Improvement to Phaltan, Pusegon , Aundh ,Gopuj , Nimsod ,Mhasurne ,Road SH- 147 KM 0+000 to 89+000 Dist Satara (Part-2 Pusegon to Mhasurne KM
47+000 to 92+670 ) Under Maharashtra Road Improvement Programme -MRIP Under Hybrid Mode
Aggregate Weigher
Display(kg)
Difference in weight
Applied load(kg) Trial -1 Trial -2 Variation (%) Remarks
Average (kg)
Loading Unloading Loading Unloading
0 0 0 0 0 0 0.0 0.00
20 20 20 20 20 20 0.0 0.00
40 40 40 40 40 40 0.0 0.00
60 60 60 60 60 60 0.0 0.00
80 80 80 80 80 80 0.0 0.00
Page 1 of 3
PN-40
Improvement to Phaltan, Pusegon , Aundh ,Gopuj , Nimsod ,Mhasurne ,Road SH- 147 KM 0+000 to 89+000 Dist Satara (Part-2 Pusegon to Mhasurne KM
47+000 to 92+670 ) Under Maharashtra Road Improvement Programme -MRIP Under Hybrid Mode
Aggregate Weigher
Display(kg)
Difference in weight
Applied load(kg) Trial -1 Trial -2 Variation (%) Remarks
Average (kg)
Loading Unloading Loading Unloading
420 421 421 421 421 421 1.0 0.24
Name: Name:
Designation: Designation:
Date: Date:
Page 2 of 3
Improvement s to Phaltan , Pusegon Aundh , Gopuj Nimsod Mhasurne ,Road SH-147 KM 0+000 to 89+000 Dist Satara (Part-2 Pusegon to Mhasurne KM
PN-40
47+000 to 92+670 ) Under Maharashtra Road Improvement Programme -MRIP Under Hybrid Annuity Mode
Make of Plant Korian Location: Base Camp Rajpath Infracon Pvt Ltd site
Bitumen Weigher
Display(kg)
Difference in
Applied load(kg) Trial -1 Trial -2 Trial -3 Error (%) Remarks
weight (kg)
Average
Loading Unloading Loading Unloading Loading Unloading
100 100 100 100 100 100 100 100.0 0.0 0.00
120 120 120 120 120 120 120 120.0 0.0 0.00
140 140 140 140 140 140 140 140.0 0.0 0.00
160 160 160 160 160 160 160 160.0 0.0 0.00
Filler Weigher
Display(kg)
Difference in
Applied load(kg) Trial -1 Trial -2 Trial -3 Error (%) Remarks
weight (kg)
Average
Loading Unloading Loading Unloading Loading Unloading
100 100 100 100 100 100 100 100.0 0.00 0.00
120 120 120 120 120 120 120 120.0 0.00 0.00