PETROLEUM ENGINEERING DEPARTMENT

School of Chemical & Energy Engineering


Universiti Teknologi Malaysia, 81310 UTM Johor Bahru, Johor.

SETP 1313 Test 2 Time: 1 hour


5

Answer all three questions.

Question 1 (25 marks)


CO CO2
Marks 25

(a) What is jack-up?


(4 marks)

(b) Give two types of oil production platform commonly used in oil industry.
(2 marks)

(c) Give five main equipments in hoisting system used on oil drilling rig.
(5 marks)

(d) Figure 1 shows the rotating equipments of a drilling rig. Give the correct name for the
equipments shown in the figure.
(4 marks)
(h) (a)
(b)

(c)

(d)

(e)

(f)

(g)
/
Figure 1: Rotating Equipment

(e) Briefly explain four functions of casing.

(8 marks)

(f) Give two equipments used to deviate the well in directional drilling.
(2 marks)
Question 2 (25 marks)
CO CO3
Marks 25

(a) What is coring? Give three reservoir information can be provided by a conventional core
analysis.
(5 marks)

(b) Briefly explain the principle and information provided by these formation evaluation
techniques:

(i) Spontaneous log


(ii) Resistivity log
(iii) Gamma Ray log
(12 marks)

(c) What is formation testing? Give two typical methods of formation testing.
(4 marks)

(d) Give four objectives of well testing.


(4 marks)
Question 3 (25 marks)
CO CO3
Marks 25

(a) Define the following items and briefly explain their function:
(i) Tubing
(ii) Packer
(iii) Christmas tree
(6 marks)

(b) Sketch a typical well completion and label all different types of christmas tree,
casings, liner, cementing zone, perforation, tubing, packer, etc.
(10 marks)

(c) Briefly explain why sometimes we need to do acidizing, types of acids used and
suitable formations for acidizing process.

(9 marks)