Coiled Tubing Interventions
Coiled Tubing Interventions
Coiled Tubing Interventions
- CT I
Dis cip line: Production and Completions Engineering
L evel: Foundation
Durat io n: 5 days
Ins t ruct o r( s ) : Diego Londono
Coiled T ubing is one of the most common technologies used for well intervention on a
daily basis throughout the oil industry during drilling, completion, and mainly production
phases of oil and gas wells around the world. T his course covers the surface and
pressure control equipment, the bottomhole assembly components, the details of the
different types of interventions performed with Coiled T ubing and how to deal with fatigue
and corrosion. Participants will also learn to calculate the string operating limits and the
volumes and rates during nitrogen interventions.T he final part presents an extensive
coverage of emergency responses and contingencies to deal with in a wide variety of
scenarios. A generous amount of time is spent in practical exercises, and technical
concepts are enhanced with pictures, videos and numerous real field cases and
problems. Participants will gain the knowledge to actively and efficiently participate in
Coiled T ubing intervention's planning, design, and/or execution.
Des ig ned Fo r:
Drilling and completion engineers, production engineers, surface/subsurface
engineers, operations engineers and service company managers, field engineers,
supervisors and operators and those professionals willing to expand their knowledge in
coiled tubing and nitrogen interventions planning, design and/or execution.
Y o u Will L earn:
How to:
Co urs e Co nt ent :
Introduction
Surface equipment
Pressure control equipment
Bottomhole assembly components
Pumping operations
Mechanical operations
CT drilling operations
Coiled tubing strings
Operational limits
Life estimation (fatigue)
Corrosion
String management
Checklists
Nitrogen
Emergency responses and contingencies
Ins t ruct o rs :
MR. DIEGO LONDONO is a Petroleum Engineer with 19+ years of experience in rigless
well interventions acquired while working with major Services and E&P companies in
different locations around the world. His comprehensive professional experience
includes coiled tubing interventions, stimulation operations, slick/braided line and
electric line interventions, hydraulic fracturing and production testing. Mr. Londono
started his career working for Halliburton for 7.5 years as a Stimulation and Coiled
T ubing Field Engineer. He then worked 3 years for BP as Well Interventions Engineer
(Company Man) in rigless well interventions. He joined ENI, and spent 3 years working in
the giant Kashagan offshore project in the Caspian Sea as Coiled T ubing/Well
Intervention Engineer. T hen, he worked for 4.5 years as a Senior Well Interventions
Engineer consultant for BP/Equion Energia in Colombia. For the last two years he has
been working/consulting for operator and services companies in the Middle East (UAE
and Saudi Arabia). Mr. Londono has been a Well Interventions instructor for the past 6
years, and has also been an IWCF Well Interventions certified instructor in the past.