FOUNDATION LOADINGS

BEFORE CASTING THE FOUNDATION VERIFY THE DIMENSIONS OF THE WIND SPEED M/SEC 47
FOUNDATION BOLT (DIA.& QTY.) AND ANCHOR PLATE (PCD) WITH BENDING MOMENT T-M 16.227
RESPECT TO THE DIMENSIONS MENTIONED IN THIS DRG. HORIZONTAL SHEAR T 1.195
VERTICAL LOAD T 1.488
MAX GR BEARING
1100 PRESSURE T/Sqm 7.603
32 nos 12 tor (T1) SAFETY FACTOR AGAINST
OVERTURNING 1.892
CONCRETE MIX VIBRATED M-20
MIN COVER [ MM ] 50
8 tor 190 c/c (T3) STEEL Fe-415
1100

NET SOIL BEARING CAPACITY (T/m2) 10.00


PROJECTED AREA Sqm 0.804

DETAIL OF PEDESTAL Bolt Nos. = 12


Bolt Dia. = 30 mm QUANTITIES
1100 Length = 850 mm RCC IN CUM PCC IN CUMSTEEL IN KGS
5.18 1.09 217
300 150

Anchor Pl. Thk.(mm) = 8


PCD (mm) = 650 mm

75 dia cable
Nos.of hole/Dia.(mm) = 12 / 32
entry for pvc
pipe
32 nos 12 tor (T1)
8 tor 190 c/c (T3) BAR BENDING SCHEDULE
MK QTY SIZE LENGTH SHAPE
2000
1600

13 nos 10 tor 100

2075
Bothways (T4) T1 32 12 2495
300

SECTIONAL ELEVATION 320


PCC

100
1:4:8 T2 34 10 3200
100

100 3100 100 3000


1000
17 nos 10 tor bothways ( T2)

1000
SECTIONAL ELEVATION T3 12 8 4192
3100 12 nos.
Bolts

100
T4 26 10 3200
10 tor 3000
250 c/c (T4)
10 tor
190 c/c(T2)

REV DESCRIPTION DATE


3100

NOTES
1- ALL DIMENSIONS ARE IN MM. DO NOT SCALE THE DRAWING
2- MIN. LAP LENGTH OF BARS SHALL BE 50xD. UNLESS OTHERWISE STATED.
3- WE RECOMMANDED THAT MAST FLANGE REMAIN UNGROUTED
4- IF GROUTING IS CARRIED OUT IT IS ESSENTIAL TO LEAVE A MINIMUM
OF 4 NOS 25MM DIA DUCTS EQUALLY SPACED AROUND THE FLANGE TO
ALLOW DRAINGE AND VENTILATION
This drawing is the property of "BAJAJ ELECTRICALS LTD." & must be returned on
10 tor 250 c/c (T4) request. It is submitted as confidential information in connection with enquiry, tender,
SECTIONAL PLAN orders or contracts. It is not to be used for any other purpose or order nor may it re-
10 tor 190 c/c(T2) copied or lent without our authority in writing
DATE 29/3/16 TITLE : GENERAL ARRANGEMENT FOUNDATION
DRN BY AUTO DRG FOR 30.5 MTS FLAG MAST Bajaj Electricals Limited
E:\Shivaji Designs\STANDARD DESIGNS\FLAG
DSGD BY VDH PROJECT : FILE PATH MAST\35.5m Flag Mast\47 mps\[FMSTD-30.5m sheet no REV
CHKD BY SRH BAJAJ STANDARD FLAG MAST
APPRD BY CSM DRAWING NUMBER 01 OF 01 0
E:\Shivaji Designs\STANDARD
SCALE NTSDESIGNS\FLAG MAST\35.5m Flag Mast\47 mps\[FMSTD-30.5m FM-STANDARD-47mps-R0-SRH.xlsx]foundation-cal

Page 1