SGT-A05 (Industrial 501) Service Solutions: Engineered Solutions To Enhance Engine Operability
SGT-A05 (Industrial 501) Service Solutions: Engineered Solutions To Enhance Engine Operability
SGT-A05 (Industrial 501) Service Solutions: Engineered Solutions To Enhance Engine Operability
(Industrial 501)
Service Solutions
Engineered Solutions to
enhance engine operability
siemens.com
SGT-A05 | Service Solutions
At Siemens we understand the rapidly changing nature of today’s industrial and commercial
environment. Market requirements and operating conditions can vary significantly – and
often unpredictably, so we design and shape our products and services to help ensure
Siemens customers maintain and increase performance and profitability throughout the life
of their power generation or oil and gas project.
The long-term reliability inherent in Siemens equipment Siemens, as the OEM for the SGT-A05, is uniquely
means we have gained unrivalled experience and positioned to support the upgrade requirements to improve
knowledge when it comes to developing the engineered the units’ operation in the facet(s) that need to be
modernizations and upgrades. addressed.
It allows Siemens to meet customer’s needs so they can The options available to your operation can be customized
sharpen their vital competitive edge by enhancing the to meet your situation.
efficiency, environmental performance and profit
With Siemens at your side you gain the benefit of a world-
generating potential of their equipment.
class, global, customer-focused organization.
These engineered solutions from Siemens enhance your
total package, from the gas turbine and its control and
ancillary systems through to the final driven equipment.
2
SGT-A05 | Service Solutions
3
Efficiency Power Availability Environment Flexibility Reliability Perfomance Emissions Lifetime
SGT-A05 | Service Solutions
Meeting emission requirements without the need for water ¡¡ More than 120 engines are already successfully utilizing
injection. DLE technology to reduce NOx and CO emissions.
¡¡ 3.9 Million Operational Hours Accumulated (Feb 2018).
Benefits
We now have 226,000 operating hours per year on our
LE5 liners.
¡¡ SGT-A05 engine variants KB5S, KB7HE and KB7S can
expect emission levels of 25 vppm NOx and 50 vppm ¡¡ High time DLE engines have over 130,000 hours of
CO. operation.
¡¡ The emission reduction is achievable at 15% O2 and Accomplished
sustainable from 50% to 100% power with a 14th stage
bleed upgrade. At overhaul
¡¡ SGT-A05 KC5 applications can expect similar emission
Bundle Opportunities
levels, but from 60% to 100% power with 14th stage
bleed.
Controls Upgrade
¡¡ DLE conversion reduces customer’s operating costs
associated with water treatment. Scope of Work
4
Efficiency Power Availability Environment Flexibility Reliability Perfomance Emissions Lifetime
SGT-A05 | Service Solutions
¡¡ Higher Power – 8% power increase (8000 SHP) at ISO This upgrade improves efficiency and increases power
condition through superior interstage sealing in the compressor and
increases power by operating at a higher control
¡¡ Lower Fuel Burn – 34% Fuel Efficiency (Uninstalled)
temperature.
¡¡ Heat rate – 2.6% improvement
Scope of work
¡¡ Fuel Flexibility – Same fuel options as current SGT-A05
KB7S Model Specification
¡¡ Remove and replace compressor wheel Stages 1st-13th
¡¡ Proven dual fuel configuration and combustion system
¡¡ Remove and replace compressor vanes 1st-13th remove
¡¡ Payback period for the upgrade of the engine – and replace ancillary hardware
customer can expect return on investment in 1-3 years*
¡¡ Balance rotor and grind blade tips
Based on proven aeroderivative, the SGT-A05 KB7HE is an ¡¡ Update control program
outstanding solution for power generation.
Experience
Siemens can supply Long-Term Programs (LTPs) and
Performance enhancement was confirmed through testing.
aftermarket services upon request.
A service evaluation engine has been running for 1.5 years.
A service upgrade kit is available for easily converting KB7S
Work Performed
to KB7HE.
At overhaul facility and at site
Applicability
Bundle opportunities
SGT-A05 KB7S**
Controls Upgrade
5
Efficiency Power Availability Environment Flexibility Reliability Perfomance Emissions Lifetime
SGT-A05 | Service Solutions
By upgrading from either LE3 or LE3.1 combustion liner to LE3.2 and LE3.4
either the LE3.2, which is recommended for dry engines or
the LE3.4, which is recommended for water or nozzle steam The LE3.2 and LE3.4 combustion liners utilize effusion
injected engines, the peak metal temperatures in the cooling technology rather than the convection cooling
turbine can be reduced. arrangement of the LE2 liner and has lower liner wall
temperatures than the LE3 and LE3.1 liners.
Improved effusion cooling of the liner walls has reduced
liner wall temperatures which can extend the working life The LE3.2 is recommended for dry engine applications.
of the liner and reduce overall engine maintenance costs
and unit down time. The LE3.4 is recommended for applications utilizing water
or nozzle steam injection.
Benefits
Experience
¡¡ Through the application of improved effusion cooling
technology the service life of the combustion liners LE3.2
may be extended as much as 50%.
¡¡ The LE3.2 barrel has achieved over 30,000 hours
¡¡ An improved pattern factor increases turbine vane life
before requiring repair.
due to the reduction in the turbine when compared to
LE2, LE3 and LE3.1 liner configurations.
LE3.4
¡¡ The LE3.4 liner builds from the experience with the
LE3.2 liner and improves liner life for operators utilising ¡¡ The LE3.4 is the OEM build standard for all engines
water or steam injection applications. currently manufactured utilizing water or steam
injection for emissions control.
¡¡ Reduction of water consumption for emissions control
by converting from LE2 to LE3.4 combustion liners.
Work Performed
Water consumption can be even further reduced when
this upgrade is combined with the use of the Pilotless
At site
Dual Fuel Nozzle upgrade.
Bundle Opportunities
Applicability
¡¡ SGT-A05 pilotless fuel nozzle conversion
This engineered solution applies to all SGT-A05 engine
variants not employing Dry Low Emissions combustion. ¡¡ SGT-A05 fuel manifold upgrade
6
Efficiency Power Availability Environment Flexibility Reliability Perfomance Emissions Lifetime
SGT-A05 | Service Solutions
This engineered solution reduces carbon build-up in nozzles All SGT-A05 engine variants not employing DLE combustion
by eliminating the pilot fuel circuit, thereby improving hot technology.
section reliability and reducing maintenance costs.
Technical Description
Benefits
The pilotless fuel nozzle eliminates the pilot fuel circuit.
¡¡ The increased orifice size helps reduce carbon coking The resultant reduction in carbon build-up alleviates first
on the fuel nozzle. This reduction in coking and second stage turbine erosion caused by carbon
subsequently reduces combustion liner distress due to shedding.
flame pattern distortion.
Scope of work
¡¡ Eliminating carbon build up on the nozzle also reduces
carbon shedding which improves first and second stage
¡¡ Install air manifold
turbine life.
¡¡ Replace gas fuel manifold
¡¡ The installation of the fuel nozzle also simplifies
maintenance cleaning by eliminating flow check ¡¡ Connection to125 PSI, 90 SCFM air source is required
requirements. for a 15 second period during start only
¡¡ For customers utilizing water injection as a method to ¡¡ Install manifold for air assist start
control NOx, water consumption may be reduced
Experience
through the use of Pilotless Fuel Nozzles.
This solution is the current build standard on all new
– Customers may further reduce their water
production units.
consumption by upgrading to LE3.4 combustion
liners.
Work Performed
At site
Bundle opportunities
7
Efficiency Power Availability Environment Flexibility Reliability Perfomance Emissions Lifetime
SGT-A05 | Service Solutions
This engineered solution increases the part time and ¡¡ Replace first stage turbine blades and vanes
therefore also the mean time between overhaul.
Experience
Benefits
This proven enhancement has accumulated millions of
¡¡ By improving the first stage turbine hardware the life operational hours and is the current production standard
utilization is significantly improved for all hot section on all new units.
parts.
Work Performed
¡¡ The increased life of the turbine reduces the teardown
frequency thus the operational costs for commonly
Portion of this engineered solution may be accomplished at
replaced parts are reduced.
the operator’s site (Vane Replacement). Alternatively the
¡¡ The life improvements are further enhanced by engineered solution may be fully implemented at Overhaul
bundling combustion liner upgrades as well as where full benefit can be realised.
embodying fuel nozzle improvements.
Bundle Opportunities
Applicability
¡¡ SGT-A05 KB/KH TOT Thermocouple Conversion
All SGT-A05 engine variants.
¡¡ Controls Upgrade
Technical Description ¡¡ SGT-A05 Combustion Liner Upgrade
¡¡ SGT-A05 Pilotless Nozzle Conversion
The enhancement replaces the first stage blades with
Directionally Solidified (DS) blades, the first stage vanes ¡¡ SGT-A05 Second Stage Turbine Enhancement
with Advanced Thermal Barrier Coating (TBC) and an
improved trailing edge cooling scheme.
To realize the full potential for power improvement, Enhanced T1 Vane Original T1 Vane
engines using Turbine Inlet Temperature (TIT) control must
be converted to Turbine Outlet Temperature (TOT).
8
Efficiency Power Availability Environment Flexibility Reliability Perfomance Emissions Lifetime
SGT-A05 | Service Solutions
Scope of work The increased life further decreases the overall operational
cost by reducing the number of commonly replaced parts
¡¡ Replace second stage turbine blades and vanes and downtime requirements. The honeycomb interstage
seals provide for an improved fit and increased rub
¡¡ Replace 1-2 spacer (if upgrading to honeycomb seal
tolerance.
vanes)
2nd Stage Vane 2nd Stage Blade
Experience
9
Efficiency Power Availability Environment Flexibility Reliability Perfomance Emissions Lifetime
SGT-A05 | Service Solutions
SGT-A05 KC MGT
Thermocouple Conversion
Relocated thermocouple position extends in-service life
This engineered solution increases thermocouple life and ¡¡ Replace vane case (if required)
reduces overall engine operating costs by adopting the
Measured Gas Temperature (MGT) position for the ¡¡ Install MGT thermocouples
thermocouple.
¡¡ Install MGT harness, inner & outer
Benefits
¡¡ Install new MGT ring
The in-service life of the thermocouple is increased by an
order of magnitude. The reduction in maintenance costs ¡¡ Install modified diaphragm
generates payback in less than two years.
¡¡ Control system modification (digital control required)
Applicability
Experience
SGT-A05 KC engine variants.
The MGT thermocouple is utilized on over 180 engines.
Technical Description
Work Performed
This conversion relocates temperature measurement from
the Turbine Inlet Temperature position to the cooler At site
environment to be found aft of the 2nd stage blades.
Bundle opportunities
¡¡ Controls Upgrade
MGT Thermocouple
10
Efficiency Power Availability Environment Flexibility Reliability Perfomance Emissions Lifetime
SGT-A05 | Service Solutions
This engineered solution may increase mean time between TOT control is the production standard on all new units and
overhauls and improves operational temperature has accrued millions of hours of operational experience.
monitoring. This is achieved by changing the locations of
the thermocouples from the turbine inlet to turbine outlet. Work Performed
Benefits At site
Scope of work
11
Efficiency Power Availability Environment Flexibility Reliability Perfomance Emissions Lifetime
SGT-A05 | Service Solutions
Improves operational flexibility by increasing the number of Dependent on your operation and engine configuration.
fuel options with a pilotless dual fuel nozzle. Additional changes may be required.
¡¡ Continuous operation of the unit can be achieved even ¡¡ Replace fuel nozzles
in periods of natural gas supply curtailment or supply
disruptions due to the ability to run on an additional ¡¡ Install additional fuel manifold(s)
diesel or kerosene fuel.
¡¡ Install additional fuel control valve
¡¡ Operating costs may be reduced by allowing the
inclusion of an interruptible clause in natural gas ¡¡ Install liquid fuel pump
supply contracts by converting to a dual fuel system.
¡¡ Misc. piping, check valves, shutoff valves, drain valves,
Applicability and gauges
All SGT-A05 engine variants not employing DLE (Dry Low ¡¡ Control system modification or replacement
Emissions) combustion technology.
Work Performed
Technical Description
At site
Operation on natural gas can be changed to operation on
liquid fuel (or vice versa) by switching during steady state Bundle opportunities
operation by the addition of a liquid fuel system. There are
multiple different fuel system options that can be used to ¡¡ Controls Upgrade
meet customer’s operational requirements.
This option can be used with both dry and water injection
applications.
12
Efficiency Power Availability Environment Flexibility Reliability Perfomance Emissions Lifetime
SGT-A05 | Service Solutions
101010101
101010101
101010101
13
SGT-A05 | Service Solutions
A Global Network
SGT-A05 packagers and Siemens maintenance,
repair and overhaul centers
Our customers may be located in diverse regions around the world, but they all have one
thing in common. They all require timely and accurate support to purchase, install and
maintain their SGT-A05 gas turbines and equipment. That’s why we continually invest in our
global infrastructure from distributors to repair and overhaul facilities.
SGT-A05 Packagers
Maintenance, Repair
and Overhaul Centers
(MROC)
Aeroderivative
Business Locations &
Service Centers
General SGT-A05 and Aftermarket Hitachi Zosen Corporation (Japan) Standard Aero Ltd.
Inquiries ene-siemensgt@mml.is.hi-tachizosen.co.jp jeff.sansome@standardaero.com
+81 6 6569 0209 +1 204 775 9711
Siemens Energy Inc.
Small Engine Business
Kobelco Hindustan Aeronautical Ltd. (HAL)
201 S. Capitol Ave Suite 910
http://www.kobelco.co.jp/english/ mktg.imgt@hal-india.com
Indianapolis, In 46225 USA
machinery/inquiry/index.html +91 80 2232 6803
Phone: +1 (317) 677-1340
+81-3-5739-6772
Fax: +1 (317) 677-1341
Spare Parts Distributor
Packagers and Heavy Maintenance Packagers
Centers (HMC) Tominaga & Co., Ltd. (Japan)
OnPower, Inc. (North America)
general-affairs@mail.tomco.co.jp
Centrax Limited, Gas Turbine info@onpowerinc.com
+81 3 3639 5360
Division (Europe) +1 513 228 2100
info@centraxgt.com
+44 1626 358 000 Maintenance, Repair and Overhaul
Centers
IHI Jet Service (Japan)
ijs_eigyoubu@ijs.ihi.co.jp RWG Inc.
+81 3 6204 7718 501sales@rwgroup.com
+1 713 538 9700
14
SGT-A05 | Service Solutions
Latin America
4400 N Alafaya Trail
Orlando, Florida 32826, USA
Tel. 407-736-6394
Fax 407-243-3094
15
Published by and copyright © 2018:
Siemens AG
Power and Gas
Freyeslebenstrasse 1
91058 Erlangen, Germany
For more information, please contact our Customer
Support Center.
Phone: +49 180 524 70 00
Fax: +49 180 524 24 71
(Charges depending on provider)
E–mail: support.energy@siemens.com
All rights reserved. Trademarks mentioned in this
document are the property of Siemens AG, its affiliates, or
their respective owners. Product Mark 501 is a trademark
of and used under license from Rolls-Royce plc.
Subject to change without prior notice. The information in
this document contains general descriptions of the
technical options available, which may not apply in all
cases. The required technical options should therefore be
specified in the contract.