In the upper third part of the window for system information you can find the software
version of the display (for example 02.00.00).
In the middle third part you can find the software version of the main controler (for
example HV005 SV02.00.01)
Write down both software versions. You need them later on, when the file names/
folder names for the data backup will be created.
Compatibility:
Basically, be aware that the software versions of the display and the main controler
have to match (except the last two numbers).
Software of main
Software of Display Compatible?
controller
02.00.00 02.00.00 Yes
02.00.02 02.00.00 Yes
02.00.00 02.00.03 Yes
02.02.00 02.00.03 No
02.00.00 02.01.03 No
02.00.00 03.00.00 No
The denomination HV… of the main controller, tells what hardware is installed on the
machine (Components like wiring harnesses, switches, sensors..)
An Update to an higher version (for example from HV005 to HV006) is not possible,
or only after consultation with Aftermarket Dept. Terex Fuchs.
Update Main Controller and Display, Operating Concept up to year 2008 Page 1 of 25
Update Main controller CR0020
Central electric box
Update Main Controller and Display, Operating Concept up to year 2008 Page 2 of 25
The connection of the laptop (Normally Com1, serial com port) and the main
controller (IFM Cr0020) must be by special IFM cable, or a standard serial (RS232)
cable with an IFM+ecology+Lenkrechner adapter.
or
Update Main Controller and Display, Operating Concept up to year 2008 Page 3 of 25
Start the Program “Download IFM” then select RS232 for interface.
Bits per Second @ 57600, Data Bits @ 8, Stop Bits @ 1, Parity @ None,
Com-port @ Com1 (It may be necessary to select alternate com port if not using a
serial port)
Select “OK”
Update Main Controller and Display, Operating Concept up to year 2008 Page 4 of 25
Select File, then from the menu select “File Options”
Identity: CR0020_Q 070629 is the New software and the application program can be
updated.
Update Main Controller and Display, Operating Concept up to year 2008 Page 5 of 25
Follow the file path as the example shown above. (Note- at “Software Projekte” it is
necessary to select the correct model machine you are updating)
Click on “Open”
Update Main Controller and Display, Operating Concept up to year 2008 Page 6 of 25
The file name will be displayed at the top.
Click “Upload”
Update Main Controller and Display, Operating Concept up to year 2008 Page 7 of 25
Click “Run” Click “OK”
Update Directions
Follow the file path as the example shown above. (Note- at “Software Projekte” it is
necessary to select the correct model machine you are updating)
Update Main Controller and Display, Operating Concept up to year 2008 Page 8 of 25
Select the file with the same hardware version and
the newest software version
Click “Open”
Click “Download”
Update Main Controller and Display, Operating Concept up to year 2008 Page 9 of 25
The laptop will begin to download the application program to the main controller.
Click “Exit” And disconnect the cable from the circuit board.
Update Main Controller and Display, Operating Concept up to year 2008 Page 10 of 25
Update Display CR9014
Connect the laptop to the display with the cat5 network cable ( use the Ethernet port
in the central electric box)
Connection in
Central Electric box
Update Main Controller and Display, Operating Concept up to year 2008 Page 11 of 25
Start the program WS_FTP95 LE
Update Main Controller and Display, Operating Concept up to year 2008 Page 12 of 25
If the Profile name displays as “Ipswitch” as shown below, follow the procedures
below;
Select “Startup” and type /home/project in the “Initial Remote Site Folder” field
Update Main Controller and Display, Operating Concept up to year 2008 Page 13 of 25
Then click “OK”. Wait for the Lap top to connect with the display.
Connecting.
Update Main Controller and Display, Operating Concept up to year 2008 Page 14 of 25
NOTE: if the lap top will not connect it may be necessary to change the network
connection settings.
The left side “Local System” Displays the lap top files
The right side “Remote Site” will show the files on the display when completely
connected.
Update Main Controller and Display, Operating Concept up to year 2008 Page 15 of 25
Make a data save
Update Main Controller and Display, Operating Concept up to year 2008 Page 16 of 25
Double click on “SoftwareProjekte”
Select with double click the folder for the machine model you are working on
Update Main Controller and Display, Operating Concept up to year 2008 Page 17 of 25
Double click on “Display”
This screen will display. Enter the Machine Model and serial number and the date
and click “OK”
Update Main Controller and Display, Operating Concept up to year 2008 Page 18 of 25
Double click on the folder you just created.
At the “Remote Site” Highlight from the top file completely to the last file.
Click the arrow to transfer the files from the display to the laptop
Update Main Controller and Display, Operating Concept up to year 2008 Page 19 of 25
When the transfer is complete the screen will have the same files on both sides.
Update Main Controller and Display, Operating Concept up to year 2008 Page 20 of 25
Double click here
Update Main Controller and Display, Operating Concept up to year 2008 Page 21 of 25
Select all the files from the top to the bottom.
Click the arrow to transfer the files form the lap top to the remote site.
Update Main Controller and Display, Operating Concept up to year 2008 Page 22 of 25
This screen will display when the transfer is complete.
Click on “Exit”
Turn key switch off; disconnect the network cable, Turn Master Battery switch off.
Wait 10 seconds
Update Main Controller and Display, Operating Concept up to year 2008 Page 23 of 25
Select System Information from the main menu
Press AND HOLD in this order – “F2” and “F3” and “F1”.
This will begin system initialization. A blue field will be show on the display.
When this is complete you will see the message “initializing variables” “DONE”
Update Main Controller and Display, Operating Concept up to year 2008 Page 24 of 25
Return to the main menu.
Update Main Controller and Display, Operating Concept up to year 2008 Page 25 of 25
Update main controller and display
(Operating concept from year 2008 and up)
Required tools:
• laptop with serial port (RS232)
• data set (C:\FuchsService\update\SoftwareProjekte)
• special data cable (see update main controller CR0020)
• network cable (see update display CR9014)
In the upper third of the window “system information”, you see the software version of
the Display (eg. 02.00.00).
In the middle of the screen you see the software version of the main controller.
(eg. HV005 SV02.00.01).
Make a note of the both software versions, you need them later to use as file names
for the data backup.
Compatibility:
Basically it’s important, that the software version of the display and the software
version of the main controller, match up to the last two digits.
The part “HV…” from the software version of the main controller, indentifies the
hardware version.
A update to a another hardware version is not possible, or only after consultation with
the Terex Fuchs Aftermarket Department.
Update Main Controller and Display, Operating Concept from 2008 and up Page 1 of 26
Update Main controller CR0020 (new cabin concept)
Update Main Controller and Display, Operating Concept from 2008 and up Page 2 of 26
Interface to the main controller (CR0020)
Update Main Controller and Display, Operating Concept from 2008 and up Page 3 of 26
Remove the red protection cover from the Sub-D socket (X3), and attach the silver
plug. After the update, remove the plug and replace the protection cover.
Update Main Controller and Display, Operating Concept from 2008 and up Page 4 of 26
The connection of the laptop (normally Com1, serial com port) and the main
controller (IFM Cr0020) must be by special IFM cable, or a standard serial (RS232)
cable with an IFM+ecolog+Lenkrechner adapter.
or
Adapter MHF001017A
Update Main Controller and Display, Operating Concept from 2008 and up Page 5 of 26
Start the program DOWNLOAD IFM V06.05.05.
Old downloader
New downloader
If you can’t find the icon “Downloader IFM V06.05.05”, you have to create a new
shortcut.
When the new Downloader opens, the following steps between the red bars can be
skipped.
Update Main Controller and Display, Operating Concept from 2008 and up Page 6 of 26
Open “My Computer”
Go to: C:\\FuchsService\CDenglisch\SoftwareEnglish\IFM_Downloader_d_060505
Update Main Controller and Display, Operating Concept from 2008 and up Page 7 of 26
Click with the right hand mouse button on the file “DOWNLOAD.exe” and chose:
Send to Desktop.
Update Main Controller and Display, Operating Concept from 2008 and up Page 8 of 26
Push the button “Identity”.
If you get an error message, check the Interface settings.
Open “Interface” on the drop down menu, to set the interface parameters.
Click on RS232
Update Main Controller and Display, Operating Concept from 2008 and up Page 9 of 26
Interface parameter menu:
If you do not have a serial port on your PC, you need a USB to RS232 adapter.
In this case select the correct COM-Port.
Before you start the data transfer, check the transfer settings:
Update Main Controller and Display, Operating Concept from 2008 and up Page 10 of 26
Only select Runtime System / Application Program”!
Go to “C:\FuchsService\backup\main_controler”.
If the path does not exist create a new folder.
Update Main Controller and Display, Operating Concept from 2008 and up Page 11 of 26
Enter file name: (File name:
main_controler_machinetype_serialnumber_date_softwareversion;
e.g. main_controler_MHL320_Sn966_2008_11_5_HV010SV03.12.04)
and press the Button „Save”.
Update Main Controller and Display, Operating Concept from 2008 and up Page 12 of 26
If you get the message „Upload successful“ the upload was done.
Press „OK“ to confirm.
press Identity Æ
press download Æ
Update Main Controller and Display, Operating Concept from 2008 and up Page 13 of 26
Select the path:
e.g.
C:\FuchsService\update\SoftwareProjekte\MHL3xxD_neuesBedienkonzept2008\Hau
ptsteuerung\6738020010_MHL3XX_HAUPTSTEUERUNG_HV010_SV03.12.04.H86
Update Main Controller and Display, Operating Concept from 2008 and up Page 14 of 26
Confirm the massage with yes.
If you get the message „Download successful“the update was complete. Press OK.
Press Identity Æ
Update Main Controller and Display, Operating Concept from 2008 and up Page 15 of 26
Press the button Run Æ
Update Main Controller and Display, Operating Concept from 2008 and up Page 16 of 26
Preparations for updating the software on display CR9014.
• CR9014 - Display PDM360
The connection between PC and Display (port ont the central electric board) via a
network cable.
Update Main Controller and Display, Operating Concept from 2008 and up Page 17 of 26
Preparations for updating the software on display CR9014.
Update Main Controller and Display, Operating Concept from 2008 and up Page 18 of 26
If the connection settings are correct, the Instructions between the two lines can be
skipped.
Update Main Controller and Display, Operating Concept from 2008 and up Page 19 of 26
Enter the following Settings in Startup:
To update the Display, the Ignition must be on and the engine off!
Press OK to connect.
After a few minutes you see on the Remote Site the files from the Display
Update Main Controller and Display, Operating Concept from 2008 and up Page 20 of 26
It can takes up to 3 minutes to connect with the Display. If you can’t connect to the
display check the Firewall and the LAN settings.
Go to Alternative Configuration
Æ User configured
IP-adress: 10.31.0.10
Subnet mask: 255.255.255.0
Update Main Controller and Display, Operating Concept from 2008 and up Page 21 of 26
Backup from the Display
Navigate in the left column to the directory:
C:\FuchsService\backup\display CR9014\.
If the directory doesn’t exist, make a new directory.
Update Main Controller and Display, Operating Concept from 2008 and up Page 22 of 26
Mark all the files on the Remote Site,
And press the arrow to the left, for uploading the Files from the Display to your PC.
After the upload there is a copy from these files on your hard disk.
Now the window has to look like shown on the following picture.
Update Main Controller and Display, Operating Concept from 2008 and up Page 23 of 26
Downloading the new files to the Display
Before each update to the Display a backup has to be made.
Mark all the files on the Remote Site and delete them
Update Main Controller and Display, Operating Concept from 2008 and up Page 24 of 26
!!! Important !!!
In this situation don’t switch off the ignition or the battery switch (data loss).
!!! Important !!!
Now press the arrow to the right, to download the files from your PC into the Display.
Update Main Controller and Display, Operating Concept from 2008 and up Page 25 of 26
After the download is complete the window has to look like shown on the following
picture:
Press the button close, to disconnect and then close the program WS_FTP.
Disconnect the network cable Æ ignition off Æ disconnect the battery switch for 10
seconds Æ ignition on Æ check all the functions of the machine.
The update of the display is now complete.