electrical supplies.
(ii) Transportation of equipment.
(iii) Stacking/storage of material.
(iv) Reinstatement of voids left by removal of equipment.
.....................................................................................................
.....................................................................................................
…………………………………
…………………………………
…………………………………
1 (02/16) Ecological site clearance restrictions or measures [cross reference Series 3000 Clauses and/or contract
specific Appendices as appropriate].
2 (02/16) Archeological site clearance restrictions or measures.
3 (02/16) Other measures or restrictions.