Marine Concrete Product: Description

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

MARINE CONCRETE PRODUCT

DESCRIPTION
Type of Marine Product A - Jack ( Concrete Armor unit on Breakwaters )
Tetrapod ( Concrete Armor unit on Breakwaters )
Precast Harbour

DESIGN & MANUFACTURING REFERENCE


Design SNI 2847 - 2013
Manufacturing WB - PCP - PS -07

PRODUCT SHAPE & SPECIFICATION | A-JACK CONCRETE ARMOR UNIT

Weight Width Concrete Compresive


Armor Type
( ton ) ( mm ) Strength
A-Jack 1.3t 1,3 2000
fc' = 28 MPa
A-Jack 4.0t 4,0 3050
( Cube 350 kg/cm2 )
A-Jack 10t 10,0 3050

PRODUCT SHAPE & SPECIFICATION | TETRAPOD CONCRETE ARMOR UNIT

Weight Width Concrete Compresive


Armor Type
( ton ) ( mm ) Strength
Tetrapod 0.5t 0,5 900
Tetrapod 1.0t 1,0 1130
fc' = 28 MPa
Tetrapod 2.0t 2,0 1420
( Cube 350 kg/cm2 )
Tetrapod 4.5t 4,5 1870
Tetrapod 6.0t 6,0 2050

PRODUCT APPLICATION
MARINE CP

HARBOUR / JETTY STRUCTURE TRESTLE STRUCTURE CONCRETE ARMOR

October - 2017
PRECAST HARBOUR | PROJECT REFERENCE

| Port of Malahayati

PRECAST PILE CAP PRECAST FENDER PRECAST HALF SLAB

A new 10.000 DWT Malahayati Harbour Project is a part of government project for rehabilitate and reconstruction facilities in Nanggroe
Aceh Darussalam Province after tsunami disaster in 2004.
The harbour uses a precast components for pile cap, beam and half slab to ensure the quality of material and fast construction method.
Precision of precast concrete is the main for success of this project.

| Port of Sabang

PRECAST PILE CAP PRECAST U-BEAM PRECAST SLAB

A new Sabang Bay Harbour which located in Nanggroe Aceh Darussalam province, is design to be a CT3 transit harbour that can also
accommodate 10.000 DWT boat. The purpose of this harbour is to support development around Sabang area in coming year as a
business and tourism hub. The harbour is designed with precast component for pile cap, U-shell beams and half slab to ensure the
quality of material and fast construction method.

| Trestle at Cirebon Coal Electric Power Plant 1x660MW

The 2-kilometer trestle at the Cirebon Coal Electrical Power Plant Area is use to distribute the coal consumed to drive the 660 MW
power plant. The Trestle uses a 20-meter long of precast PC-I girder with high concrete compression strength rods for its upper
structure.